Be used for hyperboloid net rack roofing waterproof construction operation platform Download PDF

Info

Publication number
CN219638365U
CN219638365U CN202320985228.5U CN202320985228U CN219638365U CN 219638365 U CN219638365 U CN 219638365U CN 202320985228 U CN202320985228 U CN 202320985228U CN 219638365 U CN219638365 U CN 219638365U
Authority
CN
China
Prior art keywords
platform
hyperboloid
platform body
wall
net rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320985228.5U
Other languages
Chinese (zh)
Inventor
杨建鹏
张翔鈺
刘俭
苏春阳
王硕硕
刘建涛
周成
张锐鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Fifth Engineering Co Ltd
Original Assignee
CCCC SHB Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Fifth Engineering Co Ltd filed Critical CCCC SHB Fifth Engineering Co Ltd
Priority to CN202320985228.5U priority Critical patent/CN219638365U/en
Application granted granted Critical
Publication of CN219638365U publication Critical patent/CN219638365U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a waterproof construction operation platform for a hyperboloid net rack roof, which relates to the field of building external wall construction auxiliary equipment and comprises a platform body and a lifting assembly, wherein the lifting assembly comprises a winch, steel wire ropes and connecting pieces, the connecting pieces are used for connecting a winch shell with purlines on the top wall of a building external wall, the number of the steel wire ropes is multiple, one ends of the steel wire ropes are wound on a reel of the winch, the other ends of the steel wire ropes are fixedly connected with the platform body, and the steel wire ropes are uniformly distributed along the axial direction of the reel of the winch at intervals. According to the utility model, the plurality of steel wire ropes are connected with the platform body, so that the stress points of the platform body are kept balanced, the stability of the platform body is further enhanced, the swing amplitude of the platform body in windy weather is reduced, and the safety of the outer wall in waterproof construction is further improved.

Description

Be used for hyperboloid net rack roofing waterproof construction operation platform
Technical Field
The utility model relates to the field of building external wall construction auxiliary equipment, in particular to an operation platform for hyperboloid net rack roof waterproof construction.
Background
With the continuous expansion of urban scale, high-rise buildings are more and more high. At present, the operations of building exterior wall decorative lamps, waterproof construction and the like are mostly finished by taking a hanging basket by a spider man or an operator.
In the related art, an operation platform for outer wall construction generally comprises a hanging basket, a steel wire rope and a winch, wherein the winch is fixed on a purline at the top of a side wall of a building through round steel, one end of the steel wire rope is wound on a reel of the winch, and the other end of the steel wire rope is fixedly connected with the hanging basket. During construction operation, a worker stands in the hanging basket to perform construction operation on the outer wall of the building, and then the winding machine drives the steel wire rope to wind so as to realize lifting of the hanging basket, and further construction operation on walls with different heights is realized.
However, the basket in the related art is lifted by adopting a single steel wire rope, so that the basket can drift variably and swing left and right in windy weather, and therefore, the basket has great potential safety hazard.
Disclosure of Invention
In order to improve safety in construction of an outer wall of a building, the utility model provides an operation platform for waterproof construction of a hyperboloid net rack roof.
The utility model provides an operation platform for waterproof construction of a hyperboloid net rack roof, which adopts the following technical scheme:
the utility model provides a be used for hyperboloid rack roofing waterproof construction operation platform, includes the platform body, still includes the lifting unit, the lifting unit includes hoist engine, wire rope and connecting piece, the connecting piece is used for being connected the purlin of hoist engine casing and building outer wall roof, wire rope is equipped with a plurality ofly, wire rope one end is convoluteed on the spool of hoist engine, the other end and platform body fixed connection, and many wire ropes follow the spool axial interval evenly distributed of hoist engine.
Through adopting above-mentioned technical scheme, during operation, operating personnel stands on the platform body and carries out waterproof construction operation. In the construction process, the steel wire rope is driven to wind through the winch, so that the platform body is driven to lift, and further construction operations on walls with different heights are realized. Through setting up many wire ropes and platform body coupling, be favorable to making the stress point of platform body keep balanced, and then strengthen the stability of platform body, the range of swaing of platform body when reducing strong wind weather, and then be favorable to improving the security when the waterproof construction of outer wall.
Optionally, the platform body includes platform frame and a plurality of guard plate, and is a plurality of guard plate fixed connection is on the perisporium and the diapire of platform frame respectively, wire rope and platform frame deviate from one side fixed connection of building outer wall.
Through adopting above-mentioned technical scheme, foretell platform body has stable in structure, the effectual advantage of protection. Through deviating from one side fixed connection of building outer wall with wire rope and platform frame, in the work progress, the pulling force that the stay cord provided is upwards to one side, and the pulling force can trend the platform body along the component of horizontal direction as far as closely with building outer wall to have certain extrusion to the platform body, and then be favorable to making the platform body keep stable in the work progress, can improve the security when being convenient for construction operation.
Optionally, the connection point of the steel wire rope and the platform frame is positioned at the middle upper part of the platform frame along the vertical direction.
Through adopting above-mentioned technical scheme, set up wire rope and the tie point of platform frame in well upper portion for wire rope is located the well upper portion of platform frame along vertical direction to the component of platform body horizontal direction, thereby avoids the platform body to concentrate at the platform body top because of horizontal component and leads to the easy perk of platform body bottom in the promotion in-process problem, consequently further strengthened the safety and stability of platform body in the work progress.
Optionally, one side fixedly connected with bracing piece near the building outer wall at platform frame top, the bracing piece top rotates and is connected with the pulley, wire rope deviates from behind the pulley with platform frame fixed connection after the one end of hoist engine is walked around.
Through adopting above-mentioned technical scheme, set up the pulley at the platform frame top, can have certain guiding effect to wire rope to reduce wire rope and promote the in-process and rock the range, improve wire rope's stability, and then be favorable to improving holistic security and the stability of operation platform.
Optionally, the connecting piece includes mounting panel and link plate, the casing of hoist engine with mounting panel fixed connection, link plate and mounting panel fixed connection, set up the draw-in groove that is used for with the purlin articulates on the link plate.
Through adopting above-mentioned technical scheme, can realize the quick assembly disassembly of connecting piece and building top purlin through setting up the draw-in groove to the convenience of operation platform in the use has been improved.
Optionally, the walking assembly comprises a walking roller and a motor, wherein the walking roller is positioned in the clamping groove and is rotationally connected with the hanging plate, and the motor is used for driving the walking roller to rotate.
Through adopting above-mentioned technical scheme, in the work progress, through the starter motor, the motor drives the walking roller and rotates to and drive the connecting piece and remove along purlin length direction, and then drive operation platform horizontal migration, the position of the adjustment platform body of being convenient for, thereby strengthened the convenience of operation platform in the work progress.
Optionally, fixedly connected with mount pad on the draw-in groove both sides wall, rotate on the mount pad and be connected with the auxiliary roller, the axis of rotation of auxiliary roller with the axis of rotation of walking roller is perpendicular.
Through adopting above-mentioned technical scheme, set up the auxiliary roller and lie in purlin along length direction's both sides, be favorable to reducing the frictional force between link plate and the purlin, be favorable to reinforcing simultaneously link plate and the connection stability between the purlin.
Optionally, a plurality of truckles are fixedly connected with one side of the platform frame, which is close to the outer wall of the building.
Through adopting above-mentioned technical scheme, set up the truckle and can reduce the platform frame at the friction between promotion in-process and the building outer wall, avoid damaging the building outer wall, be favorable to making the smooth and easy lift of platform body simultaneously, consequently further improved operation platform's security.
In summary, the present utility model includes at least one of the following beneficial technical effects:
1. according to the utility model, the plurality of steel wire ropes are connected with the platform body, so that the stress points of the platform body are kept balanced, the stability of the platform body is further enhanced, the swing amplitude of the platform body in windy weather is reduced, and the safety of the outer wall in waterproof construction is further improved;
2. according to the utility model, the steel wire rope is connected with the middle upper part of one side of the platform frame, which is far away from the building outer wall, in the construction process, the pull force provided by the pull rope is obliquely upwards, and the component force of the pull force along the horizontal direction can trend the platform body to be tightly attached to the building outer wall as much as possible, so that the platform body has a certain extrusion effect, the platform body is further beneficial to being kept stable in the construction process, and the problem that the bottom of the platform body is easy to tilt due to the fact that the horizontal component force is concentrated at the top of the platform body in the lifting process of the platform body is avoided, so that the safety stability of the platform body in the construction process is further enhanced;
3. according to the utility model, the walking assembly is arranged to facilitate driving the operation platform to horizontally move, and the position of the platform body is convenient to adjust, so that the convenience of the operation platform in the construction process is enhanced.
Drawings
FIG. 1 is a schematic overall structure of an embodiment of the present utility model;
FIG. 2 is a side view of an embodiment of the present utility model;
fig. 3 is an enlarged view of a portion a in fig. 2.
Reference numerals: 1. a platform body; 11. a platform stand; 12. a protection plate; 13. a protective rod; 14. casters; 15. a support rod; 151. a pulley; 2. a lifting assembly; 21. a connecting piece; 211. a mounting plate; 212. a hanging plate; 2121. a clamping groove; 213. a mounting base; 214. an auxiliary roller; 22. a hoist; 23. a wire rope; 3. a walking assembly; 31. a walking roller; 32. a motor; 4. purlins.
Detailed Description
The utility model is described in further detail below with reference to fig. 1-3.
The embodiment of the utility model discloses an operation platform for waterproof construction of a hyperboloid net rack roof. Referring to fig. 1 and 2, an operation platform for waterproofing construction of a hyperboloid net rack roof comprises a platform body 1, a lifting assembly 2 for driving the platform body 1 to lift and a walking assembly 3 for driving the platform body 1 to horizontally move.
Referring to fig. 1 and 2, the platform body 1 includes a platform frame 11 and a plurality of guard plates 12, the platform frame 11 is a rectangular frame structure, the frame of the platform frame 11 is formed by welding angle steel, a circle of guard rods 13 are welded at the midpoint of the platform frame 11 along the vertical direction, the guard rods 13 are round steel, the guard plates 12 are welded between the guard rods 13 and the platform frame 11, in this embodiment, the guard plates 12 are embossed steel plates, and in other embodiments, the guard plates 12 can also be plywood or precast slabs, etc. The platform frame 11 is close to one side of building outer wall and adopts screw fixed connection to have a plurality of truckles 14, and truckle 14 is equipped with six in this embodiment, and six truckles 14 are two rows interval distribution.
Referring to fig. 1 and 2, the lifting assembly 2 includes a connecting member 21, a winch 22 and a wire rope 23, the connecting member 21 includes a mounting plate 211 and two hanging plates 212, in this embodiment, the hanging plates 212 are arranged in two, the two hanging plates 212 are distributed at intervals along the long side direction of the mounting plate 211, the hanging plates 212 are welded with the mounting plate 211, and a clamping groove 2121 is formed in the hanging plate 212. When the operation platform is installed, the hanging plate 212 is clamped on the purline 4 at the top of the side wall of the building outer wall through the clamping groove 2121.
Referring to fig. 1 and 2, the casing of the hoist 22 is fixedly connected to the mounting plate 211 by screws, and the number of the steel wire ropes 23 is two in this embodiment, and in other embodiments, the number of the steel wire ropes 23 can be freely selected according to the size of the platform body 1, and the number is not limited by the present utility model, and it is expected that the more the number of the steel wire ropes 23, the more stable the platform body 1 is in the construction process.
Referring to fig. 1 and 2, one end of a wire rope 23 is wound on a reel of a winding machine 22, the other end of the wire rope is fixedly connected with a platform frame 11, two supporting rods 15 are welded on one side, close to an outer wall of a building, of the top of the platform frame 11, the tops of the two supporting rods 15 are respectively connected with pulleys 151 in a rotating mode, the two wire ropes 23 are installed in one-to-one correspondence with the two pulleys 151, one side, away from the outer wall of the building, of the platform frame 11 is fixedly connected with one end, away from the winding machine 22, of the wire rope 23, and a connecting point of the wire rope 23 and the platform frame 11 is located on the middle upper portion, in the vertical direction, of the platform frame 11.
Referring to fig. 1, 2 and 3, the traveling assemblies 3 are provided in two, and the two traveling assemblies 3 are respectively mounted in cooperation with the two hitch plates 212. The walking assembly 3 comprises a walking roller 31 and a motor 32, the walking roller 31 is positioned in the clamping groove 2121, the walking roller 31 is rotationally connected with the hanging plate 212, the rotation axis of the walking roller 31 is perpendicular to the rotation axis of the winch 22, a shell of the motor 32 is fixedly connected with the hanging plate 212 through screws, and an output shaft of the motor 32 is coaxially and fixedly connected with the end part of the walking roller 31 through keys.
Referring to fig. 1, 2 and 3, mounting seats 213 are welded to both side walls of the clamping groove 2121 along the axial direction of the running roller 31, auxiliary rollers 214 are rotatably connected to the mounting seats 213, the rotation axis of the auxiliary rollers 214 is perpendicular to the rotation axis of the running roller 31, and the purline 4 is clamped between the two auxiliary rollers 214.
The implementation principle of the operation platform for the waterproof construction of the hyperboloid net rack roof is as follows: when in work, an operator stands on the platform body 1 to perform waterproof construction operation. In the construction process, the steel wire rope 23 is driven to wind by the winch 22, so that the platform body 1 is driven to lift, and the construction operation of walls with different heights is realized. Through setting up many wire ropes 23 and being connected with platform body 1, be favorable to making the stress point of platform body 1 keep balanced, and then strengthen the stability of platform body 1.
In the construction process, through the start motor 32, the motor 32 drives the walking roller 31 and rotates to drive connecting piece 21 along purlin 4 length direction removal, and then drive operation platform horizontal migration, the position of the adjustment platform body 1 of being convenient for, thereby strengthened the convenience of operation platform in the work progress.
The working platform is not only suitable for the conventional vertical building outer wall, but also has better applicability to the roof of the curved net rack building outer wall, and the safety and stability of the whole working platform are further improved.
The above embodiments are not intended to limit the scope of the present utility model, so: all equivalent changes in structure, shape and principle of the utility model should be covered in the scope of protection of the utility model.

Claims (8)

1. The utility model provides a be used for hyperboloid rack roofing waterproof construction operation platform, includes platform body (1), its characterized in that: still include hoisting assembly (2), hoisting assembly (2) include hoist engine (22), wire rope (23) and connecting piece (21), connecting piece (21) are used for being connected hoist engine (22) casing and purlin (4) of building outer wall roof, wire rope (23) are equipped with a plurality ofly, wire rope (23) one end is convoluteed on the spool of hoist engine (22), the other end and platform body (1) fixed connection, and the spool axial interval evenly distributed of many wire ropes (23) along hoist engine (22).
2. The operating platform for waterproofing construction of a hyperboloid net rack roof according to claim 1, wherein: the platform body (1) comprises a platform frame (11) and a plurality of protection plates (12), the protection plates (12) are respectively and fixedly connected to the peripheral wall and the bottom wall of the platform frame (11), and the steel wire rope (23) is fixedly connected with one side, deviating from the building outer wall, of the platform frame (11).
3. The operating platform for waterproofing construction of a hyperboloid net rack roof according to claim 2, wherein: the connection point of the steel wire rope (23) and the platform frame (11) is positioned at the middle upper part of the platform frame (11) along the vertical direction.
4. The operating platform for waterproofing construction of a hyperboloid net rack roof according to claim 2, wherein: one side that is close to the building outer wall at platform frame (11) top fixedly connected with bracing piece (15), bracing piece (15) top rotation is connected with pulley (151), one end that wire rope (23) deviate from hoist engine (22) is walked around pulley (151) back and is connected with platform frame (11) fixed.
5. A water-proof construction operation platform for a hyperboloid net rack roof according to any one of claims 1 to 4, wherein: the connecting piece (21) comprises a mounting plate (211) and a hanging plate (212), a shell of the winch (22) is fixedly connected with the mounting plate (211), the hanging plate (212) is fixedly connected with the mounting plate (211), and a clamping groove (2121) for being connected with the purline (4) in a hanging mode is formed in the hanging plate (212).
6. The operating platform for waterproofing construction of a hyperboloid net rack roof according to claim 5, wherein: still include walking subassembly (3), walking subassembly (3) include walking roller (31) and motor (32), walking roller (31) are located draw-in groove (2121), walking roller (31) are connected with hanging board (212) rotation, motor (32) are used for the drive walking roller (31) rotate.
7. The operating platform for waterproofing construction of a hyperboloid net rack roof according to claim 6, wherein: the clamping groove (2121) is characterized in that mounting seats (213) are fixedly connected to two side walls of the clamping groove, auxiliary rollers (214) are rotatably connected to the mounting seats (213), and the rotation axes of the auxiliary rollers (214) are perpendicular to the rotation axes of the walking rollers (31).
8. The operating platform for waterproofing construction of a hyperboloid net rack roof according to claim 2, wherein: and one side of the platform frame (11) close to the building outer wall is fixedly connected with a plurality of casters (14).
CN202320985228.5U 2023-04-26 2023-04-26 Be used for hyperboloid net rack roofing waterproof construction operation platform Active CN219638365U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320985228.5U CN219638365U (en) 2023-04-26 2023-04-26 Be used for hyperboloid net rack roofing waterproof construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320985228.5U CN219638365U (en) 2023-04-26 2023-04-26 Be used for hyperboloid net rack roofing waterproof construction operation platform

Publications (1)

Publication Number Publication Date
CN219638365U true CN219638365U (en) 2023-09-05

Family

ID=87810045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320985228.5U Active CN219638365U (en) 2023-04-26 2023-04-26 Be used for hyperboloid net rack roofing waterproof construction operation platform

Country Status (1)

Country Link
CN (1) CN219638365U (en)

Similar Documents

Publication Publication Date Title
CN213979852U (en) Suspension type track hanging flower basket structure
CN213171204U (en) Construction equipment hoisting device
CN219638365U (en) Be used for hyperboloid net rack roofing waterproof construction operation platform
CN110748173A (en) Portable autoclaved aerated concrete strip installation device
CN210885083U (en) Cable trench cover carrying device
CN210029833U (en) Lifting equipment for building construction
CN210561720U (en) Pier stud maintenance repair operation platform
CN113955636A (en) Hoisting equipment for assembly type building construction
CN216471954U (en) Liftable support for construction engineering construction
CN216764119U (en) Hoisting device for construction of foam concrete heat-insulation roof
CN218323832U (en) Construction platform is used to construction fitment
CN220245425U (en) Movable elevator
CN217972318U (en) Support for improving tensioning efficiency of prefabricated T-shaped beam
CN212863872U (en) Double-rail device for installing curtain wall
CN217924788U (en) High overhead position climbing frame climbing fixing auxiliary device
CN215756276U (en) Self-moving type lifting platform for diesel monorail crane installation
CN218288070U (en) Scaffold platform for repairing ship convenient to install
CN212317435U (en) Construction platform with lifting function for building
CN117886229B (en) Multifunctional integrated rail type lifting mechanism
CN218539077U (en) Building curtain wall hoisting device
CN218025101U (en) Building site building materials lifting machine
CN213011665U (en) Lifting device for building engineering
CN221001879U (en) Aluminum alloy electric lifting scaffold
CN217924509U (en) Steel construction metal roofing roof boarding material loading cableway device
CN218623527U (en) Self-elevating reinforcing steel bar house