CN219554427U - Temporary overhead line supporting device for power engineering construction - Google Patents

Temporary overhead line supporting device for power engineering construction Download PDF

Info

Publication number
CN219554427U
CN219554427U CN202320460287.0U CN202320460287U CN219554427U CN 219554427 U CN219554427 U CN 219554427U CN 202320460287 U CN202320460287 U CN 202320460287U CN 219554427 U CN219554427 U CN 219554427U
Authority
CN
China
Prior art keywords
hydraulic lifting
engineering construction
power engineering
overhead line
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320460287.0U
Other languages
Chinese (zh)
Inventor
刘强强
乔芳
李清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Ketong Electric Power Engineering Co ltd
Original Assignee
Shanxi Ketong Electric Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Ketong Electric Power Engineering Co ltd filed Critical Shanxi Ketong Electric Power Engineering Co ltd
Priority to CN202320460287.0U priority Critical patent/CN219554427U/en
Application granted granted Critical
Publication of CN219554427U publication Critical patent/CN219554427U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model belongs to the technical field of power engineering construction equipment, and particularly relates to a temporary overhead line supporting device for power engineering construction. According to the utility model, two groups of symmetrical support frames and hydraulic lifting rods are arranged on the movable base, the lifting plate is arranged at the upper end of the hydraulic lifting rod, meanwhile, the bidirectional threaded rod and the clamping plate are arranged on the lifting plate, the second guide wheels are arranged at the two ends of the lifting plate, and the first guide wheels are arranged on the side walls of the support frames, so that the purpose of facilitating the use of the device can be achieved.

Description

Temporary overhead line supporting device for power engineering construction
Technical Field
The utility model relates to the technical field of power engineering construction equipment, in particular to a temporary overhead line supporting device for power engineering construction.
Background
Electric power engineering, i.e. engineering related to the production, transportation and distribution of electric energy, broadly includes engineering that uses electricity as power and energy in various fields, and in the construction process of electric power engineering, it is often necessary to use a supporting frame to erect electric wires.
The prior art has the following problems:
at present, when the cable is erected in power engineering construction, the cable is supported through the telescopic rod, however, the telescopic rod only plays a role in lifting the cable and cannot fix the tensioning degree of the cable, so that the device is inconvenient to use.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a temporary overhead line supporting device for power engineering construction, which solves the problem of inconvenient use of the device existing at present.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a temporary overhead line strutting arrangement for electric power engineering construction, includes the removal base, the below of removing the base is provided with the control box, and the top of removing the base is provided with the support frame, be provided with first leading wheel on the lateral wall of support frame, and the top of support frame is provided with hydraulic lifting rod, one side of hydraulic lifting rod is connected with the stiffener, and hydraulic lifting rod's upper end is provided with the lifter plate, the end connection of lifter plate has the second leading wheel, and the sliding tray has been seted up to the upper surface of lifter plate, be provided with two-way threaded rod in the sliding tray, and two-way threaded rod's end connection has the rotation motor, two-way threaded rod's top is connected with the grip block, and one side of support frame is provided with hydraulic lifting platform, hydraulic lifting platform's top is provided with the control board.
As a preferable technical scheme of the utility model, the supporting frames are of U-shaped structures, and the two groups of supporting frames are symmetrically arranged at two ends of the movable base.
As a preferable technical scheme of the utility model, two groups of second guide wheels are symmetrically arranged at two ends of each group of lifting plates, and the second guide wheels on one side of the lifting plates, which is close to the hydraulic lifting table, are positioned right above the first guide wheels.
As a preferable technical scheme of the utility model, two ends of the reinforcing rod are respectively fixed on the support frame and the hydraulic lifting rod, and two groups of reinforcing rods are symmetrically arranged on two sides of each group of hydraulic lifting rod.
As a preferable technical scheme of the utility model, the clamping plate is in sliding connection with the sliding groove through the sliding block at the lower end of the clamping plate, and the sliding block is provided with an internal threaded hole matched with the bidirectional threaded rod.
As a preferable technical scheme of the utility model, the hydraulic lifting rod, the rotating motor, the hydraulic lifting table and the control board are all connected with the control box through wires.
Compared with the prior art, the utility model provides a temporary overhead line support device for power engineering construction, which has the following beneficial effects:
1. this temporary stringing strutting arrangement for electric power engineering construction is through setting up support frame and the hydraulic lifting rod of two sets of symmetries on removing the base to set up the lifter plate in the upper end of hydraulic lifting rod, set up two-way threaded rod and grip block on the lifter plate simultaneously, and set up the second leading wheel at the both ends of lifter plate, set up first leading wheel on the lateral wall of support frame, the cable that will need erect passes first leading wheel and second leading wheel in proper order during the use, then utilize the hydraulic lifting rod to rise the cable to appointed height, the removal of rethread removal base or the protection line of cable at last, can realize laying of cable, when needs the cable to carry out tensioning regulation, the pulling cable is carried out tensioning then rethread grip block to it, then to the cable after tensioning wiring or other operations can, can be convenient for the staff to carry out the operation through this design.
2. This temporary overhead line strutting arrangement for electric power engineering construction is through setting up the hydraulic lifting rod of two sets of symmetries to set up hydraulic lifting platform between two sets of hydraulic lifting rods, fix two sets of cables that need dock respectively on two sets of lifter plates during the use, then the staff stands on hydraulic lifting platform, and start hydraulic lifting platform and rise the staff to suitable operation height, through this design not only can be convenient for the staff to the cable operation of not co-altitude, but also can overhaul the cable that erects.
Drawings
FIG. 1 is a schematic diagram of a front view structure of the present utility model;
FIG. 2 is a schematic view of the hydraulic lifter connection structure of the present utility model;
FIG. 3 is an enlarged schematic view of the portion A of FIG. 2 according to the present utility model;
fig. 4 is a schematic view of a lifter plate structure according to the present utility model.
In the figure: 1. a movable base; 2. a control box; 3. a support frame; 4. a first guide wheel; 5. a hydraulic lifting rod; 6. a reinforcing rod; 7. a lifting plate; 8. a second guide wheel; 9. a sliding groove; 10. a two-way threaded rod; 11. a rotating motor; 12. a clamping plate; 13. a hydraulic lifting platform; 14. and a control board.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1 to 4, in the present embodiment: the utility model provides a temporary overhead line strutting arrangement for electric power engineering construction, including removing base 1, the below of removing base 1 is provided with control box 2, the top of removing base 1 is provided with support frame 3, be provided with first leading wheel 4 on the lateral wall of support frame 3, a direction for the cable, the top of support frame 3 is provided with hydraulic lifting rod 5, one side of hydraulic lifting rod 5 is connected with stiffener 6, the upper end of hydraulic lifting rod 5 is provided with lifter 7, lifter 7's end connection has second leading wheel 8, sliding tray 9 has been seted up to lifter 7's upper surface, be provided with bi-directional threaded rod 10 in the sliding tray 9, bi-directional threaded rod 10's end connection has rotation motor 11, bi-directional threaded rod 10's top is connected with grip block 12, a side of support frame 3 is provided with hydraulic lifting platform 13, hydraulic lifting platform 13's top is provided with controls board 14, be used for the operation of device.
In the embodiment, the supporting frames 3 are in a U-shaped structure, and two groups of supporting frames 3 are symmetrically arranged at two ends of the movable base 1 so as to butt-joint two groups of cables; two groups of second guide wheels 8 are symmetrically arranged at two ends of each group of lifting plates 7, and the second guide wheels 8 on one side of the lifting plates 7 close to the hydraulic lifting table 13 are positioned right above the first guide wheels 4 so as to pay off laid cables; two ends of the reinforcing rod 6 are respectively fixed on the support frame 3 and the hydraulic lifting rods 5, and two groups of reinforcing rods 6 are symmetrically arranged on two sides of each group of hydraulic lifting rods 5 so as to strengthen the stability of the hydraulic lifting rods 5; the clamping plates 12 are in sliding connection with the sliding grooves 9 through sliding blocks at the lower ends of the clamping plates, and the sliding blocks are provided with internal threaded holes matched with the bidirectional threaded rods 10 so as to ensure synchronous and reverse movement of the two groups of clamping plates 12 on the same group of lifting plates 7; the hydraulic lifting rod 5, the rotating motor 11, the hydraulic lifting table 13 and the control board 14 are all connected with the control box 2 through wires, so that a worker stands on the hydraulic lifting table 13 to control the device.
The working principle and the using flow of the utility model are as follows: when the cable lifting device is used, cables to be erected sequentially penetrate through the first guide wheel 4 and the second guide wheel 8, the lifting plate 7 is lifted to a proper height through the hydraulic lifting rod 5, the lifted cables are operated, when two groups of cables are required to be butted, the two groups of cables are respectively fixed on the two groups of lifting plates 7 through the clamping plates 12, then a worker stands on the hydraulic lifting table 13, the worker is lifted to the proper height through the hydraulic lifting table 13, and wiring operation is performed.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. The utility model provides a temporary overhead line strutting arrangement for electric power engineering construction, includes mobile base (1), its characterized in that: the utility model discloses a hydraulic lifting device, including support frame (3), hydraulic lifting platform (13), control box (2) are provided with to the below of removing base (1), and the top of removing base (1) is provided with support frame (3), be provided with first leading wheel (4) on the lateral wall of support frame (3), and the top of support frame (3) is provided with hydraulic lifting rod (5), one side of hydraulic lifting rod (5) is connected with stiffener (6), and the upper end of hydraulic lifting rod (5) is provided with lifter plate (7), the end connection of lifter plate (7) has second leading wheel (8), and sliding tray (9) have been seted up to the upper surface of lifter plate (7), be provided with two-way threaded rod (10) in sliding tray (9), and the end connection of two-way threaded rod (10) has rotation motor (11), the top of two-way threaded rod (10) is connected with grip block (12), and one side of support frame (3) is provided with hydraulic lifting platform (13), the top of hydraulic lifting platform (13) is provided with and controls board (14).
2. The temporary overhead line support device for electric power engineering construction according to claim 1, wherein: the support frames (3) are of U-shaped structures, and the two groups of support frames (3) are symmetrically arranged at two ends of the movable base (1).
3. The temporary overhead line support device for electric power engineering construction according to claim 1, wherein: two groups of second guide wheels (8) are symmetrically arranged at two ends of each lifting plate (7), and the second guide wheels (8) on one side of the lifting plates (7) close to the hydraulic lifting table (13) are positioned right above the first guide wheels (4).
4. The temporary overhead line support device for electric power engineering construction according to claim 1, wherein: two ends of the reinforcing rod (6) are respectively fixed on the supporting frame (3) and the hydraulic lifting rods (5), and two groups of reinforcing rods (6) are symmetrically arranged on two sides of each group of hydraulic lifting rods (5).
5. The temporary overhead line support device for electric power engineering construction according to claim 1, wherein: the clamping plate (12) is in sliding connection with the sliding groove (9) through a sliding block at the lower end of the clamping plate, and an internal threaded hole matched with the bidirectional threaded rod (10) is formed in the sliding block.
6. The temporary overhead line support device for electric power engineering construction according to claim 1, wherein: the hydraulic lifting rod (5), the rotating motor (11), the hydraulic lifting table (13) and the control board (14) are all connected with the control box (2) through wires.
CN202320460287.0U 2023-03-13 2023-03-13 Temporary overhead line supporting device for power engineering construction Active CN219554427U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320460287.0U CN219554427U (en) 2023-03-13 2023-03-13 Temporary overhead line supporting device for power engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320460287.0U CN219554427U (en) 2023-03-13 2023-03-13 Temporary overhead line supporting device for power engineering construction

Publications (1)

Publication Number Publication Date
CN219554427U true CN219554427U (en) 2023-08-18

Family

ID=87700823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320460287.0U Active CN219554427U (en) 2023-03-13 2023-03-13 Temporary overhead line supporting device for power engineering construction

Country Status (1)

Country Link
CN (1) CN219554427U (en)

Similar Documents

Publication Publication Date Title
CN108726254A (en) A kind of power cable pay-off equipment
CN219554427U (en) Temporary overhead line supporting device for power engineering construction
CN111392585A (en) Movable rack for mounting electrical equipment and using method thereof
CN208890206U (en) One kind being suitable for ultra-high voltage transformer station Multifunctional worktable for electric power overhaul
CN206376617U (en) A kind of overhead transmission line Special electric line bar automatic installation apparatus
CN209298851U (en) Actinobacillus device suitable for carrying out electric power maintenance cable duct
CN109761160B (en) Electric power screen cabinet migration device
CN216272899U (en) Safe lifting device for mounting power equipment
CN216389989U (en) Novel wiring for electric power engineering device
CN212798986U (en) Pay-off is used in electric power system construction
CN214141494U (en) Box turnover device suitable for sand box
CN212503654U (en) Photovoltaic transformer subassembly hoist and mount remove frame
CN219691541U (en) Four-group linkage pipe gallery trolley
CN211393538U (en) Box-type substation hoisting device
CN210764090U (en) Portable deep groove cable lifting device
CN210012511U (en) Foldable deep groove cable lifting device
CN202817636U (en) Translation cable groove
CN221396862U (en) Hoisting platform for new energy power station construction
CN220078554U (en) Electric power construction operation platform based on green building construction technology
CN219874816U (en) Improved pipeline threading device for electric power construction
CN212425227U (en) Lifting device for power equipment installation
CN221428448U (en) Wiring device for building electrical installation
CN217676285U (en) Automatically telescopic laminated slab hanger
CN215722706U (en) Intelligent movable type lifting high-pole lamp
CN220525568U (en) Engineering quality detection device for building supervision

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant