CN219547983U - Construction equipment for hydraulic engineering - Google Patents

Construction equipment for hydraulic engineering Download PDF

Info

Publication number
CN219547983U
CN219547983U CN202320464292.9U CN202320464292U CN219547983U CN 219547983 U CN219547983 U CN 219547983U CN 202320464292 U CN202320464292 U CN 202320464292U CN 219547983 U CN219547983 U CN 219547983U
Authority
CN
China
Prior art keywords
clearance
pipeline
hydraulic engineering
shape
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320464292.9U
Other languages
Chinese (zh)
Inventor
黎旭松
邓成成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengtu Construction Co ltd
Original Assignee
Zhengtu Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengtu Construction Co ltd filed Critical Zhengtu Construction Co ltd
Priority to CN202320464292.9U priority Critical patent/CN219547983U/en
Application granted granted Critical
Publication of CN219547983U publication Critical patent/CN219547983U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses construction equipment for hydraulic engineering, which comprises an L-shaped pipeline and a well cover arranged at the upper end of the L-shaped pipeline, wherein a plurality of water flowing holes are formed in the well cover; further comprises: l shape track, when needs clear up the silt of L pipe way corner, along with the removal of second clearance subassembly, the second clearance subassembly can drive the clearance ring and slide along the slide bar through the connecting rod, and the connecting rod extrudees first spring, and the clearance ring is scraped the clearance along L pipe way corner through the cutting tooth piece this moment. This a construction operation equipment for hydraulic engineering, L pipeline corner is scraped the clearance, promotes silt simultaneously, can be convenient for follow-up rivers wash, can not cause the water pipe to block up the condition, can normally hydraulic engineering drainage operation go on, dismantles the pipeline when not needing the manual work to maintain, easy operation's effect.

Description

Construction equipment for hydraulic engineering
Technical Field
The utility model relates to the technical field of hydraulic engineering, in particular to construction operation equipment for hydraulic engineering.
Background
The pipeline that uses among the hydraulic engineering is used for discharging the rivers that contain a large amount of silt generally, and wherein silt easily deposits in pipeline kink department, can appear blocking up the condition if not maintaining for a long time, influences the going on of normal drainage operation, and manual maintenance needs to dismantle the pipeline earlier, and is comparatively loaded down with trivial details complicacy, and for this reason, the present provides a water conservancy pipeline that can be convenient for maintain.
The utility model discloses a water conservancy pipeline for hydraulic engineering for publication number CN212657441U, through set up disassembly body between first body and second body, press the control lever and make position changeing pearl compression spring to the standing groove in, the fixed inslot that the fixed ring made follow drops, the pulling filter screen makes the spliced block drop from the spliced groove, realize dismantling fast to the filter screen, inlay the spliced block in the spliced groove in the left side of new filter screen, insert the fixed ring on first body right side in the fixed groove, when spacing changeing pearl slip to spacing groove department, the spring resilience is with spacing changeing ejecting standing groove of pearl to spacing inslot, realize the quick installation of filter screen, staff's working strength has been alleviateed.
Although the above-mentioned patent can be fine to the quick installation of filter screen, prevents the jam of water conservancy pipeline, nevertheless there is the turning in the junction between pipeline and pipeline, and the silt of turning is general washes it hardly to wash it away through rivers, can appear blocking up the condition if not maintaining for a long time, influences the going on of normal drainage operation, and manual maintenance needs to dismantle the pipeline earlier, comparatively loaded down with trivial details complicacy.
So we propose a construction work device for hydraulic engineering in order to solve the problems set forth above.
Disclosure of Invention
The utility model aims to provide construction operation equipment for hydraulic engineering, which aims to solve the problems that corners exist at the joint between pipelines, which is proposed by the background technology, sediment at the corners is difficult to wash off by flushing through water flow, blockage can occur if maintenance is not performed for a long time, normal drainage operation is affected, and the pipelines are required to be detached firstly for manual maintenance, so that the construction operation equipment is complex.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the construction equipment for the hydraulic engineering comprises an L-shaped pipeline and a well cover arranged at the upper end of the L-shaped pipeline, wherein a plurality of water flowing holes are formed in the well cover;
further comprises:
l shape track, L shape orbital one end fixed mounting is covered on the well, and the other end alternates and sets up on L shape pipeline, be provided with on the L shape track and be used for carrying out the first clearance subassembly of clearance to the corner of L shape pipeline, still be provided with on the L shape track and drive first clearance subassembly and take place to move along L shape track to carry out the second clearance subassembly of clearance to the vertical inner wall of L shape pipeline.
Through adopting above-mentioned technical scheme, under the cooperation of L shape track, first clearance subassembly and second clearance subassembly, can clear up the sand on the inner chamber lateral wall of L shape pipeline corner, guarantee the patency of L shape pipeline.
Preferably, the first cleaning component comprises a sliding rod fixedly installed on the L-shaped track and a connecting rod arranged on the sliding rod in a sliding manner, the two ends of the connecting rod are fixedly provided with cleaning rings together, a first spring is sleeved on the sliding rod, and the two ends of the first spring are fixedly connected with the bottom wall of the L-shaped track and the bottom wall of the connecting rod respectively.
Through adopting above-mentioned technical scheme, under slide bar, connecting rod, first spring and orbital cooperation of L shape, can be convenient for clear up the silt of L pipeline corner.
Preferably, the diapire fixed mounting of clearance ring has a plurality of cutting tooth piece, and a plurality of the cutting tooth piece all laminates with L-shaped pipe's inner chamber lateral wall.
Through adopting above-mentioned technical scheme, through the setting of cutting tooth piece, can strike off the intractable silt better.
Preferably, the second cleaning component comprises a threaded column arranged on the L-shaped track in a rotating mode and a positioning rod arranged on the threaded column in a threaded mode, scraping rings are fixedly installed at two ends of the positioning rod together, magnets are fixedly installed at the lower ends of the scraping rings and the upper ends of the cleaning rings, and two magnets are magnetic to repel each other.
Through adopting above-mentioned technical scheme, under the cooperation of screw thread post, strike off ring, locating lever and magnet, can also drive first clearance subassembly and take place to remove when striking off the vertical lateral wall of inner chamber of L pipe way.
Preferably, the upper end fixed mounting of clearance ring has a plurality of clearance panel, and a plurality of all fixed mounting has a plurality of clearance brush on the lateral wall of clearance panel, a plurality of the clearance brush all contacts with the inner chamber lateral wall of L pipeline.
Through adopting above-mentioned technical scheme, through the setting of clearance panel and clearance brush, can further clear up the inner chamber boats and ships of L shape pipeline.
Preferably, a plurality of second springs are fixedly arranged on the lower end face of the well cover, and the second springs are located right below the water flowing holes.
Through adopting above-mentioned technical scheme, through the setting of second spring, can filter the sewage that flows in, can twine the hair and collect, can not cause the jam of L shape pipeline.
Compared with the prior art, the utility model has the beneficial effects that: the cleaning ring scrapes and cleans along the corners of the L-shaped pipeline through the cutting tooth blocks, pushes silt at the same time, can facilitate the flushing of subsequent water flow, does not cause the blocking condition of the water pipe, can normally carry out the drainage operation of hydraulic engineering, and does not need to disassemble the pipeline when maintenance is carried out manually, and has the following specific contents;
1. when needs clear up the silt of L pipe way corner, along with the removal of second clearance subassembly, the second clearance subassembly can drive the clearance ring and slide along the slide bar through the connecting rod, the connecting rod extrudees first spring, the clearance ring is scraped the clearance along L pipe way corner through the cutting tooth piece this moment, promote silt simultaneously, can be convenient for follow-up rivers wash, can not cause the water pipe to block up the condition, can normally hydraulic engineering drainage operation go on, dismantle the pipeline when not needing the manual work to maintain, easy operation.
2. The screw thread post is rotated, so that the screw thread post rotates, the screw thread post drives the locating lever to move along the surface of the locating lever, meanwhile, the locating lever drives the scraping ring to longitudinally displace along the L-shaped pipeline, the scraping ring drives the cleaning panel and the cleaning brush to further clean the inner cavity side wall of the L-shaped pipeline, when the scraping ring is gradually close to the cleaning ring, the magnet on the scraping ring repels the magnet at the upper end of the cleaning ring, and the cleaning ring can squeeze the first spring and simultaneously slide along the sliding rod.
3. Through the setting of second spring, can filter sewage that flows, can twine the hair and collect, can not cause the jam of L shape pipeline.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a partial structure of an L-shaped pipeline according to the present utility model;
FIG. 3 is an enlarged view of FIG. 2A in accordance with the present utility model;
FIG. 4 is an enlarged view of FIG. 2B in accordance with the present utility model;
FIG. 5 is a schematic view of the joint between the sliding rod and the threaded column.
In the figure: 1. an L-shaped pipe; 2. a well cover; 3. a water flow hole; 4. an L-shaped track; 5. a second cleaning assembly; 51. a threaded column; 52. a scraper ring; 53. a positioning rod; 54. a magnet; 6. cleaning the panel; 7. cleaning a hairbrush; 8. a second spring; 9. a first cleaning assembly; 91. cleaning the ring; 92. a first spring; 93. a connecting rod; 94. a slide bar; 10. cutting the tooth block.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, the present utility model provides a technical solution: the construction equipment for the hydraulic engineering comprises an L-shaped pipeline 1 and a well cover 2 arranged at the upper end of the L-shaped pipeline 1, wherein a plurality of water flowing holes 3 are formed in the well cover 2; further comprises: l shape track 4, the one end fixed mounting of L shape track 4 is on well lid 2, and the other end alternates and sets up on L shape pipeline 1, is provided with on the L shape track 4 and is used for carrying out the first clearance subassembly 9 of clearing up to L shape pipeline 1's corner, still is provided with on the L shape track 4 and drives first clearance subassembly 9 and take place the motion along L shape track 4 to carry out the second clearance subassembly 5 of clearing up to L shape pipeline 1's vertical inner wall, under the cooperation of L shape track 4, first clearance subassembly 9 and second clearance subassembly 5, can clear up the sand on the inner chamber lateral wall of L shape pipeline 1 corner, guarantee L shape pipeline 1's patency.
The first cleaning component 9 comprises a sliding rod 94 fixedly installed on the L-shaped track 4 and a connecting rod 93 arranged on the sliding rod 94 in a sliding manner, the two ends of the connecting rod 93 are fixedly installed with cleaning rings 91 together, a first spring 92 is sleeved on the sliding rod 94, resetting of the connecting rod 93 can be facilitated through the arrangement of the first spring 92, the two ends of the first spring 92 are fixedly connected with the bottom wall of the L-shaped track 4 and the bottom wall of the connecting rod 93 respectively, and sediment at the corner of the L-shaped pipeline 1 can be cleaned conveniently under the cooperation of the sliding rod 94, the connecting rod 93, the first spring 92 and the L-shaped track 4.
The diapire fixed mounting of clearance ring 91 has a plurality of cutting tooth piece 10, and a plurality of cutting tooth piece 10 all laminate mutually with the inner chamber lateral wall of L shape pipeline 1, through the setting of cutting tooth piece 10, can strike off the intractable silt better.
When needs clear up the silt of L shape pipeline 1 corner, along with the removal of second clearance subassembly 5, second clearance subassembly 5 can drive clearance ring 91 and slide along slide bar 94 through connecting rod 93, and connecting rod 93 extrudees first spring 92, and clearance ring 91 is scraped the clearance along L shape pipeline 1 corner through cutting tooth piece 10 this moment, promotes silt simultaneously, can be convenient for follow-up rivers wash.
It should be noted that: well lid 2 and L-shaped pipeline 1 accessible restriction pole alternate setting carry out spacingly in L-shaped pipeline 1, and also accessible members such as nut carry out demountable installation simultaneously, are convenient for take out of well lid 2, are also convenient for clear up first clearance subassembly 9 and second clearance subassembly 5 simultaneously.
Referring to fig. 2-3, the second cleaning assembly 5 includes a threaded column 51 rotatably disposed on the L-shaped track 4 and a positioning rod 53 screwed on the threaded column 51, the threaded column 51 is rotatably connected with the sliding rod 94 (and the sliding rod 94 cannot be separated from the threaded column 51 in the process of rotation, as can be seen in fig. 5), two ends of the positioning rod 53 are fixedly provided with a scraping ring 52 together, the lower end of the scraping ring 52 and the upper end of the cleaning ring 91 are fixedly provided with magnets 54, the two magnets 54 repel each other magnetically, and under the cooperation of the threaded column 51, the scraping ring 52, the positioning rod 53 and the magnets 54, the first cleaning assembly 9 can be driven to move while scraping the vertical sidewall of the inner cavity of the L-shaped pipeline 1.
The upper end fixed mounting of clearance ring 91 has a plurality of clearance panel 6, and the equal fixed mounting has a plurality of clearance brush 7 on the lateral wall of a plurality of clearance panel 6, and a plurality of clearance brush 7 all contacts with the inner chamber lateral wall of L shape pipeline 1, through the setting of clearance panel 6 and clearance brush 7, can further clear up the inner chamber lateral wall of L shape pipeline 1.
The lower terminal surface fixed mounting of well lid 2 has a plurality of second spring 8, and a plurality of second spring 8 are located the flow hole 3 under, and through the setting of second spring 8, can filter the sewage that flows in, can twine the hair and collect, can not cause the jam of L shape pipeline 1.
The threaded column 51 is rotated to enable the threaded column 51 to rotate, the threaded column 51 drives the positioning rod 53 to move along the surface of the threaded column and slide along the L-shaped track 4, at the moment, the positioning rod 53 drives the scraping ring 52 to longitudinally displace along the L-shaped pipeline 1, the scraping ring 52 drives the cleaning panel 6 and the cleaning brush 7 to further clean the inner cavity side wall of the L-shaped pipeline 1, and meanwhile, when the scraping ring 52 is gradually close to the cleaning ring 91, the magnet 54 on the scraping ring 52 repels the magnet 54 at the upper end of the cleaning ring 91, and the cleaning ring 91 can squeeze the first spring 92 and slide along the sliding rod 94.
What is not described in detail in this specification is prior art known to those skilled in the art.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.

Claims (6)

1. The construction equipment for the hydraulic engineering comprises an L-shaped pipeline (1) and a well cover (2) arranged at the upper end of the L-shaped pipeline (1), wherein a plurality of water flowing holes (3) are formed in the well cover (2);
characterized by further comprising:
l shape track (4), the one end fixed mounting of L shape track (4) is on well lid (2), and the other end alternates and sets up on L shape pipeline (1), be provided with on L shape track (4) and be used for carrying out first clearance subassembly (9) of clearance to the corner of L shape pipeline (1), still be provided with on L shape track (4) and drive first clearance subassembly (9) and take place the motion along L shape track (4) to carry out second clearance subassembly (5) of clearance to the vertical inner wall of L shape pipeline (1).
2. A construction work apparatus for hydraulic engineering according to claim 1, wherein: the cleaning device is characterized in that the first cleaning component (9) comprises a sliding rod (94) fixedly installed on the L-shaped track (4) and a connecting rod (93) arranged on the sliding rod (94) in a sliding mode, cleaning rings (91) are fixedly installed at two ends of the connecting rod (93) together, a first spring (92) is sleeved on the sliding rod (94), and two ends of the first spring (92) are fixedly connected with the bottom wall of the L-shaped track (4) and the bottom wall of the connecting rod (93) respectively.
3. A construction work apparatus for hydraulic engineering according to claim 2, wherein: the bottom wall fixed mounting of clearance ring (91) has a plurality of cutting tooth piece (10), a plurality of cutting tooth piece (10) all laminate with the inner chamber lateral wall of L pipe (1).
4. A construction work apparatus for hydraulic engineering according to claim 3, wherein: the second cleaning assembly (5) comprises a threaded column (51) arranged on the L-shaped track (4) in a rotating mode and a positioning rod (53) arranged on the threaded column (51) in a threaded mode, scraping rings (52) are fixedly installed at two ends of the positioning rod (53) together, magnets (54) are fixedly installed at the lower ends of the scraping rings (52) and the upper ends of the cleaning rings (91), and the two magnets (54) repel each other magnetically.
5. A construction work apparatus for hydraulic engineering according to claim 4, wherein: the upper end fixed mounting of clearance ring (91) has a plurality of clearance panel (6), a plurality of all fixed mounting has a plurality of clearance brush (7) on the lateral wall of clearance panel (6), a plurality of clearance brush (7) all contact with the inner chamber lateral wall of L pipe way (1).
6. A construction work apparatus for hydraulic engineering according to claim 5, wherein: the lower end face of the well cover (2) is fixedly provided with a plurality of second springs (8), and the second springs (8) are positioned right below the water flowing holes (3).
CN202320464292.9U 2023-03-13 2023-03-13 Construction equipment for hydraulic engineering Active CN219547983U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320464292.9U CN219547983U (en) 2023-03-13 2023-03-13 Construction equipment for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320464292.9U CN219547983U (en) 2023-03-13 2023-03-13 Construction equipment for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN219547983U true CN219547983U (en) 2023-08-18

Family

ID=87703718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320464292.9U Active CN219547983U (en) 2023-03-13 2023-03-13 Construction equipment for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN219547983U (en)

Similar Documents

Publication Publication Date Title
CN113769466A (en) Food waste water reuse of reclaimed water equipment
CN219547983U (en) Construction equipment for hydraulic engineering
CN116510397B (en) Waste water treatment device for mine tailing sludge solidification technology
CN219481754U (en) Deep bed type filtering device
CN108126376A (en) A kind of horizontal sedimentation tank
CN102198342B (en) Water outlet tank cleaning brush
CN114191864B (en) Environment-friendly water treatment device
CN207562411U (en) A kind of horizontal sedimentation tank
CN214570992U (en) Biological filter device of water supply and drainage sewage plant
CN216041639U (en) Town road drainage device
CN216223103U (en) Jacking type filtering sand cylinder
CN215841784U (en) A central transmission mud scraping device for sedimentation tank
CN220013870U (en) Distributed municipal water supply and storage facility
CN218894019U (en) Water conservancy hydropower construction drainage device
CN220214256U (en) Device for purifying and reutilizing construction precipitation
CN221030608U (en) Pipeline cleaning device with rotary structure for building water supply and drainage
CN219848451U (en) Waste water recycling device
CN214360571U (en) Active carbon filter equipment is used in system water workshop
CN220370558U (en) Tap water filtering equipment with filter element is clean
CN216664219U (en) Water supply and drainage fire control inspection shaft
CN216395446U (en) Waste water recovery processing apparatus for construction
CN212374936U (en) Advection type dissolved air flotation machine with mud scraping device
CN220513619U (en) Sediment treatment device for filter tank
CN219953781U (en) Oil tank structure capable of removing impurities and discharging oil in inclined mode
CN220877907U (en) Sand filtering treatment device for geothermal well water source

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant