CN219508769U - Novel floor drain device for constructional engineering - Google Patents

Novel floor drain device for constructional engineering Download PDF

Info

Publication number
CN219508769U
CN219508769U CN202320768415.8U CN202320768415U CN219508769U CN 219508769 U CN219508769 U CN 219508769U CN 202320768415 U CN202320768415 U CN 202320768415U CN 219508769 U CN219508769 U CN 219508769U
Authority
CN
China
Prior art keywords
water
bolted
floor drain
threaded
blocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320768415.8U
Other languages
Chinese (zh)
Inventor
于明龙
刘照俊
于小艺
刘统瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Construction Group Co ltd
Original Assignee
Weihai Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weihai Construction Group Co ltd filed Critical Weihai Construction Group Co ltd
Priority to CN202320768415.8U priority Critical patent/CN219508769U/en
Application granted granted Critical
Publication of CN219508769U publication Critical patent/CN219508769U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a novel floor drain device for constructional engineering, which belongs to the technical field of floor drains, and adopts the technical scheme that the novel floor drain device comprises an infiltration mechanism and an anti-blocking mechanism, wherein the anti-blocking mechanism is bolted to the top of the infiltration mechanism, the infiltration mechanism comprises a drainage component and a water inlet component, the anti-blocking mechanism comprises a supporting rod, a connecting screw and a net cover, the water inlet component is in threaded connection with the inner wall of the drainage component, the connecting screw is in threaded connection with the top of the water inlet component, the drainage component can drain water and block seepage water by arranging the infiltration mechanism and the anti-blocking mechanism, the water inlet component can drain seepage water and drain water to be drained, the supporting rod can support and limit the net cover, the connecting screw can support and limit the supporting rod, the net cover can block large objects moving along with water flow, and the large objects can be prevented from blocking the infiltration mechanism.

Description

Novel floor drain device for constructional engineering
Technical Field
The utility model relates to the technical field of floor drain, in particular to a novel floor drain device for constructional engineering.
Background
The construction engineering refers to construction of various buildings, in residential building construction of the construction engineering, a drainage system is installed in a residence, the drainage system comprises but is not limited to a floor drain, a sewer pipe and the like, the floor drain is an important interface for connecting the drainage pipeline system with indoor ground, the performance of the floor drain is an important part of the drainage system in the residence, the quality of indoor air is directly influenced, the floor drain is very important for controlling peculiar smell of a bathroom, residual redundant water on the ground can be led into the pipeline inside the floor drain, and the redundant water on the ground can be discharged.
Currently, the publication number is: the utility model of CN209277269U discloses a floor drain, which comprises a floor drain body, a floor drain connector, a floor drain inner sleeve, a water outlet pipe and a floor drain cover plate, wherein the floor drain body is provided with a water storage cavity and a water flowing cavity, the upper end of the water storage cavity is communicated with the upper end of the water flowing cavity, and the water outlet pipe is arranged on the outer side surface of the floor drain body and is communicated with the bottom of the water flowing cavity; the outer edge of the floor drain connector is provided with an anti-rotation shifting notch, the inner side of the upper end of the floor drain body is provided with a step notch, and the step notch is connected with the anti-rotation shifting notch in a matching way; the floor drain cover plate is arranged at the upper end of the floor drain connector and is movably connected with the floor drain connector, the floor drain inner sleeve is arranged in the water storage cavity, the upper end of the floor drain inner sleeve is connected with the floor drain cover plate, the floor drain inner sleeve is provided with a water inlet cavity, and the lower end of the water inlet cavity is communicated with the lower end of the water storage cavity. The floor drain structure can avoid overlarge force when floor drain cleaning personnel disassemble and assemble the floor drain, and the floor drain connector and the floor drain body can not be rotationally separated when the floor drain cover plate is disassembled, so that convenience is brought to the disassembly and maintenance of the floor drain cover plate.
When building drainage system in the building engineering, will use floor drain equipment, and be used for the novel floor drain device of building engineering just one of them, but current floor drain equipment lacks the structure to the infiltration drainage in the ceramic tile gap, can't drain the nearby infiltration of floor drain root, can lead to gathering a large amount of ponding and leading to leaking to the outside ground of room or floor drain root gradually to leak, and lack the anti-blocking structure to the unexpected shutoff ground water inlet of large-scale object, can lead to the large-scale object to block up ground water inlet and make the floor drain unable to drain.
Disclosure of Invention
The utility model provides a novel floor drain device for constructional engineering, which aims to solve the problems that the existing leakage equipment lacks a structure for draining water seepage in a floor tile gap, cannot drain water seepage near the root of a floor drain, can cause a large amount of accumulated water to be accumulated and gradually leak to the ground outside a room or the root of the floor drain to cause water leakage, and lacks an anti-blocking structure for accidentally blocking a ground leakage water inlet of a large object, and can cause the large object to block the ground leakage water inlet to cause the floor drain to be incapable of draining water.
The utility model is realized in such a way that the novel floor drain device for the constructional engineering comprises an infiltration mechanism and an anti-blocking mechanism, wherein the anti-blocking mechanism is bolted at the top of the infiltration mechanism, the infiltration mechanism comprises a drainage assembly and a water inlet assembly, and the anti-blocking mechanism comprises a supporting rod, a connecting screw rod and a net cover;
go into water subassembly threaded connection at the inner wall of drainage subassembly, connecting screw threaded connection is at the top of going into water subassembly, the bracing piece bolt is at the top of connecting screw, the screen panel bolt is at the top of bracing piece.
In order to achieve the effects of conveying liquid and stopping water, as a novel floor drain device for construction engineering, the water draining assembly comprises a threaded wall sewer pipe, a waterproof wing plate, a water stopping joint and a template, wherein the waterproof wing plate is bolted to the top of the surface of the threaded wall sewer pipe, the water stopping joint is bolted to the surface of the threaded wall sewer pipe, and the template is bolted to the bottom of the surface of the threaded wall sewer pipe.
In order to achieve the effect of water seepage and drainage, the novel floor drain device for the building engineering is preferable, the water inlet assembly comprises a threaded connecting pipe, a water drain and a water blocking screen plate, the threaded connecting pipe is in threaded connection with the inner wall of a threaded wall sewer pipe, the water drain is formed in the surface of the threaded connecting pipe, and the water blocking screen plate is bolted to the top of the surface of the threaded connecting pipe.
In order to achieve the effect of increasing the connection stability of the template and the threaded wall sewer pipe, the novel floor drain device for the building engineering is preferably used, the top of the template is bolted with the supporting plate, the inner wall of the supporting plate is bolted with the surface of the threaded wall sewer pipe, and the supporting plate is matched with the template for use.
In order to achieve the effect of coarse filtration of water, the novel floor drain device for the construction engineering is preferable, the top of the inner wall of the threaded connecting pipe is bolted with a protective net, the protective net is cylindrical, and the protective net is matched with the threaded connecting pipe for use.
In order to achieve the effect of increasing the stability of the connecting screw rod connecting structure, the novel floor drain device for the building engineering is preferable in the utility model, the bottom of the water-blocking net plate is bolted with a reinforcing pipe, the reinforcing pipe is made of stainless steel materials, the top of the reinforcing pipe is bolted with the connecting screw rod, and the reinforcing pipe is matched with the water-blocking net plate.
In order to achieve the effect of blocking larger impurities in the liquid, the novel floor drain device for the building engineering is preferable in the utility model, the top of the water blocking net plate is provided with the water leakage port, the water leakage port is in a circular ring shape, and the water leakage port is matched with the water blocking net plate for use.
In order to achieve the effect of increasing the tightness of the bottom of the net cover when the bottom of the net cover is contacted with the water-blocking net plate, the novel floor drain device for the building engineering is preferable in the utility model, the bottom of the net cover is bolted with a sealing ring, the sealing ring is made of rubber materials, the bottom of the sealing ring is contacted with the top of the water-blocking net plate, and the sealing ring is matched with the net cover for use.
In order to achieve the effect of protecting the joint of the support rod and the mesh enclosure, the novel floor drain device for the building engineering is preferable in the utility model, the top of the support rod is bolted with a protective cap, the surface of the protective cap is bolted with the mesh enclosure, and the protective cap is matched with the support rod for use.
Compared with the prior art, the utility model has the beneficial effects that:
this a novel floor drain device for building engineering through setting up infiltration mechanism and preventing stifled mechanism, drainage assembly can discharge water to block the infiltration, play the effect of stagnant water, go into the water subassembly and can drain the infiltration, and drain the water that needs to discharge, the bracing piece can support and spacing the screen panel, and connecting screw can support and spacing the bracing piece, and the screen panel can block the large-scale object that removes along with the rivers, avoids large-scale object to block up infiltration mechanism.
Drawings
FIG. 1 is an overall block diagram of a novel floor drain device for construction engineering according to the present utility model;
FIG. 2 is a schematic view of a drain assembly according to the present utility model;
FIG. 3 is a schematic view of the water inlet assembly of the present utility model;
FIG. 4 is a schematic structural view of a protection net according to the present utility model;
fig. 5 is a schematic structural view of an anti-blocking mechanism according to the present utility model.
In the figure, 1, a penetrating mechanism; 101. a drainage assembly; 1011. a threaded wall sewer line; 1012. waterproof wing plates; 1013. a water stop joint; 1014. a template; 102. a water inlet assembly; 1021. a threaded connecting pipe; 1022. a water discharge port; 1023. a water-blocking screen; 2. an anti-blocking mechanism; 201. a support rod; 202. a connecting screw; 203. a mesh enclosure; 3. a support plate; 4. a protective net; 5. reinforcing the pipe; 6. a water leakage port; 7. a seal ring; 8. protective cap.
Detailed Description
The present utility model will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present utility model more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
In the description of the present utility model, it should be understood that the terms "length," "width," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, merely to facilitate describing the present utility model and simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and therefore should not be construed as limiting the present utility model. Furthermore, in the description of the present utility model, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
Referring to fig. 1-5, the present utility model provides the following technical solutions: the novel floor drain device for the building engineering comprises an infiltration mechanism 1 and an anti-blocking mechanism 2, wherein the anti-blocking mechanism 2 is bolted to the top of the infiltration mechanism 1, the infiltration mechanism 1 comprises a drainage assembly 101 and a water inlet assembly 102, and the anti-blocking mechanism 2 comprises a supporting rod 201, a connecting screw 202 and a screen 203;
the water inlet assembly 102 is connected to the inner wall of the drainage assembly 101 in a threaded mode, the connecting screw 202 is connected to the top of the water inlet assembly 102 in a threaded mode, the supporting rod 201 is bolted to the top of the connecting screw 202, and the net cover 203 is bolted to the top of the supporting rod 201.
In this embodiment: through setting up infiltration mechanism 1 and preventing stifled mechanism 2, drainage assembly 101 can discharge water to block the infiltration, play the effect of stagnant water, go into water assembly 102 can drain the infiltration, and drain the water that needs to discharge, bracing piece 201 can support and spacing screen panel 203, connecting screw 202 can support and spacing bracing piece 201, screen panel 203 can block the large-scale object that removes along with the rivers, avoids large-scale object to block infiltration mechanism 1.
As a technical optimization scheme of the present utility model, the drainage assembly 101 comprises a threaded wall sewer pipe 1011, a waterproof wing plate 1012, a water stop 1013 and a template 1014, wherein the waterproof wing plate 1012 is bolted to the top of the surface of the threaded wall sewer pipe 1011, the water stop 1013 is bolted to the surface of the threaded wall sewer pipe 1011, and the template 1014 is bolted to the bottom of the surface of the threaded wall sewer pipe 1011.
In this embodiment: through setting up drainage subassembly 101, screw thread wall sewer pipe 1011 can carry out threaded connection with income water subassembly 102 to can let the height of income water subassembly 102 regulation self, waterproof pterygoid lamina 1012 can block the infiltration, avoids infiltration to take place to leak around screw thread wall sewer pipe 1011, and sealing up joint 1013 can further block the infiltration, avoids screw thread wall sewer pipe 1011 to take place to leak, and template 1014 can support and spacing screw thread wall sewer pipe 1011 when the installation, increases the stability when screw thread wall sewer pipe 1011 is connected with ground.
As a technical optimization scheme of the present utility model, the water inlet assembly 102 includes a threaded connection pipe 1021, a water drain 1022 and a water blocking screen 1023, the threaded connection pipe 1021 is in threaded connection with the inner wall of a threaded wall sewer pipe 1011, the water drain 1022 is opened on the surface of the threaded connection pipe 1021, and the water blocking screen 1023 is bolted on the top of the surface of the threaded connection pipe 1021.
In this embodiment: through setting up into water subassembly 102, threaded connection pipe 1021 can carry out threaded connection with screw thread wall sewer pipe 1011 to can change the height of self in screw thread wall sewer pipe 1011 in order to adapt to the ground of different co-altitude, drain 1022 can drain the water of infiltration ground, avoids infiltration water after the ground to last infiltration to cause and leaks, and water blocking otter board 1023 can block the debris in the threaded connection pipe 1021 drainage water, avoids debris to get into threaded connection pipe 1021.
As a technical optimization scheme of the utility model, the top of the template 1014 is bolted with a supporting plate 3, the inner wall of the supporting plate 3 is bolted with the surface of the threaded wall sewer pipeline 1011, and the supporting plate 3 is matched with the template 1014 for use.
In this embodiment: by providing the support plate 3, the junction of the additional form 1014 and the screw-wall sewer line 1011 can be reinforced and supported, increasing the structural stability of the form 1014 after being connected to the screw-wall sewer line 1011.
As a technical optimization scheme of the utility model, the top of the inner wall of the threaded connecting pipe 1021 is bolted with the protection net 4, the protection net 4 is in a cylindrical shape, and the protection net 4 is matched with the threaded connecting pipe 1021 for use.
In this embodiment: through setting up protection network 4, can carry out the coarse filtration to the liquid of screwed connection pipe 1021 drainage, block the impurity in the screwed connection pipe 1021 internal drainage liquid, avoid containing impurity water and cause the pollution to screwed connection pipe 1021.
As a technical optimization scheme of the utility model, the bottom of the water-blocking net plate 1023 is bolted with the reinforcing pipe 5, the reinforcing pipe 5 is made of stainless steel material, the top of the reinforcing pipe 5 is bolted with the connecting screw 202, and the reinforcing pipe 5 is matched with the water-blocking net plate 1023.
In this embodiment: by arranging the reinforcing pipe 5, the joint of the connecting screw 202 and the water-blocking net plate 1023 can be reinforced and supported, so that the stability of the water-blocking net plate 1023 when being connected with the connecting screw 202 is further improved, and the stainless steel material has rust resistance and higher strength.
As a technical optimization scheme of the utility model, the top of the water blocking screen 1023 is provided with the water leakage port 6, the water leakage port 6 is in a circular shape, and the water leakage port 6 is matched with the water blocking screen 1023.
In this embodiment: through setting up weeping mouth 6, can block water screen 1023 and go up the debris that flows in the liquid and further block to the ring form design can laminate the appearance that blocks water screen 1023 more, makes water screen 1023 can be more careful block debris in the liquid.
As a technical optimization scheme of the utility model, the bottom of the net cover 203 is bolted with the sealing ring 7, the sealing ring 7 is made of rubber material, the bottom of the sealing ring 7 is contacted with the top of the water-blocking net cover 1023, and the sealing ring 7 is matched with the net cover 203.
In this embodiment: by arranging the sealing ring 7, the joint of the net cover 203 and the water-blocking net cover 1023 can be sealed, and the stability of the net cover 203 in contact with the water-blocking net cover 1023 is improved.
As a technical optimization scheme of the utility model, the top of the supporting rod 201 is bolted with the protective cap 8, the surface of the protective cap 8 is bolted with the net cover 203, and the protective cap 8 is matched with the supporting rod 201.
In this embodiment: by providing the helmet 8, the joint between the mesh enclosure 203 and the support rod 201 can be protected, and the stability of the mesh enclosure 203 when connected with the support rod 201 is increased.
Working principle: first, the form 1014 is installed at the required sewer port, concrete is used to fill the surface of the threaded wall sewer line 1011, the water stop 1013 is embedded in the concrete until the concrete is flush with the waterproof wing plate 1012, then the threaded connecting pipe 1021 is screwed to the inner wall of the threaded wall sewer line 1011 until the threaded connecting pipe 1021 reaches the required height, when the excessive liquid needs to be discharged into the threaded wall sewer line 1011 and discharged, the liquid flows into the threaded connecting pipe 1021 again through the mesh enclosure 203, when the liquid passes through the mesh enclosure 203, the large object in the liquid is blocked by the mesh enclosure 203, the impurities in the liquid are blocked by the water blocking mesh enclosure 1023, finally the liquid flows into the threaded connecting pipe 1021 from the threaded connecting pipe 1021 and is discharged, when the liquid permeates the floor near the threaded connecting pipe 1021, the liquid in the floor enters the drain port 1022 and flows into the threaded connecting pipe 1021, and finally is discharged along the threaded wall sewer line 1011.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the utility model.

Claims (9)

1. The utility model provides a novel floor drain device for building engineering, includes infiltration mechanism (1) and anti-blocking mechanism (2), its characterized in that: the anti-blocking mechanism (2) is bolted to the top of the infiltration mechanism (1), the infiltration mechanism (1) comprises a drainage component (101) and a water inlet component (102), and the anti-blocking mechanism (2) comprises a supporting rod (201), a connecting screw (202) and a mesh enclosure (203);
the water inlet assembly (102) is in threaded connection with the inner wall of the water drainage assembly (101), the connecting screw (202) is in threaded connection with the top of the water inlet assembly (102), the supporting rod (201) is bolted to the top of the connecting screw (202), and the net cover (203) is bolted to the top of the supporting rod (201).
2. A novel floor drain device for construction engineering according to claim 1, characterized in that: the drainage assembly (101) comprises a threaded wall sewer pipe (1011), a waterproof wing plate (1012), a water stop joint (1013) and a template (1014), wherein the waterproof wing plate (1012) is bolted to the top of the surface of the threaded wall sewer pipe (1011), the water stop joint (1013) is bolted to the surface of the threaded wall sewer pipe (1011), and the template (1014) is bolted to the bottom of the surface of the threaded wall sewer pipe (1011).
3. A novel floor drain device for construction engineering according to claim 2, characterized in that: the water inlet assembly (102) comprises a threaded connecting pipe (1021), a water drain port (1022) and a water blocking screen plate (1023), wherein the threaded connecting pipe (1021) is in threaded connection with the inner wall of a threaded wall sewer pipeline (1011), the water drain port (1022) is formed in the surface of the threaded connecting pipe (1021), and the water blocking screen plate (1023) is bolted to the top of the surface of the threaded connecting pipe (1021).
4. A novel floor drain device for construction engineering according to claim 2, characterized in that: the top of the template (1014) is bolted with a supporting plate (3), the inner wall of the supporting plate (3) is bolted with the surface of a threaded wall sewer pipeline (1011), and the supporting plate (3) is matched with the template (1014) for use.
5. A novel floor drain device for construction engineering according to claim 3, characterized in that: the top of the inner wall of the threaded connecting pipe (1021) is bolted with a protective net (4), the protective net (4) is in a cylindrical shape, and the protective net (4) is matched with the threaded connecting pipe (1021).
6. A novel floor drain device for construction engineering according to claim 3, characterized in that: the bottom of the water-blocking net plate (1023) is bolted with a reinforcing pipe (5), the reinforcing pipe (5) is made of stainless steel materials, the top of the reinforcing pipe (5) is bolted with a connecting screw (202), and the reinforcing pipe (5) is matched with the water-blocking net plate (1023).
7. A novel floor drain device for construction engineering according to claim 3, characterized in that: the top of the water blocking net plate (1023) is provided with a water leakage port (6), the water leakage port (6) is in a circular shape, and the water leakage port (6) is matched with the water blocking net plate (1023).
8. A novel floor drain device for construction engineering according to claim 3, characterized in that: the bottom of screen panel (203) is bolted there is sealing washer (7), sealing washer (7) are made by rubber materials, the bottom of sealing washer (7) and the top contact of screen panel (1023) that blocks water, sealing washer (7) and screen panel (203) cooperation use.
9. A novel floor drain device for construction engineering according to claim 1, characterized in that: the top bolt of bracing piece (201) has helmet (8), the surface of helmet (8) is bolted with screen panel (203), helmet (8) and bracing piece (201) cooperation use.
CN202320768415.8U 2023-04-10 2023-04-10 Novel floor drain device for constructional engineering Active CN219508769U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320768415.8U CN219508769U (en) 2023-04-10 2023-04-10 Novel floor drain device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320768415.8U CN219508769U (en) 2023-04-10 2023-04-10 Novel floor drain device for constructional engineering

Publications (1)

Publication Number Publication Date
CN219508769U true CN219508769U (en) 2023-08-11

Family

ID=87530959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320768415.8U Active CN219508769U (en) 2023-04-10 2023-04-10 Novel floor drain device for constructional engineering

Country Status (1)

Country Link
CN (1) CN219508769U (en)

Similar Documents

Publication Publication Date Title
CN108679451B (en) High-rise building drainage pipeline blocking fault positioning and monitoring device
CN111424721A (en) Factory valve well type drainage structure and system
CN219508769U (en) Novel floor drain device for constructional engineering
CN216640768U (en) Reservoir and pump house system of secondary pressurization water supply and fire control
CN210976044U (en) Wall-mounted micro drainage pump station for sewage interception engineering
CN210658628U (en) Accumulated water drainer
CN210739624U (en) Novel building waterproof construction pipeline
CN214220673U (en) Energy-conserving curing means is used in construction
CN221237346U (en) Water supply and drainage pipeline for electromechanical engineering
CN217557124U (en) Floor drain device for civil engineering
CN217949294U (en) But rainwater and sewage reposition of redundant personnel's vatch basin that integrates
CN220953802U (en) Prefabricated pump station of integration
CN219623537U (en) Anti-blocking pipeline for water conservancy construction
CN220336060U (en) Integrated powered intercepting well
CN220666349U (en) Integrated prefabricated type frequency conversion water supply equipment for partition water tank
CN221219037U (en) A draw row device for irregular leakage point of hydraulic building
CN212561407U (en) Water conservancy project's water conservancy diversion formula anti-overflow dam
CN207863127U (en) Cistern
CN214169772U (en) Indoor waterproof construction for architectural design
CN211113991U (en) Pipe hanging type sewage intercepting pipeline
CN216552303U (en) Flexible diversion well modified by inspection well
CN215406333U (en) Novel toilet caisson drainage system
CN220013968U (en) Small and medium sewage lifting structure in urban sewage pipeline system
CN220486555U (en) Be used for anti integrated equipment that draws water that floats of basement
CN215585354U (en) Novel building fire control detects device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant