CN219409019U - Fixing mechanism of tower crane for building construction - Google Patents

Fixing mechanism of tower crane for building construction Download PDF

Info

Publication number
CN219409019U
CN219409019U CN202320477320.0U CN202320477320U CN219409019U CN 219409019 U CN219409019 U CN 219409019U CN 202320477320 U CN202320477320 U CN 202320477320U CN 219409019 U CN219409019 U CN 219409019U
Authority
CN
China
Prior art keywords
tower crane
base
fixed
fixing
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320477320.0U
Other languages
Chinese (zh)
Inventor
梁辰杰
刘圣付
吴军智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Dingzheng Construction Engineering Co ltd
Original Assignee
Anhui Dingzheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Dingzheng Construction Engineering Co ltd filed Critical Anhui Dingzheng Construction Engineering Co ltd
Priority to CN202320477320.0U priority Critical patent/CN219409019U/en
Application granted granted Critical
Publication of CN219409019U publication Critical patent/CN219409019U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a tower crane installation technical field, and disclose a fixed establishment of tower crane for construction, tower crane base intermediate position department welding has the solid fixed ring, gu fixed ring bottom fixedly connected with a plurality of first diagonal bars, and is a plurality of first diagonal bar end-to-end welding has the fixing base, tower crane base top is equipped with the supporting seat, the supporting seat is fixed on tower crane base top through a plurality of connecting rods, supporting seat bottom fixedly connected with a plurality of second diagonal bars, tower crane base bottom fixedly connected with a plurality of fixed plates, the fixing base bottom is equipped with the installation component, the installation component includes the base, the welding of base top has a plurality of threaded rods, and is a plurality of the threaded rods pass fixing base and a plurality of fixed plates respectively, and this scheme has increased the installation area of tower crane base bottom when the tower crane installation through design installation component to make the whole atress of tower crane more even, thereby improve the stability when the tower crane is installed.

Description

Fixing mechanism of tower crane for building construction
Technical Field
The application relates to the technical field of tower crane installation, in particular to a fixing mechanism of a tower crane for building construction.
Background
The tower crane is the most common lifting equipment on the construction site, is also called as a tower crane, and is a tower body lifting mechanism formed by bearing arm support, pull ropes, balance arms, a revolving tower, a turntable, a base and other parts. The tower crane is one of the indispensable equipment on the building site, and is usually used for hoisting and transporting raw materials for construction such as steel bars, wood ribs, concrete, steel pipes and the like in the building construction. The tower crane base is the root of the tower crane, and the tower crane base can influence the overall stability of the tower crane. At present, the tower crane is large in height, so that the bottom base is more stressed after installation, and the existing tower crane is installed by adopting a bolt assembly, and is not provided with other mechanism auxiliary bases for stress, so that the tower crane base is large in stress, the overall stability of the tower crane is influenced, and the tower crane can be inclined and offset and the like. Therefore, a fixing mechanism of a tower crane for building construction is provided for solving the problems.
Disclosure of Invention
In order to solve the problem, the application provides a fixing mechanism of a tower crane for building construction.
The application provides a fixed establishment of tower crane for construction adopts following technical scheme:
the utility model provides a fixed establishment of tower crane for construction, includes the tower crane base that sets up concrete base top, tower crane base intermediate position department welding has the solid fixed ring, gu fixed ring bottom fixedly connected with a plurality of first diagonal rods, a plurality of first diagonal rod end welding has the fixing base, tower crane base top is equipped with the supporting seat, the supporting seat is fixed on tower crane base top through a plurality of connecting rods, supporting seat bottom fixedly connected with a plurality of second diagonal rods, and is a plurality of the second diagonal rod is fixed at gu fixed ring top, tower crane base bottom fixedly connected with a plurality of fixed plates, the fixing base bottom is equipped with the installation component, the installation component is used for the installation of tower crane.
Preferably, the installation component includes the base, base top welding has a plurality of threaded rods, tower crane base and fixing base all set up at the base top, and a plurality of the threaded rod passes fixing base and a plurality of fixed plate respectively.
Preferably, the fixing seat and the supporting seat are symmetrically arranged, and the tower crane base is arranged between the fixing seat and the supporting seat.
Preferably, the base is X-shaped, and the base is fixed inside the concrete base through pouring.
Preferably, the bottom of the tower crane base is arranged inside the fixing seat, and the fixing seat and the plurality of fixing plates are respectively fixed at the top of the base through nuts.
In summary, the present application includes the following beneficial technical effects:
through design installation component, when the tower crane is installed, fix fixing base and a plurality of fixed plates on the base through the cooperation of threaded rod and nut, thereby increase the installation area of tower crane base bottom, and after other parts of tower crane are installed, bear the weight of other parts of tower crane through the supporting seat, on transmitting solid fixed ring through a plurality of second diagonal bars, share the pressure that receives on the solid fixed ring through first diagonal bar and fixing base, adopt this kind of design to make the installation area that has increased tower crane base bottom, and make the whole atress of tower crane more even, thereby stability when improving the tower crane installation.
Drawings
Fig. 1 is a schematic diagram of the overall structure of a fixing mechanism of a tower crane for construction according to an embodiment of the application.
Fig. 2 is a schematic top structure of a fixing mechanism of a tower crane for construction according to an embodiment of the application.
Fig. 3 is a schematic structural view of an installation assembly of a fixing mechanism of a tower crane for construction according to an embodiment of the application.
Reference numerals illustrate: 1. a tower crane base; 2. a fixing ring; 3. a first diagonal bar; 4. a fixing seat; 5. a support base; 6. a connecting rod; 7. a fixing plate; 8. a mounting assembly; 9. a second diagonal bar; 10. a base; 11. a threaded rod; 12. and (3) a nut.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-3.
The embodiment of the application discloses a fixed establishment of tower crane for construction, the installation of tower crane is fixed in the construction place of using. Referring to FIGS. 1-2, including the tower crane base 1 that sets up concrete base top, tower crane base 1 is not excessively repeated for prior art product, be convenient for follow-up to the installation of other parts of tower crane through installing tower crane base 1, (the installation of other parts of tower crane is prior art, do not excessively repeated for it), tower crane base 1 intermediate position department welding has solid fixed ring 2, gu fixed ring 2 is made by the metal, gu the installation of other parts of being convenient for through solid fixed ring 2, gu fixed ring 2 bottom fixedly connected with a plurality of first diagonal rods 3, first diagonal rods 3 are made by the metal, be convenient for fixing base 4's installation through first diagonal rods 3, simultaneously can share the holistic atress of device, a plurality of first diagonal rods 3 end welding has fixing base 4, make tower crane base 1 install more stable through fixing base 4, tower crane base 1 top is equipped with supporting seat 5, improve tower crane base 1 holistic bearing capacity through supporting seat 5, make its bottom other parts install more stable, fixing base 4 and supporting seat 5 symmetry set up, tower crane base 1 bottom sets up in fixing base 4, tower crane base 1 sets up in fixing base 4, be convenient for, fixing base 4 bottom is provided with a plurality of second diagonal rods 3, be connected with a plurality of supporting seat 9 through a plurality of supporting seat 5 to the second diagonal rods 9, make the bearing base 9 through a plurality of supporting seat 9, make the bearing base 9 on the top of fixing base 9, and the second diagonal rods are connected with a plurality of supporting base 9, make the top 9 through a plurality of supporting base 9, the tower crane base 1 bottom fixedly connected with a plurality of fixed plates 7, a plurality of fixed plates 7 welding is in tower crane base 1 bottom, and is equipped with the through-hole on a plurality of fixed plates 7, makes things convenient for the installation of tower crane base 1, and fixing base 4 bottom is equipped with installation component 8, is convenient for the installation of tower crane base 1 through installation component 8 for the tower crane installation is more stable.
Install other parts of tower crane at tower crane base 1 top, bear the weight of other parts of tower crane through supporting seat 5, transmit to solid fixed ring 2 through a plurality of second diagonal rods 9, share the pressure that receives on the solid fixed ring 2 through first diagonal rod 3 and fixing base 4 for thereby the atress is more even improves the stability of other parts installation of tower crane.
Referring to fig. 3, the installation component 8 includes base 10, base 10 is the X type, and base 10 is fixed inside the concrete base through pouring, be convenient for the installation of tower crane base 1 and fixing base 4 through base 10, base 10 top welding has a plurality of threaded rods 11, be convenient for the installation of fixing base 4 and a plurality of fixed plate 7 through a plurality of threaded rods 11, tower crane base 1 and fixing base 4 all set up at the base 10 top, a plurality of threaded rods 11 pass fixing base 4 and a plurality of fixed plate 7 respectively, fixing base 4 and a plurality of fixed plate 7 are fixed at the base 10 top through nut 12 respectively, cooperation through threaded rod 11 and nut 12 fixes fixing base 4 and a plurality of fixed plate 7 on base 10, thereby increase the installation area of tower crane base 1 bottom, share the pressure on a plurality of fixed plate 7 through fixing base 4 simultaneously, make tower crane base 1 installation more stable.
The implementation principle of the fixing mechanism of the tower crane for building construction is as follows: during the use, fix fixing base 4 and a plurality of fixed plates 7 on base 10 through the cooperation of threaded rod 11 and nut 12 to increase the installation area of tower crane base 1 bottom, make tower crane base 1 installation more stable, install other parts of tower crane at tower crane base 1 top again, bear the weight of other parts of tower crane through supporting seat 5, on conveying fixed ring 2 through a plurality of second diagonal rods 9, share the pressure that receives on the fixed ring 2 through first diagonal rod 3 and fixing base 4, thereby make the atress more even improves the stability of other parts installations of tower crane.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. And the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus;
secondly, unless specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be mechanical or electrical, or may be a communication between two elements, and may be a direct connection, "upper," "lower," "left," "right," etc. merely indicate relative positional relationships, where the relative positional relationships may change when the absolute position of the object being described changes;
finally, in the drawings of the disclosed embodiments, only the structures related to the embodiments of the present disclosure are referred to, and other structures may refer to the general design, so that the same embodiment and different embodiments of the present disclosure may be combined with each other without conflict.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a fixed establishment of tower crane for construction, including setting up tower crane base (1) at concrete base top, its characterized in that: the utility model discloses a tower crane base, including tower crane base (1), fixed ring (2) bottom fixedly connected with a plurality of first inclined bars (3), a plurality of first inclined bar (3) end-to-end welding has fixing base (4), tower crane base (1) top is equipped with supporting seat (5), supporting seat (5) are fixed on tower crane base (1) top through a plurality of connecting rods (6), supporting seat (5) bottom fixedly connected with a plurality of second inclined bars (9), a plurality of second inclined bars (9) are fixed at fixed ring (2) top, tower crane base (1) bottom fixedly connected with a plurality of fixed plates (7), fixing base (4) bottom is equipped with installation component (8), installation component (8) are used for the installation of tower crane.
2. The fixing mechanism of a tower crane for building construction according to claim 1, wherein: the installation component (8) includes base (10), base (10) top welding has a plurality of threaded rods (11), tower crane base (1) all set up at base (10) top with fixing base (4), a plurality of threaded rods (11) pass fixing base (4) and a plurality of fixed plate (7) respectively.
3. The fixing mechanism of a tower crane for building construction according to claim 1, wherein: the fixed seat (4) and the supporting seat (5) are symmetrically arranged, and the tower crane base (1) is arranged between the fixed seat (4) and the supporting seat (5).
4. The fixing mechanism of a tower crane for building construction according to claim 2, wherein: the base (10) is X-shaped, and the base (10) is fixed inside the concrete base through pouring.
5. The fixing mechanism of a tower crane for building construction according to claim 2, wherein: the bottom of the tower crane base (1) is arranged inside the fixed seat (4), and the fixed seat (4) and the plurality of fixed plates (7) are respectively fixed at the top of the base (10) through nuts (12).
CN202320477320.0U 2023-03-14 2023-03-14 Fixing mechanism of tower crane for building construction Active CN219409019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320477320.0U CN219409019U (en) 2023-03-14 2023-03-14 Fixing mechanism of tower crane for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320477320.0U CN219409019U (en) 2023-03-14 2023-03-14 Fixing mechanism of tower crane for building construction

Publications (1)

Publication Number Publication Date
CN219409019U true CN219409019U (en) 2023-07-25

Family

ID=87208619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320477320.0U Active CN219409019U (en) 2023-03-14 2023-03-14 Fixing mechanism of tower crane for building construction

Country Status (1)

Country Link
CN (1) CN219409019U (en)

Similar Documents

Publication Publication Date Title
CN201116267Y (en) Externally hung supporting device for internally climbing tower crane
CN211143305U (en) Steel structure building
CN202953748U (en) Wall-attached structure of overhanging external hanging type self-climbing tower crane
CN215564736U (en) Temporary supporting system for overweight steel beam
CN219409019U (en) Fixing mechanism of tower crane for building construction
CN210064895U (en) Installation hoist of prefabricated unit in space
CN202072386U (en) Lifting appliance for lifting raft foundation reinforcement cage of containment vessel of nuclear power station
CN215160506U (en) Tower crane assembled tower crane for construction of anti-wind type
CN110805258A (en) Double-triangular-support elevator shaft operating platform and construction method
CN214939431U (en) Auxiliary structure for disassembling and assembling single-tower cable-stayed steel box girder bridge floor
CN215671292U (en) Prefabricated wallboard supporting system
CN201411926Y (en) Arc beam hoisting structure
CN203225074U (en) Advertising board of net rack structure
CN202745351U (en) Bailey truss supporting structure
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN214167178U (en) Tower crane strutting arrangement
CN212507060U (en) Special prefabricated crashproof column base of assembled steel construction factory building
CN211419401U (en) External hanging type movable arm tower crane supporting device
CN110844804B (en) Supporting construction method of ultra-long truss type tower crane attachment system
CN213064864U (en) Adjustable bottom support device for gas pipeline
CN210714079U (en) Reinforced connecting device for additionally mounting new enclosure on existing enclosure
CN216195399U (en) Novel steel construction of quick construction
CN217437457U (en) Simple and easy just be convenient for installation construction lift attachment device
CN117071913B (en) Steel construction cantilever steel bar truss building carrier plate hanging die construction device
CN218813150U (en) Prefabricated pier stud

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant