CN219179473U - Smart electric meter that can carry out inside telescopic installation - Google Patents

Smart electric meter that can carry out inside telescopic installation Download PDF

Info

Publication number
CN219179473U
CN219179473U CN202223298992.XU CN202223298992U CN219179473U CN 219179473 U CN219179473 U CN 219179473U CN 202223298992 U CN202223298992 U CN 202223298992U CN 219179473 U CN219179473 U CN 219179473U
Authority
CN
China
Prior art keywords
rod
overturning
reinforcing
shaped
electric meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223298992.XU
Other languages
Chinese (zh)
Inventor
闫惠欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Quanlian Jilin Province Electricity Sales Operation Co ltd
Original Assignee
China Merchants Quanlian Jilin Province Electricity Sales Operation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Quanlian Jilin Province Electricity Sales Operation Co ltd filed Critical China Merchants Quanlian Jilin Province Electricity Sales Operation Co ltd
Priority to CN202223298992.XU priority Critical patent/CN219179473U/en
Application granted granted Critical
Publication of CN219179473U publication Critical patent/CN219179473U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/30Smart metering, e.g. specially adapted for remote reading

Landscapes

  • Details Of Measuring And Other Instruments (AREA)

Abstract

The utility model discloses a smart electric meter capable of being installed in an internal telescopic manner, and particularly relates to the technical field of smart electric meters. According to the utility model, through arranging the supporting components and corresponding matched use of each structure, the mounting box can drive the overturning L rod to rotate along the axis point of the joint of the overturning L rod and the reinforcing towing rod when in displacement, so that the mounting box can perform telescopic displacement movement, thereby facilitating the disassembly and installation of electric elements required by a main body of the intelligent electric meter by workers, and meanwhile, the limiting frame is arranged between the two overturning L rods and is used for ensuring the stability of the safety box when the two overturning L rods are simultaneously displaced, and the safety box is convenient to use and has good practicability.

Description

Smart electric meter that can carry out inside telescopic installation
Technical Field
The utility model relates to the technical field of intelligent electric meters, in particular to an intelligent electric meter capable of being installed in an internal telescopic mode.
Background
At present, an intelligent electric energy meter for resident clients adopts a digital metering technology, is composed of a measuring unit, a data processing unit, a communication unit and the like, and has the functions of electric energy metering, data processing, real-time monitoring, automatic control, information interaction and the like.
The utility model patent of patent application number CN201820900728.3 discloses a smart electric meter convenient to install, including the mount pad and be located the smart electric meter body of mount pad one side, be equipped with wireless communication module on the smart electric meter body, two spacing grooves have been seted up to one side that the mount pad is close to the smart electric meter body, one side that the smart electric meter body is close to the mount pad fixed mounting has two stopper, and stopper movable mounting is in corresponding spacing groove, the draw-in groove has all been seted up to one side that two stopper kept away from each other, first recess has all been seted up on the one side inner wall that two spacing grooves kept away from each other, the pivot is installed in first recess rotation, screw hole has all been seted up to one end that two pivots are close to each other, screw rod is installed to the screw hole internal thread, two one end that screw rod are close to each other all fixed mounting has the bayonet lock, and bayonet lock looks clamping;
the structure is convenient in use and installation, but needs to be broken off with a large force to one side in disassembly, so that the mounting seat is easy to damage, and the electric shock is easy to cause due to the fact that the ammeter is communicated with the electric wire and is in direct contact disassembly.
Disclosure of Invention
The technical scheme of the utility model aims at the technical problem that the prior art is too single, and provides a solution which is obviously different from the prior art. In order to overcome the above-mentioned drawbacks of the prior art, the present utility model provides a smart meter capable of being installed in an internal telescopic manner, which aims to solve the above-mentioned problems in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a smart electric meter that can carry out inside telescopic installation, includes smart electric meter main part, the inside of smart electric meter main part is provided with supporting component;
the support assembly comprises a support frame arranged in the intelligent ammeter main body, two ends of the support frame are respectively provided with a reinforcing towing bar through bolts, the tops of the reinforcing towing bars are respectively provided with an overturning L-shaped bar through shaft pins in movable connection, and one ends of the overturning L-shaped bars are respectively provided with a limiting frame
One side of one of the two turnover L rods is provided with a reinforcing piece which is arranged on the reinforcing towing rod, one end of the reinforcing piece is provided with an arc reinforcing plate with an arc-shaped section, a chute is arranged on the arc reinforcing plate in a penetrating way, and a guide rod which is arranged on the turnover L rod is connected in a sliding way;
the support assembly further comprises a connecting rod arranged at the end part of the overturning L-shaped rod, one end of the connecting rod is provided with a supporting plate, one side of the supporting plate is provided with a mounting box, a plurality of partition plates which are arranged in a staggered mode are arranged in the mounting box, the partition plates are detachably connected with the mounting box through bolts, and a mounting cavity is formed between two adjacent partition plates;
the section shape of the overturning L-shaped rod is L-shaped, and the connecting rod is in interactive connection with the overturning L-shaped rod through a shaft pin.
Preferably, a cover plate is arranged on one side of the surface of the intelligent ammeter main body, and the cover plate is movably connected with the intelligent ammeter main body through a hinge.
The utility model has the technical effects and advantages that:
compared with the prior art, the intelligent ammeter is simple in overall design and reasonable in structure, through corresponding matching of all structures, the mounting box can drive the overturning L rod to rotate along the axis point of the connecting part of the overturning L rod and the reinforcing towing rod when in displacement, so that the mounting box can perform telescopic displacement movement, and workers can conveniently detach and mount electric elements required by the intelligent ammeter main body;
the guide rod is guided and limited through the inner wall of the sliding groove, so that the effect of guiding and limiting the stroke of the overturning L rod during rotation is realized, the stability of the supporting plate, the connecting rod and the mounting box during displacement is ensured, meanwhile, the limiting frame is arranged between the two overturning L rods and used for lacking the stability of the two overturning L rods during simultaneous displacement, and the stability of the safety box during telescopic displacement movement from the intelligent ammeter main body can be ensured;
simultaneously through the setting of a plurality of division board for can install in the installation cavity that forms through the division board when the required electrical component of smart electric meter main part is installed, carry out the function of carding when realizing each electrical component installation, have good practicality in the time of facilitate the use.
Drawings
In order to more clearly illustrate the technical solutions of the present disclosure, the drawings that need to be used in some embodiments of the present disclosure will be briefly described below, and it is apparent that the drawings in the following description are only drawings of some embodiments of the present disclosure, and other drawings may be obtained according to these drawings to those of ordinary skill in the art. Furthermore, the drawings in the following description may be regarded as schematic diagrams, not limiting the actual size of the products, the actual flow of the methods, the actual timing of the signals, etc. according to the embodiments of the present disclosure.
Fig. 1 is a front view of the overall structure of the present utility model.
Fig. 2 is a cross-sectional view of the overall structure of the present utility model.
Figure 3 is a side view of the support assembly of the present utility model.
Fig. 4 is an exploded view of the support assembly of the present utility model.
The reference numerals are: 1. a smart meter body; 2. a support frame; 3. reinforcing the towing bar; 4. a limit frame; 5. turning over the L-shaped rod; 6. a reinforcing member; 7. an arc-shaped reinforcing plate; 8. a chute; 9. a guide rod; 10. a support plate; 11. a connecting rod; 12. a mounting box; 13. a partition plate; 14. and a cover plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In an embodiment, as shown in fig. 1-4, in a smart meter capable of being installed in an internal telescopic manner, through a support component arranged on a smart meter main body 1, when electric elements such as an aluminum disc, a current-voltage coil, a permanent magnet and the like required by the smart meter main body 1 are installed, an installation box 12 can be pulled out from the smart meter main body 1, so that a worker can conveniently disassemble and install the smart meter, and the specific structure of the component is as follows;
the supporting component comprises a supporting frame 2 arranged in a main body 1 of the intelligent electric meter, two ends of the supporting frame 2 are respectively provided with a reinforcing towing bar 3 through bolts, the tops of the two reinforcing towing bars 3 are respectively provided with a turnover L-shaped bar 5 through shaft pin movable connection, and one ends of the two turnover L-shaped bars 5 are respectively provided with a limiting frame 4
One side of one of the two turnover L rods 5 is provided with a reinforcing piece 6 arranged on the reinforcing towing rod 3, one end of the reinforcing piece 6 is provided with an arc-shaped reinforcing plate 7 with an arc-shaped section, a chute 8 is arranged on the arc-shaped reinforcing plate 7 in a penetrating way, and a guide rod 9 arranged on the turnover L rod 5 is connected in a sliding way in the chute 8;
the support assembly further comprises a connecting rod 11 arranged at the end part of the overturning L rod 5, one end of the connecting rod 11 is provided with a supporting plate 10, one side of the supporting plate 10 is provided with an installation box 12, a plurality of partition plates 13 which are arranged in a staggered mode are arranged in the installation box 12, the partition plates 13 are detachably connected with the installation box 12 through bolts, and an installation cavity is formed between two adjacent partition plates 13;
the section shape of the overturning L-shaped rod 5 is L-shaped, and the connecting rod 11 is in interactive connection with the overturning L-shaped rod 5 through a shaft pin.
According to the structure, when the intelligent ammeter is used for installing electric elements such as an aluminum disc, a current-voltage coil, a permanent magnet and the like required by the intelligent ammeter main body 1, the installation box 12 is pulled, the connection rod 11 is driven to displace when the installation box 12 displaces, and the turnover L rod 5 is driven to rotate along the axis point of the connection part of the turnover L rod 5 and the reinforcing towing rod 3 when the connection rod 11 displaces;
when the turnover L rod 5 rotates, the guide rod 9 is driven to displace when the turnover L rod 5 rotates through the arrangement of the guide rod 9, so that the installation box 12 and the partition plate 13 extend out of the intelligent ammeter main body 1, and meanwhile, the guide rod 9 is guided and limited through the inner wall of the chute 8, so that the effect of guiding and limiting the stroke of the turnover L rod 5 during rotation is realized, and the stability of the support plate 10, the connecting rod 11 and the installation box 12 during displacement is ensured;
the limiting frame 4 is arranged between the two overturning L rods 5 and is used for lacking the stability of the two overturning L rods 5 during simultaneous displacement, and the stability of the safety boxing 12 during telescopic displacement movement from the intelligent ammeter main body 1 can be ensured through the arrangement of the limiting frame 4;
and through the setting of a plurality of division board 13 for each electrical components such as required aluminium dish of smart electric meter main part 1, current voltage coil, permanent magnet can install in the installation cavity that forms through division board 13 when installing, realize the function of carding when installing each electrical components.
Referring to fig. 1, a cover plate 14 is provided on one side of the surface of a smart meter body 1, and the cover plate 14 is movably connected with the smart meter body 1 through a hinge;
it is to be added that, through the setting of apron 14, can play the effect of protection to the inside each structure of smart electric meter main part 1, also conveniently open the apron 14 simultaneously to the construction in the smart electric meter main part 1.
In other words, the utility model discloses a smart electric meter that can carry out inside telescopic installation, it is rotatory to drive upset L pole 5 through the displacement of mounting box 12 for mounting box 12 can carry out telescopic displacement motion, so that the staff carries out demountable installation to the required electrical component of smart electric meter main part 1.
The foregoing is only illustrative of the preferred embodiments of the present utility model and is not to be construed as limiting the utility model, but rather as various modifications, equivalent arrangements, improvements, etc., within the spirit and principles of the present utility model.

Claims (6)

1. The utility model provides a smart electric meter that can carry out inside telescopic installation, includes smart electric meter main part (1), its characterized in that: a supporting component is arranged in the intelligent ammeter main body (1);
the support assembly comprises a support frame (2) arranged in a main body (1) of the intelligent electric meter, two ends of the support frame (2) are respectively provided with a reinforcing towing bar (3) through bolts, the tops of the reinforcing towing bars (3) are respectively and movably connected with an overturning L-shaped bar (5) through shaft pins, and one ends of the overturning L-shaped bars (5) are respectively provided with a limiting frame (4)
One side of one of the two turnover L rods (5) is provided with a reinforcing piece (6) arranged on the reinforcing towing rod (3), one end of the reinforcing piece (6) is provided with an arc reinforcing plate (7) with an arc-shaped cross section, a chute (8) is formed in the arc reinforcing plate (7) in a penetrating mode, and a guide rod (9) arranged on the turnover L rod (5) is connected in a sliding mode in the chute (8).
2. The internally telescoping mounted smart meter of claim 1, wherein: the support assembly further comprises a connecting rod (11) arranged at the end part of the overturning L-shaped rod (5), and a support plate (10) is arranged at one end of the connecting rod (11).
3. The internally telescoping mounted smart meter of claim 2, wherein: one side of the supporting plate (10) is provided with an installation box (12), and a plurality of partition plates (13) which are arranged in a staggered mode are arranged in the installation box (12).
4. A smart meter with internal telescopic mounting according to claim 3, wherein: the separation plates (13) are detachably connected with the installation boxes (12) through bolts, and an installation cavity is formed between two adjacent separation plates (13).
5. The internally telescoping mounted smart meter of claim 1, wherein: the intelligent ammeter is characterized in that a cover plate (14) is arranged on one side of the surface of the intelligent ammeter main body (1), and the cover plate (14) is movably connected with the intelligent ammeter main body (1) through a hinge.
6. The internally telescoping mounted smart meter of claim 2, wherein: the section shape of the overturning L-shaped rod (5) is L-shaped, and the connecting rod (11) is in interactive connection with the overturning L-shaped rod (5) through a shaft pin.
CN202223298992.XU 2022-12-09 2022-12-09 Smart electric meter that can carry out inside telescopic installation Active CN219179473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223298992.XU CN219179473U (en) 2022-12-09 2022-12-09 Smart electric meter that can carry out inside telescopic installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223298992.XU CN219179473U (en) 2022-12-09 2022-12-09 Smart electric meter that can carry out inside telescopic installation

Publications (1)

Publication Number Publication Date
CN219179473U true CN219179473U (en) 2023-06-13

Family

ID=86660559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223298992.XU Active CN219179473U (en) 2022-12-09 2022-12-09 Smart electric meter that can carry out inside telescopic installation

Country Status (1)

Country Link
CN (1) CN219179473U (en)

Similar Documents

Publication Publication Date Title
CN219179473U (en) Smart electric meter that can carry out inside telescopic installation
CN216355354U (en) Automatic switch board that opens door
CN116706614A (en) Combined copper bar with fastening connection structure
CN109244910A (en) A kind of assembly tooling for switchgear
CN214589926U (en) Switch board convenient to dismantle and overhaul
CN208352764U (en) One kind can open cap structure for cabinet body main bus-bar room
CN215415676U (en) Intelligent substation local relay protection test device
CN216055815U (en) Combined multifunctional intelligent low-voltage switch cabinet
CN217934597U (en) Shielding high-voltage contact box
CN221150635U (en) Power distribution cabinet
CN220190602U (en) Explosion-proof aluminum shell motor convenient to overhaul
CN220872549U (en) Portable multi-loop direct current electric energy meter
CN215731525U (en) Circuit breaker on post convenient to stable installation
CN218731970U (en) Improved hopper socket box
CN210467686U (en) Mining phase-change vacuum contactor
CN220872600U (en) Distribution equipment fault monitoring device in electric power distribution network
CN220797445U (en) Novel guide rail structure of switch board
CN213905948U (en) Electric automatization switch board
CN218182716U (en) Five-prevention interlocking belt isolation fixed metering cabinet
CN217934656U (en) Convenient building electrical power distribution cabinet who overhauls
CN220291368U (en) Low-voltage metering inlet wire cabinet
CN203070995U (en) Three-position isolation switch
CN221224838U (en) Single-phase intelligent ammeter structure convenient to installation
CN212412536U (en) Base station differentiation is equipped with electric equipment and is divided family control and metering device
CN219041021U (en) Novel remote control electric insulation grounding operating rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant