CN219173954U - Quick pay-off of building engineering foundation ditch - Google Patents

Quick pay-off of building engineering foundation ditch Download PDF

Info

Publication number
CN219173954U
CN219173954U CN202320218387.2U CN202320218387U CN219173954U CN 219173954 U CN219173954 U CN 219173954U CN 202320218387 U CN202320218387 U CN 202320218387U CN 219173954 U CN219173954 U CN 219173954U
Authority
CN
China
Prior art keywords
fixedly connected
bearing plate
fixed
plate
pay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320218387.2U
Other languages
Chinese (zh)
Inventor
雷新
褚志远
李玟龙
吴灏斌
殷林林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202320218387.2U priority Critical patent/CN219173954U/en
Priority to JP2023001661U priority patent/JP3242809U/en
Application granted granted Critical
Publication of CN219173954U publication Critical patent/CN219173954U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a rapid paying-off device for a building engineering foundation pit, which relates to the technical field of paying-off devices and comprises a bearing plate, wherein the lower end of the bearing plate is fixedly connected with a roller, the upper end of one side of the bearing plate is fixedly connected with a handrail, the upper end of the middle of the bearing plate is fixedly provided with a motor, one side of the motor is provided with a fixed baffle, and one side of the fixed baffle is fixedly connected with a rotating rod. According to the utility model, under the combined action of the motor, the fixed baffle, the movable baffle, the adjusting rotating handle and the movable rod, the device has the functions of taking up and paying off, meanwhile, the measuring rope drum is convenient to detach and replace, under the combined action of the mounting frame, the electric sliding block, the positioning circular ring and the first clamping bolt, the device can pay off automatically, meanwhile, the measuring rope is prevented from piling and winding during collection, and under the combined action of the lifting device, the rotating frame and the guide wheel, the height and the azimuth of the lead frame can be adjusted as required during the use.

Description

Quick pay-off of building engineering foundation ditch
Technical Field
The utility model relates to the technical field of paying-off devices, in particular to a rapid paying-off device for a foundation pit of a building engineering.
Background
The building engineering is one part of the construction engineering, and refers to engineering entities formed by building various house buildings and auxiliary facilities thereof and installing and moving lines, pipelines and equipment matched with the building buildings and the auxiliary facilities. Including factory buildings, theatres, hotels, shops, schools, hospitals, houses, etc., which meet the needs of people in production, living, learning, public activities, etc. The foundation pit is an underground space excavated for constructing a building foundation and a basement, and is applied to constructional engineering. In the construction process of building engineering, the line is paid out in a foundation pit to be measured for the next construction. The following problems exist in the prior art:
for example, a quick pay-off device for a foundation pit of a constructional engineering in China (publication No. CN114604697A, application date 2022.04.08) comprises a supporting bottom plate and a pay-off assembly, wherein the pay-off assembly is arranged at the upper end of the supporting bottom plate and is used for paying out a line for detecting verticality in the construction process of the foundation pit; the winding drum is arranged at the upper end of the supporting bottom plate and is used for winding the measuring rope, the winding drum is fixedly connected to the output end of the winding motor, the lower end of the winding motor is fixedly connected with a first supporting rod for supporting, and the end head of the measuring rope is fixedly connected with a weight block; the pay-off assembly comprises a tightening assembly and a distance adjusting assembly, wherein the tightening assembly is used for enabling the winding drum to tightly wind the measuring rope, and the distance adjusting assembly is used for adjusting the distance of the measuring rope according to requirements. Similar structural design, use for a long time and lead to measuring rope wearing and tearing to scrap the back, can't dismantle the change to a receipts line section of thick bamboo, manual accurate unwrapping wire when measuring simultaneously, unwrapping wire too much leads to the use extremely inconvenient easily.
Disclosure of Invention
In order to solve the technical problems, the utility model adopts the following technical scheme:
the utility model provides a swift pay-off of building engineering foundation ditch, includes the bearing plate, the lower extreme fixedly connected with gyro wheel of bearing plate, one side upper end fixedly connected with handrail of bearing plate, the middle upper end fixedly connected with motor of bearing plate, one side of motor is provided with fixed stop, one side fixedly connected with bull stick of fixed stop, the one end of bull stick is provided with movable baffle, one side internally mounted of movable baffle has the regulation to change the handle, fixed stop's upper end is provided with the mounting bracket, the lower extreme outside fixed mounting of mounting bracket has first latch, the opposite side upper end fixed mounting of bearing plate has elevating gear.
The technical scheme of the utility model is further improved as follows: the movable baffle is characterized in that a sliding plate is fixedly connected to the outer side of the lower end of the movable baffle, a clamping groove is formed in the outer side of the sliding plate, and a fixing plate is fixedly connected to the outer side of the movable baffle.
The technical scheme of the utility model is further improved as follows: the movable rod is arranged inside penetrating through one end of the fixed plate, a spring is sleeved outside the lower end of the movable rod, and the lower end of the movable rod is fixedly connected with a bottom block.
The technical scheme of the utility model is further improved as follows: the upper end of the mounting frame is internally provided with a sliding groove, the upper end of the mounting frame is fixedly provided with an electric sliding block, the number of the first clamping bolts is two, and the two groups of the first clamping bolts are respectively arranged on two sides of the lower end of the mounting frame.
The technical scheme of the utility model is further improved as follows: the lower extreme fixedly connected with connecting block of electronic slider, the lower extreme fixedly connected with location ring of connecting block.
The technical scheme of the utility model is further improved as follows: the outside of elevating gear is provided with the second latch, elevating gear's last fixedly connected with swivel mount, the inside fixed mounting of swivel mount has the leading wheel.
The technical scheme of the utility model is further improved as follows: the bottom of swivel mount is provided with the pivot, elevating gear passes through pivot and swivel mount fixed connection, the quantity of leading wheel is two sets of.
By adopting the technical scheme, compared with the prior art, the utility model has the following technical progress:
1. the utility model provides a rapid paying-off device for a building engineering foundation pit, which has the functions of taking up and paying off under the combined action of a motor, a fixed baffle, a movable baffle, an adjusting rotating handle and a movable rod, and is convenient to detach and replace a measuring rope drum, the motor drives a rotating rod to fixedly rotate on the inner sides of the fixed baffle and the movable baffle, the adjusting rotating handle is arranged on the outer side of the movable baffle, so that the rapid paying-off is convenient to accurately adjust, the movable rod is fixedly connected with the movable baffle through the fixed plate, when the line drum is installed, a bottom block is driven to leave a bearing plate through pulling up the movable rod, the movable baffle fixed line drum is moved, and the spring arranged between the movable rod and the bottom block is utilized to enable the bottom block to rebound to be fixed with the bearing plate, so that the line drum is installed and fixed, the convenience of the movable baffle is improved, the size can be adjusted according to needs, and the practicability of the device is improved.
2. The utility model provides a rapid paying-off device for a building engineering foundation pit, which can automatically pay off under the combined action of a mounting frame, an electric sliding block, a positioning circular ring and a first clamping bolt, meanwhile, the phenomenon that measurement ropes are piled up and wound during collection is avoided, the mounting frame is connected to the upper ends of a fixed baffle plate and a movable baffle plate, the lower ends of the two sides of the mounting frame are respectively fixed with the fixed baffle plate and the movable baffle plate by the first clamping bolt, the electric sliding block is arranged at the upper end of the mounting frame, and the electric sliding block drives the positioning circular ring to move left and right in the inner side of the mounting frame, so that the phenomenon that the measurement ropes are piled up during collection and influence on subsequent use is effectively avoided.
3. The utility model provides a rapid paying-off device for a foundation pit of a building engineering, which can adjust the height and the azimuth of a lead frame as required in the use process under the combined action of a lifting device, a rotating frame and a guide wheel.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a rapid paying-off device for a foundation pit of a building engineering;
FIG. 2 is a schematic structural view of a winding drum of the rapid paying-off device for a foundation pit of the building engineering;
FIG. 3 is a schematic diagram of a positioning ring structure of the rapid paying-off device for a foundation pit of the building engineering;
fig. 4 is a schematic diagram of a lead frame structure of the rapid paying-off device for a foundation pit in the building engineering.
In the figure: 1. a bearing plate; 2. a roller; 3. an armrest; 4. a motor; 5. a fixed baffle; 6. a rotating rod; 7. a movable baffle; 8. adjusting a rotating handle; 9. a clamping groove; 10. a slide plate; 11. a fixing plate; 12. a movable rod; 13. a spring; 14. a bottom block; 15. a mounting frame; 16. an electric slide block; 17. a connecting block; 18. positioning a circular ring; 19. a first latch; 20. a lifting device; 21. a second latch; 22. a rotating frame; 23. and a guide wheel.
Detailed Description
The utility model is further illustrated by the following examples:
example 1
As shown in fig. 1-4, the utility model provides a rapid paying-off device for a foundation pit of a building engineering, which comprises a bearing plate 1, wherein the lower end of the bearing plate 1 is fixedly connected with a roller 2, the upper end of one side of the bearing plate 1 is fixedly connected with a handrail 3, the middle upper end of the bearing plate 1 is fixedly provided with a motor 4, one side of the motor 4 is provided with a fixed baffle 5, one side of the fixed baffle 5 is fixedly connected with a rotating rod 6, one end of the rotating rod 6 is provided with a movable baffle 7, one side of the movable baffle 7 is internally and fixedly provided with an adjusting rotating handle 8, the outer side of the lower end of the movable baffle 7 is fixedly connected with a sliding plate 10, the outer side of the sliding plate 10 is provided with a clamping groove 9, the outer side of the movable baffle 7 is fixedly connected with a fixed plate 11, the upper end of the fixed baffle 5 is provided with a mounting frame 15, the outer side of the lower end of the mounting frame 15 is fixedly provided with a first clamping bolt 19, and the other side of the bearing plate 1 is fixedly provided with a lifting device 20.
In this embodiment for the device has the function of receiving line and unwrapping wire, conveniently dismantle the change to measuring rope reel simultaneously, drive bull stick 6 through motor 4 at the inboard fixed rotation of fixed stop 5 and adjustable stop 7, simultaneously set up at the outside of adjustable stop 7 and adjust rotating handle 8, be convenient for accurate regulation unwrapping wire, secondly movable rod 12 passes through fixed plate 11 and adjustable stop 7 fixed connection, when carrying out the installation rope reel, drive the backing block 14 through pulling up movable rod 12 and leave bearing plate 1, remove adjustable stop 7 fixed line reel, utilize spring 13 of installation between movable rod 12 and the backing block 14, make the backing block 14 kick-back fixed with bearing plate 1, thereby install and fix the line reel, improve adjustable stop 7's convenience, can adjust the size as required, the practicality of device has been increased.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: preferably, the upper end of the mounting frame 15 is internally provided with a sliding groove, the upper end of the mounting frame 15 is fixedly provided with two groups of electric sliding blocks 16, the two groups of first clamping bolts 19 are respectively arranged on two sides of the lower end of the mounting frame 15, the lower end of the electric sliding blocks 16 is fixedly connected with a connecting block 17, and the lower end of the connecting block 17 is fixedly connected with a positioning circular ring 18.
In this embodiment for the device can be automatic unwrapping wire, avoids measuring the rope to appear piling up the winding simultaneously when collecting, through connecting mounting bracket 15 in the upper end of fixed stop 5 and adjustable fender 7, uses first latch 19 to fix both sides lower extreme of mounting bracket 15 respectively with fixed stop 5 and adjustable fender 7, secondly installs electronic slider 16 in the upper end of mounting bracket 15, and electronic slider 16 drives location ring 18 and moves about in the inboard of mounting bracket 15, can avoid effectively measuring the rope and pile up together when collecting, influences the follow-up use.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: preferably, the second latch 21 is arranged on the outer side of the lifting device 20, the rotating frame 22 is fixedly connected to the lifting device 20, the guide wheels 23 are fixedly installed in the rotating frame 22, the rotating shaft is arranged at the bottom end of the rotating frame 22, the lifting device 20 is fixedly connected with the rotating frame 22 through the rotating shaft, and the number of the guide wheels 23 is two.
In this embodiment, make in the use can adjust the height and the position of lead frame as required, through installing elevating gear 20 at the take-up front side, use second bayonet lock 21 to fix after its regulation, set up swivel mount 22 simultaneously in elevating gear 20's upper end, and install the leading wheel 23 at the swivel mount 22 inboard, wear out the measuring wire from leading wheel 23, the convenience is carried out the wire to it when using, prevent to run the line and make the in-process of collecting and unwrapping wire appear blocking, the convenience of device has been increased.
Example 4
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: preferably, a movable rod 12 is arranged in one end of the fixed plate 11 in a penetrating manner, a spring 13 is sleeved on the outer side of the lower end of the movable rod 12, and a bottom block 14 is fixedly connected to the lower end of the movable rod 12.
The working principle of the quick pay-off device for the foundation pit of the building engineering is specifically described below.
As shown in fig. 1-4, when this swift pay-off of building engineering foundation ditch is in the use, drive bull stick 6 at the inboard fixed rotation of fixed baffle 5 and movable baffle 7 through motor 4, simultaneously set up regulation commentaries on classics handle 8 in the outside of movable baffle 7, be convenient for accurate regulation unwrapping wire, secondly movable rod 12 passes through fixed plate 11 and movable baffle 7 fixed connection, when carrying out the installation bobbin, drive the bottom block 14 through pulling up movable rod 12 and leave bearing plate 1, remove movable baffle 7 fixed line section of thick bamboo, utilize movable rod 12 and bottom block 14 between the spring 13 of installation, make bottom block 14 kick-back and bearing plate 1 fixed, thereby install and fixed line section of thick bamboo, improve the convenience of movable baffle 7, can adjust the size as required, the practicality of device has been increased, through the upper end connection mounting bracket 15 at fixed baffle 5 and movable baffle 7, the both sides lower extreme of mounting bracket 15 respectively with fixed baffle 5, secondly, install electric slide 16 in the upper end mounting bracket 15, electric slide 16 drives the inside left and right sides of location ring 18 at 15 and moves, can effectively install at the side at the measuring bracket 22 when measuring the wire, can be used at the side of measuring device at the back at the side of the roller 20, the roller 20 is used to the measuring, the device is taken turns at the side of the measuring device is taken turns at the back at the side of the roller 20, the roller is convenient for use, the device is taken turns, the device is used at the side is convenient to be measured, the roller is convenient to take-up and is used to be measured, the device is taken off at the side is convenient to the roller is used to the side 23, the device is used to take-up and is convenient to take up and is used at the device is convenient to take up and convenient to take up is used.
The foregoing utility model has been generally described in great detail, but it will be apparent to those skilled in the art that modifications and improvements can be made thereto. Accordingly, it is intended to cover modifications or improvements within the spirit of the inventive concepts.

Claims (7)

1. The utility model provides a swift pay-off of building engineering foundation ditch, includes bearing plate (1), its characterized in that: the lower end of the bearing plate (1) is fixedly connected with a roller (2), the upper end of one side of the bearing plate (1) is fixedly connected with a handrail (3), the middle upper end of the bearing plate (1) is fixedly provided with a motor (4), one side of the motor (4) is provided with a fixed baffle (5), one side of the fixed baffle (5) is fixedly connected with a rotating rod (6), one end of bull stick (6) is provided with adjustable fender (7), one side internally mounted of adjustable fender (7) has regulation turning handle (8), the upper end of fixed bolster (5) is provided with mounting bracket (15), the lower extreme outside fixed mounting of mounting bracket (15) has first bayonet lock (19), the opposite side upper end fixed mounting of bearing plate (1) has elevating gear (20).
2. The rapid pay-off device for foundation pits of constructional engineering according to claim 1, wherein: the movable baffle plate (7) is characterized in that a sliding plate (10) is fixedly connected to the outer side of the lower end of the movable baffle plate (7), a clamping groove (9) is formed in the outer side of the sliding plate (10), and a fixing plate (11) is fixedly connected to the outer side of the movable baffle plate (7).
3. The rapid pay-off device for foundation pits of constructional engineering according to claim 2, wherein: the movable rod (12) is arranged inside one end of the fixed plate (11) in a penetrating mode, a spring (13) is sleeved on the outer side of the lower end of the movable rod (12), and a bottom block (14) is fixedly connected to the lower end of the movable rod (12).
4. The rapid pay-off device for foundation pits of constructional engineering according to claim 1, wherein: the sliding chute is formed in the upper end of the mounting frame (15), the electric sliding blocks (16) are fixedly arranged at the upper end of the mounting frame (15), the number of the first clamping bolts (19) is two, and the two groups of the first clamping bolts (19) are respectively arranged on two sides of the lower end of the mounting frame (15).
5. The rapid pay-off device for foundation pits of constructional engineering according to claim 4, wherein: the lower extreme fixedly connected with connecting block (17) of electronic slider (16), the lower extreme fixedly connected with location ring (18) of connecting block (17).
6. The rapid pay-off device for foundation pits of constructional engineering according to claim 1, wherein: the outer side of the lifting device (20) is provided with a second clamping bolt (21), the upper part of the lifting device (20) is fixedly connected with a rotating frame (22), and a guide wheel (23) is fixedly arranged in the rotating frame (22).
7. The rapid pay-off device for foundation pits of building engineering according to claim 6, wherein: the bottom of swivel mount (22) is provided with the pivot, elevating gear (20) are through pivot and swivel mount (22) fixed connection, the quantity of leading wheel (23) is two sets of.
CN202320218387.2U 2023-02-15 2023-02-15 Quick pay-off of building engineering foundation ditch Active CN219173954U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202320218387.2U CN219173954U (en) 2023-02-15 2023-02-15 Quick pay-off of building engineering foundation ditch
JP2023001661U JP3242809U (en) 2023-02-15 2023-05-16 Rapid extension device for construction foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320218387.2U CN219173954U (en) 2023-02-15 2023-02-15 Quick pay-off of building engineering foundation ditch

Publications (1)

Publication Number Publication Date
CN219173954U true CN219173954U (en) 2023-06-13

Family

ID=86673494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320218387.2U Active CN219173954U (en) 2023-02-15 2023-02-15 Quick pay-off of building engineering foundation ditch

Country Status (2)

Country Link
JP (1) JP3242809U (en)
CN (1) CN219173954U (en)

Also Published As

Publication number Publication date
JP3242809U (en) 2023-07-13

Similar Documents

Publication Publication Date Title
CN111610088A (en) Steel strength detection device for building detection
CN110345933B (en) Novel detection device for house gradient
CN219173954U (en) Quick pay-off of building engineering foundation ditch
CN108222078B (en) Perpendicular laying device of flexible coiled material
CN211998553U (en) Small-size machine of lifting in civil engineering
CN216950353U (en) Underground casing position measuring device for drilling engineering
CN216432807U (en) Measuring device for hydraulic engineering management
CN110424399B (en) Traffic construction deep basal pit lateral wall skew monitoring devices
CN210802482U (en) Building wall face straightness detection device that hangs down for civil engineering
CN210193266U (en) Lifting device of submersible pump
CN212807051U (en) Pile hole perpendicularity detection device
CN212427265U (en) Foundation pit construction monitoring device
CN210163043U (en) Automatic pulling device of inclinometer
CN217327289U (en) Manual observation auxiliary device of drilling inclinometer
CN221216715U (en) Well depth detection device
CN112833989A (en) Non-contact water level detection device and detection method
CN214224027U (en) Balanced heavy well civil engineering structure deviation measuring device
CN218664664U (en) Auxiliary line-setting mechanism for building engineering line-setting
CN218545673U (en) Visual video range finding multi-angle adjustment mechanism
CN216410209U (en) Measuring device for building engineering management
CN110817720A (en) Multipurpose traction winch
CN219573071U (en) Pay-off that engineering measurement used
CN221350100U (en) Civil engineering wall body straightness calibrating device that hangs down
CN219869463U (en) Underground pipeline measuring device
CN220502336U (en) Elevator installation pay-off

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant