CN219117974U - Bridge construction hanging basket - Google Patents

Bridge construction hanging basket Download PDF

Info

Publication number
CN219117974U
CN219117974U CN202223512277.1U CN202223512277U CN219117974U CN 219117974 U CN219117974 U CN 219117974U CN 202223512277 U CN202223512277 U CN 202223512277U CN 219117974 U CN219117974 U CN 219117974U
Authority
CN
China
Prior art keywords
fixed
movable
rods
plates
fixed frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223512277.1U
Other languages
Chinese (zh)
Inventor
同晓春
康乐
陈佳
李敏
臧鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Road & Bridge Co ltd
Original Assignee
Shaanxi Road & Bridge Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Road & Bridge Co ltd filed Critical Shaanxi Road & Bridge Co ltd
Priority to CN202223512277.1U priority Critical patent/CN219117974U/en
Application granted granted Critical
Publication of CN219117974U publication Critical patent/CN219117974U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field of bridge construction hanging baskets, in particular to a bridge construction hanging basket, which is characterized in that a fixed frame is sleeved on one side of a bridge body, and a plurality of movable grooves are formed in two sides of the fixed frame in a penetrating manner; the fixed rods are respectively and movably arranged in the movable grooves in a penetrating way; the jacks are fixedly arranged in the bottoms of the fixed frames respectively and are connected with an external hydraulic device; the bottom plate is fixedly arranged at the top ends of the jacks, openings are formed in the left side and the right side of the bottom plate in a penetrating mode, the two movable plates are respectively arranged in the openings in a sliding mode, and the fixed plates are respectively and fixedly arranged between the two movable plates; the bottom ends of the two side plates are respectively hinged on the moving plate, and one sides of the two side plates are respectively hinged on one ends of the fixed rods; the convenient operating personnel helps the installation or the disassembly of the template through the jack and the rotating mechanism, the operation is simple, and the construction time can be reduced.

Description

Bridge construction hanging basket
Technical Field
The utility model relates to the technical field of bridge construction hanging baskets, in particular to a bridge construction hanging basket.
Background
In the prior art bridge hanging basket construction, a template is required to be installed in the hanging basket, when the strength of bridge concrete reaches the requirement, the template is required to be detached, and the movement of the hanging basket can be facilitated.
Disclosure of Invention
The utility model aims to overcome the defects and shortcomings of the prior art, and provides a bridge construction hanging basket which is technically characterized by solving the problems.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the bridge comprises a bridge body and a supporting frame; the support frame is arranged on the bridge body through a slide rail;
it also comprises:
the fixed frame is sleeved on one side of the bridge body, and a plurality of movable grooves are formed in the two sides of the fixed frame in a penetrating manner;
the fixed rods are respectively movably arranged in the movable grooves in a penetrating way;
the plurality of jacks are fixedly arranged in the bottom of the fixed frame respectively and are connected with an external hydraulic device;
the bottom plate is fixedly arranged at the top ends of the jacks, openings are formed in the left side and the right side of the bottom plate in a penetrating mode, the two movable plates are respectively arranged in the openings in a sliding mode, and the fixed plates are respectively and fixedly arranged between the two movable plates;
the side plates are two, the bottom ends of the two side plates are respectively hinged on the movable plate, and one sides of the two side plates are respectively hinged on one ends of the fixed rods.
Preferably, a plurality of movable blocks are respectively and slidably arranged in the plurality of movable grooves, fixing holes are respectively and movably arranged in the plurality of movable blocks in a penetrating mode, a plurality of fixing rods are respectively and movably inserted in the fixing holes, a rotating column is rotatably connected to one side of each movable block through bearings, threaded rods are respectively connected to one end of each fixing rod, the plurality of threaded rods are respectively and rotatably connected to the rotating column, sliding grooves are respectively formed in the left side and the right side of each rotating column, and the plurality of rotating columns are respectively connected with the rotating mechanism.
Preferably, the rotating mechanism comprises:
the ratchet wheel is arranged on the rotating column in a sliding way by utilizing a buckle;
the two electric push rods are fixedly arranged on the left side and the right side of the fixed frame respectively and are connected with an external power supply;
the connecting rod, the connecting rod slide and set up on the left and right sides of fixed frame, and connecting rod and electric putter's output fixed connection, the slip is equipped with the several movable rod on the connecting rod, has seted up the several fluting on the several movable rod respectively, the several buckle slides respectively and sets up in the fluting, the several spring sets up in the fluting respectively, the both ends of spring respectively with movable rod and buckle fixed connection, the several buckle sets up with the ratchet meshing.
Preferably, the left and right sides of the plurality of buckles are provided with clamping grooves, and the clamping grooves are in contact with the ratchet wheel.
Preferably, the limit blocks are screwed on the threaded rods by threads, one ends of the limit blocks are screwed with the hand screws by utilizing the rotating shafts, and the hand screws are in contact with the ratchet wheels.
Compared with the prior art, the utility model has the beneficial effects that: the bridge construction hanging basket is convenient for operators to help install or detach the templates through the jack and the rotating mechanism, is simple to operate and can reduce the construction time.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
Fig. 2 is a schematic structural view of a bottom plate and a side plate in the present utility model.
Fig. 3 is a schematic structural view of a rotating mechanism in the present utility model.
Fig. 4 is a schematic view of the structure of the moving rod in the present utility model.
Fig. 5 is a schematic structural diagram of a fixed frame and a moving block in the present utility model.
Fig. 6 is a schematic view of the structure of the rotating column in the present utility model.
FIG. 7 is a schematic view of the ratchet wheel of the present utility model.
Reference numerals illustrate:
bridge body 1, support frame 2, fixed frame 3, movable groove 4, dead lever 5, jack 6, bottom plate 7, trompil 8, movable plate 9, fixed plate 10, curb plate 11, movable block 12, fixed orifices 13, pivoted post 14, threaded rod 15, spout 16, slewing mechanism 17, ratchet 18, electric putter 19, connecting rod 20, movable rod 21, fluting 22, buckle 23, spring 24, draw-in groove 25, stopper 26.
Detailed Description
The utility model is further described below with reference to the accompanying drawings.
As shown in fig. 1-7, the following technical scheme is adopted in this embodiment: the bridge comprises a bridge body 1 and a supporting frame 2; the support frame 2 is arranged on the bridge body 1 through a sliding rail, and the support frame 2 is consistent with the working principle of using a support system structure in the prior art;
it also comprises:
the fixed frame 3 is sleeved on one side of the bridge body 1, a plurality of movable grooves 4 are formed in two sides of the fixed frame 3 in a penetrating mode, the fixed frame 3 is fixedly connected with the support frame 2, the support frame 2 drives the fixed frame 3 to move through a sliding rail, and an operator can finish construction operation in the fixed frame 3;
the fixed rods 5 are a plurality of fixed rods 5, the fixed rods 5 are movably arranged in the movable grooves 4 in a penetrating mode, and the fixed rods 5 play a role in positioning and fixing;
the lifting jacks 6 are arranged, the lifting jacks 6 are respectively and fixedly arranged in the bottom of the fixed frame 3, the lifting jacks 6 are connected with an external hydraulic device, the lifting distances of the lifting jacks 6 are consistent, and the lifting elevation is convenient for operators;
the bottom plate 7 is fixedly arranged at the top ends of the plurality of jacks 6, the left side and the right side of the bottom plate 7 are respectively provided with an opening 8 in a penetrating way, the two movable plates 9 are respectively arranged in the openings 8 in a sliding way, the plurality of fixed plates 10 are respectively fixedly arranged between the two movable plates 9, the fixed plates 10 are made of steel plates, the bottom plate 7 can be formed by splicing and fixing the plurality of fixed plates 10, an operator can conveniently select proper steel plates for splicing according to the size of a bridge, the two movable plates 9 are fixed on the bottom plate 7 through bolts, and when the template is disassembled, the bolts can be processed for dismantling, so that the movable plates 9 slide, and later operation is facilitated;
the two side plates 11 are hinged to the moving plate 9 respectively, one sides of the two side plates 11 are hinged to one ends of the fixing rods 5 respectively, the side plates 11 can be fixed in the fixing frame 3 through the fixing rods 5, and an operator can remove the side plates 11 through the fixing rods 5, so that the moving operation of the fixing frame 3 is facilitated;
the movable grooves 4 are respectively provided with a plurality of movable blocks 12 in a sliding manner, the movable blocks 12 are respectively provided with a fixing hole 13 in a penetrating manner, the fixed rods 5 are respectively and movably inserted into the fixing holes 13, one side of each movable block 12 is rotatably connected with a rotary column 14 by a bearing, one end of each fixed rod 5 is respectively connected with a threaded rod 15, the threaded rods 15 are respectively and rotatably connected with the rotary columns 14 in a threaded manner, the left and right sides of each rotary column 14 are respectively provided with a sliding groove 16, the rotary columns 14 are respectively connected with a rotating mechanism 17, an operator can move the bolt rods in the rotary columns 14 by rotating the threaded rods 15, thereby the fixed rods 5 can move in the movable blocks 12, the operator can conveniently control the vertical or inclined of the side plates 11 by the fixed rods 5 according to construction requirements, and can drive the side plates 11 and concrete respectively by rotating the threaded rods 15 when the templates are disassembled, the rotating mechanism 17 is formed by a ratchet 18, an electric push rod 19 and a connecting rod 20, wherein the ratchet 18 is arranged on the rotating column 14 in a sliding way by using a buckle 23, the two electric push rods 19 are respectively and fixedly arranged on the left side and the right side of the fixed frame 3, the electric push rod 19 is connected with an external power supply, the connecting rod 20 is arranged on the left side and the right side of the fixed frame 3 in a sliding way, the connecting rod 20 is fixedly connected with the output end of the electric push rod 19, a plurality of moving rods 21 are arranged on the connecting rod 20 in a sliding way, a plurality of slots 22 are respectively arranged on the plurality of moving rods 21, a plurality of buckles 23 are respectively arranged in the slots 22 in a sliding way, two ends of each spring 24 are respectively and fixedly connected with the moving rods 21 and the buckles 23, the plurality of buckles 23 are meshed with the ratchet 18, when the operator needs to separate the side plate 11 from concrete, because suction exists between the side plate 11 and the poured concrete, an operator can easily start to separate the side plate 11 from the concrete, at the moment, the operator can positively sleeve the ratchet 18 on the rotating column 14, the electric push rod 19 is opened, the electric push rod 19 drives the connecting rod 20 to move, the connecting rod 20 drives the plurality of moving rods 21 to move, the buckles 23 are in contact with the ratchet 18, the ratchet 18 drives the rotating column 14 to rotate, the threaded rod 15 is moved, the fixed rod 5 drives the side plate 11 to move, the side plate 11 is separated from the concrete, when the side plate 11 is required to be installed at a designated position, the operator can reversely sleeve the ratchet 18 on the rotating column 14, and the electric push rod 19 drives the rotating column 14 to rotate through the ratchet 18, so that the fixed rod 5 drives the side plate 11 to move inwards, the side plate 11 is moved to a designated position, and the operator can conveniently install the side plate 11;
the draw-in groove 25 has all been seted up to the left and right sides of several buckle 23, draw-in groove 25 and ratchet 18 contact setting, operating personnel establishes ratchet 18 cover on the rotation post 14 through forward or reverse, when making movable rod 21 remove, make ratchet 18 corotation or reversal, all screw threads connect stopper 26 soon on the several threaded rod 15, it has the hand to twist to have connect soon to utilize the pivot on the one end of stopper 26, hand is twisted and ratchet 18 contact setting, can fix a position ratchet 18 on the rotation post 14 through stopper 26, when ratchet 18 rotates, make hand twist rotate, prevent that stopper 26 from influencing the rotation of ratchet 18.
When the bridge formwork is used, when an operator installs the bridge formwork, the operator firstly opens a plurality of jacks 6 through a hydraulic system, so that the bottom plate 7 moves, the bottom plate 7 contacts with the original concrete bottom surface, at the moment, the operator reversely sleeves the ratchet wheel 18 on the rotating column 14, the moving rod 21 moves, a plurality of buckles 23 on the moving rod 21 are meshed with the ratchet wheel 18, the moving rod 21 is fixed on the connecting rod 20 through bolts, the electric push rod 19 is opened, the electric push rod 19 drives a plurality of moving rods 21 to move, the ratchet wheel 18 is reversed through the buckles 23, the ratchet wheel 18 drives the rotating column 14 to reverse, the threaded rod 15 drives the fixed rod 5 to move towards the inside of the fixed frame 3, so that the fixed rod 5 drives the side plate 11 to move, when the side plate 11 moves to a proper position, the moving plate 9 and the side plate 11 are respectively fixed in the bottom plate 7 and the fixed frame 3 through bolts, the subsequent construction of the operator is facilitated, when the operator needs to detach the side plate 11, the ratchet wheel 18 can be positively sleeved on the rotating column 14, the fixed rod 5 drives the fixed frame 3 to move towards the outside of the fixed frame 11, and the concrete can be separated from the fixed frame 11 through the step, and the resistance force of the bridge formwork can be reduced.
After adopting above-mentioned structure, this embodiment's beneficial effect is as follows:
1. the bottom plate 7 and the side plates 11 are arranged, so that an operator can conveniently install and detach the bottom plate 7 and the side plates 11 through the jack 6 and the fixed rod 5, and the bottom plate 7 and the side plates 11 can be conveniently assembled by the operator;
2. the rotating mechanism 17 is arranged, the ratchet wheel 18 is movably sleeved on the rotating column 14 through forward or reverse direction, and the buckle 23 on the moving rod 21 is contacted with the ratchet wheel 18 through moving the electric push rod 19, so that the rotating column 14 is rotated forward or reversely, the fixed rod 5 drives the side plate 11 to move, and an operator can conveniently install or remove the side plate 11.
The foregoing is merely illustrative of the present utility model and not restrictive, and other modifications and equivalents thereof may occur to those skilled in the art without departing from the spirit and scope of the present utility model.

Claims (5)

1. A bridge construction hanging basket comprises a bridge body (1) and a supporting frame (2); the support frame (2) is arranged on the bridge body (1) through a slide rail;
characterized in that it further comprises:
the fixed frame (3), the said fixed frame (3) is set up on one side of the bridge body (1), both sides of the fixed frame (3) are all offered the several movable slots (4) through;
the fixing rods (5), the fixing rods (5) are a plurality of, and the fixing rods (5) are respectively and movably arranged in the movable grooves (4) in a penetrating way;
the plurality of jacks (6), the plurality of jacks (6) are respectively fixedly arranged in the bottom of the fixed frame (3), and the jacks (6) are connected with an external hydraulic device;
the base plate (7), the base plate (7) is fixedly arranged at the top ends of a plurality of jacks (6), the left side and the right side of the base plate (7) are all provided with through holes (8), two movable plates (9) are respectively arranged in the holes (8) in a sliding manner, and a plurality of fixed plates (10) are respectively fixedly arranged between the two movable plates (9);
the two side plates (11) are arranged, the bottom ends of the two side plates (11) are respectively hinged on the movable plate (9), and one sides of the two side plates (11) are respectively hinged on one ends of the plurality of fixed rods (5).
2. The bridge construction hanging basket according to claim 1, wherein: the movable grooves (4) are respectively provided with a plurality of movable blocks (12) in a sliding manner, the movable blocks (12) are respectively communicated with a fixed hole (13), the fixed rods (5) are respectively movably inserted into the fixed holes (13), one sides of the movable blocks (12) are respectively rotatably connected with a rotary column (14) by using bearings, one ends of the fixed rods (5) are respectively connected with a threaded rod (15), the threaded rods (15) are respectively rotatably connected onto the rotary column (14) in a threaded manner, the left side and the right side of the rotary column (14) are respectively provided with a sliding groove (16), and the rotary columns (14) are respectively connected with a rotary mechanism (17).
3. The bridge construction hanging basket according to claim 2, wherein: the rotating mechanism (17) comprises:
the ratchet wheel (18), the said ratchet wheel (18) uses the buckle (23) to slide and set up on the rotary column (14);
the two electric pushing rods (19) are respectively fixedly arranged on the left side and the right side of the fixed frame (3), and the electric pushing rods (19) are connected with an external power supply;
connecting rod (20), connecting rod (20) slide and set up on the left and right sides of fixed frame (3), and connecting rod (20) and electric putter's (19) output fixed connection, slide on connecting rod (20) and be equipped with several movable rod (21), the several fluting (22) have been seted up respectively on several movable rod (21), several buckle (23) slide and set up respectively in fluting (22), several spring (24) set up respectively in fluting (22), the both ends of spring (24) respectively with movable rod (21) and buckle (23) fixed connection, several buckle (23) and ratchet (18) meshing set up.
4. A bridge construction hanging basket according to claim 3, wherein: clamping grooves (25) are formed in the left side and the right side of the plurality of buckles (23), and the clamping grooves (25) are in contact with the ratchet wheel (18).
5. The bridge construction hanging basket according to claim 1, wherein: the plurality of threaded rods (15) are respectively screwed with a limiting block (26), one end of each limiting block (26) is screwed with a hand screw by utilizing a rotating shaft, and the hand screw is in contact with the ratchet wheel (18).
CN202223512277.1U 2022-12-28 2022-12-28 Bridge construction hanging basket Active CN219117974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223512277.1U CN219117974U (en) 2022-12-28 2022-12-28 Bridge construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223512277.1U CN219117974U (en) 2022-12-28 2022-12-28 Bridge construction hanging basket

Publications (1)

Publication Number Publication Date
CN219117974U true CN219117974U (en) 2023-06-02

Family

ID=86521720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223512277.1U Active CN219117974U (en) 2022-12-28 2022-12-28 Bridge construction hanging basket

Country Status (1)

Country Link
CN (1) CN219117974U (en)

Similar Documents

Publication Publication Date Title
CN109736578B (en) Auxiliary positioning device for alignment installation of prefabricated building
CN208441100U (en) A kind of hydraulic engineering pile body pile pulling device
CN213683165U (en) Quick whole formula elevartor shaft template operation platform that promotes
CN210344878U (en) Industrial control machine is with removal frame of being convenient for lift
CN111571578A (en) Intelligent grabbing arm for steel bar processing
CN110601463A (en) Unit motor assembly equipment
CN219117974U (en) Bridge construction hanging basket
CN111140021B (en) Double-door type building construction beam bearing frame
CN203245577U (en) Vertical turning disassembling and assembling machine
CN210633589U (en) Coupler dismounting device
CN109537891B (en) Automatic robot that demolishs of frame pillar template for construction
CN215443483U (en) Fender is enclosed in construction
CN112227219B (en) Main supporting leg mechanism of bridge girder erection machine
CN214373493U (en) Sampling device for pile foundation detection
CN111576859A (en) Floor laying-out opening template supporting structure
CN215798233U (en) Double-oil-cylinder shear type lifter
CN221390308U (en) Auxiliary clamping device suitable for rigid dummy bar
CN219900015U (en) Reinforcing steel bar bending device
CN221192792U (en) Portable rail line crossing device
CN114458008B (en) Reinforcing apparatus for building templates
CN216523095U (en) Well type furnace cover rotary positioning device
CN215854725U (en) Hoisting accessory is used in maintenance of door machine steering wheel
CN116122602B (en) V-shaped column auxiliary debugging and installing system and using method
CN221095779U (en) Building engineering is with climbing frame
CN212388977U (en) Floor laying-out opening template supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant