CN219100648U - Assembled movable subway station main body side wall construction operation platform - Google Patents

Assembled movable subway station main body side wall construction operation platform Download PDF

Info

Publication number
CN219100648U
CN219100648U CN202223136102.5U CN202223136102U CN219100648U CN 219100648 U CN219100648 U CN 219100648U CN 202223136102 U CN202223136102 U CN 202223136102U CN 219100648 U CN219100648 U CN 219100648U
Authority
CN
China
Prior art keywords
platform
operation platform
working platform
working
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223136102.5U
Other languages
Chinese (zh)
Inventor
赵玉生
逄明卿
屈军平
徐锋
卢政玉
马超
王利勋
李明帅
王连河
李京涛
王宝坤
唐宝库
张虎
曹玉山
应雄
赵鹏飞
闫俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway North Jilin Investment And Construction Co ltd
Road and Bridge Engineering Co Ltd of CTCE Group
Original Assignee
China Railway North Jilin Investment And Construction Co ltd
Road and Bridge Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway North Jilin Investment And Construction Co ltd, Road and Bridge Engineering Co Ltd of CTCE Group filed Critical China Railway North Jilin Investment And Construction Co ltd
Priority to CN202223136102.5U priority Critical patent/CN219100648U/en
Application granted granted Critical
Publication of CN219100648U publication Critical patent/CN219100648U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to the technical field of construction scaffolds, and discloses an assembled movable subway station main body side wall construction operation platform, which comprises the following components: the device comprises a first working platform and a second working platform, wherein the second working platform is stacked above the first working platform, the second working platform is fixed at the top of the first working platform by utilizing a connecting structure, a worker can also draw out two extending working platforms from one sides of the first working platform and the second working platform, the distance between a working surface and the first working platform and the distance between the working surface and the second working platform can be adjusted, construction is convenient, compared with a traditional scaffold, the device is high in bearing capacity and stability, and when being installed, only the first working platform and the second working platform are stacked together, the device is convenient and fast to install, simple to operate, the situation that building is not in accordance with standard requirements very easily occurs in the manual building process of double-row scaffolds is avoided, and the construction safety of high-altitude operation is effectively ensured.

Description

Assembled movable subway station main body side wall construction operation platform
Technical Field
The utility model relates to the technical field of construction scaffolds, in particular to an assembled movable subway station main body side wall construction operation platform.
Background
Along with the rapid development of the economy in China, the urban infrastructure is accelerated, the planning and construction of urban rail transit jump a new step, a subway station is used as an important hub for exchanging people flow between the rail transit and other commuting modes, and in the construction process of a main structure of the subway station, the construction procedures of waterproof pasting of side walls, installation of reinforcing steel bars and the like all involve high-altitude operation, and at present, double-row scaffolds are erected by adopting a disc-buckle scaffold, a bowl-buckle scaffold or a gate-type scaffold to assist constructors in high-altitude operation, so that the main construction mode at present is adopted.
At present, a temporary double-row scaffold is erected manually, constructors use the double-row scaffold to lay waterproof coiled materials of subway side walls and bind main steel bars, and in order to adapt to the working height, the double-row scaffold is erected manually continuously due to the fact that the working surface of the scaffold is large and the sections are more. The double-row scaffold is adopted to assist the working procedures, so that the double-row scaffold is complex and repeated in work, a large amount of resource waste is caused, the construction cost is increased, the scaffold construction quality is influenced by a plurality of factors involved in the scaffold construction process, the condition that the scaffold construction is not in accordance with the standard requirements is easy to occur, and the construction safety is influenced in the construction process.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides an assembled movable subway station main body side wall construction operation platform, which solves the problems that the scaffold erection quality is influenced by more factors in the scaffold erection process, the situation that the scaffold erection is not in accordance with the standard requirement is easy to occur, and the construction safety is influenced in the construction process.
In order to achieve the above purpose, the present utility model provides the following technical solutions: an assembled movable subway station main part side wall construction work platform includes: the first working platform and the second working platform are stacked above the first working platform; the first frame body and the second frame body are respectively connected above the first operation platform and the second operation platform, a first opening is formed in the top of the first frame body, and a second opening is formed in the top of the second frame body; the two pedestrian steps are respectively connected in the first opening and the second opening; the two iron net frames are respectively connected to the tops of the first operation platform and the second operation platform and connected with the first frame body and the second frame body; the two extending operation platforms are respectively and slidably arranged at one side of the first operation platform and one side of the second operation platform; the connecting structure is arranged between the first working platform and the second working platform and used for connecting the first working platform and the second working platform, and the connecting structure can fix the position of the second working platform.
Preferably, the first opening is located at a lower left corner of the first frame, and the second opening is located at a lower right corner of the second frame.
Preferably, the connecting structure comprises fixing blocks fixedly connected to two sides of the first working platform, connecting blocks corresponding to the fixing blocks in position are fixedly connected to two sides of the second working platform respectively, bolts are connected to the connecting blocks in a threaded mode, and the bolts are connected with the fixing blocks in a threaded mode.
Preferably, a positioning groove is formed in the bottom of the second operation platform, and a positioning strip matched with the positioning groove is fixedly connected to the top of the first operation platform.
Preferably, two one side of the extended operation platform is fixedly connected with two connecting rods, wherein the two connecting rods are in sliding connection with the first operation platform, the other two connecting rods are in sliding connection with the second operation platform, one side of the extended operation platform is fixedly connected with a fixing rod, a supporting block is sleeved on the fixing rod in a rotating mode, and the bottom of the supporting block is fixedly connected with a supporting platform.
Preferably, a groove matched with the supporting platform is formed in one side of the first working platform and one side of the second working platform, springs are connected between the two connecting rods and the first working platform, and springs are also connected between the other two connecting rods and the second working platform.
Preferably, the two sides of the extending operation platform are respectively and rotatably connected with a supporting rod, the two sides of the first operation platform and the two sides of the second operation platform are respectively and fixedly connected with a fixed shaft, and the supporting rods are provided with fixed grooves matched with the fixed shafts.
According to the utility model, through arranging the first working platform and the second working platform, when the device is used, a worker can place the first working platform at a side wall construction site needing to be constructed, can selectively stack the second working platform on the first working platform according to the side wall construction height, can meet the working heights required by different heights, can fix the second working platform on the top of the first working platform by utilizing the connecting structure, can strengthen the good stability of the second working platform when the device is used, can also extract the two extending working platforms from one side of the first working platform and the second working platform, can adjust the spacing between the working surface and the first working platform and the second working platform, is convenient to construct, can improve the safety of manual walking on the first working platform and the second working platform, can meet the requirement of temporary stock, and is simple to operate, and compared with the traditional double-row scaffold, the device has strong stability, and can be installed by only needing the first working platform and the second working platform together, and is easy to mount, the scaffold is easy to be erected in a manual setting manner, the scaffold is not convenient to meet the working requirements of high-efficient and safe construction.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a first frame structure according to the present utility model;
FIG. 3 is an enlarged schematic view of a partial structure at A in FIG. 2;
FIG. 4 is a schematic view of a first work platform according to the present utility model;
FIG. 5 is a schematic view of a second work platform according to the present utility model;
FIG. 6 is a schematic view of a strut structure according to the present utility model;
fig. 7 is an enlarged schematic view of a partial structure at B in fig. 6.
In the figure: 100. a first work platform; 101. a second work platform; 102. a first frame body; 103. a second frame body; 104. a first opening; 105. a second opening; 106. a pedestrian step ladder; 107. an iron net rack; 108. extending an operation platform; 200. a fixed block; 201. a connecting block; 202. a bolt; 203. a positioning groove; 204. a positioning strip; 300. a connecting rod; 301. a fixed rod; 302. a support block; 303. a support platform; 304. a groove; 305. a spring; 306. a support rod; 307. a fixed shaft; 308. a fixing groove.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-7, an assembled movable subway station main body side wall construction operation platform includes:
a first work platform 100 and a second work platform 101, the second work platform 101 being stacked above the first work platform 100;
the first frame 102 and the second frame 103 are respectively connected above the first working platform 100 and the second working platform 101, a first opening 104 is formed in the top of the first frame 102, and a second opening 105 is formed in the top of the second frame 103;
two pedestrian steps 106 respectively connected in the first opening 104 and the second opening 105;
two iron net frames 107 respectively connected to the tops of the first work platform 100 and the second work platform 101, and connected to the first frame 102 and the second frame 103;
two extended work platforms 108 slidably disposed on one sides of the first work platform 100 and the second work platform 101, respectively;
and a connection structure disposed between the first work platform 100 and the second work platform 101 for connecting the first work platform 100 and the second work platform 101, the connection structure being capable of fixing the position of the second work platform 101.
Through setting up first operation platform 100 and second operation platform 101, when using, the staff can place first operation platform 100 in the side wall construction site that needs to be under construction, the optional stacks second operation platform 101 on first operation platform 100 according to side wall construction height, can satisfy the job altitude that different height needs, available connection structure is fixed in the top of first operation platform 100 with second operation platform 101, can strengthen second operation platform 101 and can play good stability when using, the staff can also follow first operation platform 100 with second operation platform 101 one side with two extension operation platforms 108 and take out, can adjust the interval between operation face and first operation platform 100 and the second operation platform 101, the convenience is under construction, the security of artifical walking on first operation platform 100 and second operation platform 101 can be improved to the setting-up of the iron net rack 107, simultaneously also can satisfy the demand of interim stock, compared with traditional scaffold, the device scaffold is strong, only need first operation platform 100 and second operation platform 101 stack together when using can be strengthened, the scaffold is easy to set up, the condition is not set up in the safety specification, the safety is guaranteed to the high-efficient condition is avoided in the manual construction.
In this embodiment, the position of the first opening 104 is located at the lower left corner of the first frame 102, and the position of the second opening 105 is located at the lower right corner of the second frame 103;
by staggering the positions of the first opening 104 and the second opening 105, it is convenient for a worker to go up and down the first platform and the second platform.
In this embodiment, the connection structure includes fixing blocks 200 fixedly connected to two sides of the first working platform 100, two sides of the second working platform 101 are fixedly connected with connection blocks 201 corresponding to the positions of the fixing blocks 200 respectively, bolts 202 are connected to the connection blocks 201 in a threaded manner, and the bolts 202 are connected with the fixing blocks 200 in a threaded manner;
by arranging the bolts 202, after determining the position of the second work platform 101 on the top of the first work platform 100, a worker can twist the bolts 202 into the connecting block 201 and the fixing block 200, so that the second work platform 101 can be fixed on the first work platform 100 by using the connecting block 201 and the fixing block 200, and the arranged bolts 202 can adapt to tools used in site work, thereby improving the applicability of the first work platform 100 and the second work platform 101 in installation.
In this embodiment, a positioning slot 203 is formed at the bottom of the second working platform 101, and a positioning bar 204 adapted to the positioning slot 203 is fixedly connected to the top of the first working platform 100;
through setting up location strip 204, after stacking second operation platform 101 on first operation platform 100, establish the constant head tank 203 on the second operation platform 101 with the location strip 204 on the first operation platform 100 mutually, the position of second operation platform 101 slides again for connecting block 201 and fixed block 200 contact, can play the effect of conveniently stacking second operation platform 101 accurate, non-deviation on first operation platform 100.
In this embodiment, two connecting rods 300 are fixedly connected to one side of two extended operation platforms 108, wherein two connecting rods 300 are slidably connected to the first operation platform 100, the other two connecting rods 300 are slidably connected to the second operation platform 101, a fixing rod 301 is fixedly connected to one side of the extended operation platform 108, a supporting block 302 is rotatably sleeved on the fixing rod 301, and a supporting platform 303 is fixedly connected to the bottom of the supporting block 302;
through setting up supporting platform 303, supporting platform 303 passes through supporting piece 302 rotation to be connected on extending operation platform 108, when specifically using, can rotate supporting platform 303 to one side of extending operation platform 108, can slide extending operation platform 108 to one side of first operation platform 100 or second operation platform 101 at this moment, realize accomodating extending operation platform 108, on the contrary, the same thing, draw extending operation platform 108 out from one side of first operation platform 100 or second operation platform 101, compensate the construction interval between first operation platform 100 or second platform and the side wall, rotate supporting platform 303, supporting platform 303 is parallel with first operation platform 100 or second operation platform 101, can support the staff and be in extending operation platform 108 and construct on the side wall.
In this embodiment, a groove 304 adapted to the supporting platform 303 is formed on one side of the first working platform 100 and one side of the second working platform 101, a spring 305 is connected between two connecting rods 300 and the first working platform 100, and a spring 305 is also connected between the other two connecting rods 300 and the second working platform 101;
by arranging the springs 305, when a worker pulls out the extension work platform 108 from one side of the first work platform 100 and the second work platform 101, the springs 305 are stretched to generate potential energy, after the extension work platform 108 moves to a proper position, the support platform 303 is rotated, at the moment, the extension work platform 108 is released, the extension work platform 108 moves towards the directions of the first work platform 100 and the second work platform 101 under the force of the springs 305, the support platform 303 can be buckled in the groove 304, the weight on a part of the support platform 303 can be borne by the groove 304, and the safety of the worker during construction on the extension work platform 108 can be improved.
In this embodiment, two sides of the extended operation platform 108 are respectively and rotatably connected with a supporting rod 306, two sides of the first operation platform 100 and the second operation platform 101 are respectively and fixedly connected with a fixed shaft 307, and a fixed slot 308 adapted to the fixed shaft 307 is formed on the supporting rod 306;
by arranging the strut 306, after the worker withdraws the extension work platform 108, the strut 306 can be rotated, so that the fixing groove 308 on the strut 306 is sleeved with the fixing shaft 307, and the safety of the extension work platform 108 can be further enhanced by using the strut 306.
The specific use principle of the equipment is as follows: through setting up first operation platform 100 and second operation platform 101, when using, the staff can place first operation platform 100 in the side wall construction site that needs to be under construction, the optional stacks second operation platform 101 on first operation platform 100 according to side wall construction height, can satisfy the job altitude that different height needs, available connection structure is fixed in the top of first operation platform 100 with second operation platform 101, can strengthen second operation platform 101 and can play good stability when using, the staff can also follow first operation platform 100 with second operation platform 101 one side with two extension operation platforms 108 and take out, can adjust the interval between operation face and first operation platform 100 and the second operation platform 101, the convenience is under construction, the security of artifical walking on first operation platform 100 and second operation platform 101 can be improved to the setting-up of the iron net rack 107, simultaneously also can satisfy the demand of interim stock, compared with traditional scaffold, the device scaffold is strong, only need first operation platform 100 and second operation platform 101 stack together when using can be strengthened, the scaffold is easy to set up, the condition is not set up in the safety specification, the safety is guaranteed to the high-efficient condition is avoided in the manual construction.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a portable subway station main part side wall construction work platform of assembled, its characterized in that includes:
a first working platform (100) and a second working platform (101), wherein the second working platform (101) is stacked above the first working platform (100);
the first frame body (102) and the second frame body (103) are respectively connected above the first operation platform (100) and the second operation platform (101), a first opening (104) is formed in the top of the first frame body (102), and a second opening (105) is formed in the top of the second frame body (103);
two pedestrian steps (106) respectively connected in the first opening (104) and the second opening (105);
two iron net frames (107) which are respectively connected to the tops of the first operation platform (100) and the second operation platform (101) and are connected with the first frame body (102) and the second frame body (103);
two extended work platforms (108) slidably arranged on one side of the first work platform (100) and one side of the second work platform (101);
the connecting structure is arranged between the first working platform (100) and the second working platform (101) and used for connecting the first working platform (100) and the second working platform (101), and the connecting structure can fix the position of the second working platform (101).
2. The assembled movable subway station main body side wall construction work platform according to claim 1, wherein the first opening (104) is positioned at the lower left corner of the first frame body (102), and the second opening (105) is positioned at the lower right corner of the second frame body (103).
3. The assembly type movable subway station main body side wall construction operation platform according to claim 1, wherein the connection structure comprises fixed blocks (200) fixedly connected to two sides of the first operation platform (100), connection blocks (201) corresponding to the positions of the fixed blocks (200) are fixedly connected to two sides of the second operation platform (101) respectively, bolts (202) are connected to the connection blocks (201) in a threaded mode, and the bolts (202) are connected with the fixed blocks (200) in a threaded mode.
4. The assembly type movable subway station main body side wall construction operation platform according to claim 1, wherein a positioning groove (203) is formed in the bottom of the second operation platform (101), and a positioning strip (204) matched with the positioning groove (203) is fixedly connected to the top of the first operation platform (100).
5. The construction work platform for the side wall of the main body of the assembled movable subway station according to claim 1, wherein two connecting rods (300) are fixedly connected to one side of each extending work platform (108), two connecting rods (300) are slidably connected with the first work platform (100), the other two connecting rods (300) are slidably connected with the second work platform (101), a fixing rod (301) is fixedly connected to one side of each extending work platform (108), a supporting block (302) is rotatably sleeved on each fixing rod (301), and a supporting platform (303) is fixedly connected to the bottom of each supporting block (302).
6. The assembly type movable subway station main body side wall construction operation platform according to claim 5, wherein a groove (304) matched with the supporting platform (303) is formed on one side of the first operation platform (100) and one side of the second operation platform (101), a spring (305) is connected between two connecting rods (300) and the first operation platform (100), and a spring (305) is also connected between the other two connecting rods (300) and the second operation platform (101).
7. The construction work platform for the side wall of the main body of the assembled movable subway station according to claim 1, wherein two sides of the extension work platform (108) are respectively and rotatably connected with a supporting rod (306), two sides of the first work platform (100) and two sides of the second work platform (101) are respectively and fixedly connected with a fixed shaft (307), and a fixed groove (308) matched with the fixed shaft (307) is formed in the supporting rod (306).
CN202223136102.5U 2022-11-25 2022-11-25 Assembled movable subway station main body side wall construction operation platform Active CN219100648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223136102.5U CN219100648U (en) 2022-11-25 2022-11-25 Assembled movable subway station main body side wall construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223136102.5U CN219100648U (en) 2022-11-25 2022-11-25 Assembled movable subway station main body side wall construction operation platform

Publications (1)

Publication Number Publication Date
CN219100648U true CN219100648U (en) 2023-05-30

Family

ID=86453938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223136102.5U Active CN219100648U (en) 2022-11-25 2022-11-25 Assembled movable subway station main body side wall construction operation platform

Country Status (1)

Country Link
CN (1) CN219100648U (en)

Similar Documents

Publication Publication Date Title
CN113235947A (en) Construction method of ultrahigh large-span huge ribbed space folded plate-shaped grid structure steel shed
CN201236319Y (en) Apparatus for maintaining inclined molding edge joist dual-purpose bridge for road and railway
CN219100648U (en) Assembled movable subway station main body side wall construction operation platform
CN106121216A (en) The lower support means regulated for the hand wheel type on-line continuous of hydraulic climbing die block system
CN108979260B (en) Annular high-rise parking tower garage
CN217054267U (en) Protection device construction structure
CN205477636U (en) Underground railway track moving platform
CN110359697B (en) Overhead sliding splicing operation platform of high-altitude unit type
CN213329964U (en) A construction work platform outside building for prefabricated building
CN212559216U (en) Prefabricated part erecting device
CN206634993U (en) A kind of indoor lifting frame for building
CN209228092U (en) A kind of steel core concrete column steel slideway for building jacking increasing layer
CN208586895U (en) A kind of hydraulic climbing platform wall-attaching equipment
CN206016248U (en) For the lower support meanss that the hand wheel type on-line continuous of hydraulic climbing die block system are adjusted
CN111706363A (en) Template trolley for pipe gallery construction
CN107939034B (en) Safe and stable type operation platform and assembling method
CN219081586U (en) Jacking mobile device and multifunctional rack suitable for intermediate wall construction
CN211572484U (en) Moving platform for building construction
CN217651566U (en) Road pressing equipment is used in municipal works road construction
CN219654613U (en) Device for climbing and resting of polygonal steel pipe pole
CN221277199U (en) Folding scaffold for building construction
CN215331141U (en) Fixing device is used in installation of assembled wallboard
CN212773360U (en) Mobile platform suitable for overhauling inside of rail tunnel
CN219137970U (en) Solar simple movable house
CN213703868U (en) Locking device for urban comprehensive pipe gallery die