CN219100272U - Anti-blocking building construction rainfall drainage structure - Google Patents

Anti-blocking building construction rainfall drainage structure Download PDF

Info

Publication number
CN219100272U
CN219100272U CN202320132119.9U CN202320132119U CN219100272U CN 219100272 U CN219100272 U CN 219100272U CN 202320132119 U CN202320132119 U CN 202320132119U CN 219100272 U CN219100272 U CN 219100272U
Authority
CN
China
Prior art keywords
box
drainage
baffle
building construction
accumulated water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320132119.9U
Other languages
Chinese (zh)
Inventor
周涛
戚晓轩
赵亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hua Lingjian Engineering Group Co ltd
Original Assignee
Anhui Hua Lingjian Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hua Lingjian Engineering Group Co ltd filed Critical Anhui Hua Lingjian Engineering Group Co ltd
Priority to CN202320132119.9U priority Critical patent/CN219100272U/en
Application granted granted Critical
Publication of CN219100272U publication Critical patent/CN219100272U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses an anti-blocking rainfall drainage structure for building construction, which belongs to the technical field of building construction, and comprises a drainage box for carrying out preliminary filtration on accumulated water, a baffle frame on the drainage box, a filter hole on the baffle frame for carrying out preliminary filtration treatment on the accumulated water, removing large debris and other impurities, enabling part of the accumulated water to fall between the drainage box and an inner box, filtering through a strip-shaped hole and entering the inner box, and if the accumulated water is large, directly overflowing the baffle frame and entering the inner box from the strip-shaped hole, wherein the baffle plate is positioned below the strip-shaped hole, accumulated water can be accumulated on a guide plate in an inclined design, part of sludge can flow downwards on the guide plate, and after filtration treatment, the accumulated water can flow into two drainage pipes for being discharged after overflowing the guide plate, so that the sludge and the impurities in the accumulated water can be isolated by the filter hole, the strip-shaped hole and the guide plate, and the guide plate can be prevented from causing blocking conditions on the drainage structure in a multistage filtration mode, the drainage efficiency is improved, and normal operation of construction is ensured.

Description

Anti-blocking building construction rainfall drainage structure
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to an anti-blocking rainfall drainage structure for building construction.
Background
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, and can be said to be the process of changing various lines on a design drawing into real objects at a designated place; the construction method comprises foundation engineering construction, main body structure construction, roof engineering construction, decoration engineering construction and the like, and the construction site is called building construction site or construction site and is also called building site.
In the building construction process, the building is subjected to rainfall in the environment, the drainage of rainwater generally adopts a rainwater pipe to lead to the drainage channel to run off, in the building construction process, the construction site is comprehensively drained and utilized for precipitation and ponding, the construction site is guaranteed to be clean, sundries such as dust and debris are always continuous, the construction site is extremely easy to fall onto a rainfall drainage structure when drainage is carried out, the drainage efficiency is affected, the construction site is fully covered with ponding, and the normal construction operation is affected.
Disclosure of Invention
In order to overcome the defects, the utility model provides the anti-blocking rainfall drainage structure for the building construction, which solves the problems that sundries such as dust and fragments are always on a construction site, and the sundries are easily dropped onto the rainfall drainage structure during drainage, so that blocking conditions are caused, drainage efficiency is affected, and water is fully accumulated on the construction site to affect normal construction operation.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a prevent construction rainfall drainage structure of jam, includes keeps off the subassembly outward, keep off the subassembly outward and be equipped with interior box, a plurality of bar hole has been seted up outward to interior box, be equipped with the water conservancy diversion subassembly in the interior box, the water conservancy diversion subassembly is located the below in bar hole, the slide has been seted up to the bottom in the subassembly that keeps off outward, the bottom sliding connection of interior box is in the slide, interior box bottom is through two sets of supporting components and outer bottom fixed connection in keeping off the subassembly, and the quantity of every supporting component of group is three.
As a further aspect of the utility model: the outer baffle assembly comprises a drainage box, a baffle frame is fixedly connected inside the drainage box, a plurality of filtering holes are formed in the baffle frame, and the periphery of the inner wall of the baffle frame is overlapped with the inner box.
As a further aspect of the utility model: the flow guide assembly comprises a baffle plate which is fixedly connected in the inner box, the baffle plate is positioned below the strip-shaped holes, two flow guide plates are fixedly connected on the baffle plate, and the flow guide plates are obliquely arranged on the baffle plate.
As a further aspect of the utility model: the support assembly comprises a telescopic rod, a spring is sleeved outside the telescopic rod, the top ends of the telescopic rod and the spring are fixedly connected with the bottom of the inner box, and the bottom ends of the telescopic rod and the spring are fixedly connected with the bottom of the drainage box.
As a further aspect of the utility model: the mud discharging pipe is arranged on two sides of the bottom of the drainage box, two drainage pipes are clamped at the bottom of the inner box, and the two drainage pipes penetrate through the bottom of the drainage box.
As a further aspect of the utility model: the slide way is arranged at the bottom of the drainage box, the slide way is of rectangular design, and the two sludge discharge pipes are respectively positioned at two sides of the slide way.
Compared with the prior art, the utility model has the beneficial effects that:
1. this prevent construction rainfall drainage structures of jam carries out preliminary filtration to ponding through setting up the drainage box, ponding flow direction is then preferred keep off the frame contact on this drainage structure with the drainage box, the filtration pore on keeping off the frame can be to ponding preliminary filtration treatment, get rid of debris such as big debris, some ponding then fall between drainage box and the interior box, the rethread bar hole filters and gets into in the box, if ponding is big then directly walk and keep off the frame and get into in the box from the bar hole, because the baffle is located bar hole below, ponding can pile up on the guide plate of slope design, some silt then flows down on the guide plate, ponding after filtration treatment can flow into in two drain pipes after the diffusion guide plate, make silt and debris in the ponding can be kept apart by filtration pore, bar hole and guide plate, can prevent to cause the jam condition to this drainage structure through multistage filterable mode, improve drainage efficiency, guarantee the normal clear of construction operation.
2. This prevent construction rainfall drainage structures of jam supports interior box through setting up supporting component, receives rivers to strike or the artificial interior box of stirring in interior box, and interior box can slide in the drainage box, and cooperation telescopic link and spring support interior box, and the messenger is interior box can reciprocate the shake from top to bottom, trembles the debris of bar hole upper portion, plays good clear stifled effect to the bar hole, therefore further improves this waterproof construction's anti-blocking effect.
3. This prevent construction rainfall drainage structure of jam, through setting up fender frame and straining Kong Laiguo and straining ponding, part ponding then falls to between drainage box and the interior box, can store up a large amount of silt between drainage box and interior box, when carrying out the mud work, put through external pumping mechanism with the drain pipe, can discharge the silt that produces, the debris of fender frame top is direct cleans and can get rid of, even the water is overflowed and is kept off the frame, the filtration pore is stopped up, because the height of interior box is higher than keeps off the frame, ponding can get into from the top in interior box upper bar hole, prevent debris too much influence normal drainage work.
Drawings
FIG. 1 is a schematic view of a three-dimensional structure of the present utility model;
FIG. 2 is a schematic cross-sectional view of the present utility model;
FIG. 3 is a schematic cross-sectional view of an outer gear assembly according to the present utility model;
FIG. 4 is a schematic cross-sectional view of the inner case of the present utility model;
FIG. 5 is a schematic view of a cross-section of a drain box according to the present utility model;
in the figure: 1. an outer gear assembly; 101. a drain box; 102. a blocking frame; 103. filtering holes; 2. an inner case; 3. a bar-shaped hole; 4. a flow guiding assembly; 401. a partition plate; 402. a deflector; 5. a slideway; 6. a support assembly; 601. a telescopic rod; 602. a spring; 7. a mud pipe; 8. and (5) a water drain pipe.
Detailed Description
The technical scheme of the patent is further described in detail below with reference to the specific embodiments.
As shown in fig. 1-5, the present utility model provides a technical solution: the utility model provides a prevent construction rainfall drainage structure of jam, including outer fender subassembly 1, be equipped with interior box 2 in the outer fender subassembly 1, outer fender subassembly 1 includes drainage box 101, the inside fixedly connected with of drainage box 101 keeps off frame 102, keep off and offer a plurality of filtration pore 103 on the frame 102, keep off the overlap joint of frame 102 inner wall and interior box 2 all around, through the cooperation between keeping off frame 102 and filtration pore 103, filtration pore 103 on keeping off frame 102 can be to ponding preliminary filtration treatment, get rid of debris such as big debris, improve subsequent drainage effect;
the inner box 2 is provided with a plurality of strip-shaped holes 3, the inner box 2 is internally provided with a flow guide component 4, the flow guide component 4 is positioned below the strip-shaped holes 3, the flow guide component 4 comprises a baffle 401, the baffle 401 is fixedly connected in the inner box 2, the baffle 401 is positioned below the strip-shaped holes 3, two flow guide plates 402 are fixedly connected on the baffle 401, and the flow guide plates 402 are obliquely arranged on the baffle 401, and due to the strip-shaped holes 3, even if water overflows a baffle frame 102, the filter holes 103 are blocked, and because the height of the inner box 2 is higher than that of the baffle frame 102, accumulated water can enter from the top of the strip-shaped holes 3 on the inner box 2, so that the normal drainage work is prevented from being influenced by excessive sundries; through the arrangement of the guide plates 402 and the baffle plates 401, as the baffle plates 401 are positioned below the strip-shaped holes 3, accumulated water can be accumulated on the guide plates 402 which are obliquely designed, part of sludge downwards flows on the guide plates 402, and the filtered accumulated water can flow into two drain pipes 8 to be discharged after passing through the guide plates 402, so that the condition that the sludge flows into the drain pipes 8 to cause blockage is prevented;
the slide way 5 has been seted up to the bottom sliding connection in the outer fender subassembly 1, the bottom of interior box 2 is in slide way 5, interior box 2 bottom is through two sets of supporting component 6 and the fixed connection in the outer fender subassembly 1, and the quantity of every supporting component 6 of group is three, supporting component 6 includes telescopic link 601, telescopic link 601 overcoat has spring 602, telescopic link 601 and spring 602's top all with interior box 2's bottom fixed connection, telescopic link 601 and spring 602's bottom all with drain box 101 bottom fixed connection, through the cooperation between telescopic link 601 and the spring 602, when interior box 2 receives rivers impact or artificial stirring interior box 2, interior box 2 can slide in drain box 101, cooperation telescopic link 601 and spring 602 support interior box 2, make interior box 2 can reciprocate the shake from top to bottom, shake off bar hole 3 upper portion debris, play good clear stifled effect to bar hole 3.
The both sides of drainage box 101 bottom all are equipped with mud pipe 7, and the bottom joint of interior box 2 has two drain pipes 8, and two drain pipes 8 run through the bottom of drainage box 101, and slide 5 is offered in the bottom in drainage box 101, and slide 5 is rectangular design, and two mud pipes 7 are located the both sides of slide 5 respectively, through setting up mud pipe 7, when carrying out the mud work, with the external mud pumping mechanism of drain pipe 8 switch-on, can discharge the silt that produces, keep off the debris direct cleaning of frame 102 top and can get rid of.
The working principle of the utility model is as follows:
when the water draining box is used, accumulated water is preliminarily filtered through the water draining box 101, the accumulated water firstly contacts with the baffle frame 102 on the water draining box 101 when flowing to the water draining structure, the filter holes 103 on the baffle frame 102 can be used for preliminarily filtering the accumulated water to remove sundries such as large chips, and part of accumulated water falls between the water draining box 101 and the inner box 2 and then is filtered through the strip-shaped holes 3 and enters the inner box 2;
if the water accumulation amount is large, the water directly overflows the baffle frame 102 and enters the inner box 2 from the strip-shaped holes 3, and as the baffle 401 is positioned below the strip-shaped holes 3, the water accumulation can be accumulated on the guide plate 402 which is obliquely designed, part of sludge flows downwards on the guide plate 402, and the filtered water accumulation can flow into the two drain pipes 8 to be discharged after flowing through the guide plate 402;
when the inner box 2 is impacted by water flow or the inner box 2 is manually stirred, the inner box 2 can slide in the drainage box 101, and the inner box 2 is supported by matching the telescopic rod 601 and the spring 602, so that the inner box 2 can shake up and down in a reciprocating manner, and the sundries on the strip-shaped hole 3 can shake off;
part of accumulated water falls between the drainage box 101 and the inner box 2, a large amount of sludge is accumulated between the drainage box 101 and the inner box 2, and when the sludge discharging work is carried out, the drainage pipe 8 is connected with an external sludge pumping mechanism, so that the generated sludge can be discharged, and impurities above the baffle frame 102 can be removed by directly cleaning;
when water passes over the baffle frame 102, the filter holes 103 are blocked, and accumulated water can enter from the top of the strip-shaped holes 3 on the inner box 2 because the height of the inner box 2 is higher than that of the baffle frame 102.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art in a specific case.
While the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes may be made without departing from the spirit of the present patent within the knowledge of one of ordinary skill in the art.

Claims (6)

1. The utility model provides a prevent construction rainfall drainage structure of jam, includes outer fender subassembly (1), its characterized in that: the utility model discloses a novel structure of the automobile outer shield assembly, including outer shield assembly (1), interior box (2) are equipped with in outer box (1), a plurality of bar hole (3) have been seted up outward to interior box (2), be equipped with water conservancy diversion subassembly (4) in interior box (2), water conservancy diversion subassembly (4) are located the below of bar hole (3), slide (5) have been seted up in outer shield assembly (1), the bottom sliding connection of interior box (2) is in slide (5), interior box (2) bottom is through two sets of supporting component (6) and outer shield assembly (1) in fixed connection, and the quantity of every group supporting component (6) is three.
2. An anti-clogging rainfall drainage structure for building construction as claimed in claim 1, wherein: the outer baffle assembly (1) comprises a drainage box (101), a baffle frame (102) is fixedly connected inside the drainage box (101), a plurality of filtering holes (103) are formed in the baffle frame (102), and the periphery of the inner wall of the baffle frame (102) is overlapped with the inner box (2).
3. An anti-clogging rainfall drainage structure for building construction as claimed in claim 1, wherein: the flow guide assembly (4) comprises a baffle plate (401), the baffle plate (401) is fixedly connected in the inner box (2), the baffle plate (401) is located below the strip-shaped holes (3), two flow guide plates (402) are fixedly connected to the baffle plate (401), and the flow guide plates (402) are obliquely arranged on the baffle plate (401).
4. An anti-clogging structure for rainfall drainage in building construction as claimed in claim 2, wherein: the support assembly (6) comprises a telescopic rod (601), a spring (602) is sleeved outside the telescopic rod (601), the top ends of the telescopic rod (601) and the spring (602) are fixedly connected with the bottom of the inner box (2), and the bottom ends of the telescopic rod (601) and the spring (602) are fixedly connected with the bottom inside the drainage box (101).
5. An anti-clogging structure for rainfall drainage in building construction as claimed in claim 2, wherein: mud discharging pipes (7) are arranged on two sides of the bottom of the drainage box (101), two drainage pipes (8) are clamped at the bottom of the inner box (2), and the two drainage pipes (8) penetrate through the bottom of the drainage box (101).
6. The anti-clogging building construction rainfall drainage structure of claim 5, wherein: the slide way (5) is arranged at the inner bottom of the drainage box (101), the slide way (5) is of rectangular design, and the two sludge discharge pipes (7) are respectively positioned at two sides of the slide way (5).
CN202320132119.9U 2023-01-13 2023-01-13 Anti-blocking building construction rainfall drainage structure Active CN219100272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320132119.9U CN219100272U (en) 2023-01-13 2023-01-13 Anti-blocking building construction rainfall drainage structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320132119.9U CN219100272U (en) 2023-01-13 2023-01-13 Anti-blocking building construction rainfall drainage structure

Publications (1)

Publication Number Publication Date
CN219100272U true CN219100272U (en) 2023-05-30

Family

ID=86429725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320132119.9U Active CN219100272U (en) 2023-01-13 2023-01-13 Anti-blocking building construction rainfall drainage structure

Country Status (1)

Country Link
CN (1) CN219100272U (en)

Similar Documents

Publication Publication Date Title
CN110984337B (en) Municipal drainage pipeline filtration
CN115012474B (en) Rainwater collection and recycling system for sponge city
CN112791508B (en) Purifier is collected to rainwater in sponge city
CN219100272U (en) Anti-blocking building construction rainfall drainage structure
CN108643325A (en) A kind of municipal drainage system
CN209276937U (en) A kind of drainage arrangement suitable for express highway pavement
CN215888510U (en) Take slope resin concrete escape canal
CN214693581U (en) Drainage filter equipment
CN214994272U (en) Rural rainwater collection device
CN213407900U (en) Sewage preliminary treatment equipment
CN115538567A (en) Sponge urban rainwater drainage governing system
CN210543779U (en) Hydraulic separator
KR100986644B1 (en) Rainwater treatment system
CN209703660U (en) Municipal works multiple filtration gutter inlet device
CN220790038U (en) Rainwater collecting well with built-in corrosion-resistant layer
CN220530939U (en) Rainwater collecting and treating device for house building water supply and drainage
CN213979244U (en) Prevent blockking up municipal administration well lid convenient to clearance
CN219157401U (en) Double-deck bridge drainage Kong Bizi
CN216713272U (en) Drainage ditch structure for housing construction
CN218653187U (en) Pretreatment equipment suitable for rural sewage treatment
CN217500385U (en) Water storage device for hydraulic engineering
CN218204695U (en) Integrated prefabricated pump station water pump blockage-free device
CN218204676U (en) Water supply installation is used in road construction
CN216943011U (en) Automatic mud discharging platform
CN220686528U (en) Drainage structure for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant