CN218948475U - Supporting device for adjustable PE pipe hot-melt welding - Google Patents

Supporting device for adjustable PE pipe hot-melt welding Download PDF

Info

Publication number
CN218948475U
CN218948475U CN202223176063.1U CN202223176063U CN218948475U CN 218948475 U CN218948475 U CN 218948475U CN 202223176063 U CN202223176063 U CN 202223176063U CN 218948475 U CN218948475 U CN 218948475U
Authority
CN
China
Prior art keywords
fixedly connected
fixing
double
hot
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223176063.1U
Other languages
Chinese (zh)
Inventor
杨小燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Lushun Industrial Co ltd
Original Assignee
Zhejiang Lushun Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Lushun Industrial Co ltd filed Critical Zhejiang Lushun Industrial Co ltd
Priority to CN202223176063.1U priority Critical patent/CN218948475U/en
Application granted granted Critical
Publication of CN218948475U publication Critical patent/CN218948475U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

The utility model relates to the technical field related to thermal fusion welding and discloses an adjustable PE pipe supporting device for thermal fusion welding, which comprises a base, wherein a fixing frame is fixedly connected to the base, a first fixing rod is fixedly connected to the fixing frame, a first double-head screw rod which is rotationally connected to the fixing frame is arranged on one side of the first fixing rod, first driving blocks are connected to two ends of the first double-head screw rod in a threaded manner, one end of a rotary supporting rod is rotationally connected to the first driving blocks, a lifting table is rotationally arranged at the other end of the rotary supporting rod, a fixing seat is fixedly connected to the lifting table, a heat-resistant pin head is fixedly connected to one side of the fixing seat, a thermal fusion head is fixedly connected to the outer wall of the heat-resistant pin head, a plug tube is fixedly connected to the other side of the fixing seat, and a thermal fusion tube is fixedly connected to the inner wall of the plug tube.

Description

Supporting device for adjustable PE pipe hot-melt welding
Technical Field
The utility model relates to the technical field related to thermal fusion welding, in particular to an adjustable supporting device for PE pipe thermal fusion welding.
Background
E pipe is a common pipe in China, plastic pipes are steadily developed, PE pipe, PP-R pipe and UPVC pipe all occupy one place, the strong development trend of PE pipe is most remarkable, the application field of PE pipe is wide, water supply pipe and gas pipe are two largest application markets, and PE pipe has the characteristic of excellent resistance to most chemicals for life and industry.
In PE pipe hot melt welding operation, need fix PE pipe on the support frame usually and carry out hot melt work, current PE pipe support frame is usually by construction team's preparation on spot, and this kind of simple and easy support frame only can realize the fixed lift of PE pipe, when being connected with the connector to the pipeline, still need the workman hand to tremble grafting, has increased workman's working strength, has reduced work efficiency.
Disclosure of Invention
The utility model aims to provide an adjustable supporting device for PE pipe hot-melt welding, which solves the problems in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a PE pipe strutting arrangement for hot melt welding with adjustable, the on-line screen storage device comprises a base, fixedly connected with mount on the base, fixedly connected with first dead lever in the mount, first dead lever one side is provided with the first double-end screw rod of rotation connection in the mount, first double-end screw rod both ends threaded connection has first drive piece, first drive piece both sides sliding connection is on first dead lever, rotate the one end that is connected with the rotation bracing piece on the first drive piece, the other end that rotates the bracing piece rotates there is the elevating platform, fixedly connected with fixing base on the elevating platform, fixing base one side fixedly connected with heat-resisting round pin head, fixedly connected with hot melt head on the heat-resisting round pin head outer wall, fixing base opposite side fixedly connected with cartridge, fixedly connected with hot melt cartridge on the cartridge inner wall still includes: and the pipeline clamping assembly is connected to the base, and the connector clamping assembly is connected to the base.
As a further scheme of the utility model: one side of the fixing frame is fixedly connected with a first motor, and an output shaft of the first motor penetrates through the fixing frame to be fixedly connected to the first double-head screw rod.
As a further scheme of the utility model: the base is fixedly connected with a side plate, a second fixing rod is fixedly connected between the side plates, one side of the second fixing rod is provided with a second double-head screw rod which is rotationally connected between the side plates, one end of the second double-head screw rod is in threaded connection with a second driving block, the other end of the second double-head screw rod is in threaded connection with a third driving block, and two sides of the second driving block and two sides of the third driving block are in sliding connection with the second fixing rod.
As a further scheme of the utility model: and one side of the side plate is fixedly connected with a second motor, and an output shaft of the second motor penetrates through the side plate to be fixedly connected to the second double-head screw rod.
As a further scheme of the utility model: the pipeline clamping assembly comprises a second supporting frame fixedly connected to the second driving block, a fixed buckle is fixedly connected to the second supporting frame, a rotary buckle is connected to one side of the second fixed buckle in a rotating mode, a pin hole matched with the rotary buckle is formed in one side of the rotary buckle, and a pin is connected to the rotary buckle in a sliding mode in the pin hole.
As still further aspects of the utility model: the connector clamping assembly comprises a first supporting frame fixedly connected to a third driving block, a movable frame is fixedly connected to the first supporting frame, a third fixing rod is fixedly connected to the movable frame, a third double-head screw rod rotationally connected to the movable frame is arranged on one side of the third fixing rod, fourth driving blocks are connected to two ends of the third double-head screw rod in a threaded mode, two sides of the fourth driving blocks are slidably connected to the third fixing rod, clamping buckles are fixedly connected to two ends of the fourth driving blocks, and knobs are connected to two ends of the third double-head screw rod in a threaded mode.
Compared with the prior art, the utility model has the beneficial effects that: according to the PE pipe and connector fixing device, the PE pipe and the connector are fixed, meanwhile, the PE pipe and the connector are subjected to hot melting and automatic connection, the working intensity of workers is reduced, the working efficiency of the workers is improved, and the practicability of the PE pipe and connector fixing device is improved.
Drawings
Fig. 1 is a schematic structural diagram of an adjustable support device for hot-melt welding a PE pipe according to the present utility model.
Fig. 2 is a side view of an adjustable support device for hot-melt welding a PE pipe according to the present utility model.
FIG. 3 is a cross-sectional view of an adjustable PE tube hot-melt welding support device according to the utility model.
FIG. 4 is a cross-sectional view of an adjustable PE tube hot-melt welding support device according to the utility model.
In the figure: 1-base, 2-mount, 3-first dead lever, 4-first double-headed screw, 5-first driving block, 6-rotation supporting rod, 7-elevating platform, 8-first motor, 9-fixing seat, 10-heat-resistant pin head, 11-hot melt head, 12-cartridge, 13-hot melt cartridge, 14-curb plate, 15-second dead lever, 16-second double-headed screw, 17-second driving block, 18-third driving block, 19-second motor, 20-first support frame, 21-movable frame, 22-third dead lever, 23-third double-headed screw, 24-fourth driving block, 25-clamping buckle, 26-knob, 27-second support frame, 28-fixing buckle, 29-rotation buckle, 30-pin hole, 31-pin.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1 to 4, in the embodiment of the utility model, an adjustable support device for PE pipe hot-melt welding includes a base 1, a fixing frame 2 is fixedly connected to the base 1, a first fixing rod 3 is fixedly connected to the fixing frame 2, a first double-headed screw 4 rotatably connected to the fixing frame 2 is provided at one side of the first fixing rod 3, two ends of the first double-headed screw 4 are in threaded connection with a first driving block 5, two sides of the first driving block 5 are slidably connected to the first fixing rod 3, one end of a rotary support rod 6 is rotatably connected to the first driving block 5, the other end of the rotary support rod 6 is rotatably provided with a lifting table 7, a fixing seat 9 is fixedly connected to the lifting table 7, a heat-resistant pin head 10 is fixedly connected to one side of the fixing seat 9, a hot-melt head 11 is fixedly connected to an outer wall of the heat-resistant pin head 10, a socket 12 is fixedly connected to the other side of the fixing seat 9, a hot-melt cylinder 13 is fixedly connected to an inner wall of the socket 12, a first motor 8 is fixedly connected to one side of the fixing frame 2, and an output shaft of the first motor 8 passes through the fixing frame 2 and is fixedly connected to the first double-headed screw 4, and further includes: the PE pipe is inserted into a plug cylinder 12, the outer wall of the PE pipe is hot-melted through a hot-melting cylinder 13, the connector is sleeved on a heat-resistant pin head 10, the inner wall of the connector is hot-melted through a hot-melting head 11, the PE pipe and the connector are pulled out after the hot melting is finished, a first double-headed screw 4 is driven to rotate through a first motor 8, a first driving block 5 is driven to move through threaded connection with a first driving block 5, the first driving block 5 is driven to descend through a rotating supporting rod 6, the PE pipe and the connector are driven to move in opposite directions, the PE pipe is inserted into the hot-melting end of the connector, and the hot-melting connection is finished after the connection is cooled.
In one case of this embodiment, referring to fig. 1 to 4, the base 1 is fixedly connected with side plates 14, a second fixing rod 15 is fixedly connected between the side plates 14, one side of the second fixing rod 15 is provided with a second double-headed screw 16 rotatably connected between the side plates 14, one end of the second double-headed screw 16 is in threaded connection with a second driving block 17, the other end of the second double-headed screw 16 is in threaded connection with a third driving block 18, the second driving block 17 and the two sides of the third driving block 18 are slidably connected on the second fixing rod 15, one side of the side plates 14 is fixedly connected with a second motor 19, an output shaft of the second motor 19 penetrates through the side plates 14 and is fixedly connected on the second double-headed screw 16.
In one case of this embodiment, referring to fig. 1 to 4, the pipe clamping assembly includes a second support frame 27 fixedly connected to the second driving block 17, a fixing buckle 28 is fixedly connected to the second support frame 27, a rotating buckle 29 is rotatably connected to one side of the second fixing buckle 28, a pin hole 30 matched with the rotating buckle 29 is provided on one side of the fixing buckle 28, a pin 31 is slidably connected to the pin hole 30, the pipe clamping assembly firstly places the PE pipe in the fixing buckle 28, then rotationally buckles the PE pipe on the fixing buckle 28 through the rotating buckle 29, and then inserts the pin 31 into the pin hole 30, so that the rotating buckle 29 and the fixing buckle 28 are limited, clamped and fixed through the mutual matching of the pin 31 and the pin hole 30.
In one case of this embodiment, referring to fig. 1 to 4, the connector clamping assembly includes a first support frame 20 fixedly connected to a third driving block 18, a moving frame 21 is fixedly connected to the first support frame 20, a third fixing rod 22 is fixedly connected to the moving frame 21, a third double-headed screw 23 rotatably connected to the moving frame 21 is disposed on one side of the third fixing rod 22, a fourth driving block 24 is screwed to two ends of the third double-headed screw 23, two sides of the fourth driving block 24 are slidably connected to the third fixing rod 22, two ends of the fourth driving block 24 are fixedly connected with clamping buckles 25, two ends of the third double-headed screw 23 are screwed with knobs 26, the connector clamping assembly firstly places the connector between the two groups of clamping buckles 25, and then drives the third double-headed screw 23 to rotate through screwing the knobs 26, so as to drive the two groups of fourth driving blocks 24 to move in opposite directions, thereby driving the two groups of clamping buckles 25 to tighten, and clamp the connector.
The working principle of the utility model is as follows: according to the PE pipe hot-melt device, a connector is placed between two groups of clamping buckles 25, a third double-headed screw 23 is driven to rotate through screwing a knob 26, the third double-headed screw 23 drives two groups of fourth driving blocks 24 to move oppositely through threaded connection with the fourth driving blocks 24, so that the two groups of clamping buckles 25 are driven to tighten, the connector is clamped and fixed, meanwhile, a PE pipe is placed in a fixed buckle 28, the PE pipe is rotationally buckled on the fixed buckle 28 through a rotary buckle 29, a pin 31 is inserted into a pin hole 30, the rotary buckle 29 and the fixed buckle 28 are limited and clamped and fixed through mutual matching of the pin 31 and the pin hole 30, then the second double-headed screw 16 is driven to rotate through threaded connection with the second driving block 17 and the third driving block 18, the PE pipe and the connector are driven to move oppositely through threaded connection with the second driving block 17 and the third driving block 18, the PE pipe is driven to be inserted into a plug cylinder 12, the PE pipe is thermally fused on the outer wall of the PE pipe through a hot-melt cylinder 13, the connector is sleeved on the fixed buckle 28, the pin 31 is then inserted into the hot-melt head 11 through the inner wall of the connector 11, the PE pipe is driven to move through the first heat-melt block 5, the PE pipe is driven to move through the threaded connection with the first driving block 5, the PE pipe is driven to move through the first driving block 5, and then the PE pipe is driven to move through the first driving block 5 is driven to move through the threaded connection with the first driving rod 5, and the first driving rod 5 is cooled, and finally, the PE pipe is cooled down through the first driving rod is connected with the first driving rod 5.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, alternatives, and improvements that fall within the spirit and scope of the utility model.

Claims (6)

1. The utility model provides a strutting arrangement for PE pipe hot melt welding with adjustable, including base (1), a serial communication port, fixedly connected with mount (2) on base (1), fixedly connected with first dead lever (3) in mount (2), first dead lever (3) one side is provided with rotates first double-end screw rod (4) of connection in mount (2), first double-end screw rod (4) both ends threaded connection has first drive piece (5), first drive piece (5) both sides sliding connection is on first dead lever (3), rotate the one end that is connected with rotation bracing piece (6) on first drive piece (5), the other end of rotation bracing piece (6) rotates there is elevating platform (7), fixedly connected with fixing base (9) on elevating platform (7), fixing base (9) one side fixedly connected with heat-resisting pin head (10), fixedly connected with hot melt head (11) on the outer wall of heat-resisting pin head (10), fixing base (9) opposite side fixedly connected with cartridge (12), fixedly connected with hot melt section of thick bamboo (13) on the inner wall of cartridge (12), still include: a pipeline clamping assembly connected to the base (1), and a connector clamping assembly.
2. The adjustable supporting device for the hot-melt welding of the PE pipe according to claim 1, wherein a first motor (8) is fixedly connected to one side of the fixing frame (2), and an output shaft of the first motor (8) penetrates through the fixing frame (2) and is fixedly connected to the first double-head screw (4).
3. The adjustable support device for hot-melt welding of PE pipes according to claim 1, wherein side plates (14) are fixedly connected to the base (1), second fixing rods (15) are fixedly connected between the side plates (14), second double-headed screws (16) which are rotatably connected between the side plates (14) are arranged on one sides of the second fixing rods (15), second driving blocks (17) are connected to one ends of the second double-headed screws (16) in a threaded mode, third driving blocks (18) are connected to the other ends of the second double-headed screws (16) in a threaded mode, and two sides of the second driving blocks (17) and the two sides of the third driving blocks (18) are slidably connected to the second fixing rods (15).
4. An adjustable support device for hot-melt welding of PE pipes according to claim 3, characterized in that a second motor (19) is fixedly connected to one side of the side plate (14), and an output shaft of the second motor (19) passes through the side plate (14) and is fixedly connected to the second double-headed screw (16).
5. An adjustable support device for hot-melt welding of a PE pipe according to claim 3, characterized in that the pipe clamping assembly comprises a second support frame (27) fixedly connected to the second driving block (17), a fixing buckle (28) is fixedly connected to the second support frame (27), a rotating buckle (29) is rotatably connected to one side of the second fixing buckle (28), a pin hole (30) matched with one another is formed in one side of the rotating buckle (29) and one side of the fixing buckle (28), and a pin (31) is slidably connected to the pin hole (30).
6. The adjustable support device for hot-melt welding of PE pipes according to claim 3, wherein the connector clamping assembly comprises a first support frame (20) fixedly connected to a third driving block (18), a movable frame (21) is fixedly connected to the first support frame (20), a third fixing rod (22) is fixedly connected to the movable frame (21), a third double-headed screw (23) rotatably connected to the movable frame (21) is arranged on one side of the third fixing rod (22), fourth driving blocks (24) are connected to two ends of the third double-headed screw (23) in a threaded manner, two sides of the fourth driving blocks (24) are slidably connected to the third fixing rod (22), clamping buckles (25) are fixedly connected to two ends of the fourth driving blocks (24), and knobs (26) are connected to two ends of the third double-headed screw (23) in a threaded manner.
CN202223176063.1U 2022-11-29 2022-11-29 Supporting device for adjustable PE pipe hot-melt welding Active CN218948475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223176063.1U CN218948475U (en) 2022-11-29 2022-11-29 Supporting device for adjustable PE pipe hot-melt welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223176063.1U CN218948475U (en) 2022-11-29 2022-11-29 Supporting device for adjustable PE pipe hot-melt welding

Publications (1)

Publication Number Publication Date
CN218948475U true CN218948475U (en) 2023-05-02

Family

ID=86104803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223176063.1U Active CN218948475U (en) 2022-11-29 2022-11-29 Supporting device for adjustable PE pipe hot-melt welding

Country Status (1)

Country Link
CN (1) CN218948475U (en)

Similar Documents

Publication Publication Date Title
CN209868023U (en) Involute spline shaft drilling self-positioning device
CN218948475U (en) Supporting device for adjustable PE pipe hot-melt welding
CN217799924U (en) Hot melt welding frock of water pump case
CN212761787U (en) Open type pipe welding equipment
CN217122304U (en) Welding tool for tubular heat exchanger
CN212311325U (en) Clamp for welding heating and ventilation pipe
CN212312788U (en) Hot plate welding mould convenient to laminating butt joint
CN209955337U (en) Waterproof ventilated membrane hot-pressing welding device
CN211589074U (en) Clamp for welding
CN213512483U (en) Stainless steel water pipe easy to splice and use
CN216599734U (en) Detection apparatus for cell-phone assembly production usefulness
CN212350968U (en) Clamp for welding heating and ventilation pipe
CN210451561U (en) Small-size tubular product welding frock
CN213794903U (en) Bimetal composite pipe fitting surfacing device
CN212495094U (en) Extrusion pliers for cold extrusion of reinforcing steel bar
CN221247444U (en) Automatic welding manipulator
CN219301896U (en) Tightness detection device for glass bottle processing
CN220372559U (en) Plate pipe welding counterpoint frock
CN218946803U (en) Clamping and fixing device for welding
CN212288721U (en) Flaring device for processing polyethylene pipeline
CN213796887U (en) Positioning device of small-cutting film cutting machine for heat-conducting gasket
CN219005024U (en) Welding gun head pipeline coiling device
CN219254638U (en) Full-angle welding device for round tube frame
CN211138198U (en) Knife scraping cloth splicing and repairing device
CN112731151B (en) Lithium ion battery's test bench

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant