CN218933549U - Assembled building curtain wall mounting structure - Google Patents

Assembled building curtain wall mounting structure Download PDF

Info

Publication number
CN218933549U
CN218933549U CN202222939859.1U CN202222939859U CN218933549U CN 218933549 U CN218933549 U CN 218933549U CN 202222939859 U CN202222939859 U CN 202222939859U CN 218933549 U CN218933549 U CN 218933549U
Authority
CN
China
Prior art keywords
mounting
wall
groove
fastening
skeleton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222939859.1U
Other languages
Chinese (zh)
Inventor
詹福善
陈明敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Ruixingda Curtain Wall Design Co ltd
Original Assignee
Fujian Ruixingda Curtain Wall Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Ruixingda Curtain Wall Design Co ltd filed Critical Fujian Ruixingda Curtain Wall Design Co ltd
Priority to CN202222939859.1U priority Critical patent/CN218933549U/en
Application granted granted Critical
Publication of CN218933549U publication Critical patent/CN218933549U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses an assembled building curtain wall mounting structure which comprises a framework, a curtain wall body, dovetail clamping grooves, a fastening structure and mounting grooves, wherein the curtain wall body is arranged on one side of the framework, the dovetail clamping grooves are formed in the outer walls of the two sides of the curtain wall body, the mounting grooves are formed in the outer walls of the framework at the positions of the dovetail clamping grooves, threaded holes are formed in the mounting grooves, the fastening structure is arranged in the mounting grooves, limit sliding blocks are arranged on the outer walls of the framework at the two sides of the mounting grooves, a mounting block is arranged between the framework at the positions of the mounting grooves and the curtain wall body, one end of each mounting block is welded with a dovetail plug-in unit, and the dovetail plug-in unit is matched with the dovetail clamping grooves. The utility model has the advantages of convenient operation, strong flexibility, convenient subsequent disassembly, single-person operation, improved installation firmness and capability of preventing the fastening bolt from being corroded.

Description

Assembled building curtain wall mounting structure
Technical Field
The utility model relates to the technical field of building curtain walls, in particular to an assembly type building curtain wall mounting structure.
Background
The curtain wall is an outer wall enclosure of a building, is not load-bearing, is hung like a curtain, is also called as a curtain wall, is a light wall body with a decorative effect commonly used in modern large-scale and high-rise buildings, and compared with the traditional construction process, the assembled curtain wall can be assembled by only screwing screws, so that the civil construction process is omitted, noise and dust pollution are basically avoided on site, the construction process is green and environment-friendly, the assembled curtain wall has better thermal effect, and besides the energy conservation in the construction process, the building can also keep very low energy consumption in operation.
The assembled building curtain is generally fixed on the wall surface by adopting a mounting structure when the assembled building curtain is applied to installation, but because the common mounting mode is mainly fixed by adopting screws at multiple points, one person is required to hold the curtain, one person is required to install the assembled building curtain, one person cannot install the assembled building curtain, the assembled building curtain is inconvenient to install and operate, and subsequent disassembly is difficult, so that improvement is needed.
Disclosure of Invention
The utility model aims to provide an assembled building curtain wall mounting structure, which aims to solve the problem that the mounting structure is inconvenient to mount and operate in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides an assembled building curtain mounting structure, includes skeleton, curtain body, forked tail draw-in groove, fastening structure and mounting groove, the curtain body sets up in one side of skeleton, the forked tail draw-in groove all sets up on the outer wall of curtain body both sides, the mounting groove sets up on the skeleton outer wall of forked tail draw-in groove position department, just the inside of mounting groove all is provided with the screw hole, fastening structure sets up the inside at the mounting groove, all be provided with spacing slider on the skeleton outer wall of mounting groove both sides, be provided with the installation piece between skeleton and the curtain body of mounting groove position department, just the one end welding of installation piece has the forked tail plug-in components, and forked tail plug-in components and forked tail draw-in groove mutually support.
Preferably, the skeleton is internally provided with equidistant expansion screws, so that the skeleton is conveniently fixed on a wall.
Preferably, the outer wall of one side, far away from the dovetail plug-in components, of the mounting block is welded with a limiting sliding block, and the limiting sliding block is matched with the limiting sliding groove, so that the mounting block is in sliding connection with the framework.
Preferably, the inside of fastening structure has set gradually fastening plate, rubber piece, through-hole, the inside of mounting groove is provided with the fastening plate, just the one end of fastening plate extends to one side of installation piece and glues and have the rubber piece to the rubber piece closely laminates with the installation piece, is convenient for fix a position the installation piece.
Preferably, one side of the inside of the fastening plate is provided with a through hole, the inside of the through hole is provided with a fastening bolt, and one end of the fastening bolt extends to the inside of the threaded hole, so that the installation firmness is improved.
Preferably, the protection cover plate is installed on the outer wall of the framework on one side of the installation groove through the hinge, a rubber sheet is adhered to the inner wall of the protection cover plate, and a magnetic attraction strip is adhered to the inner wall of the protection cover plate on the outer side of the rubber sheet, so that the fastening bolt is prevented from being corroded.
Compared with the prior art, the utility model has the beneficial effects that: the mounting structure of the assembled building curtain wall is convenient to operate, high in flexibility, convenient to detach and capable of being operated by a single person, improves the mounting firmness and can prevent the fastening bolts from being corroded;
through being provided with forked tail draw-in groove, installation piece, forked tail plug-in components, spacing spout, spacing slider, the spacing slider card of installation piece one side is advanced in the spacing spout on the skeleton outer wall for installation piece and skeleton sliding connection, place the curtain body in one side of skeleton, and with the forked tail plug-in components card of installation piece surface advance in the forked tail draw-in groove on the curtain body outer wall, make installation piece and curtain body sliding connection, the curtain body passes through the installation piece and installs on the skeleton, this mounting means simple operation, the flexibility is strong, follow-up dismantlement of being convenient for, but single person's operation moreover;
through the arrangement of the fastening plate, the rubber block, the through hole, the fastening bolt and the protective cover plate, the fastening plate is placed in the mounting groove, the rubber block at one end of the fastening plate props against the mounting block, and then the fastening bolt penetrates through the through hole and is screwed into the threaded hole, so that the fastening plate compresses the mounting block, and the mounting firmness is improved;
through being provided with protective cover plate, sheet rubber, magnetism and inhale the strip, cover protective cover plate on the mounting groove, protective cover plate is inhaled strip and fastening plate magnetism actuation through magnetism, and protective cover plate and sheet rubber's setting can cover fastening bolt to can prevent fastening bolt corrosion.
Drawings
FIG. 1 is a schematic elevational view of the present utility model;
FIG. 2 is a schematic perspective view of a curtain wall body according to the present utility model;
FIG. 3 is an enlarged schematic view of the structure of FIG. 1A according to the present utility model;
FIG. 4 is a schematic view of a partially enlarged structure of the mounting framework of the present utility model;
fig. 5 is an enlarged schematic top view of the fastening structure of the present utility model.
In the figure: 1. a skeleton; 2. a curtain wall body; 3. dovetail clamping grooves; 4. a mounting block; 5. a dovetail insert; 6. limiting sliding grooves; 7. a limit sliding block; 8. a fastening structure; 801. a fastening plate; 802. a rubber block; 803. a through hole; 804. a fastening bolt; 9. a protective cover plate; 10. a rubber sheet; 11. a magnetic strip; 12. a mounting groove; 13. and (3) a threaded hole.
Detailed Description
The technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model, and all other embodiments obtained by those skilled in the art without making any inventive effort based on the embodiments of the present utility model are within the scope of protection of the present utility model.
Referring to fig. 1-5, an embodiment of the present utility model is provided: the curtain wall mounting structure of the assembled building comprises a framework 1, a curtain wall body 2, a dovetail clamping groove 3, a fastening structure 8 and a mounting groove 12, wherein the curtain wall body 2 is arranged on one side of the framework 1;
the inside of the framework 1 is provided with equidistant expansion screws, so that the framework 1 is conveniently fixed on a wall;
dovetail clamping grooves 3 are formed in the outer walls of the two sides of the curtain wall body 2;
the mounting groove 12 is arranged on the outer wall of the framework 1 at the position of the dovetail clamping groove 3, and threaded holes 13 are formed in the mounting groove 12;
the fastening structure 8 is arranged inside the mounting groove 12;
the inside of the fastening structure 8 is sequentially provided with a fastening plate 801, a rubber block 802 and a through hole 803, the inside of the mounting groove 12 is provided with the fastening plate 801, one end of the fastening plate 801 extends to one side of the mounting block 4 and is adhered with the rubber block 802, and the rubber block 802 is tightly adhered with the mounting block 4;
a through hole 803 is provided on one side of the inside of the fastening plate 801, a fastening bolt 804 is provided in the inside of the through hole 803, and one end of the fastening bolt 804 extends to the inside of the screw hole 13;
the fastening plate 801 is placed in the mounting groove 12, so that the rubber block 802 at one end of the fastening plate 801 props against the mounting block 4, and then the fastening bolt 804 passes through the through hole 803 and is screwed into the threaded hole 13, so that the fastening plate 801 compresses the mounting block 4, and the mounting firmness is improved;
limiting sliding blocks 7 are arranged on the outer walls of the frameworks 1 at two sides of the mounting groove 12;
a mounting block 4 is arranged between the framework 1 and the curtain wall body 2 at the position of the mounting groove 12, a dovetail insert 5 is welded at one end of the mounting block 4, and the dovetail insert 5 is matched with the dovetail clamping groove 3;
the outer walls of the side, far away from the dovetail plug-in components 5, of the mounting blocks 4 are welded with limit sliding blocks 7, and the limit sliding blocks 7 are matched with limit sliding grooves 6, so that the mounting blocks 4 are conveniently connected with the framework 1 in a sliding manner;
the protection cover plate 9 is installed on the outer wall of the framework 1 on one side of the installation groove 12 through a hinge, a rubber sheet 10 is adhered to the inner wall of the protection cover plate 9, and a magnetic suction strip 11 is adhered to the inner wall of the protection cover plate 9 on the outer side of the rubber sheet 10, so that the fastening bolt 804 is prevented from being corroded.
When the embodiment of the application is used, the following steps are adopted: firstly, fix skeleton 1 on the wall through the inflation screw, secondly, block the spacing slider 7 of installation piece 4 one side into spacing spout 6 on the skeleton 1 outer wall, make installation piece 4 and skeleton 1 sliding connection, place curtain wall body 2 in one side of skeleton 1, and block the forked tail plug-in components 5 of installation piece 4 surface into the forked tail draw-in groove 3 on curtain wall body 2 outer wall, make installation piece 4 and curtain wall body 2 sliding connection, at this moment, curtain wall body 2 installs on skeleton 1 through installation piece 4, this mounting means simple operation, but the follow-up dismantlement of being convenient for, but single person's operation moreover, then put into mounting groove 12 with fastening plate 801, make the rubber block 802 of fastening plate 801 one end support installation piece 4, pass through hole 803 and precession screw hole 13 again with fastening bolt 804, make fastening plate 801 compress tightly installation piece 4, thereby the fastness of installation has been improved, finally, cover protection cover plate 9 covers on mounting groove 12, protection cover plate 9 through magnetic attraction with fastening plate 801, protection cover plate 9 and rubber sheet 10 set up can carry out the fastening bolt 804 to the installation structure, thereby rust-proof structure is completed.

Claims (4)

1. The utility model provides an assembled building curtain mounting structure, its characterized in that includes skeleton (1), curtain body (2), forked tail draw-in groove (3), fastening structure (8) and mounting groove (12), curtain body (2) set up in one side of skeleton (1), forked tail draw-in groove (3) all set up on the outer wall of curtain body (2) both sides, mounting groove (12) set up on the skeleton (1) outer wall of forked tail draw-in groove (3) position department, just the inside of mounting groove (12) all is provided with screw hole (13), fastening structure (8) set up in the inside of mounting groove (12), all be provided with spacing slider (7) on the skeleton (1) outer wall of mounting groove (12) both sides, be provided with installation piece (4) between skeleton (1) and curtain body (2) of mounting groove (12) position department, just the one end welding of installation piece (4) has forked tail plug-in components (5), and forked tail plug-in components (5) and forked tail draw-in groove (3) mutually support;
the outer walls of one sides of the mounting blocks (4) far away from the dovetail plug-in components (5) are welded with limit sliding blocks (7), and the limit sliding blocks (7) are matched with the limit sliding grooves (6);
the inside of fastening structure (8) has set gradually fastening plate (801), rubber piece (802), through-hole (803), the inside of mounting groove (12) is provided with fastening plate (801), just one end of fastening plate (801) extends to one side of installation piece (4) and glues and have rubber piece (802), and rubber piece (802) closely laminates with installation piece (4).
2. The fabricated building curtain wall mounting structure according to claim 1, wherein: the inside of skeleton (1) all is provided with equidistant expansion screw.
3. The fabricated building curtain wall mounting structure according to claim 1, wherein: a through hole (803) is formed in one side of the inside of the fastening plate (801), a fastening bolt (804) is arranged in the through hole (803), and one end of the fastening bolt (804) extends to the inside of the threaded hole (13).
4. The fabricated building curtain wall mounting structure according to claim 1, wherein: the protection cover plate (9) is installed on the outer wall of the framework (1) at one side of the installation groove (12) through a hinge, a rubber sheet (10) is adhered to the inner wall of the protection cover plate (9), and a magnetic suction strip (11) is adhered to the inner wall of the protection cover plate (9) at the outer side of the rubber sheet (10).
CN202222939859.1U 2022-11-04 2022-11-04 Assembled building curtain wall mounting structure Active CN218933549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222939859.1U CN218933549U (en) 2022-11-04 2022-11-04 Assembled building curtain wall mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222939859.1U CN218933549U (en) 2022-11-04 2022-11-04 Assembled building curtain wall mounting structure

Publications (1)

Publication Number Publication Date
CN218933549U true CN218933549U (en) 2023-04-28

Family

ID=86063153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222939859.1U Active CN218933549U (en) 2022-11-04 2022-11-04 Assembled building curtain wall mounting structure

Country Status (1)

Country Link
CN (1) CN218933549U (en)

Similar Documents

Publication Publication Date Title
CN218933549U (en) Assembled building curtain wall mounting structure
CN205077670U (en) Outer containment system of unit assembly type structure
CN212926841U (en) Composite assembly formula wallboard and interior wall connection structure
CN205077678U (en) Outer containment system's of building panel unit
CN211949103U (en) Building curtain wall who founds outward convenient to maintain
CN210737854U (en) Sound insulation curtain wall convenient to install
CN112282249A (en) Assembled wall decorative board
CN208122166U (en) A kind of decorative panel installation foundation keel
CN206308859U (en) Environmental and durable bar section of stainless steel curtain wall system
CN210947497U (en) Outer wall dog-ear decorative board connection structure
CN220301593U (en) Thermal insulation external wall curtain wall
CN204691013U (en) A kind of Novel curtain wall structure built for the low energy
CN220100307U (en) Overlap joint formula curtain board mounting frame
CN205077671U (en) Outer containment system of unit assembly type structure with strip window
CN219773301U (en) Unit assembled type outer protective building system
CN216787560U (en) Energy-saving environment-friendly curtain wall with splicing structure
CN205046717U (en) Outer containment system of unit assembly type structure with strip window
CN219343783U (en) Color steel tile with high stability
CN215442563U (en) Glass curtain wall unit used as railing
CN214614861U (en) Decorate assembled environmental protection curtain
CN217400754U (en) Door pocket structure of wooden fireproof door
CN204212297U (en) Energy-saving heat-insulating curtain wall postposition fixed structure
CN220644950U (en) Decorative wallboard
CN215406776U (en) Simply-installed building curtain wall
CN220666608U (en) High-strength heat-insulation curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant