CN218860148U - Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower - Google Patents

Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower Download PDF

Info

Publication number
CN218860148U
CN218860148U CN202221655504.3U CN202221655504U CN218860148U CN 218860148 U CN218860148 U CN 218860148U CN 202221655504 U CN202221655504 U CN 202221655504U CN 218860148 U CN218860148 U CN 218860148U
Authority
CN
China
Prior art keywords
pole
hoisting
head
holding
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221655504.3U
Other languages
Chinese (zh)
Inventor
钟文
万华翔
汤小兵
常天成
窦鑫
郭超
尹黎明
张永清
武抒理
杨少春
刘云飞
黄朝永
朱立明
单长孝
余刚
张超
谢仁海
张炎燚
刘峰
汪余坤
马京
杨庆东
张文涛
周志祥
田埂
陶星东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shunkai Testing Technology Co ltd
Original Assignee
Anhui Power Transmission and Transformation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Power Transmission and Transformation Engineering Co Ltd filed Critical Anhui Power Transmission and Transformation Engineering Co Ltd
Priority to CN202221655504.3U priority Critical patent/CN218860148U/en
Application granted granted Critical
Publication of CN218860148U publication Critical patent/CN218860148U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

An embodiment of the utility model provides a special pole and hoist and mount system of embracing of column pit shaft is strideed across greatly in Yangtze river belongs to the construction tool field. The holding pole comprises: the pole comprises a pole head, wherein the pole head is square, first hoisting plates parallel to the height direction of the pole head are arranged near four corners of the pole head, first hoisting holes are formed in the first hoisting plates, second hoisting plates perpendicular to the side surfaces of the pole head are arranged on four outer side surfaces of the pole head, second hoisting holes are formed in the second hoisting plates, a third hoisting plate perpendicular to the second hoisting plates is arranged below the second hoisting plates, and third hoisting holes are formed in the third hoisting plates; the top of the pole holding top section is connected with the bottom of the head of the pole holding body so as to support the head of the pole holding body. The holding pole can conveniently lift the hoisting shaft to a specified position according to requirements.

Description

Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower
Technical Field
The utility model relates to a construction tool field specifically relates to a special armful of pole and hoist and mount system of Changjiang river stride across tower pit shaft hoist and mount greatly.
Background
In China, the shaft of the Yangtze river large-span tower is hoisted by adopting a mode of installing a beam crane or a hoisting trolley group on the top of the tower, but when the structural span of the tower head of the Yangtze river large-span tower reaches 17m and the maximum weight of a single shaft reaches 14.558 tons, the self weight of the beam crane meeting the performance requirement often exceeds 10 tons, and the structural strength of an iron tower cannot meet the requirement; the hoisting tackle set is adopted to hoist the shaft tools and appliances, and is relatively multiple and complex in operation, the technical difficulty is that the uppermost shaft is hoisted, the construction difficulty is large, the risk is high, and the conventional holding rod supporting device is difficult to meet the hoisting requirement of the shaft.
SUMMERY OF THE UTILITY MODEL
The embodiment of the utility model provides a special pole and the hoist and mount system of embracing of Changjiang river stride across tower pit shaft hoist and mount should embrace the pole and can will hoist the convenient hoist to appointed position of pit shaft as required.
In order to realize the above-mentioned purpose, on the one hand, the embodiment of the utility model provides a pole is embraced in special use of long river stride across tower pit shaft hoist and mount, embrace the pole and include:
the pole comprises a pole head part, wherein the pole head part is square, first hoisting plates parallel to the height direction of the pole head part are arranged near four corners of the pole head part, first hoisting holes are formed in the first hoisting plates, second hoisting plates perpendicular to the side surfaces of the pole head part are arranged on four outer side surfaces of the pole head part, second hoisting holes are formed in the second hoisting plates, a third hoisting plate perpendicular to the second hoisting plates is arranged below the second hoisting plates, and third hoisting holes are formed in the third hoisting plates;
the top of the pole holding top section is connected with the bottom of the head of the pole holding to support the head of the pole holding;
one end of the pole holding standard knot is connected with the bottom of the pole holding top knot to support the pole holding top knot;
the top of the pole holding bottom section is connected with the other end of the pole holding standard section so as to support the pole holding standard section;
the two pole embracing bases are respectively arranged on two sides of the bottom of the pole embracing bottom section, and connecting holes are formed in the end portions of the pole embracing bases and are matched with mounting holes of an external hoisting frame to be rotatably connected through the connecting holes.
Optionally, the number of the holding pole standard sections is multiple, and the holding pole standard sections are connected with each other to increase the length of the holding pole.
Optionally, hold the bottom of pole top section two tip of holding the pole standard festival with hold near four angles welding at the top of pole end section have the connection piece, and the same position is equipped with the connecting hole on the connection piece, will through the cooperation of bolt and connecting hole hold the pole top section hold the pole standard festival with hold the pole end section and link together.
Optionally, the pole comprises a first reinforcing rib respectively connected between the first hoisting plate and the side of the pole head.
Optionally, the pole comprises a second reinforcing rib respectively connected between the second hoisting plate and the side of the pole head.
Optionally, the outer edges of the first hoisting hole, the second hoisting hole and the third hoisting hole are provided with reinforcing rings.
Optionally, the total length of the pole is 9 meters, and the length of the pole standard knot is 2 meters.
On the other hand, this use novel embodiment still provides a longjiang river stridees across pit shaft hoist and mount system, hoist and mount system includes: hoisting frame and embrace the pole as stated above.
Through the technical scheme, the utility model provides a pair of special pole and the hoist and mount system of embracing of column pit shaft hoist and mount are provided with and embrace the pole head in Yangtze river stride across greatly, be equipped with in the below of embracing the pole head and embrace the pole overhead knot, should embrace the pole overhead knot and be used for supporting this and embrace the pole head, be equipped with in the below of embracing the pole overhead knot and embrace the pole standard festival in order to support and embrace the pole overhead knot, be equipped with in the below of embracing the pole standard festival and embrace the pole end knot, be equipped with two armful pole bases in the below of embracing the pole end knot, embrace the pole base and be connected with the bottom both sides of embracing the pole end knot, be equipped with the connecting hole and rotate with the mounting hole cooperation of outside hoist and mount frame at armful pole base and be connected. This embrace first hoist and mount board and the second hoist and mount board of pole head and be used for supplying hoist and mount pit shaft installation hoisting point and be connected with outside hoist and mount frame, the third hoist and mount board of this armful of pole head both sides can be connected on hoist and mount frame through the hawser to should stabilize this armful of pole, make objects such as hoist and mount pit shaft that this armful of pole can be better. The pole base of the pole can be rotatably connected with the mounting hole of the external hoisting frame, so that the angle of the pole can be adjusted as required, and the pole can be used for hoisting objects such as a shaft and the like better.
Other features and advantages of embodiments of the present invention will be described in detail in the detailed description which follows.
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the embodiments of the invention, but do not constitute a limitation of the embodiments of the invention. In the drawings:
fig. 1 is an overall schematic view of a holding pole special for hoisting a shaft of a great cross tower in the Yangtze river according to an embodiment of the present invention;
fig. 2 is a schematic view of a holding pole base of a holding pole special for hoisting a shaft of a great crossing tower in the Yangtze river according to an embodiment of the present invention;
fig. 3 is a three-dimensional schematic view of a holding pole head of a holding pole special for hoisting a shaft of a great crossing tower in the Yangtze river according to an embodiment of the present invention;
fig. 4 is a top view of a holding pole standard knot of a special holding pole for hoisting a shaft of a great cross tower in the Yangtze river according to an embodiment of the present invention.
Description of the reference numerals
1. Embrace pole head 10, first hoisting plate
11. First lifting hole 12 and second lifting plate
13. Second lifting hole 14 and third lifting plate
15. Hoisting hole 2 and holding pole top section in the third year
3. Holding pole standard knot 4 and holding pole bottom knot
5. Embrace pole base 50, first connecting hole
6. Connecting sheet 60, second connecting hole
7. First reinforcing rib 8 and second reinforcing rib
9. Reinforcing ring
Detailed Description
The following describes in detail embodiments of the present invention with reference to the accompanying drawings. It is to be understood that the description herein is only intended to illustrate and explain embodiments of the present invention, and is not intended to limit embodiments of the present invention.
Fig. 1 is an overall schematic view of a special holding pole for hoisting a shaft of a great cross tower in the Yangtze river according to an embodiment of the present invention. Fig. 2 is a schematic diagram of a pole base of a pole specially used for hoisting a shaft of a great-span tower in the Yangtze river according to an embodiment of the present invention. Fig. 3 is a three-dimensional schematic view of a holding pole head of a special holding pole for hoisting a shaft of a great cross tower in the Yangtze river according to an embodiment of the present invention. In an embodiment of the present invention, the holding pole may include: the pole comprises a pole head 1, a pole top section 2, a pole standard section 3, a pole bottom section 4 and a pole base 5. The pole head 1 is square, and first hoisting plates 10 parallel to the height direction of the pole head 1 can be arranged near four corners of the pole head 1. The first hoisting plate 10 may be provided with a first hoisting hole 11. And the four outer side surfaces of the head part 1 of the holding pole are provided with second hoisting plates 12 vertical to the side surfaces of the head part 1 of the holding pole. A second hoisting hole 13 may be provided in the second hoisting plate 12. A third lifting plate 14 may be provided under the second lifting plate 12 to be perpendicular to the second lifting plate 12. A third hoisting hole 15 may be provided on the third hoisting plate 14. The top of the pole top section 2 can be connected with the bottom of the pole head 1 to support the pole head 1. One end of the pole holding standard knot 3 can be connected with the bottom of the pole holding top knot 2 so as to support the pole holding top knot 2. The top of the pole holding bottom section 4 can be connected with the other end of the pole holding standard section 3 to support the pole holding standard section 3. The number of the pole embracing bases 5 can be two, the pole embracing bases can be respectively arranged on two sides of the bottom of the pole embracing bottom section 4, and the end parts of the pole embracing bases 5 can be provided with first connecting holes 50. The pole holding base 5 can be matched and rotatably connected with an installation hole of an external hoisting frame through a first connection hole 50.
When objects such as a shaft and the like need to be hoisted, the first hoisting hole 11 on the first hoisting plate 10 or the second hoisting hole 13 on the second hoisting plate 12 of the head part 1 of the derrick mast can be selected as a hoisting point, and then the first hoisting plate 10 or the second hoisting plate 12 opposite to the first hoisting plate 10 or the second hoisting plate 12 as the hoisting point is connected with an external hoisting frame as a connecting point to support the derrick mast, so that the derrick mast can hoist the objects such as the shaft and the like. When the first hoisting plate 10 and the other first hoisting plate 10 opposite to the first hoisting plate 10 are hung with objects such as shafts and hoisting frames, or the second hoisting plate 12 and the second hoisting plate 12 opposite to the second hoisting plate 12 are hung with objects such as shafts and hoisting frames, two third hoisting plates 14 which are not on the same side with the first hoisting plate 10 or the second hoisting plate 12 can be respectively connected with the hoisting frames through cables, so that the holding rod can be more stably fixed on the hoisting frames, the holding rod base 5 of the holding rod can be rotatably connected with the hoisting frames, and the holding rod can be adjusted to a certain angle according to the working requirements on site so as to better hoist the objects such as shafts and the like. When the hoisting operation is performed, the first hoisting hole 11 on the first hoisting plate 10 or the second hoisting hole 13 on the second hoisting plate 12 can be used as a hoisting point as required, so that objects such as a shaft can be hoisted better.
The utility model discloses an in the embodiment, this hold pole standard festival 3's quantity can be a plurality of, can interconnect in order to increase the length of holding the pole. When the length of this armful of pole needs to be increased, can prepare a plurality of standard festival 3 of embracing the pole according to the length that needs increased, then with the length of this a plurality of standard festival 3 interconnect of embracing the pole in order to increase this armful of pole.
In an embodiment of the utility model, as shown in fig. 4, the connecting pieces 6 can be welded near four angles at the bottom of the top section 2 of the holding pole, two ends of the standard section 3 of the holding pole and the top of the bottom section 4 of the holding pole. The same position on these a plurality of connection pieces 6 can be equipped with second connecting hole 60, and then can link together the bottom of embracing pole top section 2 and the cooperation of embracing pole standard festival 3 through bolt and second connecting hole 60, link together the bottom of embracing pole standard festival 3 and the top of embracing pole bottom section 4. When the pole is not needed to hoist objects, bolts between the pole top section 2 and the pole standard section 3 can be removed, so that the pole top section 2 and the pole standard section 3 can be separated. The bolts between the pole holding standard knot 3 and the pole holding bottom knot 4 are removed, so that the pole holding standard knot 3 and the pole holding bottom knot 4 are separated, and subsequent transportation and assembly are facilitated.
In one embodiment of the present invention, as shown in fig. 3, the holding pole may include a first reinforcing rib 7. The first reinforcing ribs 7 may be connected between the first lifting plate 10 and the side of the mast head 1 respectively. Due to the existence of the first reinforcing ribs 7, the first hoisting plate 10 can be connected to the head part 1 of the holding pole more stably, so that the first hoisting plate 10 is not easy to break in the hoisting process.
In one embodiment of the present invention, as shown in fig. 3, the holding pole may include a second reinforcing rib 8. The second reinforcing bar 8 may be connected between the second lifting plate 12 and the side of the head 1 of the pole respectively. Because the second reinforcing rib 8 exists, the second hoisting plate 12 can be connected to the head part 1 of the holding pole more stably, and the second hoisting plate 12 is not easy to break in the hoisting process.
In an embodiment of the present invention, as shown in fig. 3, the outer edge of the first hole for hoisting 11, the second hole for hoisting 13 and the third hole for hoisting 15 can be provided with a reinforcing ring 9. The strength of the first hoisting hole 11, the second hoisting hole 13 and the third hoisting hole 15 which can be reinforced by the reinforcing ring 9 makes the first hoisting hole 11, the second hoisting hole 13 and the third hoisting hole 15 not easy to break when being connected with the outside.
The utility model discloses an in the embodiment, should embrace the total length of pole and can be 9 meters, should embrace the length of pole standard festival 3 and can be 2 meters to in objects such as better hoist and mount pit shaft.
On the other hand, the utility model also provides a longjiang river stridees across pit shaft hoist and mount system, this hoist and mount system can be including hoist and mount frame with as above-mentioned embrace the pole.
Through the technical scheme, the utility model provides a pair of special armful of pole and hoist and mount system of Changjiang river stride across tower pit shaft hoist and mount are provided with armful of pole head, be equipped with armful of pole overhead gage in the below of armful of pole head, this armful of pole overhead gage is used for supporting this armful of pole head, be equipped with armful of pole standard festival in order to support armful of pole overhead gage in the below of armful of pole overhead gage, be equipped with armful of pole end festival in the below of armful of pole standard festival, be equipped with two armful of pole bases in the below of armful of pole end festival, armful of pole base is connected with the bottom both sides of armful of pole end festival, be equipped with the connecting hole at armful of pole base and rotate with the mounting hole cooperation of outside hoist and mount and be connected. This embrace first hoist and mount board and the second hoist and mount board of pole head and be used for supplying hoist and mount pit shaft installation hoisting point and be connected with outside hoist and mount frame, the third hoist and mount board of this armful of pole head both sides can be connected on hoist and mount frame through the hawser to should stabilize this armful of pole, make objects such as hoist and mount pit shaft that this armful of pole can be better. The pole base of the pole can be rotatably connected with the mounting hole of the external hoisting frame, so that the angle of the pole can be adjusted as required, and the pole can be used for hoisting objects such as a shaft and the like better.
It should also be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising a," "8230," "8230," or "comprising" does not exclude the presence of additional identical elements in the process, method, article, or apparatus comprising the element.
The above are merely examples of the present application and are not intended to limit the present application. Various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims (8)

1. The utility model provides a special pole of embracing of long river stride across tower pit shaft hoist and mount which characterized in that, it includes to embrace the pole:
the pole comprises a pole head (1), wherein the pole head is square, first hoisting plates (10) parallel to the height direction of the pole head (1) are arranged near four corners of the pole head, first hoisting holes (11) are formed in the first hoisting plates (10), second hoisting plates (12) perpendicular to the side surfaces of the pole head (1) are arranged on four outer side surfaces of the pole head (1), second hoisting holes (13) are formed in the second hoisting plates (12), third hoisting plates (14) perpendicular to the second hoisting plates (12) are arranged below the second hoisting plates (12), and third hoisting holes (15) are formed in the third hoisting plates (14);
the top of the pole holding top section (2) is connected with the bottom of the pole holding head (1) to support the pole holding head (1);
one end of the pole holding standard knot (3) is connected with the bottom of the pole holding top knot (2) to support the pole holding top knot (2);
the top of the pole holding bottom section (4) is connected with the other end of the pole holding standard section (3) to support the pole holding standard section (3);
two pole base (5) of embracing set up respectively the bottom both sides of embracing pole base (4) the tip of embracing pole base (5) is equipped with first connecting hole (50), in order to pass through first connecting hole (50) are connected with the mounting hole cooperation rotation of outside hoist and mount frame.
2. A pole according to claim 1, wherein the pole standard knot (3) is provided in a plurality of numbers, interconnected to increase the length of the pole.
3. The pole of claim 1, wherein connecting pieces (6) are welded near the bottom of the pole top section (2), two ends of the pole standard section (3) and four corners of the top of the pole bottom section (4), second connecting holes (60) are formed in the connecting pieces (6) at the same positions, and the pole top section (2), the pole standard section (3) and the pole bottom section (4) are connected together through the cooperation of bolts and the second connecting holes (60).
4. A pole according to claim 1, characterised in that the pole comprises a first reinforcing rib (7) connected between the first lifting plate (10) and the side of the pole head (1), respectively.
5. A pole according to claim 1, characterised in that the pole comprises a second reinforcing rib (8) connected between the second lifting plate (12) and the side of the pole head (1), respectively.
6. The pole according to claim 1, characterized in that the outer edges of the first lifting hole (11), the second lifting hole (13) and the third lifting hole (15) are provided with a reinforcing ring (9).
7. A pole according to claim 1, wherein the pole has a total length of 9 m and the pole standard knot (3) has a length of 2 m.
8. A hoisting system for a wellbore spanned by Yangtze river is characterized by comprising: a lifting frame and a pole as claimed in any one of claims 1 to 7.
CN202221655504.3U 2022-06-28 2022-06-28 Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower Active CN218860148U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221655504.3U CN218860148U (en) 2022-06-28 2022-06-28 Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221655504.3U CN218860148U (en) 2022-06-28 2022-06-28 Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower

Publications (1)

Publication Number Publication Date
CN218860148U true CN218860148U (en) 2023-04-14

Family

ID=87372832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221655504.3U Active CN218860148U (en) 2022-06-28 2022-06-28 Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower

Country Status (1)

Country Link
CN (1) CN218860148U (en)

Similar Documents

Publication Publication Date Title
KR100665718B1 (en) Reinforcement device for tower crane
CN203728443U (en) Combined tower crane with main and auxiliary boom structure
CN103832933B (en) A kind of group tower tower crane with auxiliary
CN210914947U (en) Hoisting and turning-over system suitable for large prefabricated stand board
CN201793330U (en) Gantry hanger frame device
CN218860148U (en) Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower
CN211141282U (en) Steel reinforcement cage installation hoist device
CN112663583A (en) Construction method for total assembly and closure of pile stabilizing platform
CN202400754U (en) Mast crane
CN111017695A (en) Process for hoisting large ship block by matching crawler crane with hoisting system
CN211775861U (en) Supporting device capable of being directionally and accurately converted for building floor slab pouring
CN210457249U (en) Electric pole holding structure with self-jacking machine body
CN204265302U (en) One can dismounting loop wheel machine flexibly
CN209493242U (en) A kind of parallel crane of both arms
CN221070772U (en) Aerial disassembly device for crane boom of tower crane
CN209651778U (en) A kind of small-sized hanging apparatus of steel construction
CN205973582U (en) Simple and easy hoisting accessory of cable cover plate
CN220928187U (en) Support girder steel structure
CN104386593A (en) Crane capable of being flexibly assembled and disassembled
CN220866895U (en) Transfer device for construction of building steel structure
CN212503724U (en) Barite platform crane
CN219469634U (en) Simple and easy convenient many pipe fittings automatic lifting device
CN219603121U (en) Rotary tower body for electric pole of large-span transmission line
CN210505219U (en) Coincide dysmorphism board overhead hoist
CN214031379U (en) Single-point hoisting shoulder pole sling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230717

Address after: 231202 No. 590, prosperous West Road, Feixi County, Hefei City, Anhui Province

Patentee after: Anhui shunkai Testing Technology Co.,Ltd.

Address before: 230000 Hongyuan building, 1599 Huaining Road, government district, Hefei City, Anhui Province

Patentee before: ANHUI TRANSMISSION AND TRANSFORMATION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right