CN218836070U - Middle ladle cover of large converter - Google Patents

Middle ladle cover of large converter Download PDF

Info

Publication number
CN218836070U
CN218836070U CN202222936337.6U CN202222936337U CN218836070U CN 218836070 U CN218836070 U CN 218836070U CN 202222936337 U CN202222936337 U CN 202222936337U CN 218836070 U CN218836070 U CN 218836070U
Authority
CN
China
Prior art keywords
installation frame
side frame
molten steel
argon blowing
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222936337.6U
Other languages
Chinese (zh)
Inventor
谢士超
孙凤桥
程传良
刘帅
邓俊棕
巩怀栋
征亚文
张晓迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Iron and Steel Co Ltd
Original Assignee
Nanjing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Iron and Steel Co Ltd filed Critical Nanjing Iron and Steel Co Ltd
Priority to CN202222936337.6U priority Critical patent/CN218836070U/en
Application granted granted Critical
Publication of CN218836070U publication Critical patent/CN218836070U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The utility model discloses a be built by contract in big converter relates to steel production facility technical field, and well be built by contract includes installation frame and side frame, and the installation frame inlays and locates in the side frame, and the installation frame is equipped with the P type intake pipe that two sets of P types were laid, and P type intake pipe runs through side frame and inlet end and is located the side frame outside, and the argon blowing outlet duct of a plurality of mutual symmetries is connected to its bottom, and the argon blowing outlet duct runs through the installation frame. The P-type air inlet pipe can separately control the flow and the pressure independently, better meets the requirement of protecting pouring argon blowing, can form a layer of argon protective gas on the surface of molten steel, prevents the oxidation and the pollution of the molten steel, ensures the purity of the poured molten steel and improves the quality of casting blanks.

Description

Middle ladle cover of large converter
Technical Field
The utility model relates to a steel production facility technical field especially relates to a ladle cover in big converter.
Background
In the continuous casting process, the tundish is used as a transition container between the crystallizer and the ladle, and plays roles in storing molten steel, distributing steel flow, stabilizing pouring speed and reducing impact momentum of the pouring flow in the crystallizer. With the increasing requirements on the quality of steel products, people develop and apply a plurality of technologies to purify molten steel. However, purer molten steel is likely to be polluted again after being injected into the tundish, especially in the pouring and pouring processes of the tundish, air is rapidly filled into the tundish after the roaster is lifted, the covering agent is not added completely after pouring, the molten steel level of the tundish is lowered during ladle replacement, and air enters the exposed part of the working layer of the tundish, so that the full-protection pouring effect is damaged, the secondary oxidation of the molten steel is caused, and the cleanliness of the molten steel is influenced.
In order to reduce secondary oxidation of molten steel in a pouring link of a tundish, at present, some enterprises can improve the flowing of the molten steel and promote inclusions to float upwards by installing perforated bricks at the bottom of the tundish and blowing argon into the perforated bricks to form a liquid surface protective layer, but in actual production, argon is easy to flow into a crystallizer along with the molten steel to cause bubbles under a casting blank. Patent CN214601907U discloses an argon blowing protection tundish cover, patent CN113828764A discloses a continuous casting tundish cover and a blowing protection pouring method thereof, patent CN213916085U discloses a tundish cover capable of safely measuring molten steel in a tundish, and argon blowing amount of an impact area (a steel connecting hole area) and a steady flow area (a steel flowing hole, a temperature measurement sampling hole and a mounting hole area) cannot be well controlled and adjusted in a subarea mode in the actual production and use process, and the requirement of protection pouring cannot be met.
At present, the capacity of a tundish is developed towards large tonnage so as to ensure that molten steel has sufficient time to stay in the tundish to promote inclusions to float, and in order to adapt to the partition arrangement of the tundish and achieve the effect of casting protection, the tundish cover of a large converter is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the above technical problem, overcome prior art's shortcoming, provide a be built by contract in big converter, well be built by contract includes installation frame and side frame, and in the installation frame inlayed and locates the side frame, the installation frame was equipped with the P type intake pipe that two sets of P fonts were laid, and P type intake pipe runs through side frame and inlet end and is located the side frame outside, and the argon outlet duct that blows of a plurality of mutual symmetries is connected to its bottom, blows the argon outlet duct and runs through the installation frame.
The utility model discloses the technical scheme who further injects is:
the mounting frame is provided with a plurality of holes beneficial to production operation, including a steel connecting hole, a baking hole, a temperature measurement sampling hole, a steel flowing hole and a mounting hole.
The middle ladle cover of the large converter has the P-shaped air inlet pipe with the outer diameter of 22mm and the inner diameter of 18mm.
In the large converter middle ladle cover, the argon blowing air outlet pipes (3) are mutually symmetrical.
The utility model has the advantages that: the P-type air inlet pipe can separately control the flow and the pressure independently, better meets the requirement of protecting pouring argon blowing, can form a layer of argon protective gas on the surface of molten steel, prevents the oxidation and the pollution of the molten steel, ensures the purity of the poured molten steel and improves the quality of casting blanks. The problem that molten steel is secondarily oxidized in the continuous casting and casting process due to the fact that the argon sealing partition adjustment slag wall and the tundish cover are arranged in a split mode in the impact area and the casting steady flow area in the tundish is solved successfully.
Drawings
FIG. 1 is a front view of a tundish cover of a large converter;
FIG. 2 is an internal structural view;
FIG. 3 is an enlarged view of the structure of the area A;
FIG. 4 is an enlarged view of the structure of the area B;
FIG. 5 is a cross-sectional view of the structure of C-C;
FIG. 6 is an enlarged view of the structure of area D;
FIG. 7 is a structural view of the connection between a P-type gas inlet pipe and an argon blowing gas outlet pipe;
FIG. 8 is a bottom view of a tundish cover in a large converter;
FIG. 9 is an enlarged view of the structure of area E;
FIG. 10 is an enlarged view of the structure of the area F;
wherein: 1. a mounting frame; 2. a P-type air inlet pipe; 3. an argon blowing gas outlet pipe; 4. a side frame; 5. connecting steel holes; 6. baking the holes; 7. a temperature measurement sampling hole; 8. a steel flowing hole; 9. a first mounting hole; 10. and a second mounting hole.
Detailed Description
The ladle cover in big converter that this embodiment provided, the structure is shown in the figure, and well ladle cover includes installation frame 1 and side frame 4, and installation frame 1 inlays and locates in side frame 4, and installation frame 1 is equipped with two sets of P types intake pipe 2,P type intake pipe 2 that the P style of calligraphy was laid and is 22mm, internal diameter for 18mm. P type intake pipe 2 runs through side frame 4 and the inlet end is located side frame 4 outsidely, and a plurality of mutual symmetries blow argon outlet duct 3 is connected to its bottom, blows argon outlet duct 3 and runs through installation frame 1. Be equipped with a plurality of holes that do benefit to production operation on the installation frame 1, including connecing steel hole 5, toasting hole 6, temperature measurement thief hole 7, flowing steel hole 8, mounting hole 9, 10.
The mounting frame 1 is integrally cast by using an unshaped refractory material and is formed by low-temperature baking. When the molten steel is required to be blown with argon, the argon is transmitted into the argon blowing outlet pipe 3 through the P-type air inlet pipe 2, the argon blowing outlet pipe 3 blows the argon, a layer of argon protection layer can be formed on the surface of the molten steel, the oxidation and the pollution of the molten steel are prevented, the purity of the molten steel in a tundish is improved, then the flow is independently controlled through the two P-type air inlet pipes 2, the flow of an impact area and the flow of a pouring stable area are independently controlled, and the requirement of protecting pouring is better met.
In addition to the above embodiments, the present invention may have other embodiments; all the technical solutions formed by adopting equivalent substitutions or equivalent transformations fall within the protection scope claimed by the present invention.

Claims (4)

1. A middle ladle cover of a large converter is characterized in that: well be built by contract and include installation frame (1) and side frame (4), installation frame (1) inlays to be located in side frame (4), installation frame (1) is equipped with P type intake pipe (2) that two sets of P fonts were laid, P type intake pipe (2) are run through side frame (4) and inlet end are located side frame (4) are outside, and a plurality of argon blowing outlet ducts (3) are connected to its bottom, argon blowing outlet duct (3) run through installation frame (1).
2. The tundish cover of a large converter according to claim 1, wherein: be equipped with a plurality of holes that do benefit to production operation on installation frame (1), including connecing steel hole (5), toast hole (6), temperature measurement thief hole (7), flow steel hole (8), mounting hole.
3. The tundish cover of a large converter according to claim 1, wherein: the outer diameter of the P-shaped air inlet pipe (2) is 22mm, and the inner diameter of the P-shaped air inlet pipe is 18mm.
4. The tundish cover of a large converter according to claim 1, wherein: the argon blowing air outlet pipes (3) are mutually symmetrical.
CN202222936337.6U 2022-11-04 2022-11-04 Middle ladle cover of large converter Active CN218836070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222936337.6U CN218836070U (en) 2022-11-04 2022-11-04 Middle ladle cover of large converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222936337.6U CN218836070U (en) 2022-11-04 2022-11-04 Middle ladle cover of large converter

Publications (1)

Publication Number Publication Date
CN218836070U true CN218836070U (en) 2023-04-11

Family

ID=87309319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222936337.6U Active CN218836070U (en) 2022-11-04 2022-11-04 Middle ladle cover of large converter

Country Status (1)

Country Link
CN (1) CN218836070U (en)

Similar Documents

Publication Publication Date Title
CN111136256A (en) Molten steel continuous casting equipment and continuous casting method
CN204842961U (en) Get rid of immersion nozzle of inclusion
CN212822661U (en) Self-drainage device for sizing nozzle of small square billet tundish
CN218836070U (en) Middle ladle cover of large converter
CN112387946B (en) Device and method for continuous casting of small square billets
CN212443158U (en) Vacuum melting atmosphere protection semi-continuous casting system
CN108555273A (en) A kind of method that bottom blowing inert gas improves ladle self-opening rate
CN201082464Y (en) Molten metal continuously casting device
CN210587055U (en) Aluminum bar casting platform
CN205270835U (en) Package be built by contract argon blowing device in middle of continuous slab casting
CN103464695A (en) Calm steel die casting device and process
CN102909323B (en) Lower suspended vacuum casting ingot mold and using method thereof
CN203599517U (en) Molten metal die casting device
CN218361911U (en) Device for improving quality of cast product
JPH05293614A (en) Pouring tube in tundish
CN220717772U (en) Liquid seal type full-closed protective casting nozzle
CN219683942U (en) Sealing device for high-alloy low-density steel die casting pouring nozzle
CN221184690U (en) T-shaped tundish bottom structure
CN215919083U (en) Pouring device for low-oxygen-concentration continuous casting tundish
CN220986197U (en) Multipurpose combined module
CN115475908A (en) Device and method for improving quality of cast product
CN214443042U (en) Non-drainage pouring device for ladle launching
CN217551103U (en) Die casting protection pouring device
CN213559782U (en) Novel special-shaped blank crystallizer
CN218785176U (en) Casting device for producing steel ingots

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant