Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223303930.3U
Other languages
Chinese (zh)
Inventor
张旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223303930.3U priority Critical patent/CN218818629U/en
Application granted granted Critical
Publication of CN218818629U publication Critical patent/CN218818629U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of the pipeline is fixed, especially, hydraulic engineering pipeline fixing device, the on-line screen storage device comprises a base, the base is all rotated on hollow structure setting and the both sides inner wall and installs lead screw and top and seted up two expansion mouths, the one end that equal screw thread cup jointed lead screw guide pin bushing and be close to each other on two lead screws is fixed connection, the equal fixed mounting in top of two lead screw guide pin bushings has the connecting rod, the top of two connecting rods extends to the expansion mouth that corresponds respectively outside and equal fixed mounting has the mounting panel, the mounting groove has all been seted up to one side that two mounting panels are close to each other, equal fixed mounting has the slide bar and all rotates in two mounting grooves and installs the pivot. The utility model discloses simple structure, convenient to use, a hydraulic engineering pipeline fixing device be convenient for fix and fixed effectual, the construction installation of the hydraulic engineering pipeline of being convenient for to the pipeline of different diameters.

Description

Hydraulic engineering pipeline fixing device
Technical Field
The utility model relates to a technical field is fixed to the pipeline, especially relates to a hydraulic engineering pipeline fixing device.
Background
Hydraulic engineering refers to projects (including new construction, extension, reconstruction, reinforcement and restoration) for flood control, flood removal, irrigation, power generation, water supply, reclamation, water conservation, water and soil conservation, civil transport, water resource protection and the like, and the matching and auxiliary projects thereof, and is used for controlling and allocating surface water and underground water in the nature to achieve the aims of removing harm and benefiting, namely the projects built and also called water projects.
An energy that is essential in the human production life during the water resource, but water resource distribution and precipitation etc. in nature often are not conform to human user demand, consequently need carry out secondary allotment work to the water resource through hydraulic engineering to satisfy the demand to the water resource among the human production life.
At present, in order to more efficiently and stably allocate water resources, water is often supplied and drained by laying pipelines. Chinese utility model with publication number CN208735063U discloses a water conservancy pipeline fixing device, including the mounting base, be provided with first mounting groove and second mounting groove on the mounting base, when laying the pipeline, the pipeline is fixed in the space that first mounting groove and second mounting groove enclose and close out.
Above-mentioned pipeline fixing device among the correlation technique because the size of first mounting groove and second mounting groove is relatively fixed, the pipe diameter that can fix is more single, and in the in-service use process, the suitability is lower, exists the space that can improve.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a hydraulic engineering pipeline fixing device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a hydraulic engineering pipeline fixing device, the on-line screen storage device comprises a base, the base all rotates on hollow structure setting and the both sides inner wall and installs lead screw and top and has seted up two expansion ports, the one end that equal screw thread cup jointed lead screw guide pin bushing and be close to each other on two lead screws is fixed connection, the equal fixed mounting in top of two lead screw guide pin bushings has the connecting rod, the top of two connecting rods extends respectively outside the expansion port that corresponds and equal fixed mounting has the mounting panel, the mounting groove has all been seted up to one side that two mounting panels are close to each other, equal fixed mounting has the slide bar and all rotates and install the pivot in two mounting grooves, all fixed cup joints worm wheel and connecting rod in two pivots, the sliding sleeve has all slided and cup jointed on two slide bars, the equal fixed mounting in one side that two sliding sleeves are close to each other has rack and the equal fixed mounting of opposite side has the fly leaf, the movable rocking hole has all been seted up on two fly leafs, equal movable block in two movable holes, two movable blocks rotate respectively with the connecting rod rotation with the worm that corresponds, all rotate the dwang on two mounting grooves and install the rack, two corresponding worm wheel and two worm wheel mesh respectively, the one end that the pipeline is equipped with two fixed grip boards, two mounting panel that the same worm wheel mesh respectively, the one end that the worm wheel that corresponds mutually.
Preferably, the turnplate is fixedly sleeved at one end of the corresponding screw rod, a plurality of clamping grooves are formed in one side, close to the turnplate, of the base at equal intervals by taking the screw rod as a hollow part, and limit bolts matched with the clamping grooves are installed on the turnplate in a threaded mode.
Preferably, the thread directions of the two lead screws are opposite, a sliding rail is fixedly mounted on the inner wall of the bottom of the base, two sliding blocks are slidably mounted on the sliding rail, and the two sliding blocks are fixedly connected with the corresponding lead screw guide sleeves respectively.
Preferably, a return spring is fixedly sleeved between each sliding rod and the corresponding sliding sleeve.
Preferably, the inner sides of the two arc-shaped clamping plates and the inner sides of the two rotating clamping plates are fixedly provided with non-slip mats.
Preferably, the four corners of the bottom of the base are fixedly provided with conical blocks.
The utility model discloses in, a hydraulic engineering pipeline fixing device, at first fix the device subaerial through the toper piece, then through placing the slipmat between two arc grip blocks, then the rotation of two lead screws has been driven through rotating the carousel, the phase displacement of two lead screw guide pin bushings can be driven, the phase displacement of two mounting panels can be driven, the phase displacement of two arc grip blocks can be driven, can tentatively fix the pipeline, then through the spacing bolt of introversion, make during spacing bolt card advances the draw-in groove, can fix the position of two arc grip blocks.
Then, the worm is driven to rotate through the corresponding crank, the worm drives the worm wheel to rotate, the connecting rod can be driven to rotate, the connecting rod drives the movable block to slide in the movable hole, the movable plate can be driven to move upwards, the sliding sleeve and the rack can be driven to move upwards, the two gears can be driven to rotate, the two rotating clamping plates can be driven to rotate downwards, and the pipeline can be fixedly clamped in the second step. The utility model discloses simple structure, convenient to use, a hydraulic engineering pipeline fixing device be convenient for fix and fixed effectual, the construction installation of the hydraulic engineering pipeline of being convenient for to the pipeline of different diameters.
Drawings
Fig. 1 is a schematic structural view of a hydraulic engineering pipeline fixing device provided by the present invention;
fig. 2 is a schematic structural view of a part a of the hydraulic engineering pipeline fixing device provided by the present invention;
fig. 3 is the utility model provides a water conservancy project pipeline fixing device's B part schematic structure.
In the figure: the device comprises a base 1, a conical block 2, a screw rod 3, a screw rod guide sleeve 4, a non-slip mat 5, an arc-shaped clamping plate 6, a mounting groove 7, a rotating clamping plate 8, a pipeline 9, a mounting plate 10, a sliding rod 11, a movable block 12, a movable plate 13, a movable hole 14, a worm wheel 15, a crank 16, a worm 17, a connecting rod 18, a return spring 19, a sliding sleeve 20, a gear 21, a fixed rod 22, a limit bolt 23, a turntable 24 and a rack 25.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a hydraulic engineering pipeline fixing device, including base 1, base 1 is the hollow structure setting and all rotates on the inner wall of both sides and installs lead screw 3 and the top has seted up two expansion ports, equal screw thread has cup jointed lead screw guide pin cover 4 and the one end that is close to each other is fixed connection on two lead screw 3, the equal fixed mounting in top of two lead screw guide pin cover 4 has the connecting rod, the top of two connecting rods extends to outside the corresponding expansion port respectively and all fixed mounting has mounting panel 10, mounting groove 7 has all been seted up to the one side that two mounting panels 10 are close to each other, equal fixed mounting has slide bar 11 and all rotates and installs the pivot in two mounting grooves 7, equal fixed mounting has cup jointed worm wheel 15 and connecting rod 18 in two pivots, equal sliding cup jointed sliding sleeve 20 on two slide bars 11, equal fixed mounting has rack 25 and the equal fixed mounting has fly leaf 13 on one side that two slide bars 20 are close to each other, all set up movable hole 14 on two fly leaves 13, equal movable mounting has movable block 12 in two movable holes 14, two movable block 12 rotate with corresponding connecting rod 18 respectively, all rotate and install the rotation of two mounting panels 7, equal fixed mounting panels has worm wheel 17 and all rotate and have had worm wheel 17, the one side that two fixed mounting panels 10 and all rotate and have the worm wheel 17 that the arc worm wheel 17 and the fixed mounting panel 17 that the fixed mounting panel was close to each other that the worm wheel 17, the worm wheel 17 is close to each other, two fixed mounting panel, the one side that the worm wheel 17 is equipped with the worm wheel 17 that the worm wheel 17 is close to each other that the fixed mounting panel, two worm wheel 17 is close to each other that the fixed mounting panel 10, two fixed mounting panel 8 is equipped with the arc-mounted, two worm wheel 17 is close to each other that the fixed mounting panel, two worm wheel 17 is close to each other that the worm wheel 17 is installed, two fixed mounting panel, two worm wheel 17 is close to each other.
The utility model discloses in, the fixed cover of one end of corresponding lead screw 3 has connect carousel 24, and one side that base 1 is close to carousel 24 uses lead screw 3 to offer a plurality of draw-in grooves for hollow equidistance, and the spacing bolt 23 with draw-in groove looks adaptation is installed to the last screw thread of carousel 24, through the spacing bolt 23 of internal rotation for during spacing bolt 23 blocks into the draw-in groove, can fix the position of two arc grip blocks 6.
The utility model discloses in, two lead screw 3's screw thread direction sets up for opposite, and fixed mounting has a slide rail on base 1's the bottom inner wall, and slidable mounting has two sliders on the slide rail, and two sliders can make two lead screw guide pin bushing 4's moving direction be opposite through setting up on the contrary with the lead screw guide pin bushing 4 fixed connection that corresponds respectively, through the slide rail with the slider be convenient for lead screw guide pin bushing 4's removal.
The utility model discloses in, two slide bars 11 respectively with the sliding sleeve 20 between the fixed cover have been connected reset spring 19, through the reset spring 19 be convenient for the reset of sliding sleeve 20.
The utility model discloses in, two arc grip blocks 6 and two equal fixed mounting in inboard that rotate grip block 8 have slipmat 5, through 5 multiplicable fixed effects of slipmat.
The utility model discloses in, the equal fixed mounting in bottom four corners of base 1 has toper piece 2, can pass through toper piece 2 with the device and fix on ground.
The utility model discloses in, at first fix the device subaerial through toper piece 2, then through placing slipmat 5 between two arc grip blocks 6, then drive two rotations of lead screw 3 through rotating carousel 24, can drive two lead screw guide pin bushing 4's in opposite directions removal, can drive two mounting panels 10's in opposite directions removal, can drive two arc grip blocks 6's in opposite directions removal, can tentatively fix pipeline 9, then through the spacing bolt 23 of internal rotation, make spacing bolt 23 block advance the draw-in groove, can fix two arc grip blocks 6's position.
Then, the worm 17 is driven to rotate by the corresponding crank 16, the worm 17 drives the worm wheel 15 to rotate, so that the connecting rod 18 can be driven to rotate, the connecting rod 18 drives the movable block 12 to slide in the movable hole 14, so that the movable plate 13 can be driven to move upwards, the sliding sleeve 20 and the rack 25 can be driven to move upwards, the two gears 21 can be driven to rotate, the two rotating clamping plates 8 can be driven to rotate downwards, and the pipeline 9 can be fixedly clamped in the second step. The utility model discloses simple structure, convenient to use, a hydraulic engineering pipeline fixing device be convenient for fix and fixed effectual, the construction installation of the hydraulic engineering pipeline of being convenient for to the pipeline of different diameters.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A hydraulic engineering pipeline fixing device comprises a base (1) and is characterized in that the base (1) is of a hollow structure, screw rods (3) are rotatably mounted on the inner walls of two sides of the base (1), two movable openings are formed in the tops of the screw rods (3), screw rod guide sleeves (4) are sleeved on the two screw rods (3) in a threaded manner, one ends of the two screw rod guide sleeves (4) close to each other are fixedly connected, connecting rods are fixedly mounted at the tops of the two screw rod guide sleeves (4), mounting plates (10) extend out of the corresponding movable openings respectively, mounting grooves (7) are formed in one sides of the two mounting plates (10) close to each other, sliding rods (11) are fixedly mounted in the two mounting grooves (7) and rotatably mounted with rotating shafts, worm gears (15) and connecting rods (18) are fixedly sleeved on the two rotating shafts, sliding sleeves (20) are slidably sleeved on the two sliding rods (11), racks (25) are fixedly mounted on one sides of the two sliding sleeves (20) close to each other, rotating rods (13) are fixedly mounted on the other sides of the two sliding sleeves (20), rotating rods (12) are fixedly mounted in the two movable holes (14), two movable blocks (12) are fixedly connected with rotating fixing rods (22), equal fixed mounting has rotation grip block (8) on two dead levers (22), the equal fixed mounting in one side that two mounting panels (10) are close to each other has arc grip block (6), one side that two mounting panels (10) kept away from each other all rotates and installs worm (17), two worm (17) mesh with worm wheel (15) that correspond respectively mutually, two gear (21) mesh with rack (25) that correspond respectively, be equipped with same pipeline (9) between two arc grip block (6) and two rotation grip block (8), the one end of two worm (17) is all fixed cup joints crank (16).
2. The hydraulic engineering pipeline fixing device as claimed in claim 1, wherein a rotary table (24) is fixedly sleeved at one end of the corresponding screw rod (3), a plurality of clamping grooves are formed in one side of the base (1) close to the rotary table (24) and are hollow and equidistant by the screw rod (3), and a limiting bolt (23) matched with the clamping grooves is mounted on the rotary table (24) in a threaded manner.
3. The water conservancy project pipeline fixing device according to claim 1, wherein the thread directions of the two screw rods (3) are opposite, a sliding rail is fixedly mounted on the inner wall of the bottom of the base (1), two sliding blocks are slidably mounted on the sliding rail, and the two sliding blocks are respectively and fixedly connected with the corresponding screw rod guide sleeves (4).
4. The hydraulic engineering pipe fixing device according to claim 1, wherein a return spring (19) is fixedly connected between each sliding rod (11) and the corresponding sliding sleeve (20).
5. The hydraulic engineering pipeline fixing device according to claim 1, wherein the inner sides of the two arc-shaped clamping plates (6) and the two rotating clamping plates (8) are fixedly provided with anti-skid pads (5).
6. The hydraulic engineering pipeline fixing device according to claim 1, wherein the conical blocks (2) are fixedly mounted at four corners of the bottom of the base (1).
CN202223303930.3U 2022-12-09 2022-12-09 Hydraulic engineering pipeline fixing device Active CN218818629U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223303930.3U CN218818629U (en) 2022-12-09 2022-12-09 Hydraulic engineering pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223303930.3U CN218818629U (en) 2022-12-09 2022-12-09 Hydraulic engineering pipeline fixing device

Publications (1)

Publication Number Publication Date
CN218818629U true CN218818629U (en) 2023-04-07

Family

ID=87248742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223303930.3U Active CN218818629U (en) 2022-12-09 2022-12-09 Hydraulic engineering pipeline fixing device

Country Status (1)

Country Link
CN (1) CN218818629U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116398699A (en) * 2023-06-06 2023-07-07 山东君洛装饰工程有限公司 Geothermal pipeline installation fixing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116398699A (en) * 2023-06-06 2023-07-07 山东君洛装饰工程有限公司 Geothermal pipeline installation fixing device
CN116398699B (en) * 2023-06-06 2024-05-07 山东君洛装饰工程有限公司 Geothermal pipeline installation fixing device

Similar Documents

Publication Publication Date Title
CN218818629U (en) Hydraulic engineering pipeline fixing device
CN110044735A (en) A kind of architecture engineering material shock resistance testing machine
CN112222468A (en) High-stability multifunctional steel plate drilling equipment
CN109113577A (en) A kind of excavation type automation radial horizontal drill
CN210099010U (en) Drilling machine for machining
CN208645554U (en) A kind of accurate perforating device of glass reinforced plastic screen casing
CN217422419U (en) Pipe fitting clamping and hanging structure for building construction
CN215785899U (en) Left-right co-bending type numerical control pipe bending machine
CN212693312U (en) A sampling device for geotechnical engineering reconnaissance
CN113356329A (en) Pipe burying device for hydraulic engineering
CN108953771B (en) Pipeline installation device for water and electricity pipeline engineering
CN212198357U (en) Piping lane water supply pipeline erects mechanism
CN220644523U (en) Drainage pipeline construction tool
CN214889327U (en) Support frame for water conservancy and hydropower construction
CN220919660U (en) Surface spraying machine for ventilation pipe production
CN217411822U (en) Printing ink jar belt cleaning device for printing ink production line
CN208380238U (en) A kind of novel concrete electric pole
CN211779366U (en) A auxiliary device is used in water pipe installation for hydraulic engineering
CN220760378U (en) Clamping and cleaning device for electric pipeline
CN213417949U (en) Water environment restoration technology is used for agricultural irrigation's energy-conserving water intake device
CN213896047U (en) Double-barrel type barrel galvanizing equipment
CN215202423U (en) Panel fluting device is used in cupboard production
CN217653619U (en) Freezing and drying combined air energy unit special for flaxseed dehulling
CN221196384U (en) Pipeline fixing frame convenient to butt joint
CN221257948U (en) Pipeline installation equipment

Legal Events

Date Code Title Description
GR01 Patent grant