CN218818603U - Warm general pipe connection load-bearing device - Google Patents
Warm general pipe connection load-bearing device Download PDFInfo
- Publication number
- CN218818603U CN218818603U CN202222242615.8U CN202222242615U CN218818603U CN 218818603 U CN218818603 U CN 218818603U CN 202222242615 U CN202222242615 U CN 202222242615U CN 218818603 U CN218818603 U CN 218818603U
- Authority
- CN
- China
- Prior art keywords
- bearing
- heating
- shaped frame
- bearing seat
- pipe connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model belongs to the technical field of heating pipelines, in particular to a heating and ventilating pipeline connecting and bearing device, which comprises a bearing seat and a connecting component arranged on the surface of the bearing seat; through the removal splint and the solid fixed splint that set up so that fix the centre gripping in the junction that will warm logical pipeline, the ball that sets up on the erection bracing board that the cooperation set up simultaneously so that when connecting, warm logical pipeline can slide on its surface, has reduced the connection degree of difficulty between two heat supply pipelines, improves the stability of connecting. Through two backup pads of major-minor that bearing seat bilateral symmetry set up, increase the bearing effect to warm logical pipeline, and then prevent that the support frame from producing the problem of damaging because of the gravity of heat supply pipeline.
Description
Technical Field
The utility model belongs to the technical field of the heating pipeline, concretely relates to warm general purpose pipe connection bearing device.
Background
Outdoor heat supply pipe network is that the share of investment is great in the central heating system, the most tedious part of construction, heat supply pipeline lays and indicates to constitute whole and make it the work of taking one's place with heat supply pipeline and annex according to the designing requirement, heat supply pipeline lay the form, divide into on the ground (built on stilts) to lay and lay two types with the underground, bearing supports connecting device and is a device that supports heat supply pipeline, current heat supply pipeline strutting arrangement, all support the junction both sides of heat supply pipeline alone through the support, long-time after using, the support is easily become flexible, thereby it is unsatisfactory to lead to heat supply pipeline to support the effect, thereby be not convenient for heat supply pipeline's concatenation, and then increased heat supply pipeline's the concatenation degree of difficulty.
To this end, a heating and ventilation pipe connection load-bearing device is designed to solve the above problems.
SUMMERY OF THE UTILITY MODEL
To solve the problems raised in the background art described above. The utility model provides a warm general pipe connection load-bearing device has reduced the connection degree of difficulty between two heat supply pipelines, improves the stability of connecting, increases the bearing effect to warm logical pipeline, and then prevents that the support frame from producing the problem of damaging because of heat supply pipeline's gravity.
In order to achieve the above object, the utility model provides a following technical scheme: a heating and ventilating pipeline connecting bearing device comprises a bearing seat and a connecting component arranged on the surface of the bearing seat;
coupling assembling is including installing the solid fixed splint on bearing seat surface and installing the U-shaped frame and the threaded connection in the solid fixed splint outside the adjusting bolt on U-shaped frame surface, adjusting bolt's one end is run through the surface of U-shaped frame and is extended to in the U-shaped frame, and with set up removal splint in the U-shaped frame pass through bearing A and rotate the connection.
As the utility model relates to a warm general pipe connection load-bearing device is preferred, movable clamp plate's lateral wall integrated into one piece has the guide block, the inside wall of U-shaped frame seted up with guide block assorted guide slot, just movable clamp plate passes through guide block and guide slot sliding connection are in the U-shaped frame.
As the utility model relates to a warm general purpose pipe connection bearing device is preferred, the surface of bearing seat is close to the both sides of U-shaped frame all are provided with erection bracing board, a plurality of recesses have been seted up to erection bracing board's intrados, all are provided with the ball in this recess, just erection bracing board's outside threaded connection has the screw rod, just the one end of screw rod runs through erection bracing board's surface, and extend to erection bracing board's below to rotate through bearing B and connect in the surface of bearing seat.
As the utility model relates to a warm general purpose pipe connection bearing device is preferred, still installs including the symmetry the bearing assembly of bearing seat both sides, bearing assembly includes sliding connection and is in two sets of slide bars of bearing seat both sides and install two sets of the fixed plate and the threaded connection of slide bar one end are in the connecting bolt on fixed plate surface, connecting bolt runs through the one end of fixed plate is passed through bearing C and is rotated and be connected with main bearing backup pad.
As the utility model relates to a warm general purpose pipe connection load-bearing device is preferred, the guide arm is installed to the lateral wall of main bearing backup pad, the lateral wall sliding connection of guide arm is in the downthehole that the fixed plate surface was seted up.
As the utility model relates to a warm general pipe connection load-bearing device is preferred, the guide arm runs through the draw-in groove has been seted up to the one end of fixed plate, the joint has the jump ring in the draw-in groove.
As the utility model relates to a warm general purpose pipe connection load-bearing device is preferred, the vice bearing support board of the equal fixedly connected with in both sides of main bearing support board.
Compared with the prior art, the beneficial effects of the utility model are that:
1. coupling assembling has been added on this basis, through the removal splint and the solid fixed splint that set up so that fix the centre gripping in the junction that will warm logical pipeline, the ball that sets up in the erection bracing board that the cooperation set up simultaneously so that when connecting, warm logical pipeline can slide on its surface, has reduced the connection degree of difficulty between two heat supply pipelines, improves the stability of connecting.
2. Meanwhile, a bearing assembly is added on the basis, and the bearing effect on the heating ventilation pipeline is increased through the main supporting plate and the auxiliary supporting plate which are symmetrically arranged on two sides of the bearing seat, so that the problem that the supporting frame is damaged due to the gravity of the heating pipeline is solved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic structural view of the movable clamp plate, the fixed clamp plate and the U-shaped frame of the present invention;
FIG. 3 is a schematic structural view of the support plate, the balls, the screw rod and the bearing seat of the present invention;
FIG. 4 is a schematic view of a load bearing assembly according to the present invention;
fig. 5 is a schematic structural view of the guide rod of the present invention;
in the figure:
1. a load bearing seat;
2. a connection assembly; 21. a U-shaped frame; 22. adjusting the bolt; 23. fixing the clamping plate; 24. moving the clamping plate; 25. a guide block; 27. a guide groove; 28. a screw; 29. mounting a support plate; 201. a ball bearing;
3. a load bearing assembly; 31. a slide bar; 32. a fixing plate; 33. a connecting bolt; 34. a guide bar; 35. a main load bearing support plate; 36. a secondary load bearing support plate; 37. a card slot; 38. and a clamp spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
As shown in fig. 1;
a heating and ventilating pipeline connecting bearing device comprises a bearing seat 1.
In this embodiment: current heat supply pipeline strutting arrangement all supports heat supply pipeline's junction both sides alone through the support, and after long-time the use, the support is not hard up easily to it is unsatisfactory to lead to heat supply pipeline support effect, thereby the concatenation of heat supply pipeline not convenient for, and then increased heat supply pipeline's the concatenation degree of difficulty, added coupling assembling 2 on this basis, be convenient for carry out the fixed stay connection to warm logical pipeline through this subassembly.
As shown in fig. 1, 2 and 3:
in combination with the above, in order to facilitate the fixed supporting connection of the heating ventilation pipeline, the heating ventilation pipeline further comprises a connecting assembly 2 installed on the surface of the bearing seat 1, the connecting assembly 2 comprises a fixed clamping plate 23 installed on the surface of the bearing seat 1, a U-shaped frame 21 installed on the outer side of the fixed clamping plate 23, and an adjusting bolt 22 in threaded connection with the surface of the U-shaped frame 21, and one end of the adjusting bolt 22 penetrates through the surface of the U-shaped frame 21, extends into the U-shaped frame 21, and is rotatably connected with a movable clamping plate 24 arranged in the U-shaped frame 21 through a bearing a.
In this embodiment: when connecting warm logical pipeline, erect the junction of warm logical pipeline on the surface of solid fixed splint 23, have adjusting bolt 22 through rotating to make adjusting bolt 22's one end promote to move splint 24 and be close to warm outer surface removal of logical pipeline mutually, until will warm the junction centre gripping of logical pipeline between solid fixed splint 23 and removal splint 24, so that improve the stability of warm logical pipeline when connecting.
It should be noted that: the fixed splint 23 and the movable splint 24 are adhered with non-slip mats on the surfaces of the sides close to each other, so as to improve the stability of the heating and ventilation pipeline when being fixed.
In an alternative embodiment: the side wall of the movable clamping plate 24 is integrally formed with a guide block 25, the inner side wall of the U-shaped frame 21 is provided with a guide groove 27 matched with the guide block 25, and the movable clamping plate 24 is slidably connected in the U-shaped frame 21 through the guide block 25 and the guide groove 27.
In this embodiment: based on the arrangement, when one end of the adjusting bolt 22 pushes the movable clamping plate 24 to move close to the outer surface of the heating and ventilation pipeline, the movable clamping plate 24 can be stably connected in the U-shaped frame 21 through the matching of the guide block 25 and the guide groove 27, and the movable clamping plate 24 is prevented from deflecting in the moving process close to the outer surface of the heating and ventilation pipeline.
In an alternative embodiment: the both sides that the surface of bearing seat 1 is close to U-shaped frame 21 all are provided with erection bracing board 29, and a plurality of recesses have been seted up to erection bracing board 29's intrados, all are provided with ball 201 in this recess, and the outside threaded connection of erection bracing board 29 has screw rod 28, and the surface of erection bracing board 29 is run through to the one end of screw rod 28, and extends to the below of erection bracing board 29 to rotate the surface of connection at bearing seat 1 through bearing B.
In this embodiment: based on this setting, so that the warm logical pipeline is when carrying out the centre gripping fixed, the accessible rotates the height of screw rod 28 adjustment erection bracing board 29, makes the surface of warm logical pipeline and the ball 201 looks butt on erection bracing board 29 surface (the surface of warm logical pipeline does not laminate with the intrados of fixed splint 23), so that slide the warm logical pipeline on the surface of erection bracing board 29, the position of the adjustment centre gripping of being convenient for, after the position has been adjusted, reverse rotation screw rod 28 makes the warm logical pipeline break away from the surface of erection bracing board 29 can.
As shown in fig. 1, 3, 4 and 5:
in combination with the above, in order to improve the stability of supporting the heating ventilation pipeline, the heating ventilation pipeline support device further comprises bearing components 3 symmetrically installed on two sides of the bearing seat 1, each bearing component 3 comprises two groups of sliding rods 31 slidably connected to two sides of the bearing seat 1, a fixing plate 32 installed at one end of each group of sliding rods 31, and a connecting bolt 33 in threaded connection with the surface of the fixing plate 32, and one end of the connecting bolt 33 penetrating through the fixing plate 32 is rotatably connected with a main bearing support plate 35 through a bearing C.
In this embodiment: at first, cooperate coupling assembling 2 to support fixedly warm logical pipeline, can manually spur slide bar 31 this moment and slide to suitable position to one side, through rotating connecting bolt 33 on fixed plate 32 surface to make connecting bolt 33's one end promote main bearing backup pad 35 and move to one side, support the bearing effect that does not have the improvement to warm logical pipeline until making the intrados of main bearing backup pad 35 and the lateral wall butt of warm logical pipeline.
In an alternative embodiment: the guide rod 34 is installed on the outer side wall of the main bearing support plate 35, and the outer side wall of the guide rod 34 is connected in a hole formed in the surface of the fixing plate 32 in a sliding mode.
In this embodiment: based on the arrangement, one end of the connecting bolt 33 can push the main bearing support plate 35 to move towards one side, the limiting effect can be achieved under the action of the arranged guide rod 34, and the main bearing support plate 35 is prevented from deflecting in the process of moving towards one side.
It should be noted that: the guide rod 34 runs through the one end of fixed plate 32 and has seted up draw-in groove 37, and the joint has jump ring 38 in the draw-in groove 37, can avoid main bearing backup pad 35 to move to one side and drive the lateral wall of guide rod 34 when the downthehole slip that the fixed plate 32 surface was seted up, can play spacing effect through draw-in groove 37 and the jump ring 38 that sets up, avoids guide rod 34 to break away from in the downthehole of seting up from the fixed plate 32 surface.
In an alternative embodiment: the two sides of the main bearing support plate 35 are fixedly connected with the auxiliary bearing support plates 36.
In this embodiment: through this setting to in the increase is to the bearing effect of warm logical pipeline, and then prevents that the support frame from producing the problem of damaging because of the gravity of heat supply pipeline.
The working principle is as follows: when the heating and ventilation pipeline is clamped and fixed, the height of the installation support plate 29 can be adjusted by rotating the screw 28, the surface of the heating and ventilation pipeline is abutted to the balls 201 on the surface of the installation support plate 29 (the surface of the heating and ventilation pipeline is not attached to the inner arc surface of the fixed clamp plate 23), so that the heating and ventilation pipeline slides on the surface of the installation support plate 29, the joint of the heating and ventilation pipeline is erected on the surface of the fixed clamp plate 23, the heating and ventilation pipeline is separated from the surface of the installation support plate 29 by rotating the screw 28 in the reverse direction, the adjusting bolt 22 is rotated, one end of the adjusting bolt 22 pushes the movable clamp plate 24 to move close to the outer surface of the heating and ventilation pipeline until the joint of the heating and ventilation pipeline is clamped between the fixed clamp plate 23 and the movable clamp plate 24, at the moment, the sliding rod 31 can be pulled to slide to a proper position to one side by manually, the connecting bolt 33 on the surface of the fixed plate 32 is rotated, one end of the connecting bolt 33 pushes the main bearing support plate 35 to move to one side until the inner arc surface of the main bearing plate 35 is abutted to support the outer side of the heating and the outer arc surface of the heating and ventilation pipeline, so that the bearing effect of the heating and ventilation pipeline is prevented from being damaged by gravity.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described above, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. The utility model provides a warm general pipe connection load-bearing device, includes bearing seat (1), its characterized in that: the device also comprises a connecting component (2) arranged on the surface of the bearing seat (1);
coupling assembling (2) are including installing solid fixed splint (23) on bearing seat (1) surface and installing U-shaped frame (21) and the threaded connection in the solid fixed splint (23) outside are in adjusting bolt (22) on U-shaped frame (21) surface, the one end of adjusting bolt (22) is run through the surface of U-shaped frame (21), and extend to in U-shaped frame (21), and with set up removal splint (24) in U-shaped frame (21) are passed through bearing A and are rotated the connection.
2. The heating and ventilation pipe connection load bearing device of claim 1, wherein: the lateral wall integrated into one piece of removal splint (24) has guide block (25), the inside wall of U-shaped frame (21) seted up with guide block (25) assorted guide slot (27), just removal splint (24) pass through guide block (25) and guide slot (27) sliding connection be in U-shaped frame (21).
3. The heating and ventilation pipe connection load bearing device of claim 1, wherein: the surface of bearing seat (1) is close to the both sides of U-shaped frame (21) all are provided with erection bracing board (29), a plurality of recesses have been seted up to the intrados of erection bracing board (29), all are provided with ball (201) in this recess, just the outside threaded connection of erection bracing board (29) has screw rod (28), just the one end of screw rod (28) is run through the surface of erection bracing board (29), and extend to the below of erection bracing board (29) to rotate through bearing B and connect in the surface of bearing seat (1).
4. The heating and ventilation pipe connection load bearing device of claim 1, wherein: still install including the symmetry bearing subassembly (3) of bearing seat (1) both sides, bearing subassembly (3) are including sliding connection be in two sets of slide bar (31) of bearing seat (1) both sides and install two sets of fixed plate (32) and the threaded connection of slide bar (31) one end are in connecting bolt (33) on fixed plate (32) surface, connecting bolt (33) run through the one end of fixed plate (32) is rotated through bearing C and is connected with main bearing backup pad (35).
5. The heating and ventilation pipe connection load bearing device of claim 4, wherein: the outer side wall of the main bearing support plate (35) is provided with a guide rod (34), and the outer side wall of the guide rod (34) is connected in a hole formed in the surface of the fixing plate (32) in a sliding mode.
6. The heating and ventilation pipe connection load bearing device of claim 5, wherein: one end of the guide rod (34) penetrating through the fixing plate (32) is provided with a clamping groove (37), and a clamping spring (38) is clamped in the clamping groove (37).
7. The heating utility pipe connection load bearing device of claim 4, wherein: and the two sides of the main bearing support plate (35) are fixedly connected with auxiliary bearing support plates (36).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222242615.8U CN218818603U (en) | 2022-08-24 | 2022-08-24 | Warm general pipe connection load-bearing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222242615.8U CN218818603U (en) | 2022-08-24 | 2022-08-24 | Warm general pipe connection load-bearing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218818603U true CN218818603U (en) | 2023-04-07 |
Family
ID=87267830
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222242615.8U Active CN218818603U (en) | 2022-08-24 | 2022-08-24 | Warm general pipe connection load-bearing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218818603U (en) |
-
2022
- 2022-08-24 CN CN202222242615.8U patent/CN218818603U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210326914U (en) | Insulating support device for electric power construction | |
CN218818603U (en) | Warm general pipe connection load-bearing device | |
CN218346599U (en) | High stability building drain pipe structure | |
CN216195505U (en) | A novel fossil fragments for building engineering | |
CN215870608U (en) | Optical cable laying height adjusting frame | |
CN215106381U (en) | Anti-falling device capable of adjusting building curtain wall | |
CN215978709U (en) | High-span steel pipe tower of 220kV overhead transmission line | |
CN211481204U (en) | Surface of water photovoltaic power generation board support floating platform | |
CN211396641U (en) | Formwork diagonal bracing for building construction | |
CN219219474U (en) | Quick-installation anti-seismic curtain wall system | |
CN219141155U (en) | Mounting bracket of remote control device | |
CN212957589U (en) | Cantilever frame wall fixing base with adjustable equipment | |
CN217923985U (en) | Pre-assembly structure for drainage branch pipe of residential toilet | |
CN217679872U (en) | Connecting assembly for mounting building engineering curtain wall | |
CN220451124U (en) | Reinforcing and connecting device for building structure | |
CN216195491U (en) | High-safety steel structure connecting piece for building | |
CN215382215U (en) | Dress designing equipment convenient to adjust | |
CN216787365U (en) | Auxiliary device for pipeline installation and construction of building water supply and drainage engineering | |
CN217054349U (en) | Concrete forming template convenient to build | |
CN220868530U (en) | Curtain wall adapter with high firmness | |
CN211655029U (en) | Antenna for 5G network base station board | |
CN212137596U (en) | Support base capable of adjusting installation position of solar photovoltaic panel | |
CN219930873U (en) | River course foundation ditch construction supporting construction | |
CN214050225U (en) | Radiotherapy positioner is used to oncology | |
CN218480772U (en) | Adjustable balcony wall-mounted flat plate collector support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |