CN218814590U - Hanging stone curtain wall structure - Google Patents

Hanging stone curtain wall structure Download PDF

Info

Publication number
CN218814590U
CN218814590U CN202223201115.6U CN202223201115U CN218814590U CN 218814590 U CN218814590 U CN 218814590U CN 202223201115 U CN202223201115 U CN 202223201115U CN 218814590 U CN218814590 U CN 218814590U
Authority
CN
China
Prior art keywords
hanging
stone
fixed
hanging piece
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223201115.6U
Other languages
Chinese (zh)
Inventor
薛浩新
魏妙展
胡慧
夏柯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Qingxing Green Energy Construction Technology Co ltd
Original Assignee
Zhuhai Qingxing Green Energy Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Qingxing Green Energy Construction Technology Co ltd filed Critical Zhuhai Qingxing Green Energy Construction Technology Co ltd
Priority to CN202223201115.6U priority Critical patent/CN218814590U/en
Application granted granted Critical
Publication of CN218814590U publication Critical patent/CN218814590U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a hanging type stone curtain wall structure, which comprises a wall body, a supporting component and a stone plate, wherein the supporting component comprises a stand column, a cross beam and a first hanging piece, the cross beam is fixedly connected with the stand column, the first hanging piece is fixed on the cross beam, a second hanging piece is fixed on the stone plate, and the second hanging piece is hooked on the first hanging piece; the embedded part is fixed in the wall body and comprises two clamping plates extending out of the wall body, the two clamping plates are respectively arranged on two sides of the stand column, and the two clamping plates are fixedly connected with the stand column. The utility model discloses can promote the joint strength of supporting component and wall body to firm hook stone material board.

Description

Hanging stone curtain wall structure
Technical Field
The utility model belongs to the technical field of the curtain technique and specifically relates to a hanging stone material curtain wall construction.
Background
The stone curtain wall is generally composed of stone panels and supporting components, is a building envelope structure which does not bear the load and the effect of a main structure, has better decorative effect because the stone is made of natural materials, and is widely applied to various high-rise buildings. In order to facilitate installation, the existing stone curtain wall is usually a suspended installation structure, so the stability of the support component connected with the stone plate is very important, and how to further improve the connection strength of the support component and the wall body becomes a technical problem to be solved in the prior art.
SUMMERY OF THE UTILITY MODEL
The utility model provides a hanging stone material curtain wall construction can promote the joint strength of supporting component and wall body to firm hook stone material board.
In order to solve the above problems, the utility model adopts the following technical scheme:
the embodiment of the utility model provides a hanging stone curtain wall structure, including wall body, supporting component and stone material board, the supporting component includes stand, crossbeam and first pendant, the crossbeam is fixed with the stand and links to each other, first pendant is fixed on the crossbeam, be fixed with the second pendant on the stone material board, the second pendant is hooked on the first pendant; the embedded part is fixed in the wall body and comprises two clamping plates extending out of the wall body, the two clamping plates are respectively arranged on two sides of the stand column, and the two clamping plates are fixedly connected with the stand column.
In some embodiments, the upright post is provided with a through hole, the two clamping plates are provided with through grooves corresponding to the through hole, screws penetrate through the through grooves and the through holes, nuts are sleeved on the screws, and the clamping plates are fastened on the upright post through the matching of the screws and the nuts.
In some embodiments, a post core is disposed within the post.
In some embodiments, the two sides of the upright post are provided with angle connectors, one connecting plate of each angle connector is fixedly connected with the side surface of the upright post, and the end part of the beam is fixedly connected with the other connecting plate of each angle connector.
In some embodiments, a polystyrene board is fixed on the outer side of the wall body, the upright posts are positioned on the outer side of the polystyrene board, and the clamping plates penetrate through the polystyrene board.
In some embodiments, the first hanging piece comprises a supporting plate fixed on the cross beam and a first hanging part and a second hanging part which are connected with one end of the outer side of the supporting plate, and the first hanging part is positioned above the second hanging part; the top surface and the bottom surface of the stone plate are both fixed with second pendants, the second pendant of the bottom surface of the stone plate above the two vertically adjacent stone plates is hooked on the first hanging part, and the second pendant of the top surface of the stone plate below the two vertically adjacent stone plates is hooked on the second hanging part.
In some embodiments, the positions where the second hanging part and the first hanging part are hooked with each other and the positions where the second hanging part and the second hanging part are hooked with each other are provided with adhesive.
In some embodiments, a stopper is fixed between the second hanging piece and the first hanging part of the top surface of the stone plate located below in the two vertically adjacent stone plates, and the stopper abuts against the second hanging piece and the first hanging part.
The utility model discloses following beneficial effect has at least: the utility model discloses owing to adopted the built-in fitting, the built-in fitting is buried underground in concrete wall, and its connection structure is very firm, and simultaneously, the built-in fitting includes two splint that stretch out the wall body, and two splint set up respectively in the both sides of stand, and two splint all link to each other with the stand is fixed, can press from both sides tight stand like this, and this kind of connection structure can promote the joint strength of whole supporting component and wall body to firm hook stone material board.
Drawings
Fig. 1 is a schematic cross-sectional view of a hanging stone curtain wall structure according to an embodiment of the present invention, taken along a transverse section;
fig. 2 is a schematic cross-sectional view of a hanging stone curtain wall structure according to an embodiment of the present invention, taken below a vertical section;
fig. 3 is an enlarged schematic view of a point a in fig. 2.
Wherein the reference numerals are:
the wall body 100, the upright posts 200, the upright post sleeve core 210, the cross beam 300, the corner connector 310, the first hanging piece 400, the first hanging part 410, the second hanging part 420, the supporting plate 430, the second hanging piece 500, the stop block 510, the stone plate 600, the embedded part 700, the clamping plate 710 and the polystyrene board 800.
Detailed Description
The present disclosure provides the following description with reference to the accompanying drawings to assist in a comprehensive understanding of various embodiments of the disclosure as defined by the claims and their equivalents. The description includes various specific details to aid understanding, but such details are to be regarded as exemplary only. Accordingly, those of ordinary skill in the art will recognize that various changes and modifications of the various embodiments described herein can be made without departing from the scope and spirit of the present disclosure. Moreover, descriptions of the disclosed functions and constructions may be omitted for clarity and conciseness.
The terms and words used in the following description and claims are not limited to the literal meanings, but are merely used by the inventors to enable a clear and consistent understanding of the disclosure. Accordingly, it will be apparent to those skilled in the art that the following descriptions of the various embodiments of the present disclosure are provided for illustration only and not for the purpose of limiting the disclosure as defined by the appended claims and their equivalents.
The terms "having," "may have," "including," or "may include" used in various embodiments of the present disclosure indicate the presence of the respective functions, operations, elements, etc., disclosed, but do not limit additional one or more functions, operations, elements, etc. Furthermore, it is to be understood that the terms "comprises" or "comprising," when used in various embodiments of the present disclosure, are intended to specify the presence of stated features, integers, operations, elements, components, or groups thereof, but do not preclude the presence or addition of one or more other features, integers, operations, elements, components, or groups thereof.
It will be understood that when an element (e.g., a first element) is "connected" to another element (e.g., a second element), the element can be directly connected to the other element or intervening elements (e.g., a third element) may be present.
An embodiment of the utility model provides a hanging stone material curtain wall construction, as shown in fig. 1-3, it includes wall body 100, supporting component and stone material board 600, and supporting component includes stand 200, crossbeam 300 and first pendant 400, and wall body 100 is located the innermost, and stone material board 600 is located the outside, and stand 200 and crossbeam 300 are located between stone material board 600 and wall body 100, and vertical and horizontal extension are followed respectively to stand 200 and crossbeam 300. Crossbeam 300 is fixed continuous with stand 200, and first pendant 400 is fixed on crossbeam 300, is fixed with second pendant 500 on the stone material board 600, and second pendant 500 hooks on first pendant 400 to realize the hook of stone material board 600, make things convenient for the installation and the dismantlement of stone material board 600. The embedded part 700 is fixed in the wall 100, and the embedded part 700 is embedded in the wall 100 when the wall 100 is poured, so that the embedded part 700 can be stably connected with the wall 100. The embedded part 700 includes two clamping plates 710 extending out of the wall 100, the two clamping plates 710 are respectively disposed at two sides of the column 200, and the two clamping plates 710 are both fixedly connected to the column 200 to clamp the column 200 from two sides, so as to strengthen the connection therebetween and keep the column 200 stable. Therefore, the present embodiment can improve the connection strength between the entire support assembly and the wall 100 to stably hook the stone plate 600.
In some embodiments, a through hole is transversely formed in the column 200, a through groove corresponding to the through hole is formed in each of the two clamping plates 710, a screw penetrates through the through groove and the through hole, a nut is sleeved on the screw, and the clamping plates 710 are fastened to the column 200 through the cooperation of the screw and the nut. In the embodiment, two clamping plates 710 are fixed on the upright post 200 together by the same set of screws and nuts, so that the steps of construction operation can be reduced, and the clamping plates 710 can be conveniently and quickly fixedly connected with the upright post 200.
In some embodiments, a column sleeve core 210 is disposed inside the column 200, the column 200 may have a square cylindrical shape, and the column sleeve core 210 abuts against an inner side surface of the column 200 to reinforce the structural strength of the column 200. The column sleeve cores 210 may be L-shaped and may be two, and the two column sleeve cores 210 are respectively disposed at two opposite corners of the column 200 to respectively abut against four inner side surfaces of the column 200.
In some embodiments, corner connectors 310 are disposed on both sides of the shaft 200, and each corner connector 310 has two connecting plates disposed vertically, one of the connecting plates is fixedly connected to a side of the shaft 200, and an end of the beam 300 is fixedly connected to the other connecting plate of the corner connector 310, so as to connect the shaft 200 and the beam 300 via the corner connector 310. Wherein, the beam 300 may be an angle-stacking beam so as to fix the first hanger 400.
In some embodiments, a polystyrene board 800 is fixed on the outer side of the wall 100, the stud 200 is located on the outer side of the polystyrene board 800, and the clamp plate 710 penetrates through the polystyrene board 800. The polystyrene board 800 has a heat preservation function, and the upright posts 200 are arranged on the outer side of the polystyrene board 800, so that the polystyrene board 800 can cover a wall 100 with a larger area, and the heat preservation function is improved.
In some embodiments, the first hanger 400 includes a first hanging portion 410, a second hanging portion 420 and a support plate 430, the support plate 430 is fixed on the cross beam 300, the first hanging portion 410 and the second hanging portion 420 are both connected to one end of the outer side of the support plate 430, and the first hanging portion 410 is located above the second hanging portion 420. The first hanging part 410 and the second hanging part 420 may be hook-shaped to hang the second hanger 500. The top surface and the bottom surface of the stone plate 600 are both fixed with the second pendant 500, the first pendant 400 is arranged at the gap of two vertically adjacent stone plates 600, and the two second pendants 500 on the same stone plate 600 are respectively hooked on the two first pendants 400. Specifically, the second hanger 500 on the bottom surface of the stone plate 600 located above of the two vertically adjacent stone plates 600 is hooked on the first hooking portion 410, and the second hanger 500 on the top surface of the stone plate 600 located below of the two vertically adjacent stone plates 600 is hooked on the second hooking portion 420.
Wherein, hook grooves may be formed on the top and bottom surfaces of the stone plate 600, and a portion of the second hanger 500 is embedded in the hook grooves. This can reduce the risk of splitting the stone plate 600 compared to a fixing mode in which screw holes are made in the back surface of the stone plate 600.
Further, the positions where the second hanger 500 and the first hanging portion 410 are hooked with each other and the positions where the second hanger 500 and the second hanging portion 420 are hooked with each other are provided with adhesive, so that the connection strength between the second hanger 500 and the first hanging portion 410 and the connection strength between the second hanger 500 and the second hanging portion 420 are enhanced through the adhesive.
Further, as shown in fig. 3, a stopper 510 is fixed between the second hanger 500 and the first hanging portion 410 on the top surface of the stone plate 600 located below of the two vertically adjacent stone plates 600, and the stopper 510 abuts against the second hanger 500 and the first hanging portion 410. Since the second hanging member 500 on the top of the stone plate 600 is subjected to a small force and may jump upwards to be separated from the second hanging part 420, the second hanging member 500 on the top of the stone plate 600 may be limited by the stopper 510 to be hung on the second hanging part 420.
The foregoing is a more detailed description of the present invention that is presented in conjunction with specific embodiments, and it is not to be understood that the specific embodiments of the present invention are limited to these descriptions. To the utility model discloses to the ordinary technical person of technical field, under the prerequisite that does not deviate from the utility model discloses the design, can also make a plurality of simple deductions or replacement.

Claims (7)

1. The utility model provides a hanging stone material curtain wall construction which characterized in that: the wall comprises a wall body, a support assembly and a stone plate, wherein the support assembly comprises an upright post, a cross beam and a first hanging piece, the cross beam is fixedly connected with the upright post, the first hanging piece is fixed on the cross beam, a second hanging piece is fixed on the stone plate, and the second hanging piece is hung on the first hanging piece in a hooking manner; an embedded part is fixed in the wall body and comprises two clamping plates extending out of the wall body, the two clamping plates are respectively arranged on two sides of the upright post, and the two clamping plates are fixedly connected with the upright post;
the first hanging piece comprises a supporting plate fixed on the cross beam, and a first hanging part and a second hanging part which are connected with one end of the outer side of the supporting plate, and the first hanging part is positioned above the second hanging part; the top surface and the bottom surface of the stone plate are both fixed with second pendants, the second pendant of the bottom surface of the stone plate above the two vertically adjacent stone plates is hooked on the first hanging part, and the second pendant of the top surface of the stone plate below the two vertically adjacent stone plates is hooked on the second hanging part.
2. A hanging stone curtain wall structure as claimed in claim 1, wherein: the stand is provided with through holes, the two clamping plates are provided with through grooves corresponding to the through holes, screws penetrate through the through grooves and the through holes, nuts are sleeved on the screws, and the clamping plates are fastened on the stand through the cooperation of the screws and the nuts.
3. A hanging stone curtain wall construction as claimed in claim 1, wherein: and an upright column sleeve core is arranged in the upright column.
4. A hanging stone curtain wall construction as claimed in claim 1, wherein: the both sides of stand all are provided with the angle sign indicating number, a connecting plate of angle sign indicating number and the fixed linking to each other of side of stand, the tip of crossbeam is fixed linking to each other with another connecting plate of angle sign indicating number.
5. A hanging stone curtain wall structure as claimed in any one of claims 1-4, wherein: a polystyrene board is fixed on the outer side face of the wall body, the stand columns are located on the outer side of the polystyrene board, and the clamping plates penetrate through the polystyrene board.
6. A hanging stone curtain wall structure as claimed in claim 1, wherein: and the positions where the second hanging piece and the first hanging part are hooked with each other and the positions where the second hanging piece and the second hanging part are hooked with each other are provided with viscose glue.
7. A hanging stone curtain wall structure as claimed in claim 1, wherein: and a stop block is fixed between the second hanging piece and the first hanging part of the top surface of the stone plate positioned below in the two vertically adjacent stone plates, and the stop block is abutted against the second hanging piece and the first hanging part.
CN202223201115.6U 2022-11-29 2022-11-29 Hanging stone curtain wall structure Active CN218814590U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223201115.6U CN218814590U (en) 2022-11-29 2022-11-29 Hanging stone curtain wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223201115.6U CN218814590U (en) 2022-11-29 2022-11-29 Hanging stone curtain wall structure

Publications (1)

Publication Number Publication Date
CN218814590U true CN218814590U (en) 2023-04-07

Family

ID=87267156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223201115.6U Active CN218814590U (en) 2022-11-29 2022-11-29 Hanging stone curtain wall structure

Country Status (1)

Country Link
CN (1) CN218814590U (en)

Similar Documents

Publication Publication Date Title
CN104929297A (en) Combined type ceiling hanging part and wood veneer ceiling installing process
KR20180047905A (en) Device for fixing concrete form for construction and method of manafacturing thereof
CN210459726U (en) Aluminum plate furred ceiling structure of preventing falling
CN210917906U (en) Detachable ceiling edge keel system
CN218814590U (en) Hanging stone curtain wall structure
CN207122081U (en) A kind of dried hanging hang structure and finishing systems
CN209228027U (en) A kind of split type building template of high bonding strength
CN205617636U (en) Steel construction building body and light steel roof skeleton thereof
CN213297120U (en) Quick-release aluminum formwork for building construction
CN204850208U (en) Modular furred ceiling pendant
CN210947537U (en) Decorative panel dry hanging piece
CN210887736U (en) Ceiling assembled metal keel structure
CN210858012U (en) Building templates link for civil engineering
CN113463822A (en) Embedded keel connecting piece, ceiling system and mounting method of ceiling system
CN208907303U (en) A kind of architectural engineering plank sheathing being easily installed disassembly
CN207846952U (en) Back of the body bolt dry-hanging component, the back of the body bolt cladding system spliced for fiber ceramic board
CN208251617U (en) A kind of deformation joint dual-shear force wall template assembling and disassembling device
CN205653964U (en) Keel hanging piece
CN217105778U (en) Double-keel hanging piece for ceiling expansion joint
CN215563621U (en) Concrete curtain wall dry-hanging connecting structure
CN212453440U (en) Panel connecting device and panel installing system
CN217128701U (en) Suspended ceiling basic structure
CN220504245U (en) Stone plate connecting device of stone curtain wall
CN211499712U (en) Horizontal support truss structure of attached lifting scaffold
CN212200894U (en) Reinforced prefabricated wallboard upright post structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant