CN218813941U - Road renovating and excavating device - Google Patents

Road renovating and excavating device Download PDF

Info

Publication number
CN218813941U
CN218813941U CN202222721105.9U CN202222721105U CN218813941U CN 218813941 U CN218813941 U CN 218813941U CN 202222721105 U CN202222721105 U CN 202222721105U CN 218813941 U CN218813941 U CN 218813941U
Authority
CN
China
Prior art keywords
fixedly connected
connecting plate
rotation
frame
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202222721105.9U
Other languages
Chinese (zh)
Inventor
方伟超
李枝平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Benmao Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222721105.9U priority Critical patent/CN218813941U/en
Application granted granted Critical
Publication of CN218813941U publication Critical patent/CN218813941U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a road engineering technical field, specifically be road renovation excavating gear, which comprises a mounting bracket, four gyro wheels of fixedly connected with on the mounting bracket, and install two first electric putter in the mounting bracket, two first electric putter's output fixedly connected with connecting plate, two connecting blocks of fixedly connected with on the connecting plate, be connected with second electric putter through the rotation of axle on the connecting block, second electric putter's output has the fixed block through the rotation of axle, four bracing pieces of fixedly connected with on the connecting plate, the one end fixedly connected with fixed plate of two corresponding bracing pieces, there are two frames of digging through two axle rotation connections between two fixed plates, fixed block fixed connection is on digging the frame, it has seted up the regulation hole on the frame to dig, install the motor on the connecting plate, the output fixedly connected with axis of rotation of motor, have in-process digging the renovation to the road, it breaks up the soil block to need not the later stage workman's manual work, time saving and labor, use the higher effect of practicality.

Description

Road renovating and excavating device
Technical Field
The utility model relates to a road engineering technical field specifically is road renovates excavating gear.
Background
As is well known, people, vehicles and roads are three major factors forming traffic, the roads directly influence the driving safety, the safety of the roads is ensured by frequently renovating the roads by excavation, a large amount of manpower and material resources are needed in the road construction process, the development speed of cities is also influenced for the road construction speed, and the slower the road construction speed is, the slower the cities are developed; on the contrary, when better mechanical equipment can accelerate the construction of roads, the development of cities is also accelerated, along with the development of the urbanization process, governments in various places actively build new roads and maintain damaged roads, and the original roads or the original land need to be excavated in the road construction process, and then the roads are constructed, so that the road renovation and excavation device is needed.
Through the retrieval, chinese patent is CN 202220440829.3's utility model patent discloses a road renovates excavating gear for road construction, and it includes excavator body, excavates mechanism, water supply mechanism and is used for excavating the mechanism and excavate the department and carry out the mechanism that sprays, excavates the mechanism and connects on the excavator body, and water supply mechanism connects on the excavator body, sprays the mechanism and excavates the mechanism and is connected, and water supply mechanism with spray the mechanism intercommunication. This application has and excavates the in-process to the road surface at excavating gear, reduces the raise dust content among the operational environment to reduce the effect to operational environment's pollution.
Although above-mentioned technical scheme can reduce the effect to operational environment's pollution, the excavator body is digging the in-process of renovating to the road, can only excavate out soil, and the soil of excavation is the cubic, and the later stage still needs the workman manual work to break up the soil block, wastes time and energy, and the practicality of use is lower.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a road renovates excavating gear to solve the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model provides a following technical scheme: road renovates excavating gear, which comprises a mounting bracket, four gyro wheels of fixedly connected with on the mounting bracket, and install two first motor push rod in the mounting bracket, two first motor push rod's output end fixedly connected with connecting plate, two connecting blocks of fixedly connected with on the connecting plate, be connected with second motor push rod through the axle rotation on the connecting block, second motor push rod's output is connected with the fixed block through the axle rotation, four bracing pieces of fixedly connected with on the connecting plate, the one end fixedly connected with fixed plate of two corresponding bracing pieces, it digs the frame to be connected with two through two axle rotations between two fixed plates, fixed block fixed connection digs on the frame, dig and seted up the regulation hole on the frame, install the motor on the connecting plate, the output fixedly connected with axis of rotation of motor, the one end of axis of rotation runs through connecting plate and regulation hole and extends to two inside of digging the frame, and a plurality of crushing roller of fixedly connected with in the axis of rotation.
Preferably, two sliding grooves are formed in the mounting frame, sliding blocks are connected in the sliding grooves in a sliding mode, and the sliding blocks are fixedly connected with the connecting plate.
Furthermore, a handrail is fixedly connected to the mounting frame.
Still further, the handrail is provided with anti-skidding lines.
In a further scheme, the rotating shaft is rotatably connected with the connecting plate through a bearing.
(III) advantageous effects
Compared with the prior art, the utility model provides a road renovates excavating gear possesses following beneficial effect:
this excavating gear is renovated to road, through controlling second electric putter, can drive the fixed block and remove, the fixed block drives and digs the frame and rotate, make two dig the frame and open, through controlling first electric putter, the position of adjustable connection board, the connecting plate drives and digs the frame and remove, rethread control second electric putter reverse movement, can make and dig the frame and dig out and make soil stay two dig the frame in, through the control motor, the motor drives the axis of rotation and rotates, the axis of rotation drives crushing roller and rotates, crushing roller carries out the repulverize to the soil of digging in the frame, thereby in-process renovating the road, it breaks up the clod soil to need not the manual work of later stage workman, time saving and labor saving, high practicability.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a portion of the enlarged structure of FIG. 1;
FIG. 3 is a schematic view of a portion of the enlarged structure of FIG. 1 at B according to the present invention;
fig. 4 is a schematic view of the overlooking structure of the middle digging frame and the rotating shaft of the present invention.
In the figure: 1. a mounting frame; 2. a roller; 3. a first motor push rod; 4. a connecting plate; 5. connecting blocks; 6. a second electric push rod; 7. a fixed block; 8. a support bar; 9. a fixing plate; 10. digging a frame; 11. a motor; 12. a rotating shaft; 13. a crushing roller; 14. a slider; 15. a handrail; 16. and (5) a bearing.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, the road renovation excavating device comprises a mounting frame 1, four rollers 2 are fixedly connected to the mounting frame 1, handrails 15 are fixedly connected to the mounting frame 1, a user can conveniently push the mounting frame 1 to move through the handrails 15, anti-slip patterns are arranged on the handrails 15, the hands of the user can be prevented from sliding on the handrails 15 through the anti-slip patterns, two push rods 3 of a first motor 11 are installed in the mounting frame 1, connecting plates 4 are fixedly connected to the output ends of the two first electric push rods, two sliding grooves are formed in the mounting frame 1, sliding blocks 14 are slidably connected to the sliding grooves, the sliding blocks 14 are fixedly connected to the connecting plates 4, the stability of the connecting plates 4 can be improved through the sliding blocks 14, two connecting blocks 5 are fixedly connected to the connecting plates 4, a second electric push rod 6 is connected to the connecting blocks 5 through a shaft, the output end of the second electric push rod 6 is rotatably connected to a fixed block 7 through a shaft, four support rods 8 are fixedly connected to the connecting plates 4, one end of the two corresponding support rods 8 is fixedly connected to a fixed plate 9, two digging frames 10 are rotatably connected to the fixed plates 9 through two shafts, the digging frames 7 are fixedly connected to the digging frame 10, the rotating shaft 7, the adjusting holes 12 are connected to the connecting plates 12, the adjusting shaft 12, the connecting plates 12 are connected to the connecting plates 12, and the connecting plates 12, the adjusting shaft can be connected to the grinding rollers 12, through controlling first electric putter, adjustable connection board 4's position, connecting plate 4 drives and digs frame 10 and remove, 6 reverse movements of rethread control second electric putter, can make dig frame 10 and dig out and make soil stay two dig in the frame 10, through control motor 11, motor 11 drives axis of rotation 12 and rotates, axis of rotation 12 drives crushing roller 13 and rotates, crushing roller 13 carries out the regrinding to the soil of digging in the frame 10, thereby digging the in-process of renovating to the road, it breaks up the soil block to need not the manual work of later stage workman, time saving and labor saving, high practicability.
To sum up, when the road renewing and excavating device is used, firstly, the road renewing and excavating device is placed at a position required to be used, a user opens the second electric push rod 6, the output end of the second electric push rod 6 drives the fixing block 7 to move, the fixing block 7 drives the excavating frames 10 to rotate, so that the two excavating frames 10 are opened, then the user opens the first electric push rod, the first electric push rod drives the connecting plate 4 to move, the connecting plate 4 drives the excavating frames 10 to move, when the road renewing and excavating device moves to a proper position, the user opens the second electric push rod 6 to reversely move the second electric push rod 6, so that the two excavating frames 10 excavate soil on the ground and the two excavating frames 10 are closed, then the user opens the motor 11, the output end of the motor 11 drives the rotating shaft 12 to rotate, the rotating shaft 12 drives the crushing rollers 13 to rotate, the crushing rollers 13 crush the soil blocks, and then the user opens the second electric push rod 6 to open the two excavating frames 10, so that the soil in the excavating frames 10 is dumped.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. Road renovates excavating gear, including mounting bracket (1), its characterized in that: four gyro wheels of fixedly connected with (2) are gone up in mounting bracket (1), and install two first motor (11) push rod (3) in mounting bracket (1), two first electric putter's output fixedly connected with connecting plate (4), two connecting block of fixedly connected with (5) are gone up in connecting plate (4), be connected with second electric putter (6) through the rotation of axes on connecting block (5), the output of second electric putter (6) is connected with fixed block (7) through the rotation of axes, four bracing piece of fixedly connected with (8) are gone up in connecting plate (4), the one end fixedly connected with fixed plate (9) of two corresponding bracing piece (8), there are two through two rotation of axes between two fixed plate (9) and dig frame (10), fixed block (7) fixed connection is on digging frame (10), dig the regulation hole has been seted up on frame (10), install motor (11) on connecting plate (4), the output fixedly connected with axis of rotation (12) of motor (11), the one end of axis of rotation (12) runs through connecting plate (4) and regulation hole and extends to two inside of digging frame (10), and fixedly connected with a plurality of smashing roller (13) on axis of rotation (12).
2. The retreaded excavation apparatus as claimed in claim 1, wherein: two sliding grooves are formed in the mounting rack (1), sliding blocks (14) are connected in the sliding grooves in a sliding mode, and the sliding blocks (14) are fixedly connected with the connecting plate (4).
3. The retreaded excavation apparatus as claimed in claim 2, wherein: the mounting frame (1) is fixedly connected with a handrail (15).
4. The retreaded excavation apparatus as claimed in claim 3, wherein: the handrail (15) is provided with anti-skid lines.
5. The retreaded excavation apparatus as claimed in claim 4, wherein: the rotating shaft (12) is rotatably connected with the connecting plate (4) through a bearing (16).
CN202222721105.9U 2022-10-14 2022-10-14 Road renovating and excavating device Withdrawn - After Issue CN218813941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222721105.9U CN218813941U (en) 2022-10-14 2022-10-14 Road renovating and excavating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222721105.9U CN218813941U (en) 2022-10-14 2022-10-14 Road renovating and excavating device

Publications (1)

Publication Number Publication Date
CN218813941U true CN218813941U (en) 2023-04-07

Family

ID=87267848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222721105.9U Withdrawn - After Issue CN218813941U (en) 2022-10-14 2022-10-14 Road renovating and excavating device

Country Status (1)

Country Link
CN (1) CN218813941U (en)

Similar Documents

Publication Publication Date Title
CN218813941U (en) Road renovating and excavating device
CN101736763B (en) Foundation pit excavator
CN214116416U (en) Construction engineering environmental protection desilting device
CN212534459U (en) Sewage pipes cleaning device for building plumbing
CN106677020A (en) Scraper adjustable road roller for constructional engineering
CN215593956U (en) Leveling device for land planning and treatment
CN201883464U (en) Rescue vehicle
CN210342043U (en) Civil engineering foundation pit excavating device
CN214530660U (en) Foundation pile pulling-out device for building construction
CN212925684U (en) Road roller for town road of adjustable rolling area
CN212026569U (en) Dredging device for municipal underground pipeline
CN210143267U (en) Quick ditching dolly is used in gardens construction
CN203594067U (en) Crawler dozer
CN210122897U (en) Side slope drilling equipment fixing device
CN209483357U (en) A kind of opened type shield machine for jacking construction
CN201354460Y (en) Civil engineering foundation pit excavating device
CN114524396B (en) Municipal drainage grating plate prying dredging device
CN214695019U (en) Equipment with opening function for constructing road roller for agricultural canal
CN217949202U (en) Land leveling device
CN215355329U (en) Self-propelled soil prosthetic devices
CN117868239B (en) Municipal works construction slot excavation device
CN212563064U (en) Digging device for civil construction
CN212120803U (en) Civil engineering stone sand screening device
CN219952083U (en) River channel dredging device
CN217557037U (en) Crawler excavator with scraper blade structure on bucket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230613

Address after: No. 8, Lane 1, Dashuiping, Luofang Village, Datong Town, Changting County, Longyan, Fujian Province, 364000

Patentee after: Fujian Benmao Construction Engineering Co.,Ltd.

Address before: 1458 Xiechun Road, Jiading District, Shanghai, 200000

Patentee before: Fang Weichao

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20230407

Effective date of abandoning: 20230809

AV01 Patent right actively abandoned

Granted publication date: 20230407

Effective date of abandoning: 20230809