CN218786984U - A template installation device for construction of frame twin columns expansion joint - Google Patents
A template installation device for construction of frame twin columns expansion joint Download PDFInfo
- Publication number
- CN218786984U CN218786984U CN202221737165.3U CN202221737165U CN218786984U CN 218786984 U CN218786984 U CN 218786984U CN 202221737165 U CN202221737165 U CN 202221737165U CN 218786984 U CN218786984 U CN 218786984U
- Authority
- CN
- China
- Prior art keywords
- bamboo plywood
- construction
- double
- expansion joint
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a template installation device for the construction of a frame double-column expansion joint in the field of expansion joint construction, which comprises a double-faced wood template, wherein the double-faced wood template consists of square timber, a first bamboo plywood, a second bamboo plywood and a top rib; the top ribs in the double-sided wood template are arranged in a column cage of the stand column at intervals of 1m multiplied by 1m, and one surface of the bamboo plywood is coated with a silicone emulsion release agent and is attached to the top ribs and placed on the outer side of the stand column. The utility model provides a two-sided plank sheathing is by bamboo offset plate one, bamboo offset plate two, the square timber, constitute with the top muscle, form wholly through the steel nail, the assembly of built-up plate has been realized, the silicone oil emulsion release agent ensures template and concrete, laminating between template and the template is more convenient with demolising, the construction speed to the frame twin columns has been improved, the efficiency of construction is improved, the manual work has been reduced, the quality and the structure size of frame twin columns have been ensured, because of it is being under construction simultaneously, also can be the at utmost in the outward appearance to the unanimity.
Description
Technical Field
The utility model relates to an expansion joint construction field specifically is a template installation device for construction of frame twin columns expansion joint.
Background
Among the house engineering, the frame twin columns structure is comparatively common, thereby sets up two frame posts and cuts apart the beam slab, subducts stress. The traditional frame double-column construction process comprises the steps of constructing one frame and then constructing the other frame, more resources are consumed, more workers are consumed, the efficiency is lower, the time limit for the formwork to be frequently disassembled is slow, the cost is high, the formwork aging can be accelerated, the efficiency is low, the simultaneous construction cannot be realized, and the appearance is inconsistent.
CN214885489U is a double-column expansion joint mould reinforcing device. The method comprises the following steps: columns, main beams and secondary beams; further comprising: the device comprises a support frame, a screw rod, a sliding block, a connecting rod, a fixed rod and a support plate; the support frame is sleeved outside the screw rod; a cavity is arranged in the supporting frame; the sliding block is sleeved on the screw rod; the sliding block is arranged in the cavity of the support frame; the connecting rod is hinged with the sliding block; the free end of the connecting rod is hinged with the fixed rod; the fixed rod is provided with a fixed block which is fixedly connected; the fixed block is fixedly connected with the supporting plate; one end of the screw rod is T-shaped; the screw is provided with a groove; a turntable is arranged on the screw rod; the rotary disc is provided with an opening; the rotary disc is arranged in the groove of the screw rod. Although the above-mentioned patent can regard as the construction of twin columns expansion joint to use, its structure is complicated, and the cost is higher, and length is not adjustable, can't adapt to not the not stand of co-altitude, and the flexibility of use is relatively poor.
Therefore, the technical personnel in the field provide a template installation device for the construction of the frame double-column expansion joint, which can be adjusted according to the sizes of different columns, has simple structure and low preparation cost.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a template installation device for construction of frame twin columns expansion joint to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a template installation device for construction of a frame double-column expansion joint comprises a double-faced wood template, wherein the double-faced wood template consists of square wood, a first bamboo plywood, a second bamboo plywood and a top rib;
the top ribs in the double-sided wood formwork are arranged in a column cage of the stand column at intervals of 1m multiplied by 1m, the emulsified silicone oil release agent is coated on the surface of the first bamboo plywood and attached to the top ribs and placed on the outer side of the stand column, two bamboo plywood sheets are arranged, the emulsified silicone oil release agent is coated on the surface of the second bamboo plywood and attached to the square timber for placement, and the second bamboo plywood and the square timber are connected in a nailing mode.
As a further aspect of the present invention: the thickness of the first bamboo plywood is 10mm, the thickness of the second bamboo plywood is 25mm, and the specification of the square wood is 40mm multiplied by 75mm.
As a further aspect of the present invention: the top rib is fixed in the structural steel bar inside the column cage, and the overlapping length of the square timber is 1m.
As a further aspect of the present invention: the bamboo plywood I on the two sides is longitudinally arranged in a length-staggered mode.
As a further aspect of the present invention: the double-sided wood formwork is matched with two unconnected bamboo plywood I and bamboo plywood II through a combined formwork to carry out mold closing construction.
As a further aspect of the present invention, the construction method of the new type match plate installation apparatus is: the method comprises the steps of firstly conveying materials to a site, processing the materials, longitudinally arranging the bamboo plywood I on two sides in a length-staggered mode, ensuring the strength, the rigidity and the stability of a combined system, fixing a top rib in a structural steel bar, coating an emulsified silicone oil release agent on the bamboo plywood II, then adhering the bamboo plywood I to the top rib, nailing the bamboo plywood I to square wood, overlapping the square wood by 1m, coating the emulsified silicone oil release agent on the bamboo plywood I after the combination is completed, adhering the bamboo plywood II to the emulsified silicone oil release agent to form a double-faced wood template system, and fully coating the emulsified silicone oil release agent on the surfaces of the bamboo plywood I and the bamboo plywood II to ensure that the bamboo plywood I and the bamboo plywood II are quickly separated.
The utility model has the advantages that:
the utility model provides a two-sided plank sheathing is by bamboo offset plate one, bamboo offset plate two, the square timber, constitute with the top muscle, form wholly through the steel nail, the assembly of built-up plate has been realized, the silicone oil emulsion release agent ensures template and concrete, laminating between template and the template is more convenient with demolising, the construction speed to the frame twin columns has been improved, the efficiency of construction is improved, the manual work has been reduced, the quality and the structure size of frame twin columns have been ensured, because of it is being under construction simultaneously, also can be the at utmost in the outward appearance to the unanimity.
Drawings
Fig. 1 is a diagram of a double-faced wood formwork of the present invention;
fig. 2 isbase:Sub>A sectional view of the double-sided wooden template of the present invention atbase:Sub>A positionbase:Sub>A-base:Sub>A;
fig. 3 is a sectional view of the double-sided wooden form of the present invention at the position B-B.
In the figure: 1. double-sided wood formwork: 101. square wood; 102. a first bamboo plywood; 103. a second bamboo plywood; 104. and (6) jacking ribs.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Fig. 1 to 3 show that, in the embodiment of the present invention, a formwork installation apparatus for construction of a frame double-column expansion joint includes a double-faced wood formwork 1, where the double-faced wood formwork 1 is composed of square timber 101, a first bamboo plywood 102, a second bamboo plywood 103, and a top rib 104;
the top rib 104 in the double-sided wood formwork 1 is arranged in a column cage of the stand column according to the interval of 1m multiplied by 1m, the first bamboo plywood 102 is coated with the emulsified silicone oil release agent on the surface and is attached to the top rib 104 and placed on the outer side of the stand column, the second bamboo plywood 103 is provided with two blocks, the second bamboo plywood 103 is attached to the square timber (101) for placement after being coated with the emulsified silicone oil release agent on the surface, and the second bamboo plywood 103 is connected with the square timber (101) in a nailing manner, so that the demoulding can be conveniently carried out.
Through adopting above-mentioned technical scheme, two-sided plank sheathing 1 comprises bamboo plywood 102, bamboo plywood two 103, square timber 101, and top muscle 104, form wholly through the steel nail, the assembly of built-up plate has been realized, the laminating and demolish between template and the template are more convenient for template and concrete, the silicone oil emulsion release agent ensures template and concrete, the construction speed to the frame twin columns has been improved, the efficiency of construction is improved, the manual work has been reduced, the quality and the structure size of frame twin columns have been ensured, because it is construction simultaneously, also can the at utmost in the outward appearance do unanimously.
The thickness of the first bamboo plywood 102 is 10mm, the thickness of the second bamboo plywood 103 is 25mm, the specification of the square timber 101 is 40mm multiplied by 75mm, the top rib 104 is fixed in structural steel bars inside the column cage, and the overlapping length of the square timber 101 is 1m. The bamboo plywood I102 on the two sides is longitudinally arranged in a length-staggered mode, so that the rigidity of the double-sided wood formwork 1 is guaranteed.
The double-sided wood formwork 1 is matched with two unconnected bamboo plywood I102 and bamboo plywood II 103 through a combined formwork to carry out mold closing construction, the size of a concrete structure is guaranteed, and the formwork can be conveniently and rapidly separated from a concrete surface.
Example 2:
the left and right bamboo plywood sheets 102 are longitudinally arranged in a staggered manner, and the square timbers 101 are overlapped by 1m, so that the strength, rigidity and stability of the combined system are ensured. The surface of the second bamboo plywood 103 is sufficiently coated with a release agent to ensure that the second bamboo plywood can be quickly separated from concrete, and the surface of the first bamboo plywood 102 is sufficiently coated with an emulsified silicone oil release agent to ensure that the first bamboo plywood can be quickly separated from the second bamboo plywood 103. The top rib 104 is fixed in the structural steel bar, the second bamboo plywood 103 is coated with the emulsified silicone oil release agent and then is attached to the top rib 104, the first bamboo plywood 102 is nailed to the square timber 101, and after the combination is completed, the first bamboo plywood 102 of 25mm is coated with the emulsified silicone oil release agent and is attached to the second bamboo plywood 103 to form the expansion joint double-faced wood formwork system.
The construction method of the novel double faced formwork installation device comprises the following steps: the method comprises the steps of firstly conveying materials to a site, processing the materials, longitudinally arranging the bamboo plywood I102 on two sides in a length-staggered mode to guarantee the strength, the rigidity and the stability of a combined system, fixing the top ribs 104 in structural steel bars, coating the emulsified silicone oil release agent on the bamboo plywood II 103, then adhering the bamboo plywood I102 to the top ribs 104, nailing the bamboo plywood I102 to square timbers (101), overlapping the square timbers 101 for 1m, coating the emulsified silicone oil release agent on the bamboo plywood I102 after the combination is completed, adhering the coated emulsified silicone oil release agent to the bamboo plywood II 103 to form the expansion joint double-faced wood formwork 1 system, and fully coating the emulsified silicone oil release agent on the surfaces of the bamboo plywood I102 and the bamboo plywood II 103 to guarantee the rapid separation of the bamboo plywood I102 and the bamboo plywood II 103.
The above, only be the embodiment of the preferred of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, which are designed to be replaced or changed equally, all should be covered within the protection scope of the present invention.
Claims (5)
1. The utility model provides a formwork installation device for construction of frame twin columns expansion joint, includes two-sided plank sheathing, its characterized in that: the double-faced wood template consists of square wood, a bamboo plywood I, a bamboo plywood II and a top rib;
the top ribs in the double-sided wood formwork are arranged in a column cage of the stand column at intervals of 1m multiplied by 1m, the emulsified silicone oil release agent is coated on the surface of the first bamboo plywood and attached to the top ribs and placed on the outer side of the stand column, two bamboo plywood sheets are arranged, the emulsified silicone oil release agent is coated on the surface of the second bamboo plywood and attached to the square timber for placement, and the second bamboo plywood and the square timber are connected in a nailing mode.
2. The formwork mounting device for construction of the frame double-column expansion joint as claimed in claim 1, wherein: the thickness of the first bamboo plywood is 10mm, the thickness of the second bamboo plywood is 25mm, and the specification of the square wood is 40mm multiplied by 75mm.
3. The formwork mounting device for construction of the frame double-column expansion joint as claimed in claim 1, wherein: the top rib is fixed in the structural steel bar inside the column cage, and the overlapping length of the square timber is 1m.
4. The formwork mounting device for construction of the frame double-column expansion joint as claimed in claim 1, wherein: the bamboo plywood I on the two sides is longitudinally arranged in a length-staggered mode.
5. The formwork installation device for construction of the frame double-column expansion joint as claimed in claim 1, wherein: the double-sided wood formwork is matched with two unconnected bamboo plywood I and bamboo plywood II through a combined formwork to carry out mold closing construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221737165.3U CN218786984U (en) | 2022-07-07 | 2022-07-07 | A template installation device for construction of frame twin columns expansion joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221737165.3U CN218786984U (en) | 2022-07-07 | 2022-07-07 | A template installation device for construction of frame twin columns expansion joint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218786984U true CN218786984U (en) | 2023-04-04 |
Family
ID=86503756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221737165.3U Active CN218786984U (en) | 2022-07-07 | 2022-07-07 | A template installation device for construction of frame twin columns expansion joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218786984U (en) |
-
2022
- 2022-07-07 CN CN202221737165.3U patent/CN218786984U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10837166B2 (en) | Building structure and construction method for same | |
CN106320691B (en) | Aluminum wood template construction method | |
RU2465415C1 (en) | Wall unit (versions), material for manufacturing of wall units, mould to manufacture wall units (versions), method to make wall units and flow line to manufacture wall units | |
CN211369521U (en) | Concrete building frame template system | |
DE69836339D1 (en) | LATERAL FORMWORK ASSEMBLY FOR MANUFACTURING THE PLASTERING OF A CONCRETE CONCRETE CONCRETE | |
CN110821156A (en) | Sinking type toilet hanging die structure and construction method thereof | |
CN211257811U (en) | Turnover screw rod for laminated slab cast-in-place slab band | |
CN210396134U (en) | Reinforcing tool for controlling horizontal joint quality of shear wall | |
CN218786984U (en) | A template installation device for construction of frame twin columns expansion joint | |
CN111877163A (en) | Reaming seam construction die pasting process for hollow slab beam | |
WO2016203483A1 (en) | Composite framing and wall | |
CN205955193U (en) | Can have enough to meet need integral concrete beam reinforcing apparatus | |
CN212835512U (en) | Circular inspection shaft template | |
CN211973582U (en) | Basement template system | |
CN212642113U (en) | Formwork support system and construction structure | |
CN111691657A (en) | Anchoring bolt structure of cantilever scaffold and mounting method | |
CN112482636A (en) | Underground assembly type station cast-in-place beam formwork-free structure and construction method thereof | |
CN111576681A (en) | FS composite heat-preservation construction integrated technology construction process | |
CN112342929A (en) | Continuous beam inclined web circular arc section construction method adopting steel-wood mixed template | |
CN210369912U (en) | Cast-in-place concrete stair formwork | |
CN217128500U (en) | High-strength concrete precast slab | |
CN110863589A (en) | Mold device for manufacturing L-shaped cavity concrete module and using method thereof | |
CN211662287U (en) | Cushion block die | |
CN217400011U (en) | Anchor decoration pendant is exempted from to tear open template wallboard structure earlier | |
CN219451216U (en) | double-T plate seam joint processing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |