CN218724193U - Construction site surveying and mapping device - Google Patents

Construction site surveying and mapping device Download PDF

Info

Publication number
CN218724193U
CN218724193U CN202222981803.2U CN202222981803U CN218724193U CN 218724193 U CN218724193 U CN 218724193U CN 202222981803 U CN202222981803 U CN 202222981803U CN 218724193 U CN218724193 U CN 218724193U
Authority
CN
China
Prior art keywords
support
detecting head
groove
sliding
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222981803.2U
Other languages
Chinese (zh)
Inventor
王力
雷蓉
陈小明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222981803.2U priority Critical patent/CN218724193U/en
Application granted granted Critical
Publication of CN218724193U publication Critical patent/CN218724193U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses a job site mapping device relates to the mapping technology field, this job site mapping device, which comprises a bracket, the top of support is provided with the detecting head, two connecting blocks of bottom fixedly connected with of detecting head, the structure homogeneous phase on two connecting blocks, the spout has been seted up to the rear side of connecting block, be provided with the disengaging gear in the spout, the disengaging gear includes first slide bar, first slide bar is at the inside fixed connection of spout, the fixture block has been cup jointed in the surface slip of first slide bar, the rear side bottom of fixture block is the inclined plane setting, through removing the connecting rod and then effectual work that makes the detecting head accomplish the separation and disassembly with the support, and then it separately to be more convenient for detecting head and support, make the detecting head can be more convenient when overhauing, and then the effectual use convenience that improves whole device, can be convenient for maintaining the detecting head, further improved the stability of whole device in long-term use.

Description

Construction site surveying and mapping device
Technical Field
The utility model relates to a survey and drawing technical field, in particular to job site mapping device.
Background
The surveying and mapping device is simply an instrument and a device for data acquisition, processing, output and the like designed and manufactured for surveying and mapping operation. In engineering construction, various instruments in aspects of orientation, distance measurement, angle measurement, height measurement, mapping, photogrammetry and the like are required for measurement in planning and designing, construction and operation management stages.
In the work of job site, need use the survey device to accomplish the measurement of some data, although current survey device can satisfy the data measurement work to the job site, but in survey device's long-term use, need overhaul maintenance work to survey device, in order to guarantee the long-term life of integrated device, this moment because for the integration setting between most current survey device's the mapping head and the support, can not break away from separately using between mapping head and the support, and then under the condition of overhauing the mapping position alone, then can cause the detection inconvenience to the mapping head, make the work efficiency of the maintenance work of examining and repairing of mapping head reduce, further reduce the result of use of integrated device.
SUMMERY OF THE UTILITY MODEL
The utility model discloses an at least solve one of the technical problem that exists among the prior art, can solve because set up for the integration between most current mapping device's survey and drawing head and the support, can not break away from separately using between survey and drawing head and the support, and then under the condition of overhauing the survey and drawing position alone, then can cause the detection to the survey and drawing head inconvenient, make the problem that the work efficiency of the maintenance work of examining and repairing of survey and drawing head reduces.
In order to achieve the above object, the utility model provides a following technical scheme: a surveying and mapping device for a construction site comprises a support, wherein a detection head is arranged at the top of the support, two connecting blocks are fixedly connected to the bottom of the detection head, the two connecting blocks have the same structure, a sliding groove is formed in the rear side of each connecting block, and a separation device is arranged in the sliding groove;
the separation device comprises a first sliding rod which is fixedly connected inside the sliding groove, a clamping block is sleeved on the surface of the first sliding rod in a sliding mode, and the bottom of the rear side of the clamping block is arranged on an inclined plane.
Preferably, the surface of the first sliding rod is movably sleeved with a first spring, two ends of the first spring are respectively and fixedly connected between the sliding groove and the clamping block, and two clamping grooves are formed in the top of the support.
Preferably, the bottoms of the two clamping grooves are communicated with connecting grooves, a second sliding rod is fixedly connected to the inside of each connecting groove, and a push rod is sleeved on the surface of each second sliding rod in a sliding mode.
Preferably, the surface of the second sliding rod is movably sleeved with a second spring, two ends of the second spring are respectively and fixedly connected to two ends of the connecting groove and the push rod, and a channel is formed in the left side of the support.
Preferably, the left side of the push rod is fixedly connected with a connecting rod, the connecting rod is connected in the channel in a sliding mode, and the left side of the connecting rod extends to the left side of the support.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) This job site mapping device accomplishes the work of separation dismantlement through the movable connection pole and then effectual messenger's detecting head and support, and then the more convenient detecting head separates with the support, makes more convenient that the detecting head can be when overhauing, and then the effectual use convenience that has improved the overall arrangement, can be convenient for maintain the detecting head, has further improved the stability of overall arrangement in long-term the use.
(2) This job site mapping device because the rear side bottom of fixture block is the inclined plane setting, and then can effectually receive when the fixture block enters into the draw-in groove and block and contract and enter into the spout in, and then make the connecting block can not receive the draw-in groove that enters into that blocks in, finally make the fixture block reset under the spring action of first spring and enter into the inside of draw-in groove, and then the effectual use smoothness nature and the stability that have improved whole device.
(3) This job site mapping device through removing the connecting block to the draw-in groove in, finally accomplishes the installation work of detecting head and support, and then can be more convenient with detecting head and leg mounting together to in can be quick the drop-in use, further improved the result of use of whole device.
Drawings
The invention will be further described with reference to the following figures and examples:
FIG. 1 is a schematic structural view of a surveying and mapping device for construction site according to the present invention;
fig. 2 is a left side view of the inside of the bracket of the present invention;
fig. 3 is an enlarged schematic view of a point a in fig. 2 according to the present invention.
Reference numerals: 1. a support; 2. a probe; 3. connecting blocks; 4. a chute; 5. a first slide bar; 6. a clamping block; 7. a first spring; 8. a card slot; 9. connecting grooves; 10. a second slide bar; 11. a second spring; 12. a push rod; 13. a connecting rod; 14. a channel.
Detailed Description
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a job site mapping device, which comprises a bracket 1, the top of support 1 is provided with detecting head 2, support 1 is greater than detecting head 2 and has certain supporting role, two connecting blocks 3 of bottom fixedly connected with of detecting head 2, the structure homogeneous phase on two connecting blocks 3 is the same, spout 4 has been seted up to the rear side of connecting block 3, the first slide bar 5 of inside fixedly connected with of spout 4, fixture block 6 has been cup jointed in the surface slip of first slide bar 5, the rear side bottom of fixture block 6 is the inclined plane setting, first spring 7 has been cup jointed in the surface activity of first slide bar 5, fixed connection is between spout 4 and fixture block 6 respectively at the both ends of first spring 7, two draw-in grooves 8 have been seted up at the top of support 1.
When needs use the integrated device to come to survey and drawing the use to the job site, need assemble detecting head 2 and support 1 this moment, under initial condition, under the elastic force effect of first spring 7, 6 outstanding spout 4's of fixture block inside, later with two connecting block 3 alignment two draw-in grooves 8 and lapse detecting head 2, because the rear side bottom of fixture block 6 is the inclined plane setting, and then when fixture block 6 follows connecting block 3 and gets into draw-in groove 8, the inclined plane of fixture block 6 can be smooth receives blockking of draw-in groove 8, the fixture block 6 gets into the inside of spout 4 and compresses first spring 7 this moment, after connecting block 3 fully enters into draw-in groove 8, fixture block 6 is not receiving to block this moment, under the elastic force effect of first spring 7, fixture block 6 removes to reset, this moment the fixture block 6 enter into in draw-in groove 8 and accomplish each other with draw-in groove 8 and block, detecting head 2 and support 1 accomplish the installation work this moment.
Through removing connecting block 3 to draw-in groove 8 in, the final installation work who accomplishes detecting head 2 and support 1, and then can be more convenient with the installation of detecting head 2 and support 1 together to in the drop-in use that can be quick, further improved whole device's result of use.
Because the rear side bottom of fixture block 6 is the inclined plane setting, and then can effectually receive when fixture block 6 enters into draw-in groove 8 and block and contract and enter into spout 4 in, and then make connecting block 3 can not receive the entering into draw-in groove 8 that blocks, finally make fixture block 6 reset under the elastic force effect of first spring 7 and enter into the inside of draw-in groove 8, and then the effectual use smoothness nature and the stability that have improved whole device.
The bottom of two draw-in grooves 8 all communicates has spread groove 9, the inside fixedly connected with second slide bar 10 of spread groove 9, push rod 12 has been cup jointed in the surface sliding of second slide bar 10, the relative one side in top of push rod 12 is the arcuation, second spring 11 has been cup jointed in the surface activity of second slide bar 10, fixed connection is at the both ends of spread groove 9 and push rod 12 respectively at the both ends of second spring 11, passageway 14 has been seted up in the left side of support 1, the left side fixedly connected with connecting rod 13 of push rod 12, connecting rod 13 is sliding connection in passageway 14, the left side of connecting rod 13 extends to the left side of support 1.
Under initial condition, under the elastic force effect of second spring 11, push rod 12 does not contact fixture block 6, carry out solitary maintenance during operation to detecting head 2 as required, need break away from detecting head 2 and support 1 this moment, connecting rod 13 needs to be removed this moment, connecting rod 13 removes and begins to compress second spring 11, connecting rod 13 removes and begins to promote two fixture blocks 6, two fixture blocks 6 begin to move back to back under the promotion of push rod 12 this moment, two fixture blocks 6 move back to back and begin to compress two first springs 7, two fixture blocks 6 are not being located the inside of two draw-in grooves 8 this moment, can be smooth at this moment with the separation of detecting head 2 and support 1, the dismantlement of final completion detecting head 2 and support 1, be convenient for maintain detecting head 2.
Through the work of removing connecting rod 13 and then effectual messenger detecting head 2 and the completion separation of support 1 and dismantling, and then the more convenient detecting head 2 and support 1 part, make detecting head 2 more convenient when overhauing, and then the effectual use convenience that has improved the integrated device can be convenient for maintain detecting head 2, further improved the stability of integrated device in long-term the use.
The working principle is as follows: when needs use the integrated device to come to survey and drawing the use to the job site, need assemble detecting head 2 and support 1 this moment, under initial condition, under the spring action of first spring 7, 6 outstanding spout 4's of fixture block inside, later with two connecting block 3 alignment two draw-in grooves 8 and lapse detecting head 2, because the rear side bottom of fixture block 6 is the inclined plane setting, and then when fixture block 6 follows connecting block 3 and gets into draw-in groove 8, the inclined plane of fixture block 6 can be smooth receives blockking of draw-in groove 8, the fixture block 6 gets into the inside of spout 4 and compresses first spring 7 this moment, after connecting block 3 fully enters into draw-in groove 8, the fixture block 6 is not being blockked this moment, under the spring action of first spring 7, fixture block 6 removes and resets, this moment fixture block 6 enter into in draw-in groove 8 and accomplish each other with draw-in groove 8 and block, this moment, detecting head 2 accomplishes installation work with support 1 this moment.
Under initial condition, under the elastic force effect of second spring 11, push rod 12 does not contact fixture block 6, carry out solitary maintenance during operation to detecting head 2 as required, need break away from detecting head 2 and support 1 this moment, connecting rod 13 needs to be removed this moment, connecting rod 13 removes and begins to compress second spring 11, connecting rod 13 removes and begins to promote two fixture blocks 6, two fixture blocks 6 begin to move back to back under the promotion of push rod 12 this moment, two fixture blocks 6 move back to back and begin to compress two first springs 7, two fixture blocks 6 are not being located the inside of two draw-in grooves 8 this moment, can be smooth at this moment with the separation of detecting head 2 and support 1, the dismantlement of final completion detecting head 2 and support 1, be convenient for maintain detecting head 2.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (5)

1. A job site mapping device, includes support (1), its characterized in that: the detector head (2) is arranged at the top of the support (1), the bottom of the detector head (2) is fixedly connected with two connecting blocks (3), the two connecting blocks (3) are identical in structure, a sliding groove (4) is formed in the rear side of each connecting block (3), and a separation device is arranged in each sliding groove (4);
the separation device comprises a first sliding rod (5), the first sliding rod (5) is fixedly connected in the sliding groove (4), a clamping block (6) is sleeved on the surface of the first sliding rod (5) in a sliding mode, and the bottom of the rear side of the clamping block (6) is arranged on an inclined plane.
2. A job site surveying and mapping apparatus according to claim 1, characterized in that: a first spring (7) is movably sleeved on the surface of the first sliding rod (5), two ends of the first spring (7) are respectively and fixedly connected between the sliding groove (4) and the clamping block (6), and two clamping grooves (8) are formed in the top of the support (1).
3. A job site surveying and mapping apparatus according to claim 2, characterized in that: two the bottom of draw-in groove (8) all communicates connection groove (9), and the inside fixedly connected with second slide bar (10) of connection groove (9), the surperficial slip of second slide bar (10) has cup jointed push rod (12).
4. A job site surveying and mapping device according to claim 3, characterized in that: a second spring (11) is movably sleeved on the surface of the second sliding rod (10), two ends of the second spring (11) are respectively and fixedly connected to two ends of the connecting groove (9) and the push rod (12), and a channel (14) is formed in the left side of the support (1).
5. A job site surveying and mapping apparatus according to claim 4, characterized in that: the left side fixedly connected with connecting rod (13) of push rod (12), connecting rod (13) sliding connection in passageway (14), the left side of connecting rod (13) extends to the left side of support (1).
CN202222981803.2U 2022-11-09 2022-11-09 Construction site surveying and mapping device Active CN218724193U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222981803.2U CN218724193U (en) 2022-11-09 2022-11-09 Construction site surveying and mapping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222981803.2U CN218724193U (en) 2022-11-09 2022-11-09 Construction site surveying and mapping device

Publications (1)

Publication Number Publication Date
CN218724193U true CN218724193U (en) 2023-03-24

Family

ID=85612604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222981803.2U Active CN218724193U (en) 2022-11-09 2022-11-09 Construction site surveying and mapping device

Country Status (1)

Country Link
CN (1) CN218724193U (en)

Similar Documents

Publication Publication Date Title
CN218724193U (en) Construction site surveying and mapping device
CN210319187U (en) Enclosure structure inclination measuring equipment for metro survey
CN209979626U (en) Soil and water conservation water erosion monitoring device convenient to fix and monitoring angle is adjustable
CN218645119U (en) High surveying instrument of engineering cost
CN218180326U (en) Land planning is with multi-level soil sample collection system
CN208334267U (en) A kind of efficient capillary electrophoresis system
CN215111211U (en) High canned type conduit supports connecting device for hydraulic engineering
CN213840332U (en) Tripod for mapping engineering convenient to height-adjusting
CN213715190U (en) Outdoor environmental monitoring folding test bench convenient to carry
CN214011318U (en) Double-end probe for semiconductor performance test
CN211453853U (en) CCD detection device convenient to dismouting
CN219869726U (en) Be suitable for collection flat topography elevation one pole many prism pole that survey
CN108669727B (en) Ground-grabbing mountain-climbing rod and using method thereof
CN212321114U (en) Civil engineering is with portable's geology detecting device
LU503183B1 (en) Portable atmospheric single particle sampler bracket
CN2405184Y (en) Tool for measuring curvatures and right angle of steel plate
CN210533243U (en) Cylinder sleeve support shoulder height precision measuring instrument suitable for field detection
CN214696147U (en) Light-duty portable house mounting structure that stability is good
CN217655228U (en) Handheld alternating current signal detector for distribution network ground fault locator
CN211085719U (en) Occupational health sampling device convenient to accomodate
CN214621141U (en) Tunnel construction detects uses section appearance
CN217541737U (en) Hydraulic ring geological crack measuring device
CN212253968U (en) Steel construction levelness detection device
CN217046182U (en) Tail fiber dismantling clamp of BOSA optical device
CN213447997U (en) Detector for road detection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant