CN218714953U - Be used for integral lift frock installation operation platform device - Google Patents

Be used for integral lift frock installation operation platform device Download PDF

Info

Publication number
CN218714953U
CN218714953U CN202222979820.2U CN202222979820U CN218714953U CN 218714953 U CN218714953 U CN 218714953U CN 202222979820 U CN202222979820 U CN 202222979820U CN 218714953 U CN218714953 U CN 218714953U
Authority
CN
China
Prior art keywords
operation platform
platform
tool
platform device
frock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222979820.2U
Other languages
Chinese (zh)
Inventor
韩瑞京
高文冬
胡鸿志
靳昭承尚
曾凡伟
李卓
池艳鹏
李闯
王文胜
付玉香
李朝阳
陆尧
邵九婷
王香华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Machinery Construction Group Co ltd
Beijing Construction Engineering Group Co Ltd
Original Assignee
Beijing Machinery Construction Group Co ltd
Beijing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Machinery Construction Group Co ltd, Beijing Construction Engineering Group Co Ltd filed Critical Beijing Machinery Construction Group Co ltd
Priority to CN202222979820.2U priority Critical patent/CN218714953U/en
Application granted granted Critical
Publication of CN218714953U publication Critical patent/CN218714953U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a be used for whole promotion frock installation operation platform device, include: platform device main part, platform device main part include frock roof beam, side's pipe operation platform, and the pipe operation platform is managed in the both ends difference installation side of frock roof beam, and the quantity of managing pipe operation platform is two, and square pipe operation platform installs in advance and can make things convenient for the workman to operate on square pipe operation platform on the frock roof beam, is connected to the steel strand wires simultaneously on the frock roof beam, can promote the frock roof beam to fold up the department. Through the design of the structure, the square tube operating platform can be arranged on the tool beam in advance, so that the work of erecting a scaffold operating platform at high altitude is reduced, and the risk of high-altitude operation is reduced; the operation platform device is installed by adopting the integral lifting tool, so that the construction speed is accelerated, and the construction cost is reduced; the platform device main body is simple in structure, safe, reliable and convenient to operate, the working efficiency is improved, and the economic benefit is improved.

Description

Be used for whole lifting tool equipment installation operation platform device
Technical Field
The utility model relates to a building engineering technical field, more specifically say, the utility model relates to a be used for whole promotion frock installation operation platform device is applied to building steel construction engineering.
Background
With the development of economic construction, building structures are developing towards high-rise, large-space and large-span directions. The large-span prestressed steel structure system formed by combining the prestressing technology and the space steel structure is one of the important structural forms for realizing large space and large span at present. The large-span prestressed space steel structure system comprises a prestressed net frame, a net shell, a cable net, a cable arch, a cable-stayed system and the like, and has the greatest advantage that the high tensile strength of a prestressed cable is fully utilized, the structure generates deformation reverse to the action of an external load by applying prestress to the cable, and simultaneously, a tension member is subjected to prepressing action before being loaded, so that the deflection or tensile stress under the action of the external load can be partially or completely counteracted, and the overall stress performance of the structure is improved. The structure has reasonable stress, large rigidity, light weight and convenient manufacture and installation, is developed and developed in nearly more than ten years, is applied to public and industrial buildings with large span and large column nets, is concerned and valued by the scientific and technological boundary and the engineering boundary at home and abroad, and has extremely wide popularization, application and development prospects. The large-span prestressed steel structure is a novel structural form formed by combining high-strength, corrosion-resistant and fatigue-resistant steel elements and various spatial steel structures, the flexible steel elements and the rigid steel structures are perfectly fused together, and a practical and economic construction means for covering large areas and large spaces is provided for architects.
During construction, the arch springing at two sides is a construction method of assembling by a ground jig frame, hoisting by a crawler crane and temporarily supporting a supporting section for a hoisting area, the middle area is a hoisting area, an accumulated hoisting construction method is adopted, the arch springing is hoisted to a designed elevation and then starts to be folded, welding installation construction needs to be carried out at a connector by personnel at the connector during folding, a safety operation frame needs to be set up, and therefore, an integral hoisting tool installation operation platform device is adopted.
SUMMERY OF THE UTILITY MODEL
In the summary section a series of concepts in a simplified form is introduced, which will be described in further detail in the detailed description section. The inventive content does not imply any attempt to define the essential features and essential features of the claimed solution, nor is it implied to be intended to define the scope of the claimed solution.
For at least partly solving above-mentioned problem, the utility model provides a be used for whole promotion frock installation operation platform device, include: the platform device main part, the platform device main part includes frock roof beam, side's pipe operation platform is provided with two to set up respectively the both ends of frock roof beam, the frock roof beam is connected with steel strand wires.
According to the utility model discloses be used for whole promotion frock installation operation platform device, the tip of frock roof beam is provided with the landing leg, landing leg and steel structural connection.
According to the utility model discloses be used for whole promotion frock installation operation platform device, be provided with two horizontal pterygoid lamina, two in the middle of the lateral wall of frock roof beam be provided with a plurality of stiffening ribs between the horizontal pterygoid lamina.
According to the utility model discloses be used for whole promotion frock installation operation platform device, side's pipe operation platform welding is in the tip of frock roof beam.
According to the utility model discloses be used for whole promotion frock installation operation platform device, square pipe operation platform includes that square tube base claps, square pipe guardrail, fang Guande claps the welding and is in the lateral wall tip of frock roof beam, square pipe guardrail sets up clap at the bottom of the square tube.
According to the utility model discloses be used for whole lifting tool equipment installation operation platform device, fang Guande is clapped and is provided with the horizontal pole in.
According to the utility model discloses be used for whole promotion frock installation operation platform device, the centre of frock roof beam is provided with the hole, steel strand wires wear to establish in the hole.
According to the utility model discloses be used for whole promotion frock installation operation platform device, the bottom of frock roof beam be provided with down the anchor dish with the hole corresponds, steel strand wires with anchor dish fixed connection down.
Compared with the prior art, the utility model discloses at least, including following beneficial effect:
the utility model provides a be used for integral lift frock installation operation platform device, this be used for integral lift frock installation operation platform device includes: platform device main part, platform device main part include frock roof beam, side's pipe operation platform, and the pipe operation platform is managed in the both ends difference installation side of frock roof beam, and the quantity of managing pipe operation platform is two, and square pipe operation platform installs in advance and can make things convenient for the workman to operate on square pipe operation platform on the frock roof beam, is connected to the steel strand wires simultaneously on the frock roof beam, can promote the frock roof beam to fold up the department. Through the design of the structure, the square tube operating platform can be arranged on the tool beam in advance, so that the work of erecting a scaffold operating platform at high altitude is reduced, and the risk of high-altitude operation is reduced; the operation platform device is installed by adopting the integral lifting tool, so that the construction speed is accelerated, and the construction cost is reduced; the platform device main body is simple in structure, safe, reliable and convenient to operate, the working efficiency is improved, and the economic benefit is improved.
A be used for whole promotion frock installation operation platform device, other advantages, targets and characteristics of the utility model will be embodied in part through the following description, and the part will still be through right the utility model discloses a research and practice are understood for technical personnel in the field.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of a part of the structure of the present invention.
Detailed Description
The present invention is further described in detail below with reference to the drawings and examples so that those skilled in the art can implement the invention with reference to the description.
It will be understood that terms such as "having," "including," and "comprising," as used herein, do not preclude the presence or addition of one or more other elements or groups thereof.
As shown in fig. 1-2, the utility model provides a be used for whole lifting frock installation operation platform device, include: the platform device comprises a platform device main body 100, wherein the platform device main body 100 comprises a tool beam 1 and a square pipe operating platform 2, the square pipe operating platform 2 is provided with two parts and is respectively arranged at two ends of the tool beam 1, and the tool beam 1 is connected with a steel strand 3.
The working principle and the beneficial effects of the technical scheme are as follows: the utility model provides a be used for integral lift frock installation operation platform device, this be used for integral lift frock installation operation platform device includes: platform device main part 100, here platform device main part 100 includes frock roof beam 1, square pipe operation platform 2, and square pipe operation platform 2 is installed respectively at the both ends of frock roof beam 1, and the quantity of square pipe operation platform 2 is two like this, and square pipe operation platform 2 is installed in advance and can be made things convenient for the workman to operate on square pipe operation platform 2 on frock roof beam 1, is connected to steel strand wires 3 on frock roof beam 1 simultaneously, can promote frock roof beam 1 to fold up the department like this.
Through the design of the structure, the square pipe operating platform 2 can be installed on the tool beam 1 in advance, so that the work of erecting a scaffold operating platform at high altitude is reduced, and the risk of high-altitude operation is reduced; the operation platform device is installed by adopting the integral lifting tool, so that the construction speed is accelerated, and the construction cost is reduced; the main body 100 of the platform device has simple structure, safety, reliability and convenient operation, improves the working efficiency and the economic benefit.
Further, the end of the tooling beam 1 is provided with the support leg 12, and the support leg 12 is connected to the end of the steel structure 4, so that the tooling beam 1 fixes the steel structure 4 and the lifting of the steel structure 4 is avoided. Further, in order to increase the structural strength of the tooling beam 1, two cross wing plates 11 are installed in the middle of the side wall of the tooling beam 1, and a plurality of stiffening ribs 13 are installed between the two cross wing plates 11, as shown in fig. 1, two stiffening ribs 13 can be designed to form a symmetrical structure, so as to increase the strength.
In one embodiment, the square tube operating platform 2 of the utility model is installed at the end of the tool beam 1 by welding; the square pipe operating platform 2 comprises a square pipe bottom bat 21 and a square pipe guardrail 22, the square pipe bottom bat 21 can be welded at the end part of the side wall of the tool beam 1 in advance, the square pipe guardrail 22 is welded on the square pipe bottom bat 21, operation of workers on the square pipe operating platform 2 is facilitated, and the square pipe operating platform 2 provides installation protection for the workers; further, a cross bar 23 is arranged in the square tube bottom racket 21, so that the cross bar 23 increases the safety of the square tube operating platform 2.
In one embodiment, the utility model provides a middle of frock roof beam 1 is provided with hole 14, wears to establish this steel strand wires 3 in hole 14 here, is provided with down anchor plate 31 in the bottom of frock roof beam 1 simultaneously, and this down anchor plate 31 corresponds with hole 14 here, can be with steel strand wires 3 and down anchor plate 31 fixed connection like this, and then can promote frock roof beam 1, make the utility model discloses simple structure, safe and reliable, convenient operation have improved work efficiency, improve economic benefits. It should be noted that the lower anchor plate 31 is an existing component known in the art, and the detailed structure is not described herein.
Further, in the present embodiment, the cross section of the tooling beam 1 is a welded box 600x400x20x30mm, the plate thickness of the stiffening rib 13 is 20mm, the pipe section Φ 219x10mm of the leg 12, the cross section opening 100x100x5mm of the square pipe bottom racket 21, and the cross section opening 50x50x4mm of the square pipe guardrail 22.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; may be mechanically coupled, may be electrically coupled or may be in communication with each other; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
While the embodiments of the invention have been disclosed above, it is not limited to the applications listed in the description and the embodiments, which are fully applicable in all kinds of fields of application suitable for this invention, and further modifications may be readily made by those skilled in the art, and the invention is therefore not limited to the specific details shown and described herein without departing from the general concept defined by the claims and their equivalents.

Claims (8)

1. The utility model provides a be used for whole lifting tool equipment installation operation platform device which characterized in that includes:
the platform device comprises a platform device main body (100), wherein the platform device main body (100) comprises a tooling beam (1) and a square pipe operating platform (2), the two square pipe operating platforms (2) are arranged and are respectively arranged at two ends of the tooling beam (1), and the tooling beam (1) is connected with a steel strand (3).
2. The device for integrally lifting a tool mounting and operating platform according to claim 1, wherein a leg (12) is arranged at the end of the tool beam (1), and the leg (12) is connected with the steel structure body (4).
3. The device for mounting and operating the integral lifting tool according to claim 1, wherein two transverse wing plates (11) are arranged in the middle of the side wall of the tool beam (1), and a plurality of stiffening ribs (13) are arranged between the two transverse wing plates (11).
4. The installation and operation platform device for the integral lifting tool according to claim 1, wherein the square tube operation platform (2) is welded at the end of the tool beam (1).
5. The device for integrally lifting the tool installation operation platform is characterized in that the square tube operation platform (2) comprises Fang Guande beats (21) and a square tube guardrail (22), the Fang Guande beats (21) are welded at the end part of the side wall of the tool beam (1), and the square tube guardrail (22) is arranged on the Fang Guande beats (21).
6. The device for installing the operating platform on the integral lifting tool as claimed in claim 5, wherein a cross bar (23) is arranged in the Fang Guande racket (21).
7. The device for mounting and operating the integral lifting tool according to claim 1, wherein a hole (14) is formed in the middle of the tool beam (1), and the steel strand (3) is arranged in the hole (14) in a penetrating manner.
8. The device for installing and operating the integral lifting tool according to claim 7, wherein a lower anchor plate (31) corresponding to the hole (14) is arranged at the bottom of the tool beam (1), and the steel strand (3) is fixedly connected with the lower anchor plate (31).
CN202222979820.2U 2022-11-09 2022-11-09 Be used for integral lift frock installation operation platform device Active CN218714953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222979820.2U CN218714953U (en) 2022-11-09 2022-11-09 Be used for integral lift frock installation operation platform device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222979820.2U CN218714953U (en) 2022-11-09 2022-11-09 Be used for integral lift frock installation operation platform device

Publications (1)

Publication Number Publication Date
CN218714953U true CN218714953U (en) 2023-03-24

Family

ID=85613632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222979820.2U Active CN218714953U (en) 2022-11-09 2022-11-09 Be used for integral lift frock installation operation platform device

Country Status (1)

Country Link
CN (1) CN218714953U (en)

Similar Documents

Publication Publication Date Title
CN101629408A (en) Composite anchoring structure on guyed tower end of cable-stayed bridge
CN113175091B (en) Fully assembled prestressed frame cable system combined structure
KR101922534B1 (en) Composite type steel temporary construction and construction method thereof
CN114482280A (en) Hexagonal-section assembled annular supporting system and installation method thereof
CN113756592B (en) Lifting system of truss roof when height of upper lifting point is limited and construction method thereof
CN218714953U (en) Be used for integral lift frock installation operation platform device
CN110107095B (en) Mounting method of high-altitude large-span steel truss
CN215107474U (en) Truss roof lifting system capable of increasing lifting height
CN109914614A (en) A kind of connection structure of assembling frame structural construction side column or center pillar and beam
CN215053871U (en) Newly-increased interlayer steel beam and concrete column connecting joint
JP3709080B2 (en) String string structure
CN212129965U (en) Interim securing device is assembled in air to box steel construction post
CN210340110U (en) Two T board hoisting structure of large-span assembled
CN211920714U (en) Support system of pull-up and pull-down type external hanging self-climbing tower crane
CN109898645B (en) Construction method of spliced load-bearing steel structure factory building framework
CN219951707U (en) Overpass construction temporary supporting structure free of underbridge support
CN217998360U (en) High-rise building high-altitude large-span connected structure with post-cast strip
CN218346753U (en) Assembled operation platform of steel column
CN217419334U (en) Prestressed Bailey beam combined support
CN217129527U (en) Mining shaft structure
CN216665107U (en) Historical architecture renewal structure reinforcerment system
CN220133153U (en) Assembled concrete type steel frame column-steel frame beam joint connection structure
CN115787921B (en) Wind-resistant beam string structure with high durability and construction method thereof
CN217400294U (en) Angle joint piece for building construction climbing frame
CN219604925U (en) Profile steel column cap structure for reinforcing and reforming girderless floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant