CN218714101U - Prefabricated embedded JDG (JDG) line pipe building wallboard structure - Google Patents

Prefabricated embedded JDG (JDG) line pipe building wallboard structure Download PDF

Info

Publication number
CN218714101U
CN218714101U CN202223332942.9U CN202223332942U CN218714101U CN 218714101 U CN218714101 U CN 218714101U CN 202223332942 U CN202223332942 U CN 202223332942U CN 218714101 U CN218714101 U CN 218714101U
Authority
CN
China
Prior art keywords
jdg
buried
spool
embedded
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223332942.9U
Other languages
Chinese (zh)
Inventor
张艳平
刘川正
于杰
范锦瑞
张毅
庞晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Fifth Construction Group Co Ltd
Original Assignee
Shanxi Fifth Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Fifth Construction Group Co Ltd filed Critical Shanxi Fifth Construction Group Co Ltd
Priority to CN202223332942.9U priority Critical patent/CN218714101U/en
Application granted granted Critical
Publication of CN218714101U publication Critical patent/CN218714101U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model relates to an assembled pre-buried JDG spool building wallboard structure, including perpendicular butt joint ALC wallboard and coincide floor, be provided with pre-buried bottom box and first pre-buried JDG spool in the ALC wallboard, the entrance to a cave has been seted up to ALC wallboard bottom, and first pre-buried JDG spool top is connected with pre-buried bottom box, and the bottom is worn out from the entrance to a cave; be provided with pre-buried terminal box in the coincide floor, laid the pre-buried JDG spool of second on the coincide floor, the one end and the pre-buried terminal box of the pre-buried JDG spool of second are connected, the other end is connected with first pre-buried JDG spool. The utility model discloses the structure moves to the prefabricated workshop in various end boxes and the pre-buried process of electric pipeline in with the building basically, has reduced the site operation time, has promoted the efficiency of construction, and pre-buried position is accurate, and shaping and outward appearance effect are all good, have greatly improved construction quality. The utility model discloses the structure practicality is stronger in assembly type structure, accords with assembly type structure's theory more.

Description

Prefabricated embedded JDG (JDG) line pipe building wallboard structure
Technical Field
The utility model belongs to the technical field of the construction, in particular to assembly type construction technical field specifically is a pre-buried JDG spool building wallboard structure of assembled.
Background
In the assembly type structure construction, the pre-buried construction of electric JDG spool becomes for new problem, and assembled ALC wallboard is connected for the mortar between board and the board when the installation, and ALC wallboard is fixed with two expansion bolts for the coincide floor, when using traditional electric piping installation, can have following main problem: 1) The ALC wallboard needs to be subjected to slotting and piping construction, as the ALC wallboard is an integral masonry wall, slotting piping has great influence on the ALC wall structure, meanwhile, the thickness of a distribution box and the like is often consistent with that of the ALC wallboard, and the quality of the ALC wallboard is influenced by the expanded size of a hole; 2) When the ALC wallboard is grooved, dust flies in a construction site, so that the construction environment is greatly polluted, and the damage is caused to constructors; 3) When the pipeline on the ALC wallboard is connected with the pipeline on the composite floor slab, the operation difficulty is high, the connection is not easy, the connection is not firm, and the construction quality has problems; 4) When carrying out the pipeline laying on the coincide floor, because the terminal box on the coincide floor is fixed knot structure, it can influence laying of pipeline between the terminal box, and pipeline interface leakproofness is poor, pours the in-process and can take place to leak thick liquid phenomenon.
Therefore, the traditional construction method cannot play a role of integral assembly for the assembly type building, has a large influence on the quality of the ALC wallboard and the laminated floor slab, and needs to be improved by combining the assembly type building construction concept.
Disclosure of Invention
The utility model aims at solving the problem that exists among the above-mentioned prior art, and provide a pre-buried JDG spool building wallboard structure of assembled.
The utility model discloses a realize through following technical scheme:
the utility model provides a pre-buried JDG spool building wallboard structure of assembled, includes ALC wallboard and coincide floor, the ALC wallboard sets up with the perpendicular butt joint of coincide floor.
An embedded bottom box and a first embedded JDG line pipe are arranged in the ALC wallboard, the first embedded JDG line pipe is vertically arranged in the ALC wallboard, and a top pipe orifice of the first embedded JDG line pipe is communicated with the embedded bottom box; the entrance to a cave has been seted up to the bottom plate edge department of ALC wallboard, and the bottom mouth of pipe of first pre-buried JDG spool wears out from the entrance to a cave of ALC wallboard bottom.
An embedded junction box is arranged in the composite floor slab, the bottom surface of the embedded junction box is flush with the bottom surface of the composite floor slab, and the top surface of the embedded junction box is higher than the top surface of the composite floor slab; a second embedded JDG wire pipe is distributed on the top surface of the laminated floor slab, is horizontally arranged on the top surface of the laminated floor slab and is fixed on the top surface of the laminated floor slab through an iron sheet clamp; the one end mouth of pipe of the pre-buried JDG spool of second communicates with each other with pre-buried terminal box is connected, and the other end mouth of pipe of the pre-buried JDG spool of second communicates with each other with the bottom mouth of pipe of first pre-buried JDG spool to the tie point is located the entrance to a cave department of ALC wallboard bottom.
Furthermore, the pre-buried bottom box comprises a junction box, a switch box and a distribution box.
Further, the mouth of pipe of the pre-buried JDG spool of second passes through JDG elbow connection with the mouth of pipe of first pre-buried JDG spool and communicates with each other, and JDG elbow is located the entrance to a cave department of ALC wallboard bottom.
Furthermore, all the shutoff has PVC stifled cap on the mouth of pipe of the pre-buried JDG spool of first pre-buried JDG spool and the mouth of pipe of the pre-buried JDG spool of second.
Furthermore, the interface of the second embedded JDG spool and the JDG pipe elbow and the interface of the first embedded JDG spool and the JDG pipe elbow are both connected in a sealing manner by heat-shrinkable belts.
Further, adopt through pipe to connect when butt joint is connected between the pre-buried JDG spool of second on the coincide floor to adopt pyrocondensation area to carry out sealing connection at the kneck.
Furthermore, the opening size of the bottom of the ALC wallboard is 20cm × 20cm.
Furthermore, the thickness of the superposed floor slab is 60mm, and the height of the embedded junction box is 100mm.
In carrying out the assembly type structure construction, building wall board often can use coincide floor and ALC wallboard, and these two kinds of assembled structures are processed the preparation at prefabricated factory, and the later stage when carrying out electric pipeline pre-buried, because of the fixity of various line boxes on the assembled wall board, can be for the pre-buried inconvenience that brings a great deal of electric pipeline, developed for this reason the pre-buried JDG spool building wall panel structure of assembled, the utility model discloses the structure is fit for using under above-mentioned condition.
The utility model discloses the structure is at the prefabricated in-process of assembled ALC wallboard, will need pre-buried JDG spool and various pre-buried end boxes to put into the mould, carry out the monolithic and pour and form integratively with the ALC wallboard, has avoided carrying out grooved construction at the job site, opens a square entrance to a cave in ALC wallboard lower part simultaneously, makes things convenient for the pre-buried JDG spool in the ALC wallboard and carries out the operation construction that docks with the pre-buried JDG spool in the coincide floor. In assembled coincide floor prefabrication course of working, place pre-buried terminal box in coincide floor mould in advance, reduced and carried out the process of trompil to the coincide floor at the job site, pre-buried JDG spool adopts the iron sheet card to fix on the superimposed sheet simultaneously fixedly, carries out thermal shrinkage with the pyrocondensation area between pre-buried JDG spool and the pre-buried JDG spool and connects, prevents to pour in-process concrete inflow pre-buried JDG spool. The utility model discloses the better construction quality who has guaranteed electric pipeline of structure, the utility model discloses the structure makes the efficiency of construction improve greatly, has responded the requirement of the whole construction of assembled, and construction period and quality have obtained better guarantee.
Compared with the prior art, the structure of the utility model basically moves various bottom boxes and the pre-buried procedures of the electric pipelines in the building into an assembly type workshop, reduces the on-site construction time, creates a good on-site construction environment and greatly improves the construction efficiency; technical personnel in the construction earlier stage make all wallboards and floor obtain more accurate location through carrying out more excellent plan to the drawing, fully guaranteed the accuracy of position, compare traditional construction method more accurate, shaping and outward appearance effect are all good, have greatly improved construction quality. Furthermore, the utility model discloses structural design science, rational in infrastructure, construction are simple, labour saving and time saving, the utility model discloses the structure practicality is stronger in assembly type structure, accords with assembly type structure's theory more.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate exemplary embodiments of the invention and, together with the description, serve to explain the invention and not to limit the invention in any way.
Fig. 1 is a schematic structural diagram of the structure of the present invention.
In the figure: 1-ALC wallboard, 2-laminated floor slab, 3-embedded bottom box, 4-first embedded JDG line pipe, 5-opening, 6-embedded junction box, 7-second embedded JDG line pipe, 8-iron sheet clamp, 9-thermal shrinkage band and 10-JDG pipe elbow.
Detailed Description
In order to make the present invention better understood by those skilled in the art, the present invention will be further clearly and completely described below with reference to the accompanying drawings and embodiments. In addition, the features of the embodiments and examples in the present application may be combined with each other without conflict.
In the description of the present invention, it is to be understood that the terms "top", "bottom", "vertical", "horizontal", and the like refer to orientations or positional relationships based on those shown in the drawings, and are used only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
An assembled embedded JDG spool building wallboard structure is shown in figure 1 and comprises an ALC wallboard 1 and a laminated floor slab 2, wherein the ALC wallboard 1 and the laminated floor slab 2 are vertically butted and installed through expansion bolts.
An embedded bottom box 3 and a first embedded JDG line pipe 4 are arranged in the ALC wallboard 1, the surface of the embedded bottom box 3 is flush with the ALC wallboard 1, and the embedded bottom box 3 comprises a junction box, a switch box, a distribution box and the like; the first embedded JDG line pipe 4 is vertically arranged in the ALC wallboard 1, a top pipe orifice of the first embedded JDG line pipe 4 is communicated with the embedded bottom box 3, and a PVC (polyvinyl chloride) plug cap is plugged at a pipe orifice of the first embedded JDG line pipe 4 to prevent sundries from entering the first embedded JDG line pipe 4; 20cm x 20cm's entrance to a hole 5 is seted up to ALC wallboard 1's bottom flange department, and the bottom mouth of pipe of first pre-buried JDG spool 4 wears out 10cm long from entrance to a hole 5 of 1 bottom of ALC wallboard, makes things convenient for the pipeline in 1 interior spool of later stage ALC wallboard and the coincide floor 2 to carry out the butt joint, reduces the construction degree of difficulty for the efficiency of construction.
The composite floor slab 2 is internally provided with an embedded junction box 6, the thickness of the composite floor slab 2 is 60mm, rows of truss ribs are arranged on the composite floor slab 2, and the embedded junction box 6 can be shortened on the composite floor slab 2, so that the height of the embedded junction box 6 is designed to be 100mm, the bottom surface of the embedded junction box 6 is flush with the bottom surface of the composite floor slab 2, the top surface of the embedded junction box 6 is 40mm higher than the top surface of the composite floor slab 2, and a connecting pipe opening of the embedded junction box 6 is just positioned on the composite floor slab 2; a second embedded JDG wire pipe 7 is arranged on the top surface of the laminated floor slab 2, the second embedded JDG wire pipe 7 is horizontally arranged on the top surface of the laminated floor slab 2, and the second embedded JDG wire pipe 7 is fixed on the top surface of the laminated floor slab 2 through an iron sheet clamp 8; because the pre-buried junction box 6 is fixed on the laminated floor slab 2 and cannot move back and forth, when the second pre-buried JDG line pipes 7 are laid, the second pre-buried JDG line pipes 7 are connected by through type pipe joints, and the joint parts are hermetically connected by the thermal shrinkage belt 9, so that the sealing performance between the pipes is ensured, and the slurry leakage is prevented; a pipe orifice at one end of the second embedded JDG pipe 7 is communicated with the embedded junction box 6, and a PVC plug cap is plugged at the pipe orifice of the second embedded JDG pipe 7 to prevent sundries from entering the second embedded JDG pipe 7; the other end mouth of pipe of the pre-buried JDG spool of second 7 and the bottom mouth of pipe of first pre-buried JDG spool 4 pass through JDG elbow 10 and connect and communicate with each other, JDG elbow 10 is located the entrance to a cave 5 department of 1 bottom of ALC wallboard to all adopt pyrocondensation area 9 to carry out sealing connection at the kneck of the pre-buried JDG spool of second 7 and JDG elbow 10 and the kneck of first pre-buried JDG spool 4 and JDG elbow 10, thereby guarantee the leakproofness between pipe and the pipe, prevent the appearance of leaking the thick liquid condition.
Most procedures of the structure of the utility model are carried out on the prefabrication processing site, thereby avoiding grooving on the construction site and reserving wire boxes, and reducing dust flying on the site; construction site operating personnel only need connect coincide floor 2 and ALC wallboard 1 pre-buried JDG spool can, because there is wiring on the ALC wallboard 1 to reserve entrance to a cave 5 in ALC wallboard 1 junction with coincide floor 2, made things convenient for the connection of pre-buried JDG spool, need not fluting again and open a hole, greatly reduced the construction degree of difficulty.
Before the assembly type building construction, the construction drawing can be split firstly, according to the splitting mode of a construction major, the wall board and the floor board in the construction drawing are split into the ALC wall board 1 and the composite floor board 2 in an assembly type, each separated ALC wall board 1 and each separated composite floor board 2 are numbered, at the moment, the electrical major carries out drawing splitting of the electrical major according to the original construction drawing, the splitting mode is split according to the splitting mode of the ALC wall board 1 and the composite floor board 2 in the building, the splitting drawing is formed after splitting, terminal equipment in an electrical system is displayed in the drawing, the ALC wall board 1 is provided with a switch, a socket bottom box, an embedded JDG line pipe, a distribution box and the like, the split drawing of the composite floor board 2 is provided with a point diagram of an embedded junction box 6, and all the point diagrams are point positions arranged after deep design. Therefore, all the wallboards and the floor slabs are accurately positioned, the accuracy of point positions is guaranteed, and compared with the conventional construction method, the method is more accurate and more reliable in quality.
The above-mentioned embodiments only represent one embodiment of the present invention, and the description thereof is specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several variations and modifications can be made, which are within the scope of the present invention.

Claims (8)

1. The utility model provides a pre-buried JDG spool building wallboard structure of assembled, its characterized in that: the ALC wallboard and the composite floor slab are vertically butted;
an embedded bottom box and a first embedded JDG line pipe are arranged in the ALC wallboard, the first embedded JDG line pipe is vertically arranged in the ALC wallboard, and a top pipe orifice of the first embedded JDG line pipe is communicated with the embedded bottom box; an opening is formed in the edge of the bottom plate of the ALC wallboard, and a bottom pipe orifice of the first embedded JDG wire pipe penetrates out of the opening in the bottom of the ALC wallboard;
an embedded junction box is arranged in the composite floor slab, the bottom surface of the embedded junction box is flush with the bottom surface of the composite floor slab, and the top surface of the embedded junction box is higher than the top surface of the composite floor slab; a second embedded JDG wire pipe is distributed on the top surface of the laminated floor slab, is horizontally arranged on the top surface of the laminated floor slab and is fixed on the top surface of the laminated floor slab through an iron sheet clamp; the one end mouth of pipe of the pre-buried JDG spool of second is connected with pre-buried terminal box and is communicated with each other, and the other end mouth of pipe of the pre-buried JDG spool of second is connected with the bottom mouth of pipe of first pre-buried JDG spool and is communicated with each other to the tie point is located the entrance to a cave department of ALC wallboard bottom.
2. The assembled pre-buried JDG spool building wallboard structure of claim 1, wherein: the pre-buried bottom box comprises a junction box, a switch box and a distribution box.
3. The fabricated embedded JDG line pipe building wallboard structure of claim 1, wherein: the mouth of pipe of the pre-buried JDG spool of second passes through JDG elbow connection with the mouth of pipe of first pre-buried JDG spool and communicates with each other, and JDG elbow is located the opening department of ALC wallboard bottom.
4. The fabricated embedded JDG line pipe building wallboard structure of claim 1, wherein: all the shutoff has the stifled cap of PVC on the mouth of pipe of first pre-buried JDG spool and the mouth of pipe of the pre-buried JDG spool of second.
5. The assembled pre-buried JDG spool building wallboard structure of claim 3, wherein: and the interface of the second embedded JDG spool and the JDG pipe elbow and the interface of the first embedded JDG spool and the JDG pipe elbow are hermetically connected by adopting a heat-shrinkable belt.
6. The fabricated embedded JDG line pipe building wallboard structure of claim 1, wherein: adopt through-type coupling to connect during butt joint connection between the pre-buried JDG spool of second on the coincide floor to adopt pyrocondensation area to carry out sealing connection at the kneck.
7. The assembled pre-buried JDG spool building wallboard structure of claim 1, wherein: the opening size of the bottom of the ALC wallboard is 20cm to 20cm.
8. The fabricated embedded JDG line pipe building wallboard structure of claim 1, wherein: the thickness of the laminated floor slab is 60mm, and the height of the embedded junction box is 100mm.
CN202223332942.9U 2022-12-13 2022-12-13 Prefabricated embedded JDG (JDG) line pipe building wallboard structure Active CN218714101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223332942.9U CN218714101U (en) 2022-12-13 2022-12-13 Prefabricated embedded JDG (JDG) line pipe building wallboard structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223332942.9U CN218714101U (en) 2022-12-13 2022-12-13 Prefabricated embedded JDG (JDG) line pipe building wallboard structure

Publications (1)

Publication Number Publication Date
CN218714101U true CN218714101U (en) 2023-03-24

Family

ID=85625761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223332942.9U Active CN218714101U (en) 2022-12-13 2022-12-13 Prefabricated embedded JDG (JDG) line pipe building wallboard structure

Country Status (1)

Country Link
CN (1) CN218714101U (en)

Similar Documents

Publication Publication Date Title
CN211499913U (en) Low-energy-consumption prefabricated house
CN111424981A (en) Pre-embedding laying method for wires of fabricated building
CN111827736A (en) Prefabricated stand of large-scale venue assembled combination
CN218714101U (en) Prefabricated embedded JDG (JDG) line pipe building wallboard structure
CN216344379U (en) Pipeline node two-way connecting piece
CN214798668U (en) Electric concealed piping mounting structure suitable for assembly type building construction
CN213742297U (en) Prefabricated wall body installation seam shutoff template mounting structure
CN211775776U (en) Socket joint type exhaust passage structure for multi-story and high-rise building
CN214329977U (en) Concealed production water pipeline
CN208934219U (en) A kind of light gauge cold-formed steel shape well word floor construction
CN213062583U (en) Assembly type disassembly-free heat-preservation integrated roof template and roof
CN212078228U (en) Prefabricated wallboard structure of grooving is exempted from to on-spot pipeline
CN216672525U (en) Electrical butt-joint structure of prefabricated wallboard, roof board and floor
CN209011158U (en) Prefabricated piping lane section
CN206174139U (en) Assembled steel structure node
CN215211879U (en) Assembled combined wall board
US7856773B2 (en) All-in-one modular construction system
CN216446280U (en) Be applicable to assembled PEC roof beam and superimposed sheet electric wire pipeline structure
CN216892966U (en) Pipeline integration building wall body module
CN206396997U (en) Precast wall body, prefabricated unit body and building system
CN217580790U (en) Prefabricated wall surface non-perforated building block combined wall body
CN213539371U (en) Connection structure of vertical seam crossing of prefabricated shear force wall of prevention of seepage water
CN103498525A (en) Floor slab with preinstalled pipelines
CN220167478U (en) Shaping die for electric box construction
CN216239264U (en) Assembled heat preservation ramp plate reaches by its roof of constituteing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant