CN218625737U - First floor fixing device for concrete pump conveying pipe of high-rise building - Google Patents

First floor fixing device for concrete pump conveying pipe of high-rise building Download PDF

Info

Publication number
CN218625737U
CN218625737U CN202222669700.2U CN202222669700U CN218625737U CN 218625737 U CN218625737 U CN 218625737U CN 202222669700 U CN202222669700 U CN 202222669700U CN 218625737 U CN218625737 U CN 218625737U
Authority
CN
China
Prior art keywords
support
conveying pipe
rods
fixing
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222669700.2U
Other languages
Chinese (zh)
Inventor
孙光达
吕喜昌
王浩亮
韩广辉
张霖
钟雷
王方珂
周旺
陈许争
柴红博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN202222669700.2U priority Critical patent/CN218625737U/en
Application granted granted Critical
Publication of CN218625737U publication Critical patent/CN218625737U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a first floor fixing device for high-rise building concrete pumping pipe, include: the base is fixedly connected with the ground of the layer where the concrete pump is located; the first fixing assembly comprises a rectangular support frame consisting of vertical rods and transverse rods, the vertical rods are respectively connected with the base and the top surface of the layer where the concrete pump is located, the transverse rods are arranged in groups, and one group of transverse rods is provided with a clamping rod for clamping the lower edge of a flange at the top of the elbow of the conveying pipe; the second fixing component comprises a triangular support connected with the base, the triangular support is arranged in a coplanar manner with the conveying pipe elbow, and the transverse support, the inclined support and the vertical support are respectively provided with a first fixing clamp connected with the conveying pipe elbow; and the third fixing component comprises a support connected with the base, and a second fixing clamp used for connecting the horizontal section of the conveying pipe is arranged on the support. The utility model discloses simple structure, it is convenient to be under construction, can effectively reduce rocking of first floor concrete pump conveying pipe in pumping process, reaches noise reduction, protection concrete finished product, increase pumping efficiency's purpose.

Description

First floor fixing device for concrete pump conveying pipe of high-rise building
Technical Field
The utility model belongs to the technical field of the construction technique and specifically relates to a first floor fixing device for high-rise building concrete pumping pipe is related to.
Background
In the construction process of high-rise buildings, a large amount of concrete cast-in-place construction is involved. Concrete uses the concrete pump to carry out the flat bed and carries or cross the layer and carry, because the transport distance is longer, under the vibration effect of concrete pump, the conveyer pipe can take place to rock and produce great noise, influences constructor and nearby resident's healthy. Especially, when the long-distance conveying pipe for cross-layer conveying shakes seriously, pipe blockage and pipe explosion can occur, so that material waste and labor waste are caused, and the construction period is influenced. Through research, the conveying pipe section (namely the first layer of pump pipe) arranged on the same layer with the conveying pump is found to vibrate seriously, and after the conveying pipe section is fixed, the adverse phenomenon can be greatly reduced. However, the traditional pipe frame cannot effectively fix the conveying pipe with the elbow, and the construction is tedious and time-consuming.
Disclosure of Invention
In order to solve the problem that the layer-striding conveying long distance conveying pipe easily produces and rocks, the utility model provides a first floor fixing device for high-rise building concrete pump conveying pipe specifically can take following technical scheme:
a first floor fixing device for high-rise building concrete pump delivery pipe, include
The base is fixedly connected with the ground of the layer where the concrete pump is located;
the first fixing assembly comprises a rectangular support frame consisting of vertical rods and transverse rods, the bottom of each vertical rod is connected with the top of the base, the top of each vertical rod is connected with the top surface of the layer where the concrete pump is located, the transverse rods are arranged in groups, each group of transverse rods form a rectangular structure, one group of transverse rods are provided with a clamping rod, and the clamping rods and the adjacent parallel transverse rods are used for clamping the lower edge of a flange at the top of a elbow of the conveying pipe;
the second fixing assembly comprises a triangular support arranged in the rectangular support frame, the triangular support is connected with the base and is arranged coplanar with the conveying pipe elbow, and a first fixing clamp connected with the conveying pipe elbow is arranged on each of a cross brace, an inclined brace and a vertical brace of the triangular support;
and the third fixing assembly comprises a support connected with the base, and a second fixing clamp used for connecting the horizontal section of the conveying pipe is arranged on the support.
The straight pipe section and the elbow section of the output pipe of the first layer of the concrete pump are fixed, so that the overall stability of the output pipe is enhanced, and the adverse effect caused by vibration of the concrete pump is greatly reduced.
The base is provided with a pair of fixed plates arranged in parallel, the fixed plates are connected with the cross braces of the triangular supports, the vertical rods are hollow rods with spiral lifting joints at the tops, and four positioning columns corresponding to the positions of the vertical rods are arranged on the fixed plates. The above measures are beneficial to the installation of the vertical rod and the positioning of the triangular supports.
The hollow rod is a telescopic lifting rod with a locking mechanism. The method can be suitable for the installation of buildings with different floor heights, and the application range of the method is enlarged.
The first fixing clamp and the second fixing clamp are identical in structure and comprise U-shaped clamps with lug plates at two ends, and the lug plates are provided with connecting bolts. The structure is simple, and the connection is convenient and stable.
The number of the third fixing assemblies is at least one.
The utility model provides a first floor fixing device for high-rise building concrete pump pipe, simple structure, it is convenient to be under construction, can adapt to different layer heights, will firmly fix with the delivery pump with the delivery pipe section that the layer set up to effectively reduce rocking of first floor concrete pump pipe in pumping process, reach noise reduction, protection concrete finished product, increase pumping efficiency's purpose. The utility model discloses but reuse carries out green construction, further practices thrift the cost.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 isbase:Sub>A sectional view taken along linebase:Sub>A-base:Sub>A of fig. 1.
Detailed Description
The embodiments of the present invention will be described in detail with reference to the accompanying drawings, and the embodiments are implemented on the premise of the technical solution of the present invention, and detailed embodiments and specific construction processes are given, but the scope of the present invention is not limited to the following embodiments.
As shown in fig. 1 and 2, the first floor fixing device for the high-rise building concrete pump conveying pipe comprises a base 1 fixedly connected with the ground of the concrete pump layer, wherein a first fixing component, a second fixing component and a third fixing component are arranged on the base 1 and used for fixing a first floor pump pipe (particularly a pipe section near a vertical right-angled bend).
Specifically, a pair of parallel I-shaped steel is installed on the base 1 and serves as the fixing plate 2, two positioning columns 3 are welded on each fixing plate 2, the positioning columns 3 are used for being connected with vertical hollow rods (namely vertical rods 4), spiral lifting joints 5 are installed on the vertical rods 4, and the vertical rods 4 can be conveniently installed between floors of concrete pump layers. Further, the vertical rod 4 may be a telescopic lifting rod with a locking mechanism, so that it can be installed in floors of different heights. The vertical rods 4 are arranged in a rectangular shape, three groups of cross rods 6 are mounted on the vertical rods through pipe fittings, the three groups of cross rods 6 are vertically arranged at intervals, and each group of cross rods 6 is also in a rectangular structure and used for enhancing the structural stability of the first fixing assembly (composed of the vertical rods 4 and the cross rods 6). Wherein, a clamping rod 7 is also arranged on the cross rod 6 of the middle layer, and the clamping rod 7 and the adjacent parallel cross rod 6 are jointly clamped at the lower edge of the flange at the top of the elbow of the conveying pipe. Secondly, weld a stull 81 in the middle of two fixed plates 2, weld a stull 82 on stull 81, weld an bracing 83 between stull 81 and the stull 82, above-mentioned stull 81, bracing 83 and stull 82 all adopt the I-steel preparation, and the triangle brace (being the second fixed subassembly) and the coplane setting of conveyer pipe elbow that its constitutes, and install the first fixing clip 9 that links to each other with the conveyer pipe elbow respectively on stull 81, bracing 83 and the stull 82 of triangle brace. The first fixing clips 9 are each a U-shaped clip 91 having lug plates at both ends thereof, which are fixed to the wale 81, the diagonal brace 83 and the vertical brace 82 by connecting bolts 92. Third, a third fixing assembly is further installed on the base 1, which is coplanar with the triangular supports and is located at the inlet end of the delivery pipe, and comprises a support 101 and a second fixing clip 102 (see fig. 2). The third fixing component is one or more and is used for fixing the horizontal section of the conveying pipe. The second fixing clip 102 has the same structure as the first fixing clip 9.
When the base is used, the base 1 is placed below the conveying pipe M, the position is adjusted, the triangular supports are attached to the 90-degree bent pipe of the conveying pipe M, the second fixing clamps 102 are arranged in the same direction with the horizontal section of the inlet of the bent pipe of the conveying pipe M, and then the base 1 is fixed on the ground through bolts and the like; then, the vertical rod 4 is inserted into the positioning column 3, the height of the vertical rod 4 is adjusted through the top spiral lifting joint 5, the vertical rod is firmly clamped between the first floor slabs, then four groups of cross rods 6 are installed on the vertical rod 4, the middle cross rods 6 are located at the lower edge of the top flange of the 90-degree elbow end of the conveying pipe M, a clamping rod 7 is installed on the middle cross rods 6, the clamping rod is parallel to one cross rod 6 and located on the two sides of the conveying pipe M respectively, the distance between the clamping rod and the conveying pipe M is adjusted, and the top flange of the 90-degree elbow end can be clamped. After the above-mentioned device is assembled, the delivery pipe M is fixed by the first fixing clip 9 and the second fixing clip 102.
The utility model discloses a straight tube section, the elbow section to the first layer output tube of concrete pump are fixed, have strengthened the overall stability of output tube, have reduced the produced harmful effects of concrete pump vibration by a wide margin.
It should be noted that in the description of the present invention, terms such as "front", "rear", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating orientations or positional relationships are based on the orientations or positional relationships shown in the drawings only for the convenience of description of the present invention and for simplification of description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.

Claims (5)

1. The utility model provides a first floor fixing device for high-rise building concrete pumping pipe which characterized in that: comprises that
The base is fixedly connected with the ground of the layer where the concrete pump is located;
the first fixing assembly comprises a rectangular support frame composed of vertical rods and cross rods, the bottoms of the vertical rods are connected with the top of the base, the tops of the vertical rods are connected with the top surface of the layer where the concrete pump is located, the cross rods are arranged in groups, each group of cross rods form a rectangular structure, a clamping rod is arranged on one group of cross rods, and the clamping rods and adjacent parallel cross rods are used for clamping the lower edge of a flange at the top of a elbow of the conveying pipe;
the second fixing assembly comprises a triangular support arranged in the rectangular support frame, the triangular support is connected with the base and is arranged in a coplanar manner with the conveying pipe elbow, and first fixing clamps connected with the conveying pipe elbow are respectively arranged on a transverse support, an inclined support and a vertical support of the triangular support;
and the third fixing assembly comprises a support connected with the base, and a second fixing clamp used for connecting the horizontal section of the conveying pipe is arranged on the support.
2. The first floor fixing device for the concrete pump pipe of the high-rise building as recited in claim 1, wherein: the base is provided with a pair of fixed plates arranged in parallel, the fixed plates are connected with the cross braces of the triangular supports, the vertical rods are hollow rods with spiral lifting joints at the tops, and four positioning columns corresponding to the positions of the vertical rods are arranged on the fixed plates.
3. The first floor fixing device for the concrete pumping pipe of the high-rise building as claimed in claim 2, wherein: the hollow rod is a telescopic lifting rod with a locking mechanism.
4. The first floor fixing device for the concrete pump pipe of the high-rise building as recited in claim 1, wherein: the first fixing clamp and the second fixing clamp are identical in structure and comprise U-shaped clamps, two ends of each U-shaped clamp are provided with ear plates, and the ear plates are provided with connecting bolts.
5. The first floor fixing device for the concrete pump pipe of the high-rise building as recited in claim 1, wherein: the number of the third fixing assemblies is at least one.
CN202222669700.2U 2022-10-11 2022-10-11 First floor fixing device for concrete pump conveying pipe of high-rise building Active CN218625737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222669700.2U CN218625737U (en) 2022-10-11 2022-10-11 First floor fixing device for concrete pump conveying pipe of high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222669700.2U CN218625737U (en) 2022-10-11 2022-10-11 First floor fixing device for concrete pump conveying pipe of high-rise building

Publications (1)

Publication Number Publication Date
CN218625737U true CN218625737U (en) 2023-03-14

Family

ID=85470419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222669700.2U Active CN218625737U (en) 2022-10-11 2022-10-11 First floor fixing device for concrete pump conveying pipe of high-rise building

Country Status (1)

Country Link
CN (1) CN218625737U (en)

Similar Documents

Publication Publication Date Title
CN215104737U (en) A assembled support for bridge construction
CN111173249A (en) Overhanging support system attached to rectangular beam and column
CN218625737U (en) First floor fixing device for concrete pump conveying pipe of high-rise building
CN212129839U (en) Steel pipe reinforcing column structure
CN109339105B (en) Square arched pipe gallery mounting support, pipe gallery system and pipe gallery system mounting method
CN216298427U (en) Reinforcing bar interfacing apparatus that building engineering technique was used
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN216428338U (en) Supporting structure of pipe well pipeline
CN212865961U (en) Detachable building foundation pit supporting beam
CN210439298U (en) Detachable positioner of lattice column that pile bolck is located subaerial
CN212249076U (en) Large-scale space bending steel pipe truss aerial work operation platform
CN211873868U (en) Strengthen cloth pole that side direction is firm
CN210049630U (en) Weather enclosure for historic building
CN207314532U (en) A kind of box column-H-type joist steel frame joint
CN110952761A (en) Steel pipe reinforcing column structure and installation method thereof
CN215717003U (en) Tool type support device for fixing concrete pump pipe
CN212201288U (en) A template reinforcing assembly for crossbeam braced system
CN211923555U (en) Simple assembly type support for pump pipe erection
CN217299769U (en) Vertical rod positioning device for overhanging scaffold
CN213358625U (en) Full-space supporting system for supporting foundation pit region
CN215926949U (en) Steel leaning tower force rod type support structure system
CN218989921U (en) Reinforcing bar operation platform of superelevation pier shaft
CN220666460U (en) Assembled ditch
CN219520355U (en) Reinforcing steel mesh binding frame for prefabrication of large caisson
CN214739718U (en) Platform fast-assembling structure with protective structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant