CN218623192U - Temporary lap joint climbing frame for construction engineering construction - Google Patents
Temporary lap joint climbing frame for construction engineering construction Download PDFInfo
- Publication number
- CN218623192U CN218623192U CN202223085817.2U CN202223085817U CN218623192U CN 218623192 U CN218623192 U CN 218623192U CN 202223085817 U CN202223085817 U CN 202223085817U CN 218623192 U CN218623192 U CN 218623192U
- Authority
- CN
- China
- Prior art keywords
- bolt
- bracing piece
- fixing plate
- hole
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a building engineering construction is with interim overlap joint frame of climbing, including first bracing piece, the both sides of first bracing piece all are equipped with the support column, and the bottom fixed mounting of support column has the mounting panel, and surface one side of first bracing piece is equipped with the arc fixed block, and the other end threaded connection of first bolt has first nut. The utility model discloses a first bolt and first nut are fixed arc fixed block and fixing base, make first bracing piece fixed mounting on the surface of support column, through the second bolt, third nut and third bolt are fixed first fixed plate and second fixed plate, make second bracing piece fixed mounting on the top of first bracing piece, fix fixing base and first mounting panel through screw rod and second nut, it is fixed to make first bracing piece obtain the secondary, thereby it is safer to let this building climb, avoid the fixed potential safety hazard that exists of single, and when dismantling, dismantle also very portably to screw bolt and nut, carry and transport after the convenient to use.
Description
Technical Field
The utility model relates to a building field, in particular to building engineering construction is with interim overlap joint frame of climbing.
Background
The building climbing frame comprises a common floor type scaffold, an attached lifting scaffold, an overhanging type scaffold and an attached wall climbing frame, attachment points are required to be arranged on the outer wall surface in the construction and installation processes, the wall body of an assembled structure is prefabricated, the decoration and internal heat preservation treatment of the outer vertical surface of the wall body are already done before the construction, and the attachment points cannot be arranged on the outer wall surface when the climbing frame is used in order to avoid damaging the prefabricated outer wall body.
Present building climbing frame is all fixed in the fixed time with the single mainly, at long-term use mouth, potential safety hazard can appear, and present building climbing frame is because the volume is too big simultaneously for weight also grow thereupon, and quick dismantlement makes also very difficulty of workman when the transportation.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art's defect, a building engineering construction is with interim overlap joint frame of climbing is provided.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a building engineering construction is with interim overlap joint climbing frame, including first bracing piece, the top surface of first bracing piece is equipped with the second bracing piece, the both sides of first bracing piece all are equipped with the support column, the bottom fixed mounting of support column has the mounting panel, surface one side of first bracing piece is equipped with the arc fixed block, the top of arc fixed block is equipped with first through-hole, one side that the arc fixed block was kept away from to first bracing piece is equipped with the fixing base, the inside top of fixing base has cup jointed first bolt, and the other end of first bolt runs through first through-hole, the other end threaded connection of first bolt has first nut.
As a preferred technical scheme of the utility model, one side that first bracing piece was kept away from to the support column is equipped with first fixed plate, and the other end of first fixed plate is connected with the second bracing piece, one side of first fixed plate is inside to be opened there is the second through-hole.
As a preferred technical scheme of the utility model, the inside thread groove of opening of one end of keeping away from the second through-hole of first fixed plate, the inside third through-hole that has opened in top of first fixed plate.
As a preferred technical scheme of the utility model, the fixing base is kept away from arc fixed block fixed mounting and is had the screw rod, and the other end of screw rod runs through the second through-hole to extend to the outside of first fixed plate, the screw rod is located the outside one end threaded connection of first fixed plate and has the second nut.
As a preferred technical scheme of the utility model, one side of keeping away from first fixed plate of second bracing piece is equipped with the second fixed plate, the inside second bolt that has run through in top of second fixed plate, the other end of second bolt runs through the third through-hole to extend to the outside of first fixed plate, the other end threaded connection of second bolt has the third nut.
As a preferred technical scheme of the utility model, bottom one side of second fixed plate is equipped with the third bolt, open the inside bottom of second fixed plate has the fourth through-hole, the third bolt runs through the third through-hole to threaded connection has the thread groove.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses a first bolt and first nut are fixed arc fixed block and fixing base, make first bracing piece fixed mounting on the surface of support column, through the second bolt, third nut and third bolt are fixed first fixed plate and second fixed plate, make second bracing piece fixed mounting on the top of first bracing piece, fix fixing base and first mounting panel through screw rod and second nut, it is fixed to make first bracing piece obtain the secondary, thereby it is safer to let this building creeper, avoid the fixed potential safety hazard that exists of single, and when dismantling, dismantle also very portably to screw bolt and nut, carry and transport after the convenient to use.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a front view of the present invention;
fig. 2 is a side view of the present invention;
FIG. 3 is an exploded view of the first and second retaining plates;
FIG. 4 is an exploded view of the arcuate retention block and the retention block;
in the figure: 1. a first support bar; 2. a second support bar; 3. a support pillar; 4. mounting a plate; 5. an arc-shaped fixed block; 6. a first through hole; 7. a fixed seat; 8. a first bolt; 9. a first nut; 10. a first fixing plate; 11. a second through hole; 12. a thread groove; 13. a third through hole; 14. a screw; 15. a second nut; 16. a second fixing plate; 17. a second bolt; 18. a third nut; 19. a third bolt; 20. and a fourth via.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Wherein like reference numerals refer to like parts throughout.
Example 1
As shown in fig. 1-4, the utility model provides a building engineering construction is with interim overlap joint climbing frame, including first bracing piece 1, the top surface of first bracing piece 1 is equipped with second bracing piece 2, the both sides of first bracing piece 1 all are equipped with support column 3, the bottom fixed mounting of support column 3 has mounting panel 4, surface one side of first bracing piece 1 is equipped with arc fixed block 5, the top of arc fixed block 5 is equipped with first through-hole 6, one side that arc fixed block 5 was kept away from to first bracing piece 1 is equipped with fixing base 7, first bolt 8 has been cup jointed on the inside top of fixing base 7, and first bolt 8's the other end runs through first through-hole 6, first bolt 8's other end threaded connection has first nut 9.
Furthermore, one side of the supporting column 3, which is far away from the first supporting rod 1, is provided with a first fixing plate 10, the other end of the first fixing plate 10 is connected with a second supporting rod 2, and a second through hole 11 is formed inside one side of the first fixing plate 10.
As a preferred technical scheme of the utility model, the inside thread groove 12 that opens of the one end of keeping away from second through-hole 11 of first fixed plate 10, the inside third through-hole 13 that opens in top of first fixed plate 10.
The fixing seat 7 is far away from the arc-shaped fixing block 5 and is fixedly provided with a screw rod 14, the other end of the screw rod 14 penetrates through the second through hole 11 and extends to the outside of the first fixing plate 10, and one end of the screw rod 14, which is located at the outside of the first fixing plate 10, is in threaded connection with a second nut 15.
One side of the second support rod 2, which is far away from the first fixing plate 10, is provided with a second fixing plate 16, a second bolt 17 penetrates through the top end of the second fixing plate 16, the other end of the second bolt 17 penetrates through the third through hole 13 and extends to the outside of the first fixing plate 10, and the other end of the second bolt 17 is connected with a third nut 18 through threads.
A third bolt 19 is arranged on one side of the bottom end of the second fixing plate 16, a fourth through hole 20 is formed in the bottom end of the second fixing plate 16, and the third bolt 19 penetrates through the third through hole 13 and is in threaded connection with the thread groove 12.
Specifically, the support column 3 is fixedly mounted on the ground through the mounting plate 4, the first support rod 1 is placed on one side of the support column 3, the first support rod 1 is clamped by using the arc-shaped fixed block 5 and the fixed block 7, then the arc-shaped fixed block 5 and the fixed block 7 are fixed by using the first bolt 8 and the first nut 9, so that the first support rod 1 is fixedly mounted on one side of the support column 3, then the second support rod 2 is placed on the top end surface of the first support rod 1, the second support rod 2 is clamped by using the first fixed plate 10 and the second fixed plate 16, then the first fixed plate 10 and the second fixed plate 16 are fixed by using the second bolt 17, the third nut 18 and the third bolt 19, so that the second support rod 2 is fixedly mounted on the top end surface of the first support rod 1, and then the fixed block 7 and the first mounting plate 10 are secondarily fixed by using the screw 14 and the second nut 15, so that the building frame is safer. Then to climbing the frame and dismantling and accomodate, the workman of being convenient for climbs the transportation of frame to the building.
To sum up, the utility model discloses a first bolt and first nut are fixed arc fixed block and fixing base, make first bracing piece fixed mounting on the surface of support column, through the second bolt, third nut and third bolt are fixed first fixed plate and second fixed plate, make second bracing piece fixed mounting on the top of first bracing piece, fix fixing base and first mounting panel through screw rod and second nut, it is fixed to make first bracing piece obtain the secondary, thereby it is safer to let this building climb the frame, avoid the fixed potential safety hazard that exists of single, and when dismantling, dismantle also very portably to screw bolt and nut, carry and the transportation after the convenient to use.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described above, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. The utility model provides a frame is climbed with interim overlap joint in building engineering construction, includes first bracing piece (1), its characterized in that, the top surface of first bracing piece (1) is equipped with second bracing piece (2), the both sides of first bracing piece (1) all are equipped with support column (3), the bottom fixed mounting of support column (3) has mounting panel (4), surface one side of first bracing piece (1) is equipped with arc fixed block (5), the top of arc fixed block (5) is equipped with first through-hole (6), one side that arc fixed block (5) were kept away from in first bracing piece (1) is equipped with fixing base (7), the inside top cover of fixing base (7) has first bolt (8), and the other end of first bolt (8) runs through first through-hole (6), the other end threaded connection of first bolt (8) has first nut (9).
2. The temporary lapping climbing frame for building engineering construction according to claim 1, wherein a first fixing plate (10) is arranged on one side of the supporting column (3) far away from the first supporting rod (1), a second supporting rod (2) is connected to the other end of the first fixing plate (10), and a second through hole (11) is formed in one side of the first fixing plate (10).
3. The temporary lap joint scaffold for building engineering construction according to claim 2, wherein a threaded groove (12) is formed inside one end of the first fixing plate (10) far from the second through hole (11), and a third through hole (13) is formed inside the top end of the first fixing plate (10).
4. The temporary lapping climbing frame for building engineering construction according to claim 1, wherein a screw (14) is fixedly installed on the fixing seat (7) far away from the arc-shaped fixing block (5), the other end of the screw (14) penetrates through the second through hole (11) and extends to the outside of the first fixing plate (10), and a second nut (15) is connected to one end of the screw (14) located at the outside of the first fixing plate (10) in a threaded manner.
5. The temporary lapping climbing frame for building engineering construction according to claim 1, wherein a second fixing plate (16) is arranged on one side of the second supporting rod (2) far away from the first fixing plate (10), a second bolt (17) penetrates through the top end of the second fixing plate (16), the other end of the second bolt (17) penetrates through the third through hole (13) and extends to the outside of the first fixing plate (10), and a third nut (18) is connected to the other end of the second bolt (17) in a threaded manner.
6. The temporary lap joint scaffold for building engineering construction according to claim 5, wherein a third bolt (19) is provided at one side of the bottom end of the second fixing plate (16), a fourth through hole (20) is provided at the inner bottom end of the second fixing plate (16), and the third bolt (19) penetrates through the third through hole (13) and is in threaded connection with a thread groove (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223085817.2U CN218623192U (en) | 2022-11-17 | 2022-11-17 | Temporary lap joint climbing frame for construction engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223085817.2U CN218623192U (en) | 2022-11-17 | 2022-11-17 | Temporary lap joint climbing frame for construction engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218623192U true CN218623192U (en) | 2023-03-14 |
Family
ID=85449010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223085817.2U Active CN218623192U (en) | 2022-11-17 | 2022-11-17 | Temporary lap joint climbing frame for construction engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218623192U (en) |
-
2022
- 2022-11-17 CN CN202223085817.2U patent/CN218623192U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112424105B (en) | Steel structure composite assembly for lifting equipment | |
CN218623192U (en) | Temporary lap joint climbing frame for construction engineering construction | |
CN210683021U (en) | Rotary tower body structure of tower crane | |
CN217106099U (en) | Novel combined climbing frame attachment device | |
CN210888010U (en) | Construction handling frame | |
CN212507275U (en) | Auxiliary operation platform for installing peripheral guard board of ventilation clerestory | |
CN208830765U (en) | Prefabricated balcony supporting apparatus | |
JPS5833873Y2 (en) | Anti-frost fan mounting device | |
CN216406098U (en) | Movable construction platform for workshop construction of factory building | |
CN205421892U (en) | Even wall scaffold for building | |
CN217871223U (en) | Assembled toughened glass curtain wall of building outer wall | |
CN219794741U (en) | Door and window construction protection device | |
CN209817383U (en) | Portable scaffold frame for fitment | |
CN214523432U (en) | Fastening tool for urban rail contact network tunnel suspension post bolt | |
CN218149706U (en) | Steel grating plate convenient to unsettled installation | |
CN214531997U (en) | High-rise steel structure column installation measurement correction structure | |
CN220014275U (en) | Temporary protective fence for side edges of multi-layer stairs | |
CN213268817U (en) | External wall overhauling operation platform | |
CN215948842U (en) | Safe type scaffold frame for construction | |
CN216616754U (en) | Scaffold for building engineering | |
CN212689510U (en) | Scaffold for civil engineering that can fold and have height-adjusting function | |
CN219491633U (en) | Scaffold with anti-drop structure | |
CN219431313U (en) | Floor type double-row scaffold | |
CN216664912U (en) | Safe type supporting platform for construction | |
CN219451412U (en) | Safety frame for engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |