Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022719966.4U
Other languages
Chinese (zh)
Inventor
童金清
刘建刚
王磊
陈远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022719966.4U priority Critical patent/CN218622297U/en
Application granted granted Critical
Publication of CN218622297U publication Critical patent/CN218622297U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a deep foundation pile, enlarged footing at the bottom of pile body, stake, the pile body includes the peripheral stake as first stake and the core stake as the second stake, and the core stake inserts in the enlarged footing. The utility model discloses quality safe and reliable, construction convenience. The utility model discloses basic expansibility can be good, can explore the innovation as green assembled building to underground space geotechnical engineering, accords with the development direction of national green building.

Description

Deep foundation pile
Technical Field
The utility model relates to a pile.
Background
The existing deep foundation pile generally needs to be subjected to enlarged footing construction, the pile body structure cannot be well matched with the enlarged footing at the bottom, the expansion performance is not ideal, and further improvement is needed.
Disclosure of Invention
An object of the utility model is to provide a pile body structure and the fine cooperation of enlarged footing of bottom, the deep foundation pile that the extension foundation performance is good.
The technical solution of the utility model is that:
the deep foundation pile comprises a pile body and an enlarged head at the bottom of the pile, and is characterized in that: the pile body includes a peripheral pile as a first pile and a core pile as a second pile, the core pile being inserted into the enlarged head.
The second pile is an outer prefabricated inner cast-in-place pile or an inner prefabricated outer cast-in-place pile. A layer of deformable, compressible material is provided beneath the bottom of the second pile.
The utility model discloses quality safe and reliable, construction convenience. The utility model discloses basic expansibility can be good, can explore the innovation as green assembled building to underground space geotechnical engineering, accords with the development direction of national green building.
Drawings
The present invention will be further explained with reference to the drawings and examples.
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Detailed Description
A deep foundation pile comprises a pile body and an enlarged head 1 at the bottom of the pile body, wherein the pile body comprises a peripheral pile 3 as a first pile and a core pile 2 as a second pile, and the core pile is inserted into the enlarged head.
The second pile is an outer prefabricated inner cast-in-place pile or an inner prefabricated outer cast-in-place pile. A layer of deformable, compressible material (e.g. sand, foam) is provided beneath the second pile base.
Firstly, constructing a first pile, wherein the first pile is a cast-in-place pile; constructing a second pile;
the second pile construction method is one of the following methods:
a) The second pile is an external prefabricated and internal cast-in-place pile, and the construction method comprises the following steps:
(1) In-place: the outer pipe is concentrically positioned on a set first pile position;
(2) Sinking the tube: sinking the outer pipe to a set depth;
(3) Bottom expanding: carrying out bottom expanding construction according to a construction method of the pile bottom expanding head, and pressing out a concave part on the upper part of the expanding head; a layer of deformable, compressible material (e.g., sand, foam) is added to the recess as desired.
(4) No-pipe-drawing pouring molding: placing the reinforcement cage into the outer pipe, pouring fluid concrete to form a reinforced concrete mixed pile body in the outer steel pipe, wherein the pile body extends into the concave of the enlarged head;
b) The second pile is an inner prefabricated and outer cast-in-place pile, and the construction method comprises the following steps:
(1) In-place: the outer pipe is concentrically positioned on a set first pile position;
(2) Sinking the tube: sinking the outer pipe to a set depth;
(3) Bottom expanding: carrying out bottom expanding construction according to the construction method of the pile bottom expanding head, and pressing the upper part of the expanding head to be concave; a layer of deformable, compressible material (e.g., sand, foam) is added to the recess as desired.
(4) Pipe drawing and pouring molding: the prefabricated pile is placed into the outer pipe, the hammer of the inner tamping pipe is propped against the prefabricated pile head, the filler is put into a cavity between the outer pipe and the prefabricated pile body, the prefabricated pile is vibrated and pressed to be pulled upwards, the prefabricated pile is repeatedly vibrated, pressed to sink and pulled upwards, the filler fills the cavity, the terrace pulled out of the outer pipe forms a convex, concave-convex or bamboo-joint-shaped filler pile body, and the pile body extends into the concave of the enlarged head.

Claims (2)

1. The deep foundation pile comprises a pile body and an enlarged head at the bottom of the pile, and is characterized in that: the pile body comprises a peripheral pile as a first pile and a core pile as a second pile, and the core pile is inserted into the expanded head; a layer of deformable, compressible material is provided beneath the bottom of the second pile.
2. The deep foundation pile of claim 1, wherein: the second pile is an outer prefabricated inner cast-in-place pile or an inner prefabricated outer cast-in-place pile.
CN202022719966.4U 2020-11-23 2020-11-23 Deep foundation pile Active CN218622297U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022719966.4U CN218622297U (en) 2020-11-23 2020-11-23 Deep foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022719966.4U CN218622297U (en) 2020-11-23 2020-11-23 Deep foundation pile

Publications (1)

Publication Number Publication Date
CN218622297U true CN218622297U (en) 2023-03-14

Family

ID=85420606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022719966.4U Active CN218622297U (en) 2020-11-23 2020-11-23 Deep foundation pile

Country Status (1)

Country Link
CN (1) CN218622297U (en)

Similar Documents

Publication Publication Date Title
CN110318393B (en) Construction method of composite pile
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN101298772B (en) Static pressure sunken tube pedestal concrete pile construction method
CN110318412A (en) A kind of solution cavity pile base construction method
KR101332848B1 (en) Method for constructing micro pile using deformed or screw steel pipe and pressure grouting
CN107012861B (en) A kind of discrete material core expansive concrete stake and its construction method
CN106192999A (en) The construction method of uplift pile
CN102635110B (en) Construction method for concrete pile
CN111794216A (en) Construction method of uplift carrier pile
JP4984308B2 (en) Ready-made pile
CN101936004A (en) Precast expanding pile as well as construction method and construction mechanical equipment thereof
KR100618597B1 (en) Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
CN218622297U (en) Deep foundation pile
CN111636420A (en) Construction equipment and construction method of anti-necking sinking pipe cast-in-place pile
CN216428281U (en) Thin-wall concrete steel pipe combined support pile
CN112323785A (en) Deep foundation pile with enlarged head and construction method thereof
CN212248222U (en) Construction equipment for grouting thin-wall tubular pile
CN212316905U (en) Construction equipment of anti-necking immersed tube bored concrete pile
CN212835365U (en) Construction structure of PHC tubular pile
WO2022134224A1 (en) Construction method for pre-stressed pull-resistant anchor rod of concrete expansion head
CN112323836A (en) Construction method of combined assembly type deep foundation pile
CN105019449B (en) Prestressed concrete pipe pile and its construction method with degassing function
JP3919852B2 (en) Method for construction of cast-in-place pile
CN112144522A (en) Construction method of prestressed pipe pile and special prestressed pipe pile thereof
CN111411791A (en) Existing foundation upper and lower column connecting structure and method for expanding underground space

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant