CN218547926U - Progress management device - Google Patents

Progress management device Download PDF

Info

Publication number
CN218547926U
CN218547926U CN202222739456.2U CN202222739456U CN218547926U CN 218547926 U CN218547926 U CN 218547926U CN 202222739456 U CN202222739456 U CN 202222739456U CN 218547926 U CN218547926 U CN 218547926U
Authority
CN
China
Prior art keywords
management device
progress management
fixed mounting
cartridge case
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222739456.2U
Other languages
Chinese (zh)
Inventor
陈少伟
文志运
文素莉
李少群
陈少端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiandong Construction Management Co ltd
Original Assignee
Tiandong Construction Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiandong Construction Management Co ltd filed Critical Tiandong Construction Management Co ltd
Priority to CN202222739456.2U priority Critical patent/CN218547926U/en
Application granted granted Critical
Publication of CN218547926U publication Critical patent/CN218547926U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model provides a progress management device. The schedule management apparatus includes: backplate and flip, the equal fixed mounting in flip's both sides has the vertical retort, and the equal fixed mounting in one side of two vertical retort has the montant, and the cover that all slides on two montants is equipped with the slider, and one side fixed mounting that two sliders are close to each other has same half cartridge case, the brush roller is installed to half cartridge case internal rotation, the connecting axle at brush roller both ends all extends to half cartridge case outside and fixed mounting have the round gear, the equal fixed mounting in one side of two vertical retort has the rack, two round gear respectively with the rack toothing who corresponds, install two stay tubes on the backplate. The utility model provides a progress management device has the advantage of deashing mechanism.

Description

Progress management device
Technical Field
The utility model relates to a progress management technical field especially relates to a progress management device.
Background
When building construction is carried out, in order to facilitate constructors to know data of project expected expenses and actual expenses, project budget expenditure data and actual expenses data are updated every day, and then project managers paste paper data reports to a progress management device for display.
Through retrieval, the related art discloses an engineering progress management device, including the bottom plate, characterized by: the upside swing joint carousel of bottom plate, the eccentric department of carousel corresponds bottom plate threaded connection jackscrew, the one end of the central fixed connection bracing piece of carousel, the downside of the other end fixed connection show board of bracing piece, the horizontal pole of the L shape pole of one side fixed connection symmetry of show board, the downside the center pin of the montant swing joint disc of L shape pole, one side eccentric department fixed connection handle of disc, the center pin fixed connection swing mechanism of disc, however, above-mentioned technical scheme lacks the function of clearance dust, and the job site dust is great, and the dust adhesion can influence the visibility of construction report data on the data report, consequently, necessarily provides a new progress management device and solves above-mentioned technical problem.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide a progress management device with deashing mechanism.
In order to solve the technical problem, the utility model provides a progress management device includes: backplate and flip, the equal fixed mounting in flip's both sides has the vertical retort, and the equal fixed mounting in one side of two vertical retort has the montant, and the cover that all slides on two montants is equipped with the slider, and one side fixed mounting that two sliders are close to each other has same half cartridge case, the brush roller is installed to half cartridge case internal rotation, the connecting axle at brush roller both ends all extends to half cartridge case outside and fixed mounting have a round gear, the equal fixed mounting in one side of two vertical retort has the rack, two round gear respectively with the rack toothing who corresponds, install two stay tubes on the backplate.
Preferably, one side of the vertical bar is fixedly provided with two supporting blocks, and the top end and the bottom end of the vertical bar are respectively fixedly connected with the two supporting blocks.
Preferably, the vertical rod is sleeved with a buffer spring in a sliding manner, the bottom end of the buffer spring is in contact with the top of the corresponding supporting block, and the top end of the buffer spring is in contact with the bottom of the sliding block.
Preferably, a pull ring is fixedly installed on one side of the half cylinder shell.
Preferably, two inserting cylinders are fixedly mounted on one side of the back plate, and the top ends of the two supporting tubes extend into the corresponding inserting cylinders respectively and are in sliding connection with the corresponding inserting cylinders.
Preferably, the fixed cover in bottom of two stay tubes is equipped with same bottom plate, and equal slidable mounting has the inserted bar in two stay tubes, one side fixed mounting of inserted bar has the extension piece, one side of extending the piece extend to the stay tube outside and with stay tube sliding connection.
Preferably, one side of the sliding block is fixedly provided with two connecting frames, and the two connecting frames are fixedly connected with the half cylinder shell.
Compared with the prior art, the utility model provides a progress management device has following beneficial effect:
the utility model provides a progress management device, can play dustproof and weather proof's effect to paper data report through flip, through the vertical retort, the supporting shoe, the montant, the slider, half cartridge case and brush roller cooperate, make progress management device have dust clearance mechanism, thereby adhere on flip after the dust, can clear up the dust of adhesion, wherein, half cartridge case not only can regard as the carrier that holds of brush roller, can also prevent the dust diffusion simultaneously when brush roller clearance dust, the circular gear cooperation rack then makes the brush roller can rotate by oneself when following half cartridge case and sliding from top to bottom, with this improvement to the clearance effect of dust, cooperate through inserted bar and extension piece, make and need not excavate the pre-buried hole when settling progress management device, can be convenient fix progress management device.
Drawings
Fig. 1 is a schematic front sectional view of a progress management device provided in the present invention;
FIG. 2 is an enlarged schematic view of portion A of FIG. 1;
fig. 3 is a first side view cross-sectional structural schematic diagram of the progress management device provided by the present invention;
FIG. 4 is an enlarged view of portion B of FIG. 3;
fig. 5 is a schematic cross-sectional view of a second side view of the progress management device provided by the present invention;
fig. 6 is an enlarged schematic view of the portion C shown in fig. 5.
Reference numbers in the figures: 1. a back plate; 2. a cover is turned; 3. vertical bars; 4. a support block; 5. a vertical rod; 6. a slider; 7. a buffer spring; 8. a semi-cylindrical shell; 9. a brush roller; 10. a circular gear; 11. a rack; 12. inserting a cylinder; 13. supporting a tube; 14. a base plate; 15. inserting a rod; 16. an extension block.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1-6, wherein fig. 1 is a schematic front sectional view of a schedule management device according to the present invention; FIG. 2 is an enlarged schematic view of portion A of FIG. 1; fig. 3 is a schematic side view of a cross-sectional structure of a progress management device according to the present invention; FIG. 4 is an enlarged view of portion B of FIG. 3; fig. 5 is a schematic cross-sectional view of a second side view of the progress management device according to the present invention; fig. 6 is an enlarged schematic view of the portion C shown in fig. 5. The progress management device includes: the novel paper data report pasting device comprises a back plate 1 and a flip cover 2, wherein one side of the back plate 1 is provided with a groove, so that the back plate 1 can be changed into a frame plate, the combination of the flip cover 2 cannot be influenced when a paper report is pasted, meanwhile, two hinges are installed at the top of the back plate 1, the top of the flip cover 2 is fixedly connected with connectors of the two hinges, the flip cover 2 consists of a frame body, transparent glass and a limiting frame, the transparent glass is clamped in the frame body, the limiting frame is used for limiting the transparent glass, the paper data report can be isolated and protected through the flip cover 2 to avoid being influenced by rain and dust, vertical bars 3 are fixedly installed on two sides of the flip cover 2, two supporting blocks 4 are fixedly installed on one side of each vertical bar 3, the same vertical bar 5 is fixedly installed on one side of the two supporting blocks 4, and the two supporting blocks 4 are fixed on the vertical bars 3 through screws, the dust cleaning mechanism mainly serves as a cushion block of a buffer spring 7 and a supporting piece of a vertical bar 3, sliding blocks 6 are respectively sleeved on two vertical bars 5 in a sliding mode, the buffer spring 7 is sleeved on the vertical bars 5 in a sliding mode, the bottom end of the buffer spring 7 is in contact with the top of a corresponding supporting block 4, the top end of the buffer spring 7 is in contact with the bottom of the sliding block 6, when the dust cleaning mechanism is pushed to the top of the progress management device and then falls down, the buffer spring 7 can play a role in buffering the dust cleaning mechanism, the dust cleaning mechanism is prevented from being damaged due to violent collision with the supporting block 4, two connecting frames are fixedly installed on one sides, close to each other, of the two sliding blocks 6, the same half cylindrical shell 8 is installed on the four connecting frames, the four connecting frames are L-shaped metal pieces, screw holes are formed in the upper surfaces of the four connecting frames and are mainly used as an auxiliary mechanism of the sliding block 6, and the sliding block 6 can be connected with the half cylindrical shell 8 through screws, meanwhile, the rotation of the circular gear 10 cannot be influenced, the half cylinder shell 8 is made of plastic, the half cylinder shell is close to the joint of the flip cover 2, but a certain gap is kept, so that the half cylinder shell can not interfere with the flip cover 2 when moving, when the brush roller 9 cleans dust on the flip cover 2, the brush roller 9 can cover a dust cleaning area, the dust is prevented from being diffused by the cleaning, one side of the half cylinder shell 8 is fixedly provided with a pull ring, the pull ring is made of plastic, the flip cover 2 is turned and the dust cleaning mechanism is convenient to slide, the brush roller 9 is installed on the half cylinder shell 8, rotating holes are formed in inner walls of two sides of the half cylinder shell 8, connecting shafts of the brush roller 9 respectively penetrate through the corresponding rotating holes and are rotatably connected with the corresponding rotating holes, connecting shafts at two ends of the brush roller 9 both extend out of the half cylinder shell 8 and are fixedly provided with the circular gear 10, one side of the two vertical bars 3 is fixedly provided with a rack 11, the two circular gears 10 are respectively engaged with the corresponding rack 11, one side of the back plate 1 is fixedly provided with two insertion cylinders 12, the supporting tube 12 fixed on one side of the back plate 1, and the supporting tube 13 can be used for facilitating the transportation of the two insertion cylinders, and the two insertion tubes, and the supporting tube are respectively extended into the supporting tube, and are more convenient to be transported as a bottom management device for the supporting tube.
The fixed cover in bottom of two stay tubes 13 is equipped with same bottom plate 14, bottom plate 14 is made for metal material, it not only can improve the steadiness between two stay tubes 13, simultaneously can also improve the area of contact of two stay tubes 13 and ground with this stability that improves whole progress management device, equal slidable mounting has inserted bar 15 in two stay tubes 13, one side fixed mounting of inserted bar 15 has extension piece 16, one side of extension piece 16 extends outside stay tube 13 and with stay tube 13 sliding connection, inserted bar 15 cooperation extension piece 16 can let inserted bar 15 become a chisel, and in nailing inserted bar 15 into ground through the hammer, the spout has been seted up to one side inner wall of stay tube 13, extension piece 16 runs through the spout and with spout sliding connection.
The utility model provides a progress management device's theory of operation as follows:
when the progress management device needs to be arranged on a construction site, the progress management device is firstly placed in a proper area, a bottom plate 14 is made to be in contact with the ground, then an extension block 16 is knocked by an iron hammer, the extension block 16 drives an insertion rod 15 to descend until the insertion rod 15 is inserted into the ground, so that the progress management device can be conveniently arranged on a construction local area, when a paper data report needs to be pasted on the progress management device, a flip cover 2 is flipped over from a back plate 1 through a pull ring, then the paper data report is pasted on the back plate 1, then the flip cover 2 is covered, when a dust influence report is adhered on glass of the flip cover 2, the pull ring is held to push up a half cylinder shell 8, the half cylinder shell 8 drives two sliders 6 to slide on two vertical rods 5, meanwhile, the half cylinder shell 8 also drives the brush roll 9 and two circular gears 10 to synchronously move, the circular gears 10 are limited by a rack 11 to continuously rotate, so that the brush roll 9 can rotate and clean glass on the two vertical rods 2 in the moving process, when the half cylinder shell 8 is limited by the rack 11, the brush roll 9 and the brush roll 7 can continuously move, the dust can be prevented from being adhered on the half cylinder shell 7, the brush roll 9 and the half cylinder shell can be automatically when the brush roll 9 is loosened, and the dust can be automatically, and the dust buffer the brush roll 9 is loosened, and the brush roll 7, at the dust can be automatically.
Compared with the prior art, the utility model provides a progress management device has following beneficial effect:
the utility model provides a progress management device, can play dustproof and weather proof's effect to paper data report through flip 2, through vertical retort 3, supporting shoe 4, montant 5, slider 6, half cartridge case 8 and brush roller 9 cooperate, make progress management device have dust clearance mechanism, thereby after dust on flip 2 goes up the adhesion, can clear up the dust of adhesion, wherein, half cartridge case 8 not only can regard as the carrier of brush roller 9, can also prevent the dust diffusion when brush roller 9 clears up the dust simultaneously, 10 cooperation racks 11 of round gear make brush roller 9 can rotate by oneself when following half cartridge case 8 and slide from top to bottom, with this improvement to the clearance effect of dust, cooperate through inserted bar 15 and extension piece 16, make and need not excavate pre-buried pit when settling progress management device, can be convenient fix progress management device.
It should be noted that the device structure and the accompanying drawings of the present invention mainly describe the principle of the present invention, and in the technology of this design principle, the settings of the power mechanism, the power supply system, the control system, etc. of the device are not completely described, and the details of the power mechanism, the power supply system, and the control system can be clearly known on the premise that the person skilled in the art understands the principle of the present invention.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (7)

1. The progress management device comprises a back plate and a flip, and is characterized in that: the equal fixed mounting in flip's both sides has the vertical retort, and the equal fixed mounting in one side of two vertical retort has the montant, and equal slip cap is equipped with the slider on two montants, and one side fixed mounting that two sliders are close to each other has same half cartridge case, the brush roller is installed to half cartridge case internal rotation, the connecting axle at brush roller both ends all extends to half cartridge case outside and fixed mounting has the round gear, and the equal fixed mounting in one side of two vertical retort has the rack, two round gear respectively with the rack toothing who corresponds, install two stay tubes on the backplate.
2. The progress management device according to claim 1, wherein two support blocks are fixedly installed at one side of the vertical bar, and the top end and the bottom end of the vertical bar are fixedly connected with the two support blocks respectively.
3. The progress management device according to claim 2, wherein the vertical rod is slidably sleeved with a buffer spring, the bottom end of the buffer spring is in contact with the top of the corresponding supporting block, and the top end of the buffer spring is in contact with the bottom of the sliding block.
4. The progress management device according to claim 1, wherein a pull ring is fixedly installed at one side of the half cylinder case.
5. The progress management device according to claim 1, wherein two insertion cylinders are fixedly mounted on one side of the back plate, and top ends of the two support tubes extend into the corresponding insertion cylinders and are slidably connected with the corresponding insertion cylinders.
6. The progress management device according to claim 1, wherein the bottom ends of the two support tubes are fixedly sleeved with the same bottom plate, the two support tubes are internally provided with the inserted rod in a sliding manner, one side of the inserted rod is fixedly provided with the extension block, and one side of the extension block extends out of the support tubes and is connected with the support tubes in a sliding manner.
7. The progress management device according to claim 1, wherein two connecting frames are fixedly mounted on one side of the slider, and both connecting frames are fixedly connected with the half cylinder shell.
CN202222739456.2U 2022-10-18 2022-10-18 Progress management device Active CN218547926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222739456.2U CN218547926U (en) 2022-10-18 2022-10-18 Progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222739456.2U CN218547926U (en) 2022-10-18 2022-10-18 Progress management device

Publications (1)

Publication Number Publication Date
CN218547926U true CN218547926U (en) 2023-02-28

Family

ID=85280577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222739456.2U Active CN218547926U (en) 2022-10-18 2022-10-18 Progress management device

Country Status (1)

Country Link
CN (1) CN218547926U (en)

Similar Documents

Publication Publication Date Title
CN213735056U (en) Transportation frame with adjustable building site is used
CN211472255U (en) Water conservancy job site safety warning device
CN218547926U (en) Progress management device
CN210375128U (en) Bicycle GPS broken step measuring device
CN214410510U (en) Architectural design outward appearance effect show instrument
CN211914930U (en) Dust screen for building engineering
CN210378331U (en) Novel adjustable advertisement frame for billboard
CN219642507U (en) Movable propaganda device
CN215981526U (en) 5g communication device mounting rack
CN218894024U (en) Movable water retaining wall structure
CN215881488U (en) Hollow shaft internal support block dismounting device
CN213837017U (en) Green environmental protection light gauge steel building frame
CN213339406U (en) Public service sign in rural tourist attraction
CN216590684U (en) Device for bidding management of constructional engineering
CN220171747U (en) Station advertisement show board convenient to change
CN218813280U (en) Guideboard convenient to replace
CN219105721U (en) Information push display column
CN214752815U (en) Picture and text advertisement propaganda board convenient for changing content
CN218631315U (en) Be applied to indoor media's advertisement image wall
CN214312430U (en) Rotatable signboard is used in landscape garden
CN211654259U (en) Engineering cost progress management device
CN114046422B (en) Insurance business-oriented insurance claim settlement service display platform
CN210777697U (en) Subway direction tablet with removable function
CN219730348U (en) Lifting frame for building construction