CN218541562U - Building wall auxiliary device for building house - Google Patents

Building wall auxiliary device for building house Download PDF

Info

Publication number
CN218541562U
CN218541562U CN202222790464.XU CN202222790464U CN218541562U CN 218541562 U CN218541562 U CN 218541562U CN 202222790464 U CN202222790464 U CN 202222790464U CN 218541562 U CN218541562 U CN 218541562U
Authority
CN
China
Prior art keywords
building
plate
frame
fixing
conveying plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222790464.XU
Other languages
Chinese (zh)
Inventor
赵茹茹
魏攀
甘愿
景格红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Jingwei Construction Group Co ltd
Original Assignee
Shaanxi Jingwei Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Jingwei Construction Group Co ltd filed Critical Shaanxi Jingwei Construction Group Co ltd
Priority to CN202222790464.XU priority Critical patent/CN218541562U/en
Application granted granted Critical
Publication of CN218541562U publication Critical patent/CN218541562U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a building a wall auxiliary device is used in building a house, it includes support body mechanism and draw bridge mechanism, draw bridge mechanism includes hoist engine, transport plate and bracing piece, the hoist engine is located the top of support body mechanism, the transport plate articulate in support body mechanism, the bracing piece articulate in one side bottom that the hinged end was kept away from to the transport plate, the lifting rope of hoist engine with transport plate fixed connection, the support body is used for having the fixed action to draw bridge mechanism. This application has the effect of guaranteeing workman's safety.

Description

Building wall auxiliary device for building house
Technical Field
The application relates to the technical field of building appliances, in particular to a building auxiliary device for building a wall.
Background
The building, also called building construction engineering, refers to various building constructions and their accessories, and the matching lines, pipelines, equipment installation engineering and indoor and outdoor decoration engineering. The house building is a project which is provided with a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of people on production, living, study, public activities and the like. The building construction engineering is generally called building engineering for short, and refers to engineering entities for surveying, planning, designing, constructing, installing, maintaining and the like performed by newly building, rebuilding or expanding building and auxiliary structures and the completed engineering entities.
At present, in the wall building process of building a house in a rural area, a worker usually piles bricks from low to high by using concrete, the bricks are piled layer by layer from bottom to top, the total height of a common two-layer civil house is 5-6 meters, and the worker can build a scaffold to build the wall in the wall building process.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: when building a wall to eminence, workman's friend loses the brick on the scaffold frame on ground, and the workman's master on the scaffold frame catches and puts things in good order again, at the in-process of losing the brick always, takes place the incident easily, endangers workman's safety.
Disclosure of Invention
In order to guarantee workman's safety, this application provides a room is built with auxiliary device that builds a wall.
The application provides a room is built with auxiliary device that builds a wall adopts following technical scheme:
the utility model provides a building a wall auxiliary device for building a house, includes support body mechanism and draw bridge mechanism, draw bridge mechanism includes hoist engine, transport plate and bracing piece, the hoist engine is located the top of support body mechanism, the transport plate articulate in support body mechanism, the bracing piece articulate in one side bottom that the hinged end was kept away from to the transport plate, the lifting rope of hoist engine with transport plate fixed connection, the support body is used for having a fixed action to draw bridge mechanism.
Through adopting above-mentioned technical scheme, when the height of building a wall has reached need just can continue on the scaffold frame, the accessible hoist engine is put transport plate one end to ground, realize a transportation to fragment of brick and concrete through setting up an inclined plane platform, thereby realized reducing the effect of potential safety hazard, after the material that needs to build a wall has transported, rethread hoist engine lifts the transport plate again, accomplish the support to the transport plate through the bracing piece that turns over a transport plate bottom, and then begin the work of can building a wall.
Optionally, the support body mechanism includes mount and fixed plate, the fixed plate is located on the mount, the mount is used for providing the mounted position to hoist engine and transport plate, the transport plate is located fixed plate one side, the transport plate with the fixed plate is articulated.
Through adopting above-mentioned technical scheme, the mount all provides the position of installation for hoist engine, transport board and fixed plate to, transport board and fixed plate are articulated, provide very big facility when transporting fragment of brick and cement to the usefulness of building a wall, the mount is to providing the stability in the transportation, has guaranteed going on that the transportation can be stable.
Optionally, the winch is arranged at the top of the fixing frame and located above the end, far away from the hinge joint, of the conveying plate.
Through adopting above-mentioned technical scheme, the transport plate realizes going up and down through the hoist engine to the transportation to the goods has been saved the manpower and has still improved work efficiency simultaneously.
Optionally, be equipped with placement mechanism on the fixed plate, placement mechanism includes rack and slip subassembly, the rack is equipped with a plurality ofly, slip subassembly includes slide and magnet, two spouts have all been seted up to fixed plate and transport plate bottom, the slide has a plurality ofly, slide sliding connection be in the spout, magnet is located on the slide, magnet is used for fixing the rack.
Through adopting above-mentioned technical scheme, through placing brick and the cement of building a wall usefulness to the rack, through fixing the rack on the slide, push away the rack to fixed plate department along the spout, under the cooperation between rack and slide, fundamentally has avoided the condition of throwing out the fragment of brick from ground to the scaffold frame of traditional mode, and then has reduced the possibility that the incident takes place.
Optionally, the rack is including placing frame and metal wheel, the metal wheel is located place the four corners department of frame.
Through adopting above-mentioned technical scheme, place the frame and be used for holding article, the metal wheel is arranged in coordinating with the magnet in the slide, fixes the transportation to the rack, has also avoided the emergence of incident when having improved work efficiency.
Optionally, the bottom of the fixing plate is also provided with a support rod, and the support rods are telescopic rods.
Through adopting above-mentioned technical scheme, the height that can adjust the construction under the effect of telescopic link is managed with transport plate to the fixed plate, makes things convenient for constructor to be under construction to the position of co-altitude not.
Optionally, guard rails are arranged around the transport plate and the fixing plate.
By adopting the technical scheme, the protective guard is used for protecting constructors and reducing safety accidents.
Optionally, a limiting groove is arranged in the middle of the metal wheel.
Through adopting above-mentioned technical scheme, magnet setting has seted up the spacing groove at the intermediate position of slide in the centre of metal wheel after, can carry out the block through spacing groove and magnet to accompanied the effect of magnetism, further carry out spacing fixed to the rack.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the height of the wall building is up to the level that the wall building can be carried out continuously on the scaffold, one end of the conveying plate can be placed on the ground through the winch, and the brick and concrete can be conveyed through the inclined platform, so that the potential safety hazard is reduced;
2. bricks and cement for building walls are placed on the placing frame, the placing frame is fixed on the sliding seat and pushed to the position of the fixing plate along the sliding groove, and under the matching of the placing frame and the sliding seat, the condition that bricks are thrown out of the scaffold from the ground in the traditional mode is fundamentally avoided, and the possibility of safety accidents is further reduced;
3. the mount all provides the position of installation for hoist engine, transport board and fixed plate to, transport board and fixed plate are articulated, provide very big facility when transporting fragment of brick and cement to building a wall usefulness, the mount is to providing the stability in the transportation, has guaranteed going on that the transportation can be stable.
Drawings
Fig. 1 is a schematic perspective view of a wall building assisting device for building a house according to an embodiment of the present application.
Fig. 2 is a sectional view of a wall building aid for building construction according to an embodiment of the present application.
Fig. 3 is an enlarged schematic view of a portion a in fig. 2.
Reference numerals: 1. a frame body mechanism; 11. a fixed mount; 12. a fixing plate; 2. a suspension bridge mechanism; 21. a winch; 22. a transport plate; 23. a support bar; 3. a placing mechanism 31 and a placing rack; 311. placing the frame; 312. a metal wheel; 313. a limiting groove; 32. a sliding assembly; 321. a slide base; 322. a magnet; 33. a chute; 4. a guard rail.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses a building wall auxiliary device is used in room construction. Referring to fig. 1, a building wall auxiliary device is built in room includes support body mechanism, draw bridge mechanism and placement machine structure, draw bridge mechanism includes hoist engine, transport plate and bracing piece, and support body mechanism includes mount and fixed plate, has four telescopic links in the welding of fixed plate bottom four corners department, and transport plate is articulated on one side with the fixed plate, and the mount that fixed plate one end top was kept away from to the transport plate passes through screwed connection with the hoist engine, and the lifting rope and the transport plate of hoist engine are kept away from fixed plate one end and are passed through the couple and be connected, and the bottom of keeping away from fixed plate one end at the transport plate articulates there are two telescopic links.
Referring to fig. 1, fig. 2 and fig. 3, place the mechanism and include rack and slip subassembly, the rack is including placing the frame and placing frame bottom four corners department welded metal wheel, the spacing groove has been seted up along circumference to the metal wheel, two spouts have been seted up on fixed plate and transport plate, spout on the fixed plate corresponds with the spout opening on the transport plate and is connected, sliding connection has a plurality of slide in the spout, disclose four slides in every spout in this embodiment, the rack is disclosed to be two, the intermediate position welding has magnet on the slide, spacing groove and magnet block in the metal wheel, it realizes the transportation to building a wall raw materials such as brick cement to move in the spout through the rack, the welding has the rail guard around transport plate and fixed plate, can play the guard action to the constructor when high altitude construction.
The implementation principle of the building wall auxiliary device for building a house in the embodiment of the application is as follows: when needs build a wall, at first adjust the telescopic link and the hoist engine of fixed plate bottom, make the level of fixed plate and transport plate reach suitable height, the rethread adjustment hoist engine with transport plate one end put to with ground department, raw materials such as the brick cement that will build a wall needs to use this moment and article are put into and are placed the frame, rack through the workman with adorning is along spout propelling movement to the fixed plate, this moment, receive the transport plate through the hoist engine and play the same level with the fixed plate, turn over the telescopic link of transport plate bottom and turn over and put down, it just can work of building a wall after supporting to adjust suitable height, at the in-process of building a wall, along with unknown change, only need along the spout with the rack remove can, not only laborsaving but also can improve work efficiency.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a room is built with auxiliary device that builds a wall which characterized in that: the hoisting device comprises a frame body mechanism and a hoisting bridge mechanism, wherein the hoisting bridge mechanism comprises a winch, a conveying plate and a supporting rod, the winch is arranged at the top of the frame body mechanism, the conveying plate is hinged to the frame body mechanism, the supporting rod is hinged to the bottom of one side, far away from a hinged end, of the conveying plate, a hoisting rope of the winch is fixedly connected with the conveying plate, and the frame body is used for fixing the hoisting bridge mechanism.
2. The building wall auxiliary device for building according to claim 1, wherein: the support body mechanism comprises a fixing frame and a fixing plate, the fixing plate is arranged on the fixing frame, the fixing frame is used for providing mounting positions for the winch and the conveying plate, the conveying plate is arranged on one side of the fixing plate, and the conveying plate is hinged to the fixing plate.
3. A building aid according to claim 2 wherein: the winch is arranged at the top of the fixing frame and is positioned above the end, far away from the hinge joint, of the conveying plate.
4. A building aid according to claim 2 wherein: the automatic placing device is characterized in that a placing mechanism is arranged on the fixed plate and comprises a placing frame and a sliding assembly, the placing frame is provided with a plurality of sliding assemblies, each sliding assembly comprises a sliding seat and a magnet, two sliding grooves are formed in the bottoms of the fixed plate and the conveying plate, the sliding seats are multiple in number, the sliding seats are connected in the sliding grooves in a sliding mode, the magnets are arranged on the sliding seats, and the magnets are used for fixing the placing frame.
5. The building wall auxiliary device according to claim 4, wherein: the rack is including placing frame and metal wheel, the metal wheel is located place the four corners department of frame.
6. A building aid according to claim 2 wherein: the bottom of the fixing plate is also provided with a supporting rod, and the supporting rods are telescopic rods.
7. A building aid according to claim 2 wherein: guard rails are arranged around the conveying plate and the fixing plate.
8. The building wall auxiliary device according to claim 5, wherein: and a limiting groove is formed in the middle of the metal wheel.
CN202222790464.XU 2022-10-21 2022-10-21 Building wall auxiliary device for building house Active CN218541562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222790464.XU CN218541562U (en) 2022-10-21 2022-10-21 Building wall auxiliary device for building house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222790464.XU CN218541562U (en) 2022-10-21 2022-10-21 Building wall auxiliary device for building house

Publications (1)

Publication Number Publication Date
CN218541562U true CN218541562U (en) 2023-02-28

Family

ID=85280828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222790464.XU Active CN218541562U (en) 2022-10-21 2022-10-21 Building wall auxiliary device for building house

Country Status (1)

Country Link
CN (1) CN218541562U (en)

Similar Documents

Publication Publication Date Title
JP2008274637A (en) Construction method for continuous viaduct
CN109505309B (en) Pipe gallery segment displacement system and pipe gallery installation method using same
KR101305913B1 (en) Rebar jig for psm box girder mould
CN113060565A (en) Building construction material carries rail formula to transport platform
CN205955234U (en) Movable discharging platform
AU2010253486A1 (en) A loading platform
CN110578338A (en) System capable of moving aluminum alloy template integrally and operation method
CN218541562U (en) Building wall auxiliary device for building house
CN202064281U (en) Slip form frame
CN109098314A (en) One kind being easily installed compact assembled lining
CN202401753U (en) Sliding die device
US3494091A (en) Method of constructing houses
CN111576878A (en) Construction process for quick-release system of aluminum alloy template
CN209339365U (en) One kind being easily installed compact assembled lining
CN207957611U (en) A kind of small members are mobile and install equipment
CN213356779U (en) Overweight steel column translation transportation installation device
CN107792802A (en) A kind of small members movement and mounting system and method
CN111997345B (en) Lifting scaffold hangs hoist system upside down
CN109403674B (en) Assembled prefabrication factory for bridge construction and construction method thereof
CN210636823U (en) Rail type overhead connecting device for pier body steel bar overhead connecting construction
CN211173029U (en) A liftable platform structure for chimney reinforcement construction
KR100687136B1 (en) Main carrier for constructing upper structure of bridge
CN211682710U (en) Movable template system for assembled culvert channel
CN218714939U (en) Adjustable elevator shaft lifting platform
CN215798013U (en) Reinforced concrete roof truss beam conveyor in hole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant