CN218507478U - Adjusting frame for mounting boiler pulverized coal pipeline - Google Patents

Adjusting frame for mounting boiler pulverized coal pipeline Download PDF

Info

Publication number
CN218507478U
CN218507478U CN202222397803.8U CN202222397803U CN218507478U CN 218507478 U CN218507478 U CN 218507478U CN 202222397803 U CN202222397803 U CN 202222397803U CN 218507478 U CN218507478 U CN 218507478U
Authority
CN
China
Prior art keywords
fixedly connected
box
boiler
pulverized coal
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222397803.8U
Other languages
Chinese (zh)
Inventor
杨柏依
李念震
刘兆庆
孙式洋
胥枫
刘鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiangong Zhihua Beijing Technology Co ltd
Huaneng Laiwu Power Generation Co Ltd
Huaneng Shandong Power Generation Co Ltd
Original Assignee
Tiangong Zhihua Beijing Technology Co ltd
Huaneng Laiwu Power Generation Co Ltd
Huaneng Shandong Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiangong Zhihua Beijing Technology Co ltd, Huaneng Laiwu Power Generation Co Ltd, Huaneng Shandong Power Generation Co Ltd filed Critical Tiangong Zhihua Beijing Technology Co ltd
Priority to CN202222397803.8U priority Critical patent/CN218507478U/en
Application granted granted Critical
Publication of CN218507478U publication Critical patent/CN218507478U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an adjustment frame for boiler coal dust piping erection, the power distribution box comprises a box body, the inside wall fixedly connected with baffle of box, two bearings of the equal fixedly connected with in the front of baffle and the back of baffle. This device is through being provided with driving motor, utilize the cooperation of driving motor and bearing, it carries out rotation work to drive the threaded rod, and through the relation of connection of screw thread section of thick bamboo and threaded rod, the slide bar of being convenient for drives splint and carries out the centre gripping location to the buggy pipeline, thereby can guarantee that the buggy pipeline can not appear the swing, simultaneously through the thrust that the hydraulic stem provided, be convenient for adjust the position of buggy pipeline and boiler interface according to the height of boiler interface, its mode easy operation is convenient to use, the mounted position of staff's adjustment buggy pipeline of being convenient for, and make things convenient for buggy pipeline and boiler erection, it wastes time and energy and the easy staff that collides of staff and causes the injured problem to have solved the mounting means simultaneously.

Description

Adjusting frame for mounting boiler pulverized coal pipeline
Technical Field
The utility model belongs to the technical field of the boiler and specifically relates to an adjustment frame for boiler coal dust piping erection.
Background
The boiler is an energy conversion device, the energy input to the boiler comprises chemical energy and electric energy in fuel, the boiler outputs steam, high-temperature water or an organic heat carrier with certain heat energy, the origin of the boiler refers to a water container heated on fire, the boiler refers to a place where the fuel is combusted, the boiler comprises a boiler and a furnace, the hot water or the steam generated in the boiler can directly provide heat energy for industrial production and life, and can also be converted into mechanical energy through a steam power device or be converted into the electric energy through a generator.
When boiler pulverized coal pipeline and boiler interface were installed in present stage, need adopt hoisting equipment to hoist the pulverized coal pipeline, but the swing appears easily in the pulverized coal pipeline after hoisting, in order to prevent the swing of pulverized coal pipeline, consequently need staff's hand pulverized coal pipeline to adjust pulverized coal pipeline and boiler interface position, its mounting means wastes time and energy, and because the swing of pulverized coal pipeline collides the staff easily and causes personnel's injury, for this reason, we provide an adjusting bracket for installation of boiler pulverized coal pipeline and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an adjustment frame for boiler coal dust piping erection to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides an adjustment frame for boiler coal dust piping erection, includes the box, the inside wall fixedly connected with baffle of box, two bearings of the front of baffle and the equal fixedly connected with in the back of baffle, the front of box and the equal fixed two driving motor of inlaying in the back of box, every driving motor's the equal fixedly connected with threaded rod of output, every driving motor's one end is kept away from to the threaded rod all with the inner circle fixed connection of bearing, two sliding openings, every have been seted up to the upper surface of box the inside of sliding opening all is equipped with two slide bars, every the equal threaded connection of surface of threaded rod has a screw thread section of thick bamboo, every the bottom of slide bar all is connected with the surface fixed connection of a screw thread section of thick bamboo, every the equal fixedly connected with splint in top of slide bar, two hydraulic stems of bottom surface fixedly connected with of box, two the common fixedly connected with bottom plate in bottom of hydraulic stem.
In a further embodiment, two sets of moving wheels are fixedly connected to the bottom surface of the bottom plate, and pushing handles are fixedly connected to the front surface of the box body and the back surface of the box body.
In a further embodiment, the upper surface of the bottom plate is fixedly connected with a storage battery, and the front surface of the box body is fixedly connected with a control switch.
In a further embodiment, the side surfaces of the two clamping plates close to each other are arc-shaped.
In a further embodiment, a warning board is arranged on the right side of the box body, and the left side face of the warning board is fixedly connected with the right side face of the box body.
In a further embodiment, two reinforcing blocks are fixedly connected to the outer surface of each hydraulic rod, and the upper surface of each reinforcing block is fixedly connected with the bottom surface of the box body.
Compared with the prior art, the beneficial effects of the utility model are that:
this device is through being provided with driving motor, utilize the cooperation of driving motor and bearing, it carries out rotary work to drive the threaded rod, and the relation of connection through threaded cylinder and threaded rod, the slide bar of being convenient for drives splint and carries out the centre gripping location to the buggy pipeline, thereby can guarantee that the swing can not appear in the buggy pipeline, the thrust that provides through the hydraulic stem simultaneously, be convenient for adjust the position of buggy pipeline and boiler interface according to the height of boiler interface, its mode easy operation uses conveniently, be convenient for the staff adjusts the mounted position of buggy pipeline, and make things convenient for buggy pipeline and boiler erection, it wastes time and energy and the easy staff of colliding of buggy pipeline swing causes personnel injured problem to have solved the mounting means simultaneously.
Drawings
FIG. 1 is a schematic perspective view of an overall adjusting bracket for installing a pulverized coal pipeline of a boiler;
FIG. 2 is a cross-sectional side view of a pedestal box for boiler fines duct mounting;
FIG. 3 is a cross-sectional view of a top view of a trim bracket box for boiler pulverized coal piping installation;
FIG. 4 is an enlarged view of the adjusting bracket for installing the pulverized coal pipe of the boiler at A in FIG. 2.
In the figure: 1. a moving wheel; 2. a base plate; 3. a storage battery; 4. a hydraulic rod; 5. a warning board; 6. a box body; 7. a splint; 8. a control switch; 9. a drive motor; 10. a push handle; 11. a reinforcing block; 12. a sliding port; 13. a partition plate; 14. a bearing; 15. a threaded rod; 16. a slide bar; 17. and (4) a threaded cylinder.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or to implicitly indicate a number of the indicated technical features. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Please refer to fig. 1-4, the utility model discloses a, an adjustment frame for installation of boiler coal dust pipeline, the power distribution box comprises a box body 6, inside wall fixedly connected with baffle 13 of box 6, two bearings 14 of the equal fixedly connected with in the front of baffle 13 and the back of baffle 13, the front of box 6 and the equal fixed two driving motor 9 of inlaying in the back of box 6, the equal fixedly connected with threaded rod 15 of output of every driving motor 9, the one end that driving motor 9 was kept away from to every threaded rod 15 all with bearing 14's inner circle fixed connection, two sliding exits 12 have been seted up to the upper surface of box 6, the inside of every sliding exit 12 all is equipped with two slide bars 16, the equal threaded connection of surface of every threaded bar 15 has a screw section of thick bamboo 17, the bottom of every slide bar 16 all is connected with screw section of thick bamboo 17's outer fixed surface, the equal fixedly connected with splint 7 in top of every slide bar 16, two hydraulic stems 4 of bottom surface fixedly connected with of box 6, the common fixedly connected with bottom plate 2 of two hydraulic stems 4.
Two sets of removal wheels 1 of bottom surface fixedly connected with of bottom plate 2, the equal fixedly connected with in the front of box 6 and the back of box 6 push away 10, through removing wheel 1 and pushing away the cooperation of 10, be convenient for remove the device to the service position, the last fixed surface of bottom plate 2 is connected with battery 3, and the positive fixedly connected with control switch 8 of box 6 utilizes battery 3 to be convenient for provide electric power, and a side that two splint 7 are close to each other is the arc.
The right side of box 6 is equipped with warning sign 5, and warning sign 5's left surface and box 6's right flank fixed connection are convenient for indicate the staff notice through warning sign 5, and two back-up blocks 11 of the equal fixedly connected with of surface of every hydraulic stem 4, the upper surface of every back-up block 11 all with box 6's bottom surface fixed connection, through back-up block 11 be convenient for hydraulic stem 4 and box 6 be connected more firm.
The utility model discloses a theory of operation is:
when the device is used by a worker, firstly, the device is integrally moved to a using position through the matching of the push handle 10 and the moving wheel 1, then, a pulverized coal pipeline is placed above the box body 6, then, the control switch 8 is pressed to control the driving motor 9 to start, the driving motor 9 is used for driving the threaded rod 15 to rotate inside the bearing 14, meanwhile, the threaded cylinder 17 is used for driving the sliding rod 16 to slide inside the sliding port 12 according to the rotation of the threaded rod 15, the clamping plate 7 is used for clamping the pulverized coal pipeline through the movement of the sliding rod 16, then, the box body 6 and the pulverized coal pipeline are pushed by the hydraulic rod 4 to move up and down, the height of the pulverized coal pipeline is adjusted according to a boiler interface, and then, the device is pushed by the push handle 10 and the moving wheel 1 to drive the pulverized coal pipeline to be in contact with and installed on the boiler interface.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.

Claims (6)

1. The utility model provides an alignment jig for boiler coal dust piping erection which characterized in that: including box (6), the inside wall fixedly connected with baffle (13) of box (6), the front of baffle (13) and two bearings (14) of the equal fixedly connected with in the back of baffle (13), the front of box (6) and the back of box (6) are all fixed to be inlayed and are had two driving motor (9), every the equal fixedly connected with threaded rod (15) of output of driving motor (9), every the one end that driving motor (9) were kept away from in threaded rod (15) all with the inner circle fixed connection of bearing (14), two sliding opening (12), every have been seted up to the upper surface of box (6) the inside of sliding opening (12) all is equipped with two slide bar (16), every the equal threaded connection of surface of threaded rod (15) has a screw thread section of thick bamboo (17), every the bottom of slide bar (16) all is connected with the outer fixed surface of screw thread section of thick bamboo (17), every the equal fixedly connected with splint (7) in top of slide bar (16), the bottom surface fixedly connected with two hydraulic stem (4) of box (6), two the bottom fixedly connected with bottom plate (2) jointly.
2. The adjusting bracket for installation of the boiler pulverized coal pipeline as claimed in claim 1, characterized in that: the bottom surface of the bottom plate (2) is fixedly connected with two sets of moving wheels (1), and the front surface of the box body (6) and the back surface of the box body (6) are fixedly connected with push handles (10).
3. The adjusting bracket for installation of the boiler pulverized coal pipeline as claimed in claim 1, wherein: the upper surface of the bottom plate (2) is fixedly connected with a storage battery (3), and the front surface of the box body (6) is fixedly connected with a control switch (8).
4. The adjusting bracket for installation of the boiler pulverized coal pipeline as claimed in claim 1, wherein: one side surfaces of the two clamping plates (7) which are close to each other are arc-shaped.
5. The adjusting bracket for installation of the boiler pulverized coal pipeline as claimed in claim 1, wherein: the right side of box (6) is equipped with warning sign (5), the left surface of warning sign (5) and the right flank fixed connection of box (6).
6. The adjusting bracket for installation of the boiler pulverized coal pipeline as claimed in claim 1, wherein: the outer surface of each hydraulic rod (4) is fixedly connected with two reinforcing blocks (11), and the upper surface of each reinforcing block (11) is fixedly connected with the bottom surface of the box body (6).
CN202222397803.8U 2022-09-08 2022-09-08 Adjusting frame for mounting boiler pulverized coal pipeline Active CN218507478U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222397803.8U CN218507478U (en) 2022-09-08 2022-09-08 Adjusting frame for mounting boiler pulverized coal pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222397803.8U CN218507478U (en) 2022-09-08 2022-09-08 Adjusting frame for mounting boiler pulverized coal pipeline

Publications (1)

Publication Number Publication Date
CN218507478U true CN218507478U (en) 2023-02-21

Family

ID=85211887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222397803.8U Active CN218507478U (en) 2022-09-08 2022-09-08 Adjusting frame for mounting boiler pulverized coal pipeline

Country Status (1)

Country Link
CN (1) CN218507478U (en)

Similar Documents

Publication Publication Date Title
CN218507478U (en) Adjusting frame for mounting boiler pulverized coal pipeline
CN208173719U (en) A kind of power battery production accessory transport device
CN210859051U (en) Wind power generation equipment convenient to installation
CN211967503U (en) Distribution rack with lifting workbench
CN215525796U (en) Component glass monitor
CN215119821U (en) Overhauling device for 10kv high-voltage power supply and distribution equipment
CN211701598U (en) Fire-fighting emergency power supply cabinet structure for fire-fighting power supply
CN210717483U (en) Boiler protector
CN209737560U (en) Portable power system maintenance device
CN113721048A (en) Fixing device for detecting new energy automobile battery
CN218763454U (en) Boiler soot blower for blowing soot on heating surface of boiler
CN211102521U (en) Disassembling and assembling mechanism for converter module
CN216330965U (en) Novel pneumatic element processing is with beating mark device
CN212628798U (en) Inverter for solar power generation device
CN211019551U (en) Waste heat power generation automation equipment
CN221440114U (en) Inner box hoisting device
CN220485092U (en) Heavy-duty car battery replacement top hanging system
CN220845392U (en) Lifting device for auxiliary installation of electric power engineering
CN214177135U (en) High-voltage frequency converter for high-voltage variable-frequency speed regulation system
CN221391001U (en) Maintenance equipment for hydraulic and electromechanical use
CN211949491U (en) Steam boiler's maintenance equipment
CN112066066B (en) Portable intelligent valve control
CN220647523U (en) Detection device for desulfurization wastewater of thermal power plant
CN220098562U (en) Industrial oil gas recovery device
CN219554356U (en) Improved pressure release mechanism of low-voltage distribution equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant