CN218378369U - City heat supply engineering pipeline protective equipment - Google Patents

City heat supply engineering pipeline protective equipment Download PDF

Info

Publication number
CN218378369U
CN218378369U CN202222785240.XU CN202222785240U CN218378369U CN 218378369 U CN218378369 U CN 218378369U CN 202222785240 U CN202222785240 U CN 202222785240U CN 218378369 U CN218378369 U CN 218378369U
Authority
CN
China
Prior art keywords
pipeline
wall
heat supply
coating
protective
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222785240.XU
Other languages
Chinese (zh)
Inventor
陈少平
武树峰
赵洋
高正杰
栗巍
孙留洋
张恒硕
崔亚衡
张恩慈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Airport City Operation Co ltd
Original Assignee
Zhengzhou Airport City Operation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Airport City Operation Co ltd filed Critical Zhengzhou Airport City Operation Co ltd
Priority to CN202222785240.XU priority Critical patent/CN218378369U/en
Application granted granted Critical
Publication of CN218378369U publication Critical patent/CN218378369U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Thermal Insulation (AREA)

Abstract

The utility model discloses a city heat supply engineering pipeline protective equipment relates to heat supply pipeline technical field, if the leakage problem appears after laying for solving current heat supply pipeline, the discovery is untimely to lead to leaking more seriously easily, seeks the leak point simultaneously comparatively difficultly, if the leak point judges that the mistake can influence and excavate repair work to influence the problem that the resident heated. A heat supply pipeline is arranged in the middle of the inside of the pipeline protection shell; the pipeline coating is arranged outside the heat supply pipeline, the heat supply pipeline is connected with the pipeline coating in an adhesive mode, a protective inner wall is arranged outside the pipeline coating, and the heat supply pipeline is connected with the protective inner wall in a welding mode through a supporting block; the vacuum heat-insulating layer is arranged between the protective inner wall and the pipeline coating, a transmission control box is arranged at the front end of the interior of the vacuum heat-insulating layer and connected with the protective inner wall through bolts, and a water sensor is arranged below the interior of the vacuum heat-insulating layer.

Description

City heat supply engineering pipeline protective equipment
Technical Field
The utility model relates to a heat supply pipeline technical field specifically is a city heat supply engineering pipeline protective equipment.
Background
The heat supply pipeline is a conveying pipeline which starts from a boiler room, a direct-fired machine room, a heat supply center and the like and leads from a heat source to a thermal inlet of a building;
for example, chinese copyright patent (a heating pipeline) with publication number CN207880247U, the upper right side of heat transfer pipe is equipped with the pipe, just pipe and heat transfer pipe closely weld, the pipe right-hand member is equipped with the filter screen, just the filter screen card connects in the pipe, the pipe below is equipped with the steam pipe, just steam pipe and heat transfer pipe closely weld, the steam pipe left side is equipped with the thermostat, just the steam pipe cup joints in the thermostat, thermostat right side below is equipped with adjust knob, just adjust knob and heat transfer pipe fixed connection, adjust knob right side is equipped with the radiator, just the radiator links to each other with heat transfer pipe, and this kind of heating pipeline is equipped with the radiator, the radiator is "cuboid" form, just the radiator is same horizontal plane with adjust knob and places.
However, if leakage occurs after the existing heat supply pipeline is laid, leakage is more serious when the leakage is found out untimely, and simultaneously, the leakage point is difficult to find, and if the leakage point is misjudged, excavation and repair work is influenced, so that heating of residents is influenced; therefore, the existing requirements are not met, and the urban heat supply engineering pipeline protection equipment is provided for the requirements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a city heat supply engineering pipeline protective equipment to if the problem of leaking appears after the current heat supply pipeline laying that provides in solving above-mentioned background art, the discovery is untimely leads to leaking more seriously easily, seeks the leak point simultaneously comparatively difficultly, if the leak point judges that the mistake can influence and excavate repair work, thereby influences the problem that the resident supplied heat.
In order to achieve the above object, the utility model provides a following technical scheme: a pipeline protection device for urban heat supply engineering comprises a pipeline protection shell, wherein a heat supply pipeline is arranged in the middle of the inside of the pipeline protection shell;
further comprising:
the pipeline coating is arranged outside the heat supply pipeline, the heat supply pipeline is bonded with the pipeline coating, a protective inner wall is arranged outside the pipeline coating, and the heat supply pipeline is welded with the protective inner wall through supporting blocks;
the vacuum heat preservation layer is arranged between the protective inner wall and the pipeline coating, a transmission control box is arranged at the front end of the interior of the vacuum heat preservation layer and connected with the protective inner wall through bolts, a water sensor is arranged below the interior of the vacuum heat preservation layer and connected with the protective inner wall through bolts, and the water sensor is electrically connected with the transmission control box.
Preferably, the outer side of the protective inner wall is provided with an inner wall coating, and the inner wall coating is bonded with the protective inner wall.
Preferably, the outside of inner wall coating is provided with protection outer wall, protection inner wall passes through connecting block and protection outer wall welded connection.
Preferably, a filling layer is arranged between the inner wall coating and the protective outer wall, and filling foaming glue is filled in the filling layer.
Preferably, the outer wall coating is arranged outside the protective outer wall, and the outer wall coating is connected with the protective outer wall in an adhesive mode.
Preferably, one side of heat supply pipeline is provided with first agreeing with the ring, and first agreeing with the ring and heat supply pipeline structure as an organic whole, the opposite side of heat supply pipeline is provided with the second and agrees with the ring, and the second agrees with the ring and heat supply pipeline structure as an organic whole, the outside that first agrees with the ring and second agrees with the ring all fills and is provided with seam filling glue, the outside that seam filling glue is provided with the seal groove, and seal groove and pipeline protecting crust structure as an organic whole, the inside of seal groove is provided with the closing plate, and closing plate and seal groove welded connection.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an outside at heat supply pipeline sets up vacuum heat preservation, and set up water sensor and transmission control box in vacuum heat preservation's inside, when heat supply pipeline takes place to leak, water can flow into vacuum heat preservation's inside earlier, the water sensor is soaked in the downward flow, the water sensor gives transmission control box with signal transmission after detecting water, transmission control box gives the terminal with place information transmission again, so that the staff judges to leak the place and go to the processing, if the leakage problem appears after avoiding current heat supply pipeline to lay, the discovery is untimely leads to leaking more seriously easily, it is comparatively difficult to seek the leakage point simultaneously, can influence the excavation repair work if the leakage point judges to miss, thereby influence the problem of resident's heating.
2. Through setting up vacuum insulation layer, the heat preservation effect of multiplicable heat supply pipeline reduces heat loss, sets up the packing foaming glue in the outside of protective inner wall simultaneously, can further increase the heat preservation effect to all be provided with the coating in protective outer wall, protective inner wall and heat supply pipeline's outside, can play the guard action to the three, avoid the three to receive external erosion, increase the life of pipeline.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic side sectional view of the present invention;
FIG. 3 is a schematic view of the internal structure of the present invention;
fig. 4 is a schematic view of the connection structure of the present invention;
in the figure: 1. a pipeline protective shell; 2. a protective outer wall; 3. coating the outer wall; 4. filling foaming glue; 5. an inner wall coating; 6. protecting the inner wall; 7. a transmission control box; 8. a water immersion sensor; 9. a support block; 10. a heat supply pipeline; 11. coating the pipeline; 12. a first engagement ring; 13. a second engagement ring; 14. filling glue into the joint; 15. a sealing plate; 16. a sealing groove; 17. and (4) a vacuum heat-insulating layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides an embodiment: a pipeline protection device for urban heat supply engineering comprises a pipeline protection shell 1, wherein a heat supply pipeline 10 is arranged in the middle inside the pipeline protection shell 1;
further comprising:
the pipeline coating 11 is arranged outside the heat supply pipeline 10, the heat supply pipeline 10 is connected with the pipeline coating 11 in an adhesive mode, the protective inner wall 6 is arranged outside the pipeline coating 11, and the heat supply pipeline 10 is connected with the protective inner wall 6 in a welding mode through the supporting blocks 9;
vacuum insulation layer 17, it sets up between protective inner wall 6 and pipeline coating 11, the inside front end of vacuum insulation layer 17 is provided with transmission control box 7, and transmission control box 7 passes through the bolt and is connected with protective inner wall 6, the inside below of vacuum insulation layer 17 is provided with water sensor 8, and water sensor 8 passes through the bolt and is connected with protective inner wall 6, and water sensor 8 and transmission control box 7 electric connection, if the pipeline takes place to break and leak, water can flow into the inside of vacuum insulation layer 17 earlier, water sensor 8 in the vacuum insulation layer 17 detects behind the water, give transmission control box 7 with signal transmission, transmission control box 7 gives the terminal with positional information transmission again, so that the staff at terminal judges the leakage point, go to the processing, the coating can prevent that materials such as outside water from corroding the pipeline, increase the life of pipeline, vacuum insulation layer 17 can play the heat preservation effect simultaneously, reduce heat loss.
Referring to fig. 3, the inner wall coating 5 is disposed on the outer side of the protective inner wall 6, and the inner wall coating 5 is bonded to the protective inner wall 6, so that the inner wall coating 5 can protect the protective inner wall 6 from being corroded by the outside, and the service life of the pipeline is prolonged.
Referring to fig. 3, the protective outer wall 2 is disposed outside the inner wall coating 5, and the protective inner wall 6 is welded to the protective outer wall 2 through a connecting block, so that the protective outer wall 2 can further increase the protection effect, prevent the inner pipeline from being corroded, and prolong the service life of the pipeline.
Referring to fig. 2, a filling layer is arranged between the inner wall coating 5 and the protective outer wall 2, and the filling layer is filled with a filling foam adhesive 4, so that the filling foam adhesive 4 can further increase the heat insulation performance of the pipeline, reduce heat loss, and fully utilize heat.
Referring to fig. 2, an outer wall coating 3 is disposed outside the protective outer wall 2, and the outer wall coating 3 is bonded to the protective outer wall 2, so that the outer wall coating 3 can protect the protective outer wall 2, thereby preventing the protective outer wall 2 from being eroded by soil and increasing the service life of the protective outer wall 2.
Referring to fig. 2 and 4, a first engagement ring 12 is disposed on one side of a heat supply pipeline 10, the first engagement ring 12 and the heat supply pipeline 10 are integrated, a second engagement ring 13 is disposed on the other side of the heat supply pipeline 10, the second engagement ring 13 and the heat supply pipeline 10 are integrated, a seam filling adhesive 14 is filled on the outer sides of the first engagement ring 12 and the second engagement ring 13, a sealing groove 16 is disposed on the outer portion of the seam filling adhesive 14, the sealing groove 16 and the pipeline protection shell 1 are integrated, a sealing plate 15 is disposed inside the sealing groove 16, the sealing plate 15 and the sealing groove 16 are welded, the first engagement ring 12 of each pipeline and the second engagement ring 13 of another pipeline are both connectable, so that the pipelines can be welded together, the sealing plate 15 is welded to the outer portion of each pipeline, the sealing performance of the pipeline is further increased, and the seam filling adhesive 14 is filled to increase the heat insulation performance at the pipeline seams.
The working principle is as follows: during the use, if the pipeline takes place the leakage fault, water can flow into inside vacuum heat preservation 17 earlier, water sensor 8 in vacuum heat preservation 17 detects behind the water with signal transmission for transmission control box 7, transmission control box 7 gives the terminal with data transmission such as positional information again, so that the terminal judges the leak point according to the information, the staff can go to maintaining according to the place information, if the leakage problem appears after avoiding current heat supply pipeline laying, it is more serious to lead to leaking in time not finding, it is comparatively difficult to look for the leak point simultaneously, if the leak point judges that the mistake can influence excavation repair work, thereby influence resident's heating problem and take place, vacuum heat preservation 17 can play the heat preservation effect simultaneously, reduce the heat and run off, outside packing foamed rubber 4 can further increase the thermal insulation performance of pipeline, make the heat obtain make full use of, and outside protection outer wall 2 can further protect the pipeline, increase its heat insulating ability and life, and the coating that sets up in pipeline 10, protection inner wall 6 and the outside of protection outer wall 2 can further carry out the pipeline, avoid the erosion of materials such as outside water, make the life of pipeline increase, the damage probability of pipeline, the heat supply pipeline increase.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. A pipeline protection device for urban heat supply engineering comprises a pipeline protection shell (1), wherein a heat supply pipeline (10) is arranged in the middle of the inside of the pipeline protection shell (1); the method is characterized in that: further comprising: the pipeline coating (11) is arranged outside the heat supply pipeline (10), the heat supply pipeline (10) is connected with the pipeline coating (11) in an adhesive mode, a protective inner wall (6) is arranged outside the pipeline coating (11), and the heat supply pipeline (10) is connected with the protective inner wall (6) in a welding mode through a supporting block (9); vacuum heat preservation layer (17), it sets up between protective inner wall (6) and pipeline coating (11), the inside front end of vacuum heat preservation layer (17) is provided with transmission control box (7), and transmission control box (7) are connected with protective inner wall (6) through the bolt, the inside below of vacuum heat preservation layer (17) is provided with water sensor (8), and water sensor (8) are connected with protective inner wall (6) through the bolt, and water sensor (8) and transmission control box (7) electric connection.
2. The urban heating engineering pipeline protection device according to claim 1, characterized in that: the outer side of the protective inner wall (6) is provided with an inner wall coating (5), and the inner wall coating (5) is in adhesive connection with the protective inner wall (6).
3. The urban heating engineering pipeline protection device according to claim 2, characterized in that: the outside of inner wall coating (5) is provided with protection outer wall (2), protection inner wall (6) pass through connecting block and protection outer wall (2) welded connection.
4. The urban heating engineering pipeline protection device according to claim 2, characterized in that: a filling layer is arranged between the inner wall coating (5) and the protective outer wall (2), and filling foaming glue (4) is filled in the filling layer.
5. The urban heating engineering pipeline protection device according to claim 3, characterized in that: the outer wall coating (3) is arranged outside the protective outer wall (2), and the outer wall coating (3) is connected with the protective outer wall (2) in an adhesive mode.
6. The urban heating engineering pipeline protection device according to claim 1, characterized in that: one side of heat supply pipeline (10) is provided with first agreeing with and encloses (12), and first agreeing with and enclose (12) and heat supply pipeline (10) structure as an organic whole, the opposite side of heat supply pipeline (10) is provided with second agreeing with and encloses (13), and second agreeing with and enclose (13) and heat supply pipeline (10) structure as an organic whole, the outside of first agreeing with and enclose (12) and second agreeing with and enclose (13) all fills and is provided with seam filling adhesive (14), the outside of seam filling adhesive (14) is provided with seal groove (16), and seal groove (16) and pipeline protective shell (1) structure as an organic whole, the inside of seal groove (16) is provided with closing plate (15), and closing plate (15) and seal groove (16) welded connection.
CN202222785240.XU 2022-10-22 2022-10-22 City heat supply engineering pipeline protective equipment Active CN218378369U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222785240.XU CN218378369U (en) 2022-10-22 2022-10-22 City heat supply engineering pipeline protective equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222785240.XU CN218378369U (en) 2022-10-22 2022-10-22 City heat supply engineering pipeline protective equipment

Publications (1)

Publication Number Publication Date
CN218378369U true CN218378369U (en) 2023-01-24

Family

ID=84931957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222785240.XU Active CN218378369U (en) 2022-10-22 2022-10-22 City heat supply engineering pipeline protective equipment

Country Status (1)

Country Link
CN (1) CN218378369U (en)

Similar Documents

Publication Publication Date Title
CN211976562U (en) Device for monitoring long heat transmission network directly-buried steam heat-preservation pipe
CN218378369U (en) City heat supply engineering pipeline protective equipment
CN205001745U (en) Direct burial flexbleJoint
CN104501463B (en) Water-source heat-pump central air conditioner water supply well inside and outside integrative welding type is with well backflow device
CN103912731B (en) The warning direct-burried independent sealed steam tube of prefabricated thermal insulation layer and manufacture method are revealed in tube bank
CN208281646U (en) A kind of outer protective polyethylene layer polyurethane foam heat-insulation pipe road
CN208564570U (en) A kind of section of jurisdiction with freezing function
CN207999586U (en) A kind of heat supply insulating tube
CN108386625A (en) A kind of reinforced type prefabricated direct-buried thermal insulation pipe road
CN213452147U (en) Polyurethane heat preservation pipeline coupling assembling
CN214579731U (en) Cotton multilayer cold insulation structure pipeline of rubber and plastic heat preservation
CN202125701U (en) Expansion joint for pipe
CN203857140U (en) Direct-burial prefabricated independent thermal insulation layer sealing steam pipe with pipe bundle leakage alarm
CN209196310U (en) A kind of winding structure pipe of primary merging location structure
CN211083643U (en) Leakage detection device of heat supply underground pipeline
CN112856229A (en) Gas is jacket pipe and gas system for pipeline
CN205877593U (en) Insulating tube and direct -burried type heat - supply pipeline
CN219994770U (en) Heavy-calibre thick wall seamless steel pipe for natural gas line low temperature station yard
CN219775491U (en) Heating power pipeline leak protection device for municipal works
CN111734917B (en) Finished product protection device for directly-buried pipeline
CN213629297U (en) Environment-friendly direct-buried heat preservation pipe convenient to install rapidly
CN216158600U (en) Prefabricated elbow of insulating tube
CN216480294U (en) Leakage alarm device for natural gas pipeline
CN217272861U (en) Prefabricated insulating tube of direct-burried
CN216666729U (en) Through-wall connection structure of boiler through-wall pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant