CN218378133U - Road drainage is with facing forever and combining construction structures - Google Patents

Road drainage is with facing forever and combining construction structures Download PDF

Info

Publication number
CN218378133U
CN218378133U CN202222731828.7U CN202222731828U CN218378133U CN 218378133 U CN218378133 U CN 218378133U CN 202222731828 U CN202222731828 U CN 202222731828U CN 218378133 U CN218378133 U CN 218378133U
Authority
CN
China
Prior art keywords
pipeline
permanent
road drainage
fixed
construction structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222731828.7U
Other languages
Chinese (zh)
Inventor
王宏哲
金彦钊
沈子俊
闵昆仑
赵玮鹏
张新
李达伟
林凤辉
马宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202222731828.7U priority Critical patent/CN218378133U/en
Application granted granted Critical
Publication of CN218378133U publication Critical patent/CN218378133U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a road drainage is with facing combination construction structures forever, including permanent pipeline and interim pipeline, the outer end welded fastening of permanent pipeline has the connecting seat, the link of interim pipeline passes the inside that the connecting seat stretched into permanent pipeline, just fixed cover has been cup jointed to the outside of interim pipeline link, it is fixed with a plurality of joint piece to encircle on the outer wall of fixed cover, it is fixed with a plurality of socket piece to encircle on the inner wall of connecting seat, the inside of socket piece is equipped with the gomphosis groove identical with joint piece structure, and the both sides of socket joint piece outer end all are fixed with the installation ear, the inside interlude of installation ear has same pin. This road drainage is with facing forever that combines construction structure can be convenient be connected fixedly temporary pipeline and permanent pipeline, efficiency when improving both assembles is favorable to temporary pipeline later stage to demolish work.

Description

Road drainage is with facing forever and combining construction structures
Technical Field
The utility model belongs to the technical field of the road drainage technique and specifically relates to a road drainage is with facing forever and combining construction structures.
Background
At present, the construction sequence of the building engineering in China is generally that the main body is firstly carried out and then the outdoor is carried out, the construction period is long, and the temporary construction investment is large. Aiming at the situation and the actual situation of the project, the construction concept of 'permanent temporary combination' is provided, the technical and economic feasibility of the construction concept are actually verified, and another construction concept is provided for the same party. The permanent temporary combination is that temporary facilities and permanent facilities in engineering construction are combined for one-time construction, and part of the permanent facilities can be directly used in the construction, so that the purpose of saving the cost is achieved.
At present, the temporary pipeline and the permanent pipeline are often required to be connected and fixed in the construction process of the road drainage engineering, the flange is mostly adopted to fix the existing mode of connecting the temporary pipeline and the permanent pipeline, the operation of the connection mode is very complicated, and great inconvenience is caused to the dismantling work of the later temporary pipeline.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a road drainage is with facing combination construction structure forever to when solving the present flange that the above-mentioned background art provided and adopting the flange to be connected interim pipeline and permanent pipeline at the in-process of road drainage engineering construction, because the process of operation is very loaded down with trivial details to the work of demolising of later stage interim pipeline causes very big inconvenient problem.
The utility model provides a road drainage is with facing combination construction structures forever, including permanent pipeline and interim pipeline, the outer end welded fastening of permanent pipeline has the connecting seat, the link of interim pipeline passes the inside that the connecting seat stretched into permanent pipeline, just fixed cover has been cup jointed to the outside of interim pipeline link, it is fixed with a plurality of joint piece to encircle on the outer wall of fixed cover, it is fixed with a plurality of socket piece to encircle on the inner wall of connecting seat, the inside of socket piece is equipped with the gomphosis groove identical with joint piece structure, and the both sides of socket joint piece outer end all are fixed with the installation ear, the inside interlude of installation ear has same pin.
Furthermore, a plurality of clamping blocks are uniformly fixed on the outer wall of the fixing sleeve in a surrounding manner.
Furthermore, the inside of installation ear is equipped with the perforation that coincides with the pin structure, just the length of pin is greater than the interval between the installation ear.
Furthermore, the mounting lug is made of elastic metal materials.
Furthermore, the number of the clamping blocks is the same as that of the socket blocks, and rubber pads are fixedly bonded on the outer walls of the clamping blocks.
Furthermore, the outer end of the temporary pipeline is fixedly sleeved with a clamping ring, an annular stop block is fixed on the inner wall of the permanent pipeline, and the outer side of the clamping ring is pressed against the outer side of the annular stop block.
Furthermore, a plurality of magnet columns are fixed on the outer side of the clamping ring in a surrounding mode, and a plurality of magnetic holes matched with the magnet columns in structure are formed in the outer side of the annular blocking block.
Furthermore, a plurality of magnet columns are fixed on the outer side of the annular stop block in a surrounding mode, and a plurality of magnetic holes matched with the magnet columns are formed in the outer side of the clamping ring.
Further, the intervals between adjacent magnet columns are equal.
Furthermore, the outer edge of the clamping ring is fixedly bonded with a rubber sealing gasket, and the rubber sealing gasket is tightly attached to the inner wall of the permanent pipeline.
Has the advantages that:
this road drainage faces to combine construction structure forever can be convenient be connected fixedly to interim pipeline and permanent pipeline, efficiency when improving both assembles is favorable to interim pipeline later stage to demolish work. The device's interim pipeline can be through stretching into the inside of permanent pipeline with the link, when interim pipeline drives the inside that fixed cover enters into the connecting seat, fixed cover can carry out spacing fixed through the gomphosis inslot with a plurality of joint piece and utilize the pin, and this makes permanent pipeline and interim pipe connection get up more conveniently, avoids adopting flange joint's mode to demolish work to the interim pipeline in later stage and causes certain inconvenience.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the prior art descriptions will be briefly described below, it is obvious that the drawings in the following descriptions are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic structural view of a permanent temporary combined construction structure for road drainage of the present invention;
FIG. 2 is a schematic view of the connection structure of the connecting seat and the fixing sleeve of the temporary combined construction structure for road drainage of the present invention;
fig. 3 is the utility model relates to a road drainage is with facing interim pipeline outer end structure sketch map that combines construction structures forever.
1. A permanent pipe; 2. a temporary pipeline; 3. a connecting seat; 4. fixing a sleeve; 5. a bearing and inserting block; 6. a clamping block; 7. an annular stop block; 8. a magnetic column; 9. a rubber gasket; 10. a snap ring; 11. mounting ears; 12. a stop lever.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", may explicitly or implicitly include one or more of the described features. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise. Furthermore, the terms "mounted," "connected," and "coupled" are to be construed broadly and may include, for example, fixed connections, removable connections, or integral connections; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.
Example 1
Referring to fig. 1-3, the present invention provides a technical solution: a permanent temporary combined construction structure for road drainage comprises a permanent pipeline 1 and a temporary pipeline 2, wherein a connecting seat 3 is fixedly welded at the outer end of the permanent pipeline 1, a connecting end of the temporary pipeline 2 penetrates through the connecting seat 3 and extends into the permanent pipeline 1, a fixing sleeve 4 is fixedly sleeved outside the connecting end of the temporary pipeline 2, a plurality of clamping blocks 6 are fixedly welded on the outer wall of the fixing sleeve 4 in a surrounding manner, a plurality of socket blocks 5 are fixedly welded on the inner wall of the connecting seat 3 in a surrounding manner, a tabling groove matched with the structure of the clamping blocks 6 is formed in each socket block 5, mounting lugs 11 are fixedly welded on two sides of the outer end of each socket block 5, the same stop lever 12 is inserted in each mounting lug 11 in a penetrating manner, when the permanent pipeline 1 and the temporary pipeline 2 need to be connected, the temporary pipeline 2 can extend into the permanent pipeline 1 by penetrating through the connecting end through the connecting seat 3, and when the temporary pipeline 2 drives the fixing sleeve 4 to enter the inside of the connecting seat 3, the fixing sleeve 4 can be embedded into the embedding grooves of the bearing and inserting blocks 5 one by embedding a plurality of clamping blocks 6, and meanwhile, the blocking rod 12 is utilized to be inserted into the mounting lug 11 to limit and fix the clamping blocks 6, so that the permanent pipeline 1 and the temporary pipeline 2 can be conveniently connected and fixed, thereby improving the efficiency of assembling the temporary pipeline and the temporary pipeline, avoiding certain inconvenience caused by the flange connection mode for later-stage temporary pipeline 2 dismounting, wherein the mounting lug 11 is made of elastic metal materials, the mounting lug 11 is internally provided with a through hole matched with the blocking rod 12 in structure, the length of the blocking rod 12 is greater than the distance between the mounting lugs 11, the blocking rod 12 of the structure can be more firmly inserted into the through hole of the mounting lug 11 under the elastic action of the mounting lug 11, the clamping blocks 6 are more stably fixed inside the socket block 5, the quantity of the clamping blocks 6 is the same as that of the socket block 5, a rubber pad is fixedly bonded on the outer wall of the clamping blocks 6, the clamping blocks 6 of the structure can increase the friction force when contacting with the inner wall of the embedding groove of the socket block 5 through the rubber pad on the outer wall, so that the connection stability of the clamping blocks 6 and the socket block 5 is further improved, the outer end of the temporary pipeline 2 is fixedly sleeved with a clamping ring 10, the inner wall of the permanent pipeline 1 is fixedly provided with an annular blocking block 7, the outer side of the clamping ring 10 is pressed against the outer side of the annular blocking block 7, when the connecting end of the temporary pipeline 2 extends into the permanent pipeline 1, the annular blocking block 7 can block the clamping ring 10, so that the connecting end of the temporary pipeline 2 is positioned, the outer side of the clamping ring 10 is circumferentially fixed with a plurality of magnet columns 8, and the outer side of the annular blocking block 7 is provided with a plurality of magnet holes which are matched with the magnet columns 8 in structure, (or the outer side of the annular blocking block 7 is circumferentially fixed with a plurality of magnet columns 8, and the outer side of the clamping ring 10 is provided with adjacent magnet holes with a plurality of adjacent magnet holes with magnet columns 8); this structure supports when pressing in annular dog 7's the outside in the outside of snap ring 10 simultaneously can go into annular dog 7's outside magnetism hole with magnet post 8 card, this makes snap ring 10 can be more firm support under magnet post 8's effort and press in annular dog 7 outside, with this steadiness that improves connecting seat 3 and interim pipeline 2 and be connected, snap ring 10 outer along the bonding be fixed with rubber packing 9, and rubber packing 9 closely laminates with the inner wall of permanent pipeline 1, this structure rubber packing 9 can play sealed effect to permanent pipeline 1 and interim pipeline 2 junction, avoid the condition that the seepage appears.
The working and using processes are as follows:
when using this road drainage with facing combination construction structures forever, at first when the in-process of road drainage engineering construction needs to be connected permanent pipeline 1 and interim pipeline 2, pass connecting seat 3 earlier and stretch into the inside of permanent pipeline 1 with interim pipeline 2, when interim pipeline 2 drives snap ring 10 and supports the outside of pressing annular dog 7, at this moment magnet post 8 can block simultaneously and adsorb fixedly in the outside magnetism hole of annular dog 7, and when interim pipeline 2 drives fixed cover 4 and enters into the inside of connecting seat 3, fixed cover 4 can drive a plurality of joint piece 6 gomphosis one by one at the gomphosis inslot of bearing insertion piece 5 simultaneously, at this moment joint piece 6 can increase the frictional force when contacting with the gomphosis inslot wall of bearing insertion piece 5 through the rubber pad on the outer wall, with this stability of improving joint piece 6 and bearing insertion piece 5 and being connected, then carry out spacing fixed to joint piece 6 with the inside of inserting stop lever 12 at installation lug 11, permanent pipeline 1 and interim pipeline 2 can be convenient connect fixedly, thereby avoid adopting the mode of flange connection to accomplish a series of work later stage temporarily pipeline 2 this moment inconveniently, thereby a series of work is dismantled inconveniently accomplished.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications or substitutions do not depart from the scope of the invention in its corresponding aspects.

Claims (10)

1. The utility model provides a road drainage is with facing combination construction structure forever, its characterized in that, including permanent pipeline (1) and interim pipeline (2), the outer end welded fastening of permanent pipeline (1) has connecting seat (3), the link of interim pipeline (2) passes connecting seat (3) and stretches into the inside of permanent pipeline (1), just fixed cover (4) have been cup jointed to the outside of interim pipeline (2) link, it is fixed with a plurality of joint piece (6) to encircle on the outer wall of fixed cover (4), it is fixed with a plurality of socket joint piece (5) to encircle on the inner wall of connecting seat (3), the inside of socket joint piece (5) is equipped with the gomphosis groove identical with joint piece (6) structure, and the both sides of socket joint piece (5) outer end all are fixed with installation ear (11), the inside interlude of installation ear (11) has same pin (12).
2. The permanent temporary combination construction structure for road drainage according to claim 1, wherein a plurality of clamping blocks (6) are uniformly fixed on the outer wall of the fixing sleeve (4) in a surrounding manner.
3. The permanent temporary combination construction structure for road drainage according to claim 2, wherein the installation lugs (11) are internally provided with through holes which are matched with the stop lever (12) in structure, and the length of the stop lever (12) is greater than the distance between the installation lugs (11).
4. The permanent temporary combination construction structure for road drainage according to claim 1, wherein the mounting lugs (11) are made of elastic metal.
5. The permanent temporary combination construction structure for road drainage according to claim 3, wherein the number of the clamping blocks (6) is the same as that of the socket blocks (5), and rubber pads are adhered and fixed on the outer walls of the clamping blocks (6).
6. The permanent temporary combination construction structure for road drainage according to claim 5, wherein a snap ring (10) is fixedly sleeved at the outer end of the temporary pipeline (2), an annular stop block (7) is fixed on the inner wall of the permanent pipeline (1), and the outer side of the snap ring (10) is pressed against the outer side of the annular stop block (7).
7. The permanent temporary combination construction structure for road drainage according to claim 6, wherein a plurality of magnet columns (8) are fixed around the outside of the snap ring (10), and a plurality of magnetic holes matched with the magnet columns (8) in structure are arranged on the outside of the annular stop block (7).
8. The permanent temporary combination construction structure for road drainage according to claim 6, wherein a plurality of magnet columns (8) are fixed around the outer side of the annular stop block (7), and a plurality of magnetic holes matched with the magnet columns (8) are formed in the outer side of the clamping ring (10).
9. The permanent temporary combination construction structure for road drainage according to claim 7 or 8, wherein the adjacent magnet columns (8) are equally spaced.
10. The permanent temporary combination construction structure for road drainage according to claim 6, wherein a rubber gasket (9) is fixedly bonded to the outer edge of the snap ring (10), and the rubber gasket (9) is tightly attached to the inner wall of the permanent pipeline (1).
CN202222731828.7U 2022-10-17 2022-10-17 Road drainage is with facing forever and combining construction structures Active CN218378133U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222731828.7U CN218378133U (en) 2022-10-17 2022-10-17 Road drainage is with facing forever and combining construction structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222731828.7U CN218378133U (en) 2022-10-17 2022-10-17 Road drainage is with facing forever and combining construction structures

Publications (1)

Publication Number Publication Date
CN218378133U true CN218378133U (en) 2023-01-24

Family

ID=84930758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222731828.7U Active CN218378133U (en) 2022-10-17 2022-10-17 Road drainage is with facing forever and combining construction structures

Country Status (1)

Country Link
CN (1) CN218378133U (en)

Similar Documents

Publication Publication Date Title
CN218378133U (en) Road drainage is with facing forever and combining construction structures
CN213512567U (en) Joint convenient to install fast
CN211951793U (en) Clamping device is fixed to hydraulic engineering construction pipeline
CN101981364A (en) Connector for branch pipe
CN212178064U (en) Pipeline connection supporting device for electric power transmission
CN2409403Y (en) Slot type mechanical joint device for pipe
CN202360993U (en) Sealing gasket for half joint
CN210398027U (en) Heater pipeline connecting device convenient to location
CN208804361U (en) Flange connecting assembly
CN211624408U (en) Prefabricated integrated assembled sectional support based on BIM
CN217736511U (en) A drain pipe fixing device for civil engineering
CN213954599U (en) Connecting device for clamping and pressing stainless steel pipe fitting
CN212804650U (en) Sealing pipe joint
CN213952710U (en) Connecting assembly of rotary steel pipe pile and column base
CN212584477U (en) Connecting device for building heating and ventilation
CN214093313U (en) Air pipe mounting structure
CN216813283U (en) Bellows for municipal construction
CN214466811U (en) Water heating pipe joint with good sealing performance
CN219606295U (en) Air duct splicing sealing structure
CN210947171U (en) Steel structure node connecting device
CN215136349U (en) Novel fire hydrant
CN219300076U (en) Water conservancy pipeline support piece
CN113531214B (en) High-strength compression-resistant PE solid-wall pipe and preparation method thereof
CN218510369U (en) Connecting device for ventilating duct
CN218622538U (en) Buried prefabricated pump station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant