CN218301515U
CN218301515U CN202221128978.2U CN202221128978U CN218301515U CN 218301515 U CN218301515 U CN 218301515U CN 202221128978 U CN202221128978 U CN 202221128978U CN 218301515 U CN218301515 U CN 218301515U
Authority
CN
China
Prior art keywords
camera
mounting panel
control mechanism
power supply
video acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221128978.2U
Other languages
Chinese (zh)
Inventor
李志辉
李小进
宋超
阎丹丹
杜毓慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221128978.2U priority Critical patent/CN218301515U/en
Application granted granted Critical
Publication of CN218301515U publication Critical patent/CN218301515U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Studio Devices (AREA)

Abstract

The utility model provides a building engineering management video acquisition equipment, including the mounting panel, the bottom of mounting panel is equipped with moving mechanism, the upper portion of mounting panel is equipped with adjustment mechanism, control mechanism and power supply mechanism, the top detachably of adjustment mechanism is equipped with the camera and blows the dirt fan, the outside of camera is equipped with the protection casing, blow the dirt fan towards the camera setting, control mechanism respectively with moving mechanism, adjustment mechanism, power supply mechanism, the camera with blow dirt fan electric connection; make video acquisition equipment can carry out position shift and angle, altitude mixture control according to the demand through setting up moving mechanism and adjustment mechanism, realized the all-round collection of construction scene image, can avoid the camera to take place to damage because of the dust corrodes through setting up the protection casing and blowing dirt fan, improved the life of equipment.

Description

Building engineering management video acquisition equipment
Technical Field
The utility model relates to a building engineering management equipment field especially relates to a building engineering management video acquisition equipment.
Background
A large amount of video data often need to be gathered in the building engineering management, traditional building engineering management video acquisition often realizes image data's collection through arranging a plurality of cameras in unison, however this kind of method camera installation back rigidity, inconvenient removal, consequently hardly the omnidirectional carries out video acquisition to the job site, although the camera that can remove has appeared on the market, these cameras are difficult angle regulation and position, and dustproof effect is poor, easy damage.
Therefore, a video collecting device for building engineering management is needed, which can solve the problem that the use effect of the existing video collecting device in building engineering management is not good.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a building engineering management video acquisition equipment to solve the above-mentioned not good problem of result of use of current video acquisition equipment in the building engineering management.
In order to achieve the above purpose, the utility model provides a following scheme:
the utility model provides a building engineering management video acquisition equipment, including the mounting panel, the bottom of mounting panel is equipped with moving mechanism, the upper portion of mounting panel is equipped with adjustment mechanism, control mechanism and power supply mechanism, adjustment mechanism's top detachably is equipped with the camera and blows the dirt fan, the outside of camera is equipped with the protection casing, blow dirt fan orientation the camera setting, control mechanism respectively with moving mechanism adjustment mechanism power supply mechanism the camera with blow dirt fan electric connection.
Preferably, moving mechanism includes the drive shaft, the drive shaft rotationally set up in the bottom of mounting panel, the middle part cover of drive shaft is equipped with driven sprocket, the bottom of mounting panel still is equipped with driving motor, driving motor with control mechanism electric connection, driving motor's power take off end is equipped with drive sprocket, drive sprocket with connect through chain drive between the driven sprocket, the both ends of drive shaft all are equipped with athey wheel, every side the outside tensioning of athey wheel is equipped with the track.
Preferably, adjustment mechanism includes the guard box, rotationally be equipped with the stand in the guard box, the top of stand is equipped with the carousel, the carousel is located the top of guard box, the middle part cover of stand is equipped with driven gear, still includes the rotating electrical machines, the rotating electrical machines with control mechanism electric connection, the power take off end of rotating electrical machines is equipped with the driving gear, the driving gear with driven gear meshes mutually, still includes electric telescopic handle, electric telescopic handle with control mechanism electric connection, electric telescopic handle is vertical to be fixed in the upper surface of carousel, blow the dirt fan with camera detachably is fixed in electric telescopic handle's top.
Preferably, the power supply mechanism includes the battery, the battery with control mechanism electric connection, battery still electric connection has solar panel, solar panel set up in the upper surface of mounting panel.
Preferably, the control mechanism comprises a central processing unit, the central processing unit is electrically connected with the moving mechanism, the adjusting mechanism, the power supply mechanism, the camera and the dust blowing fan respectively, the central processing unit is further connected with a memory and a wireless signal transceiver, and the wireless signal transceiver is wirelessly connected with the mobile terminal equipment.
Preferably, the mobile terminal device is a smart phone or a tablet computer.
The utility model discloses for prior art gain following beneficial technological effect:
the utility model provides a pair of building engineering management video acquisition equipment, including the mounting panel, the bottom of mounting panel is equipped with moving mechanism, the upper portion of mounting panel is equipped with adjustment mechanism, control mechanism and power supply mechanism, adjustment mechanism's top detachably is equipped with the camera and blows the dirt fan, the outside of camera is equipped with the protection casing, blow the dirt fan towards the camera setting, control mechanism respectively with moving mechanism, adjustment mechanism, power supply mechanism, the camera with blow dirt fan electric connection; make video acquisition equipment can carry out position movement and angle, altitude mixture control according to the demand through setting up moving mechanism and adjustment mechanism, realized the all-round collection of construction scene image, can avoid the camera to take place to damage because of the dust corrodes through setting up the protection casing and blowing the dirt fan, improved the life of equipment.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor.
Fig. 1 is a schematic structural view of a video acquisition device for building engineering management provided by the present invention;
fig. 2 is a schematic diagram of an electrical connection relationship of a video acquisition device for building engineering management provided by the present invention;
fig. 3 is a schematic structural view of a part of a moving mechanism of a video acquisition device for building engineering management provided by the present invention;
fig. 4 is a schematic structural view of a part of an adjusting mechanism of a video acquisition device for building engineering management provided by the present invention;
in the figure: 1: mounting plate, 2: moving mechanism, 21: drive shaft, 22: driven sprocket, 23: drive motor, 24: drive sprocket, 25: chain, 26: crawler wheel, 27: track, 3: adjustment mechanism, 31: protective box, 32: column, 33: turntable, 34: driven gear, 35: rotating electric machine, 36: drive gear, 37: electric telescopic rod, 4: control mechanism, 41: central processing unit, 42: memory, 43: wireless signal transceiver, 5: power supply mechanism, 51: storage battery, 52: solar power generation panel, 6: camera, 7: dust blowing fan, 8: protective cover, 9: a mobile terminal device.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model aims at providing a building engineering management video acquisition equipment to solve the not good problem of result of use of current video acquisition equipment in the building engineering management.
In order to make the aforementioned objects, features and advantages of the present invention more comprehensible, the present invention is described in detail with reference to the accompanying drawings and the following detailed description.
Example 1:
the embodiment provides a building engineering management video acquisition equipment, as shown in fig. 1-2, including mounting panel 1, the bottom of mounting panel 1 is equipped with moving mechanism 2, the upper portion of mounting panel 1 is equipped with adjustment mechanism 3, control mechanism 4 and power supply mechanism 5, camera 6 and dust blowing fan 7 are installed through bolt detachably in adjustment mechanism 3's top, the outside of camera 6 is equipped with transparent protection casing 8, dust blowing fan 7 sets up towards camera 6, the air current that its produced can make the dust not be close to camera 6, avoid camera 6 to take place to damage because of the erosion of dust, control mechanism 4 respectively with moving mechanism 2, adjustment mechanism 3, power supply mechanism 5, camera 6 and dust blowing fan 7 electric connection.
Specifically, as shown in fig. 3, the moving mechanism 2 includes a driving shaft 21, the driving shaft 21 is rotatably disposed at the bottom of the mounting plate 1, a driven sprocket 22 is sleeved at the middle of the driving shaft 21, a driving motor 23 is further disposed at the bottom of the mounting plate 1, the driving motor 23 is electrically connected to the control mechanism 4, a driving sprocket 24 is disposed at a power output end of the driving motor 23, the driving sprocket 24 is in transmission connection with the driven sprocket 22 through a chain 25, crawler wheels 26 are disposed at two ends of the driving shaft 21, a crawler 27 is disposed outside the crawler wheel 26 on each side in a tensioned manner, and the crawler moving mechanism 2 is disposed to cope with complicated road conditions on a construction site, so as to ensure normal movement.
Further, as shown in fig. 4, the adjusting mechanism 3 includes a protection box 31, an upright post 32 is rotatably disposed in the protection box 31, a turntable 33 is disposed on a top end of the upright post 32, the turntable 33 is located on a top portion of the protection box 31, a driven gear 34 is sleeved in a middle portion of the upright post 32, the adjusting mechanism further includes a rotating motor 35, the rotating motor 35 is electrically connected with the control mechanism 4, a power output end of the rotating motor 35 is provided with a driving gear 36, the driving gear 36 is meshed with the driven gear 34, the adjusting mechanism further includes an electric telescopic rod 37, the electric telescopic rod 37 is electrically connected with the control mechanism 4, the electric telescopic rod 37 is vertically fixed on an upper surface of the turntable 33, the dust blowing fan 7 and the camera 6 are detachably fixed on the top portion of the electric telescopic rod 37, the protection box 31 can accommodate elements such as the rotating gear 35, and when the device is not in use, the camera 6 and the dust blowing fan 7 can be detached and placed in the protection box 31 for storage.
Further, power supply mechanism 5 includes battery 51, battery 51 and control mechanism 4 electric connection, and battery 51 still electric connection has solar panel 52, and solar panel 52 sets up in the upper surface of mounting panel 1, through the supplementary power supply of solar panel 52, not only can the energy saving, can also guarantee equipment steady operation.
Further, the control mechanism 4 comprises a central processing unit 41, the central processing unit 41 is electrically connected with the moving mechanism 2, the adjusting mechanism 3, the power supply mechanism 5, the camera 6 and the dust blowing fan 7, the central processing unit 41 is further connected with a storage 42 and a wireless signal transceiver 43, the wireless signal transceiver 43 is wirelessly connected with the mobile terminal device 9, and the storage 42 can store the collected video data.
Further, mobile terminal 9 adopts the smart mobile phone, and its convenient to use can long-rangely control, can also adopt intelligent mobile device such as panel computer in other embodiments, as long as can realize remote interaction function, all is the utility model discloses the within range of protection.
The utility model provides a building engineering management video acquisition equipment, its application method is: the mobile terminal device 9 remotely controls the mobile mechanism 2 to move the device to a specified position, then controls the adjusting mechanism 3 to adjust the angle and the height, the camera 6 can collect construction site images after the adjustment is finished, and collected image data are stored in the memory 42.
The utility model discloses a specific embodiment is applied to explain the principle and the implementation mode of the utility model, and the explanation of the above embodiment is only used to help understand the method and the core idea of the utility model; meanwhile, for the general technical personnel in the field, according to the idea of the present invention, there are changes in the concrete implementation and the application scope. In summary, the content of the present description should not be construed as a limitation of the present invention.

Claims (6)

1. The utility model provides a building engineering management video acquisition equipment which characterized in that: including the mounting panel, the bottom of mounting panel is equipped with moving mechanism, the upper portion of mounting panel is equipped with adjustment mechanism, control mechanism and power supply mechanism, adjustment mechanism's top detachably is equipped with the camera and blows the dirt fan, the outside of camera is equipped with the protection casing, blow dirt fan orientation the camera setting, control mechanism respectively with moving mechanism adjusting mechanism power supply mechanism the camera with blow dirt fan electric connection.
2. The construction management video capture device of claim 1, wherein: moving mechanism includes the drive shaft, the drive shaft rotationally set up in the bottom of mounting panel, the middle part cover of drive shaft is equipped with driven sprocket, the bottom of mounting panel still is equipped with driving motor, driving motor with control mechanism electric connection, driving motor's power take off end is equipped with drive sprocket, drive sprocket with connect through chain drive between the driven sprocket, the both ends of drive shaft all are equipped with athey wheel, every side the outside tensioning of athey wheel is equipped with the track.
3. The video capture device for construction management according to claim 1, wherein: adjustment mechanism includes the guard box, rotationally be equipped with the stand in the guard box, the top of stand is equipped with the carousel, the carousel is located the top of guard box, the middle part cover of stand is equipped with driven gear, still includes the rotating electrical machines, the rotating electrical machines with control mechanism electric connection, the power take off end of rotating electrical machines is equipped with the driving gear, the driving gear with driven gear meshes mutually, still includes electric telescopic handle, electric telescopic handle with control mechanism electric connection, electric telescopic handle is vertical to be fixed in the upper surface of carousel, blow the dirt fan with camera detachably is fixed in electric telescopic handle's top.
4. The video capture device for construction management according to claim 1, wherein: the power supply mechanism comprises a storage battery, the storage battery is electrically connected with the control mechanism, the storage battery is also electrically connected with a solar power generation panel, and the solar power generation panel is arranged on the upper surface of the mounting plate.
5. The construction management video capture device of claim 1, wherein: the control mechanism comprises a central processing unit, the central processing unit is respectively connected with the moving mechanism, the adjusting mechanism, the power supply mechanism, the camera and the dust blowing fan in an electric mode, the central processing unit is further connected with a storage and a wireless signal transceiver, and the wireless signal transceiver is in wireless connection with the mobile terminal device.
6. The video capture device for construction management according to claim 5, wherein: the mobile terminal equipment adopts a smart phone or a tablet computer.
CN202221128978.2U 2022-05-11 2022-05-11 Building engineering management video acquisition equipment Expired - Fee Related CN218301515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221128978.2U CN218301515U (en) 2022-05-11 2022-05-11 Building engineering management video acquisition equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221128978.2U CN218301515U (en) 2022-05-11 2022-05-11 Building engineering management video acquisition equipment

Publications (1)

Publication Number Publication Date
CN218301515U true CN218301515U (en) 2023-01-13

Family

ID=84802243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221128978.2U Expired - Fee Related CN218301515U (en) 2022-05-11 2022-05-11 Building engineering management video acquisition equipment

Country Status (1)

Country Link
CN (1) CN218301515U (en)

Similar Documents

Publication Publication Date Title
CN214744656U (en) Safety monitoring device for building construction
CN108008722A (en) A kind of photovoltaic robot system and control method
CN107990266A (en) A kind of solar panel adjustable LED street lamp
CN218301515U (en) Building engineering management video acquisition equipment
CN206626353U (en) Remote automatic observation device
CN219646991U (en) Dustproof device for charging pile test
CN211916856U (en) Offshore platform track inspection robot based on wireless power carrier communication mode
CN115581005B (en) Power dispatching control system with wind-solar complementary structure
CN110224667A (en) One kind being based on Internet of Things luminous energy reforming unit
CN213576374U (en) A collection system for big data information
CN115841738A (en) Movable intelligent transmission line external damage prevention alarm device and system
CN210241422U (en) Multipurpose solar energy intelligence street lamp
CN211232341U (en) Intelligent energy-saving monitoring equipment
CN210439453U (en) Multifunctional ecological landscape building body
CN211738703U (en) Energy-saving portable mobile lighting equipment
CN114200294A (en) High-voltage switch on-line monitoring equipment and monitoring method
CN212966527U (en) Pedestrian inductor for urban traffic intelligent control system
CN112963679A (en) Monitoring type enclosure structure for building engineering construction
CN220820991U (en) Three-dimensional LED lamp pole display device
CN212745699U (en) Monitoring device for closed management
CN220379320U (en) Wireless monitoring system of communication equipment
CN212385121U (en) Numerical control machine tool prevents grey safety device that falls
CN214695267U (en) Novel traffic engineering direction tablet
CN211058383U (en) Solar L ED bus station with rain shelter
CN218141075U (en) Dustproof rain-proof electric pile that fills

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230113