CN218270772U - On-site marker post for building engineering management - Google Patents

On-site marker post for building engineering management Download PDF

Info

Publication number
CN218270772U
CN218270772U CN202222366934.XU CN202222366934U CN218270772U CN 218270772 U CN218270772 U CN 218270772U CN 202222366934 U CN202222366934 U CN 202222366934U CN 218270772 U CN218270772 U CN 218270772U
Authority
CN
China
Prior art keywords
rod
handle
groove
engineering management
conical head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222366934.XU
Other languages
Chinese (zh)
Inventor
魏城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222366934.XU priority Critical patent/CN218270772U/en
Application granted granted Critical
Publication of CN218270772U publication Critical patent/CN218270772U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an on-site marker post for building engineering management, including a post body component, the post body component includes a post body and a conical head, the conical head is installed at one end of the post body, and the post body and the conical head are of an integral structure, and also includes an insertion component and a protection component, the insertion component is installed at the inner side of the post body component, the protection component is installed at one end of the post body component, the insertion component includes an insertion handle, a rotating shaft and a bulge, the bulge is arranged at one end of the insertion handle, and the rotating shaft and the bulge are of an integral structure; set up the rotatable handle that receive and releases through the one end at this sighting rod, when the sighting rod inserts, can rotate the level with installing the handle of inserting on the sighting rod, insert ground through inserting the handle convenience with the one end of sighting rod to improve the convenience when inserting, better use.

Description

On-site marker post for building engineering management
Technical Field
The utility model belongs to the technical field of the sighting rod, concretely relates to building engineering management is with on-spot sighting rod.
Background
The construction engineering refers to the installation engineering of various technical works and completed engineering entities such as planning, surveying, designing, constructing and completing for newly building, reconstructing or extending building structures and auxiliary structure facilities, and the lines, pipelines and equipment matched with the engineering entities, and also refers to the construction engineering of various buildings and structures, and is also called the construction workload. The investment amount of the part needs to be increased by moving materials and can be realized through construction activities, and in the building engineering, the mark post is a measuring tool and is made of wood rods, and paint with red and white intervals is coated on the mark post and is mainly used for indicating a measuring point.
The utility model discloses a building engineering management is used to the convenience when inserting, and the utility model discloses a current sighting rod, usually in building engineering, in order to measure the height of fixed object etc. can use the sighting rod usually, conveniently measure and use, but the sighting rod commonly used when using, through manpower disect insertion ground when the sighting rod uses usually, inconvenient operation when inserting the operation, the problem of the convenience when the influence is inserted, for this we propose a building engineering management for the sighting rod.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering management is with on-spot sighting rod to solve the current sighting rod that proposes in the above-mentioned background art, when using, through manpower disect insertion ground when ordinary sighting rod uses, inconvenient operation when the operation of inserting influences the problem of the convenience when inserting.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides an on-spot sighting rod is used in building engineering management, includes body of rod subassembly, body of rod subassembly includes the body of rod and conical head, the conical head is installed the one end of the body of rod, just body of rod and conical head formula structure as an organic whole still includes insertion assembly and protection component, insertion assembly installs the inboard at body of rod subassembly, protection component installs the one end at body of rod subassembly, insertion assembly is including inserting handle, pivot and arch, the arch sets up the one end of inserting the handle, just pivot and protruding formula structure as an organic whole, the handle groove has been seted up to the inboard of the body of rod, the inboard both ends in handle groove are seted up flutedly, it installs to insert the handle through the pivot rotation in the handle groove, simultaneously the both ends of inserting the handle are established spacingly through protruding and recess card, protection component includes protective sheath and spacing fixture block, spacing fixture block integral type shaping is in the inboard edge of the body of rod, the draw-in groove has been seted up to the one end of the body of rod, the draw-in groove is L type structure, protective sheath passes through spacing fixture block and the rotation card with the body of rod and establishes, just the symmetry is provided with two sets of protective sheath and the fixture block between the protective sheath.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) When the sighting rod uses, measure the height of object through the sighting rod, thereby strict carry out supervisory control to the interval, mark the safe distance of construction occasion simultaneously, convenient management, current sighting rod, generally when measuring objects such as height of fixed object, generally when the sighting rod uses through manpower disect insertion ground, inconvenient operation during the insert operation, convenience when influence is inserted, set up the rotatable handle that receive and releases through the one end at this sighting rod, when the sighting rod inserts, can be with installing the handle rotation level of inserting on the sighting rod, conveniently insert ground with the one end of sighting rod through inserting the handle, thereby improve the convenience when inserting, better use.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the right-hand partial mounting structure of the insertion handle of the present invention;
FIG. 3 is a schematic view of a three-dimensional disassembled structure of the protective sheath of the present invention;
in the figure: 1. a rod body; 2. inserting a handle; 201. a rotating shaft; 202. a protrusion; 203. a groove; 3. a protective sleeve; 301. a limiting clamping block; 4. a handle slot; 5. a card slot; 6. a conical head.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1 and fig. 2, the present invention provides a technical solution: the utility model provides a construction engineering management is with on-spot sighting rod, including the body of rod subassembly, the body of rod subassembly includes the body of rod 1 and awl head 6, the one end at the body of rod 1 is installed to awl head 6, and body of rod 1 and awl head 6 formula structure as an organic whole, still include insertion component and protective assembly, insertion component installs the inboard at the body of rod subassembly, protective assembly installs the one end at the body of rod subassembly, insertion component is including inserting handle 2, pivot 201 and arch 202, arch 202 sets up the one end inserting handle 2, and pivot 201 and arch 202 formula structure as an organic whole, handle groove 4 has been seted up to the inboard of the body of rod 1, recess 203 has been seted up at the inboard both ends of handle groove 4, insert handle 2 and install the inboard at handle groove 4, and insert handle 2 and rotate through pivot 201 and install in handle groove 4, simultaneously insert handle 2's both ends and establish spacingly through arch 202 and recess 203 card, can rotate to the horizontality when using, conveniently apply the decurrent effort of level, better inserting is used, after the use, can accomodate handle 2 in handle groove 4, thereby better inserting.
Example 2
Referring to fig. 1 and fig. 3, the present invention provides a technical solution: the utility model provides an on-spot sighting rod is used in building engineering management, the protection component includes protective sheath 3 and spacing fixture block 301, the inboard edge at protective sheath 3 of spacing fixture block 301 integral type shaping, draw-in groove 5 has been seted up to the one end of the body of rod 1, draw-in groove 5 is L type structure, protective sheath 3 rotates the card with the body of rod 1 through spacing fixture block 301 and draw-in groove 5 and establishes, and the symmetry is provided with two sets of draw-in grooves 5 and spacing fixture block 301 between the body of rod 1 and the protective sheath 3, the structure that the card was established is rotated makes things convenient for the dismouting of protective sheath 3, improve the stability of protective sheath 3 installation simultaneously, prevent that the device when carrying or accomodating that protective sheath 3 drops, can avoid conical head 6 to be collided with the deformation simultaneously.
The utility model discloses a theory of operation and use flow: when the sighting rod in current building engineering field uses, height through the sighting rod measurement object, thereby strict carry out supervisory control to the interval, mark the safe distance of construction occasion simultaneously, circle out safe construction distance simultaneously, convenient management, but current sighting rod, generally when measuring objects such as the height of fixed object, direct insertion ground through the manpower during sighting rod use, inconvenient operation during the plug-in operation, convenience when the influence is inserted, through setting up rotatable receiving and releasing insertion handle 2 in the one end of this body of rod 1, when the one end of the body of rod 1 is inserted, can be with installing the insertion handle 2 in handle groove 4 through pivot 201 rotation level, insert the effort through the convenient application of insertion handle 2 of horizontality, through inserting the convenient one end with the body of rod 1 of handle 2 and inserting ground, and when inserting handle 2 and receiving, convenient stable card is established through arch 202 and recess 203, be convenient for receiving, thereby improve the convenience when inserting, better use, protective sheath 3 that sets up in the one end of this body of rod 1 simultaneously, 3 card is established in the outside of this device, carry or place through the protective sheath 3 when the safe tip of preventing to be collided with the card and set up through the safe installation problem of the tip of preventing, thereby it is favorable to be established.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a construction engineering management is with on-spot sighting rod, includes body of rod subassembly, body of rod subassembly includes the body of rod (1) and conical head (6), install conical head (6) the one end of the body of rod (1), just body of rod (1) and conical head (6) formula structure as an organic whole, its characterized in that: still include insertion components and protection component, insertion components installs in the inboard of body of rod subassembly, protection component installs the one end at body of rod subassembly.
2. The construction work management field pole of claim 1, wherein: the inserting assembly comprises an inserting handle (2), a rotating shaft (201) and a protrusion (202), wherein the protrusion (202) is arranged at one end of the inserting handle (2), and the rotating shaft (201) and the protrusion (202) are of an integrated structure.
3. The site pole for construction engineering management according to claim 2, wherein: the handle is characterized in that a handle groove (4) is formed in the inner side of the rod body (1), and grooves (203) are formed in two ends of the inner side of the handle groove (4).
4. The site pole for construction engineering management according to claim 3, wherein: insert handle (2) and install the inboard in handle groove (4), just insert handle (2) and rotate through pivot (201) and install in handle groove (4), simultaneously the both ends that insert handle (2) are established spacingly through protruding (202) and recess (203) card.
5. The construction work management site post of claim 1, wherein: the protective assembly comprises a protective sleeve (3) and a limiting clamping block (301), and the limiting clamping block (301) is integrally formed at the edge of the inner side of the protective sleeve (3).
6. The site pole for construction engineering management according to claim 5, wherein: a clamping groove (5) is formed in one end of the rod body (1), and the clamping groove (5) is of an L-shaped structure.
7. The site pole for construction engineering management according to claim 6, wherein: protective sheath (3) and the body of rod (1) rotate the card through spacing fixture block (301) and draw-in groove (5) and establish, just the symmetry is provided with two sets of between the body of rod (1) and protective sheath (3) draw-in groove (5) and spacing fixture block (301).
CN202222366934.XU 2022-09-05 2022-09-05 On-site marker post for building engineering management Active CN218270772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222366934.XU CN218270772U (en) 2022-09-05 2022-09-05 On-site marker post for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222366934.XU CN218270772U (en) 2022-09-05 2022-09-05 On-site marker post for building engineering management

Publications (1)

Publication Number Publication Date
CN218270772U true CN218270772U (en) 2023-01-10

Family

ID=84711682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222366934.XU Active CN218270772U (en) 2022-09-05 2022-09-05 On-site marker post for building engineering management

Country Status (1)

Country Link
CN (1) CN218270772U (en)

Similar Documents

Publication Publication Date Title
CN218270772U (en) On-site marker post for building engineering management
CN201650319U (en) Angle installer for anchor bolt
CN103389082A (en) 360-degree free-of-leveling forced centering collimation equipment and using method thereof
CN205861022U (en) A kind of diastimeter position fixed mount
CN208688398U (en) Laser-marking installs ruler
CN211312510U (en) Pile casing embedding and positioning device
CN211178173U (en) Measuring tool for architectural design
CN214604333U (en) Scribing tool for external hub of blade root of wind power blade
CN208686021U (en) A kind of exterior window windowsill and hang face gradient construction tool
CN212158392U (en) Measuring tool for building engineering management
CN215448048U (en) High-precision land rapid measuring device
CN202255403U (en) Upper centering bracket for gyroscopic total station
CN211651633U (en) Wall post template straightness detection instrument that hangs down
CN206677837U (en) A kind of shafting positioner for the dismounting of nuclear power station water pump
CN219570023U (en) Pile foundation drill bit
CN218480991U (en) Portable survey and drawing dipperstick that facilitates use
CN220170252U (en) On-site marker post for building engineering management
CN205166438U (en) Festival segmentation multistage centrifugal pump pump body sole dowelling jig frock positioning tool
CN218091874U (en) Window caulking plastering tool
CN207487651U (en) A kind of combination type sedimentation observation device
CN210264758U (en) Auxiliary positioning device for primary support steel frame of tunnel by drilling and blasting method
CN217716412U (en) Lamp hole is with accurate positioning tool of elongated
CN210263135U (en) Temporary plugging structure for reserved hole of underground structure
CN215986051U (en) Slope soil and water conservation detection device convenient to daily maintenance
CN220690117U (en) Engineering exploration survey and drawing lofting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant