CN218161626U - Pipeline mounting structure is used in building engineering construction - Google Patents

Pipeline mounting structure is used in building engineering construction Download PDF

Info

Publication number
CN218161626U
CN218161626U CN202222562662.0U CN202222562662U CN218161626U CN 218161626 U CN218161626 U CN 218161626U CN 202222562662 U CN202222562662 U CN 202222562662U CN 218161626 U CN218161626 U CN 218161626U
Authority
CN
China
Prior art keywords
pipeline
threaded rod
fixed
bracing piece
fixing base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222562662.0U
Other languages
Chinese (zh)
Inventor
陈宗付
解明寿
沈国春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhengan Intelligent Information Engineering Co ltd
Original Assignee
Anhui Zhengan Intelligent Information Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhengan Intelligent Information Engineering Co ltd filed Critical Anhui Zhengan Intelligent Information Engineering Co ltd
Priority to CN202222562662.0U priority Critical patent/CN218161626U/en
Application granted granted Critical
Publication of CN218161626U publication Critical patent/CN218161626U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a pipeline installation technical field, and a pipeline mounting structure is used in building engineering construction is disclosed, the mounting panel comprises a mounting plate, four bracing pieces of bottom fixedly connected with of mounting panel, clip the pipeline through making arc splint, prevent that the pipeline from droing when the upward movement, through the fourth threaded rod, the fixed plate cooperation is used, with fixed plate fixed mounting between two arc clamp plates, then through the couple, the stay cord, a fixed base, the reel, the hand wheel, the bull stick cooperation is used, the pulling stay cord passes through the fixing base and drives the pipeline upward movement, make fixing base and bracing piece contact, then be in the same place fixing base and bracing piece are fixed through first threaded rod, then the pulling slide moves along the bracing piece downwards, make the slide drive arc clamp plate contact with the top of pipeline, then the inside that rotates third threaded rod and alternates the slide and insert the bracing piece is fixed to the slide, it is fixed to the pipeline to reach, thereby reach and accomplish the effect fixed to the pipeline fast.

Description

Pipeline mounting structure is used in building engineering construction
Technical Field
The utility model belongs to the technical field of the pipeline installation technique and specifically relates to a pipeline mounting structure is used in building engineering construction.
Background
Modern large public buildings, office buildings, commercial office buildings, hotels and restaurants and other buildings have more building equipment, sometimes reach twenty-three functional systems, including domestic water supply pipelines, fire-fighting water supply pipelines, air-conditioning water pipelines, drainage pipelines, heating pipelines, fire-fighting smoke exhaust pipelines and the like.
At present, in building engineering work process, need install the pipeline, chinese utility model patent of publication number "CN209444891U" among the prior art "a construction pipeline fixing device", the change technology discloses including the pipe clamp, the mounting panel, a fixed base, the extrusion stem, the arc stripper plate, press from both sides tight piece, the retainer plate, magnet, the fixed block, the limiting plate, stable seat and extrusion spring, the fixing base up end is provided with the mounting panel, the pipe clamp is installed to the mounting panel up end, stable seat fixes at the inside upside of pipe clamp, the inside upside of stable seat is provided with extrusion spring, the limiting plate is installed to extrusion spring lower terminal surface, the terminal surface is connected with the extrusion stem under the limiting plate, arc stripper plate is installed to extrusion stem lower terminal surface, the retainer plate is installed inside the mounting panel, the inside magnet that is provided with of retainer plate, the tight piece is installed to the magnet up end, the fixed block is fixed terminal surface under the mounting panel, realized the problem that the collection fixed effect of pipeline is not enough when construction pipeline is installed but foretell pipeline, because pipeline and pipe clamp need keep the level, and foretell pipeline fixing device lacks horizontal auxiliary structure, make the pipeline installation, lead to the pipeline installation is not high, lead to the efficiency of construction.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem provided above, the present application provides a pipeline mounting structure for building engineering construction.
The application provides a pair of pipeline mounting structure for building engineering construction adopts following technical scheme:
the utility model provides a pipeline mounting structure for building engineering construction, includes the mounting panel, four bracing pieces of bottom fixedly connected with of mounting panel, and four bracing piece range are listed as four angle departments in the bottom of mounting panel, the bottom threaded connection of bracing piece has first threaded rod, and the surface threaded connection of first threaded rod has the fixing base, the internally mounted installation mechanism of fixing base, there is the pipeline in installation mechanism's inside is cliped, the through hole has been seted up at the top of fixing base, the inside interlude of through hole has the couple, the top fixedly connected with stay cord of couple, and the surface of stay cord rotate and be connected with the leading wheel, and the output shaft surface of leading wheel rotates and is connected with the fixed plate, and the internal thread of fixed plate is connected with the fourth threaded rod, and the one end that the fourth threaded rod passed the fixed plate is connected with the internal thread of mounting panel, reel mechanism is installed to the other end of stay cord.
Through adopting above-mentioned technical scheme, make fixing base internally mounted mechanism clip the pipeline, pass through fourth threaded rod fixed mounting between two bracing pieces with the fixed plate again, then pass the inside of fixing base with four couples, through reel mechanism winding stay cord, the pulling stay cord drives fixing base upward movement, fixing base upward movement drives pipeline upward movement, makes fixing base and bracing piece contact, then rotates the inside that first threaded rod passed the fixing base and inserted the bracing piece, accomplishes the effect fixed to the pipeline fast.
Preferably, installation mechanism includes the arc bracket, the fixed surface of arc bracket installs in the inside of fixing base, the pipeline has been placed at the top of fixing base, the left and right equal contact of pipeline has the arc splint, the internal rotation of arc splint is connected with the second threaded rod, and the internal thread connection of the surface of second threaded rod and fixing base.
Through adopting above-mentioned technical scheme, put the top at the arc bracket with the pipeline, then rotate the second threaded rod and promote the inboard motion of arc splint to the completion is cliied the pipeline of different models.
Preferably, two of transverse arrangement the surface sliding connection of bracing piece has the slide, the inside center fixedly connected with arc clamp plate of slide, the equal threaded connection in left and right side of slide has the third threaded rod, and the surface of third threaded rod and the inside threaded connection of bracing piece, the thread groove with third threaded rod size assorted is seted up to the inside of bracing piece, and the equidistant range of thread groove is at the surface of bracing piece.
Through adopting above-mentioned technical scheme, the slide makes the slide drive arc clamp plate and contact with the top of pipeline along bracing piece downstream, then rotates the inside fixed the fixing to the slide of third threaded rod interlude slide insert bracing piece, reaches to fix the pipeline.
Preferably, the reel mechanism includes the bull stick, the outer fixed surface of bull stick is connected with two reels, the surface of reel twines with the one end of stay cord, the surface of bull stick rotates and is connected with the supporting seat, the one end fixedly connected with hand wheel that passes the supporting seat rotates.
Through adopting above-mentioned technical scheme, rotate hand runner and drive the bull stick and rotate, the bull stick rotates and drives two reels and rotate, and the reel rotates the winding stay cord.
To sum up, this application includes following beneficial technological effect:
through the arc bracket, the second threaded rod, arc splint cooperation is used, make arc splint clip the pipeline, prevent that the pipeline from droing when the upward movement, through the fourth threaded rod, the fixed plate cooperation is used, with fixed plate fixed mounting between two arc clamp plates, then through the couple, the stay cord, a fixed base, the reel, the hand wheel, the bull stick cooperation is used, the pulling stay cord passes through the fixing base and drives the pipeline upward movement, make the fixing base contact with the bracing piece, then fix fixing together fixing base and bracing piece through first threaded rod, then the pulling slide is along bracing piece downstream, make the slide drive arc clamp plate contact with the top of pipeline, then it alternates the inside of bracing piece and fixes the slide to rotate the third threaded rod, reach and fix the pipeline, thereby reach and accomplish the effect fixed to the pipeline fast.
Drawings
FIG. 1 is a schematic diagram of the front internal structure of the application example.
Fig. 2 is a schematic view of a partial enlarged structure of an application embodiment.
Fig. 3 is a schematic perspective view of the installed pipeline according to the embodiment of the present invention.
Description of reference numerals: 1. mounting a plate; 2. a support bar; 3. a first threaded rod; 4. a fixed seat; 5. an arc bracket; 6. a pipeline; 7. a second threaded rod; 8. an arc-shaped splint; 9. a third threaded rod; 10. a slide plate; 11. an arc-shaped pressing plate; 12. pulling a rope; 13. a guide wheel; 14. a fixing plate; 15. a fourth threaded rod; 16. a reel; 17. a hand wheel; 18. and (4) supporting the base.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses pipeline mounting structure for building engineering construction. Referring to fig. 1, a pipeline mounting structure for building engineering construction comprises a mounting plate 1, upper supporting rods 2 are fixedly mounted at four corners of the bottom of the mounting plate 1, a fixing seat 4 and the supporting rods 2 are fixed together through a first threaded rod 3 at the bottom of each supporting rod 2, a mounting mechanism is mounted inside each fixing seat 4 and comprises an arc-shaped bracket 5, each arc-shaped bracket 5 is fixedly mounted inside each fixing seat 4, a pipeline 6 is placed at the top of each arc-shaped bracket 5, arc-shaped clamping plates 8 are mounted on the left side and the right side of each pipeline 6, each arc-shaped clamping plate 8 is used for clamping each pipeline 6, a second threaded rod 7 is rotatably connected inside each arc-shaped clamping plate 8, the outer surface of each second threaded rod 7 is in threaded connection with the inside of each fixing seat 4 and used for pushing each arc-shaped clamping plate 8 to move inwards;
as shown in fig. 1-3, two sliding plates 10 are slidably mounted on the outer surfaces of two transversely aligned support rods 2, the number of the sliding plates 10 is two, an upper arc-shaped pressing plate 11 is fixedly mounted at the center inside the sliding plate 10 and used for fixing a pipeline 6, the left and right sides of the sliding plate 10 are fixedly mounted on the outer surfaces of the support rods 2 through third threaded rods 9, threaded grooves are formed in the outer surfaces of the support rods 2, the threaded grooves provide spaces for the third threaded rods 9 to be inserted into, and the threaded grooves are arranged inside the support rods 2 at equal intervals;
as shown in fig. 1-3, four through holes are formed in the top of the fixing seat 4, a hook is inserted into the through holes, a pull rope 12 is fixedly mounted on the top of the hook, a guide wheel 13 penetrates through the outer surface of the pull rope 12, the guide wheel 13 is rotatably mounted at the bottom of a fixing plate 14, the four guide wheels 13 are arranged at corners of the bottom of the fixing plate 14, the fixing plate 14 is fixedly mounted at the bottom of the mounting plate 1 through a fourth threaded rod 15, the fixing plate 14 is located between two arc-shaped pressing plates 11, and the other end of the pull rope 12 is mounted on a reel mechanism;
as shown in FIG. 1, the winding drum mechanism includes a supporting base 18, a rotating rod is rotatably mounted on the top of the supporting base 18, two winding drums 16 are fixedly mounted on the outer surfaces of the rotating rod, one end of a pull rope 12 is wound on the outer surface of each winding drum 16, and a hand-rotating wheel 17 is fixedly mounted at one end of the rotating rod, which penetrates through the supporting base 18.
The embodiment of the application provides a pipeline mounting structure's for building engineering construction implementation principle does: put pipeline 6 at the top of arc bracket 5, then rotate second threaded rod 7 and promote the inside side motion of arc splint 8, accomplish the clamp to pipeline 6, then pass through fourth threaded rod 15 fixed mounting with fixed plate 14 between two arc clamp plates 11, then pass four couples the inside of fixing base 4, it rotates to drive the bull stick through turning hand wheel 17, the bull stick rotates and drives two reels 16 and rotate, reel 16 rotates winding stay cord 12, pulling stay cord 12 drives pipeline 6 upward movement through fixing base 4, make fixing base 4 contact with bracing piece 2, then rotate first threaded rod 3 and pass the inside that fixing base 4 inserted bracing piece 2, fix fixing base 4 and bracing piece 2, then pulling slide 10 moves down along bracing piece 2, make slide 10 drive arc clamp plate 11 contact with the top of pipeline 6, then rotate third threaded rod 9 and insert the inside of bracing piece 2 and fix slide 10, reach and fix pipeline 6, thereby reach and accomplish the effect of fixing to pipeline 6 fast.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a pipeline mounting structure is used in building engineering construction, includes mounting panel (1), its characterized in that: the utility model discloses a pipeline installation structure, including mounting panel (1), four equal fixedly connected with bracing piece (2) in bottom of mounting panel (1), the bottom threaded connection of bracing piece (2) has first threaded rod (3), the surface threaded connection of first threaded rod (3) has fixing base (4), the installation mechanism of installing of fixing base (4), pipeline (6) have been placed to the inside of installation mechanism, it has the couple to peg graft in the inside of fixing base (4), the top fixedly connected with stay cord (12) of couple, the surface of stay cord (12) rotates and is connected with leading wheel (13), the pivot surface of leading wheel (13) rotates and is connected with fixed plate (14), and fixed plate (14) install the bottom at mounting panel (1), reel mechanism is installed to the other end of stay cord (12).
2. The pipeline installation structure for building engineering construction according to claim 1, wherein: installation mechanism includes arc bracket (5), the inside fixed connection of the surface of arc bracket (5) and fixing base (4), pipeline (6) have been placed at the top of arc bracket (5), arc splint (8) are all installed on the left and right side of pipeline (6), the internal rotation of arc splint (8) is connected with second threaded rod (7), and the surface of second threaded rod (7) and the internal thread of fixing base (4) are connected.
3. The pipe installation structure for building engineering construction according to claim 1, wherein: the surface sliding connection of bracing piece (2) has slide (10), the inside threaded connection of slide (10) has third threaded rod (9), and the surface of third threaded rod (9) and the inside threaded connection of bracing piece (2), the inside fixedly connected with arc clamp plate (11) of slide (10).
4. The pipeline installation structure for building engineering construction according to claim 1, wherein: the reel mechanism comprises a reel (16), a pull rope (12) is wound on the outer surface of the reel (16), a rotating rod is fixedly connected to the inner portion of the reel (16), a supporting seat (18) is connected to the outer surface of the rotating rod in a rotating mode, and the rotating rod penetrates through a hand rotating wheel (17) fixedly connected to one end of the supporting seat (18).
5. The pipe installation structure for building engineering construction according to claim 3, wherein: the fixed seat (4) is positioned between the two sliding plates (10).
CN202222562662.0U 2022-09-27 2022-09-27 Pipeline mounting structure is used in building engineering construction Active CN218161626U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222562662.0U CN218161626U (en) 2022-09-27 2022-09-27 Pipeline mounting structure is used in building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222562662.0U CN218161626U (en) 2022-09-27 2022-09-27 Pipeline mounting structure is used in building engineering construction

Publications (1)

Publication Number Publication Date
CN218161626U true CN218161626U (en) 2022-12-27

Family

ID=84565238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222562662.0U Active CN218161626U (en) 2022-09-27 2022-09-27 Pipeline mounting structure is used in building engineering construction

Country Status (1)

Country Link
CN (1) CN218161626U (en)

Similar Documents

Publication Publication Date Title
CN109163146B (en) Pipeline installation structure and installation method thereof
CN106436874A (en) Blockage-preventive floor drain
CN218161626U (en) Pipeline mounting structure is used in building engineering construction
CN211738235U (en) Assembled butterfly type water supply and drainage pipeline support
CN209194963U (en) One kind is corniced bottom operation platform
CN212700212U (en) Pipeline installation device for gas fire extinguishing system
CN211813526U (en) Hydraulic engineering is with keeping off dirty grid
CN113914536A (en) Suspended ceiling assembly and top plate hanging component
CN109277496B (en) Reinforcing bar cutting equipment for building
JP2005274114A (en) Method of washing indoor unit of wall-embedded air conditioner
CN214746374U (en) Air pipe capable of controlling air direction of air outlet
CN215646669U (en) Solar panel fixing frame for high-rise building
CN218031818U (en) Purify engineering water supply pipe's a gallows
CN220647002U (en) Screw suspender comprehensive support
CN219355176U (en) A fire control pipeline mount for fire engineering
CN215371311U (en) Building antidetonation gallows
CN210380121U (en) Novel integral crane span structure of steel
CN217824100U (en) High-temperature-resistant embedded section steel cable bridge
CN212231017U (en) Assembled crane span structure
CN219929242U (en) Pipe coiling device for production and processing of environment-friendly pipe
CN216385863U (en) Automatic change gas processing apparatus
CN217508205U (en) Cable bridge and bridge assembly using same
CN212960791U (en) High-strength anti-seismic support and hanger
CN220540476U (en) Pipeline laying and fixing device for water supply and drainage engineering
CN216383063U (en) Rigid support hanger for pipeline installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant