CN218092120U - Improved discharging platform with detachable channel - Google Patents

Improved discharging platform with detachable channel Download PDF

Info

Publication number
CN218092120U
CN218092120U CN202221991792.XU CN202221991792U CN218092120U CN 218092120 U CN218092120 U CN 218092120U CN 202221991792 U CN202221991792 U CN 202221991792U CN 218092120 U CN218092120 U CN 218092120U
Authority
CN
China
Prior art keywords
steel
floor
girder
steel sheet
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221991792.XU
Other languages
Chinese (zh)
Inventor
彭亮清
贺亮亮
张宇飞
雷超雯
李恒达
龙礼彬
马东
齐建宏
代存辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No5 Construction Engineering Co ltd Xinjiang Construction Engineering Group
Original Assignee
No5 Construction Engineering Co ltd Xinjiang Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No5 Construction Engineering Co ltd Xinjiang Construction Engineering Group filed Critical No5 Construction Engineering Co ltd Xinjiang Construction Engineering Group
Priority to CN202221991792.XU priority Critical patent/CN218092120U/en
Application granted granted Critical
Publication of CN218092120U publication Critical patent/CN218092120U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a platform technical field of unloading, specifically speaking relates to a modified has platform of unloading of dismantling passageway, including a pair of girder, a plurality of secondary beams of vertical welding between a pair of girder, the welding of secondary beam upside has the blowing steel sheet, and the welding of secondary beam one side has a plurality of steel sheet draw-in groove, and a plurality of steel sheet draw-in groove leaves the clearance, and steel sheet draw-in groove cooperates with the one end joint of steel nest of tubes, and the other end of steel nest of tubes is located first floor upside, and the one end of girder is located the upside of first floor. The utility model discloses, through welding the steel sheet draw-in groove on the secondary beam, utilize steel sheet draw-in groove joint to be organized by steel pipe welded steel pipe, form safe effectual walking passageway, avoided scaffold frame and the influence in the platform clearance of unloading, can carry out safe unloading, secondly easy operation to can take off steel pipe group from the steel sheet draw-in groove when not using, make it dismantle the use many times.

Description

Improved discharging platform with detachable channel
Technical Field
The utility model relates to a platform technical field of unloading, specifically speaking relates to a modified has platform of unloading of dismantling the passageway.
Background
The unloading platform is a framework type platform which is usually used for bearing materials in a certain construction period and carrying out various operations therein, is called as an operation platform, and a scaffold is required to be arranged between the operation platform and a building structure to form a construction walking channel
After the existing unloading platform is erected, a scaffold must be erected between an operating platform and a building structure to form a walking channel, the construction scaffold parameter design (scaffold step distance parameter) cannot be leveled with the construction plane where the unloading platform is erected, and therefore a gap exists between a hopper platform of the unloading platform and a building main body structure due to the separation of double rows of scaffolds, so that the walking channel needs to be erected temporarily, and safety unloading can be performed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a modified has platform of unloading of dismantling the passageway to solve the problem that proposes among the above-mentioned background art.
In order to realize the above-mentioned purpose, the utility model provides a modified has platform of unloading of dismantling passageway, including first floor and a pair of girder, it is a pair of a plurality of secondary beams of vertical welding between the girder, the welding of secondary beam upside has the blowing steel sheet, the welding of secondary beam one side has a plurality of steel sheet draw-in groove, a plurality of the clearance is left to the steel sheet draw-in groove, the steel sheet draw-in groove cooperates with the one end joint of steel nest of tubes, the other end of steel nest of tubes is located first floor upside, just the one end of girder is located the upside of first floor.
As a further improvement of the technical scheme, the other end of the main beam is welded with a guardrail, the guardrail is welded with a protection plate, and the lower surface of the protection plate is connected with the secondary beam.
As a further improvement of the technical scheme, first steel wire ropes are arranged on two sides of the main beam at one end of the protection plate, and one end of each first steel wire rope is connected with a third floor.
As a further improvement of the technical scheme, a second steel wire rope is arranged on the main beam on one side of the first steel wire rope, one end of the second steel wire rope is connected with a second floor, and the second floor is positioned on the lower side of the third floor.
As a further improvement of the technical scheme, a first pedal is laid on the upper side of the steel pipe group and is in threaded connection with the connecting bolt, a second pedal is arranged on the lower side of the steel pipe group, and the first pedal is connected with the second pedal through the connecting bolt.
As a further improvement of the technical scheme, the first floor is provided with embedded steel bars, one end of the main beam is located inside the embedded steel bars, and fixing bolts penetrate through the embedded steel bars and are in threaded connection with the main beam.
Compared with the prior art, the beneficial effects of the utility model are that:
in this modified has the platform of unloading of dismantling the passageway, through welding the steel sheet draw-in groove on the secondary beam, utilize steel sheet draw-in groove joint by steel pipe welded steel pipe group, form safe effectual walking passageway, avoided scaffold frame and the influence in the platform clearance of unloading, can carry out safe unloading, secondly easy operation to can take off steel pipe group from the steel sheet draw-in groove when not using, make it dismantle the use many times.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a point a in fig. 1 according to an embodiment of the present invention;
fig. 3 is a schematic structural view of a main beam according to an embodiment of the present invention;
FIG. 4 is a schematic structural view of a steel tube assembly according to an embodiment of the present invention;
fig. 5 is a schematic structural view of a steel plate slot according to an embodiment of the present invention;
fig. 6 is a schematic structural view of a first pedal according to an embodiment of the present invention.
The various reference numbers in the figures mean:
1. a first floor; 11. a second floor; 12. a third floor; 13. embedding reinforcing steel bars in advance; 14. fixing the bolt; 2. a main beam; 21. a guardrail; 22. a secondary beam; 23. discharging a steel plate; 3. a protection plate; 4. a first wire rope; 5. a second wire rope; 6. a steel plate clamping groove; 7. a steel pipe group; 8. a first pedal; 81. a second pedal; 82. and connecting the bolts.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
An embodiment, please refer to fig. 1-6, this embodiment provides an improved discharging platform with a detachable channel, including a first floor 1 and a pair of main beams 2, a plurality of secondary beams 22 are vertically welded between the pair of main beams 2, in order to detach the steel tube group 7, and can be repeatedly used many times after being detached, a discharging steel plate 23 is welded on the upper side of the secondary beam 22, a plurality of steel plate clamping grooves 6 are welded on one side of the secondary beam 22, gaps are left in the plurality of steel plate clamping grooves 6, the steel plate clamping grooves 6 are in clamping fit with one end of the steel tube group 7, the other end of the steel tube group 7 is located on the upper side of the first floor 1, and one end of the main beam 2 is located on the upper side of the first floor 1.
In this embodiment, according to actual conditions with the steel sheet draw-in groove 6 welding of suitable interval in secondary beam 22 one side, the interval welding that cooperates steel sheet draw-in groove 6 is used for current steel pipe group 7, the welding is accomplished the back, can organize 7 joints with the steel pipe in the steel sheet draw-in groove 6 that corresponds, install the one end of girder 2 on first floor 1, the one end of steel pipe group 7 is also installed on 1 upside in first floor, usable steel pipe group 7 shelters from the clearance of unloading between platform and the building this moment, the platform of messenger unloading can the safety unloading.
Because need when unloading with the material at first place the platform of unloading, for safe material of accepting, the other end welding of girder 2 has guardrail 21, and the welding has guard plate 3 on the guardrail 21, and the lower surface of guard plate 3 links to each other with secondary beam 22, utilizes guardrail 21 to form the frame of protection, recycles guard plate 3 and forms semi-enclosed space with girder 2 one end, is used for accepting the material to and protect workman and material.
It is worth explaining that in order to enhance the stability of the discharging platform, the two sides of the main beam 2 at one end of the protection plate 3 are provided with the first steel wire ropes 4, one end of each first steel wire rope 4 is connected with the third floor 12, and the first steel wire ropes 4 are used for bearing tensile force to enhance the stability of the discharging platform.
Further, in order to prevent the unloading platform from being unstable after the first steel wire rope 4 is broken, the second steel wire rope 5 is arranged on the main beam 2 on one side of the first steel wire rope 4, one end of the second steel wire rope 5 is connected with the second floor 11, the second floor 11 is positioned on the lower side of the third floor 12, the second steel wire rope 5 is used as a standby rope, the second steel wire rope 5 is not stressed when the first steel wire rope 4 is used, and when the first steel wire rope 4 is broken, the second steel wire rope 5 stretches the unloading platform.
After the one end of girder 2 is strengthened fixedly, in order to guarantee the stability of the 2 other ends of girder, be equipped with embedded bar 13 on the first floor 1, the one end of girder 2 is located embedded bar 13's inside, fixing bolt 14 passes embedded bar 13 and 2 threaded connection of girder, utilizes fixing bolt 14 and embedded bar 13 fixed 2 other ends of girder to make the stability at 2 both ends of girder all can strengthen, reduce the potential safety hazard.
Consider gapped between the steel pipe group 7, inconvenient and workman walk to unload, first footboard 8 has been laid to steel pipe group 7 upside, first footboard 8 and connecting bolt 82 threaded connection, steel pipe group 7 downside is equipped with second footboard 81, link to each other through connecting bolt 82 between first footboard 8 and the second footboard 81, utilize first footboard 8 and second footboard 81 to wrap up steel pipe group 7, form safe effectual people's passageway, the slippage in the use has been avoided, wherein utilize connecting bolt 82 to meet first footboard 8 and connect second footboard 81, stability is improved.
The utility model is used for the platform of unloading when specifically using, according to actual conditions with the 6 welding of steel sheet draw-in groove 6 of suitable interval in secondary beam 22 one side, interval welding at cooperation steel sheet draw-in groove 6 is used for current steel pipe group 7, after the welding is accomplished, can be with 7 joints of steel pipe group in steel sheet draw-in groove 6 that correspond, install the one end of girder 2 on first floor 1 through fixing bolt 14 and embedded bar 13, stabilizing the 2 other ends of girder on third floor 12 through first wire rope 4, 1 upside in first floor is also installed to the one end of steel pipe group 7, can be connected with the scaffold frame according to the condition, the clearance that usable steel pipe group 7 will unload between platform and the building shelters from this moment, make the platform of unloading can the safety unloading.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a modified has platform of unloading of dismantling passageway, includes first floor (1) and a pair of girder (2), its characterized in that: it is a pair of perpendicular welding has a plurality of secondary beam (22) between girder (2), secondary beam (22) upside welding has blowing steel sheet (23), secondary beam (22) one side welding has a plurality of steel sheet draw-in groove (6), a plurality of the clearance is left in steel sheet draw-in groove (6), steel sheet draw-in groove (6) and the cooperation of the one end joint of steel pipe group (7), the other end of steel pipe group (7) is located first floor (1) upside, just the one end of girder (2) is located the upside of first floor (1).
2. The improved drop platform with removable channel as claimed in claim 1, wherein: the other end welding of girder (2) has guardrail (21), the welding has guard plate (3) on guardrail (21), the lower surface of guard plate (3) with secondary beam (22) link to each other.
3. The improved knockdown chute platform as in claim 2, wherein: and the two sides of the main beam (2) positioned at one end of the protection plate (3) are provided with first steel wire ropes (4), and one ends of the first steel wire ropes (4) are connected with a third floor (12).
4. The improved drop platform with removable channel as claimed in claim 3, wherein: and a second steel wire rope (5) is arranged on the main beam (2) on one side of the first steel wire rope (4), one end of the second steel wire rope (5) is connected with a second floor (11), and the second floor (11) is positioned on the lower side of a third floor (12).
5. The improved drop platform with removable channel as claimed in claim 1, wherein: first footboard (8) have been laid to steel nest of tubes (7) upside, first footboard (8) and connecting bolt (82) threaded connection, steel nest of tubes (7) downside is equipped with second footboard (81), first footboard (8) with pass through between second footboard (81) connecting bolt (82) link to each other.
6. The improved drop platform with removable channel as claimed in claim 1, wherein: be equipped with embedded steel bar (13) on first floor (1), the one end of girder (2) is located the inside of embedded steel bar (13), fixing bolt (14) pass embedded steel bar (13) with girder (2) threaded connection.
CN202221991792.XU 2022-08-01 2022-08-01 Improved discharging platform with detachable channel Active CN218092120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221991792.XU CN218092120U (en) 2022-08-01 2022-08-01 Improved discharging platform with detachable channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221991792.XU CN218092120U (en) 2022-08-01 2022-08-01 Improved discharging platform with detachable channel

Publications (1)

Publication Number Publication Date
CN218092120U true CN218092120U (en) 2022-12-20

Family

ID=84483830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221991792.XU Active CN218092120U (en) 2022-08-01 2022-08-01 Improved discharging platform with detachable channel

Country Status (1)

Country Link
CN (1) CN218092120U (en)

Similar Documents

Publication Publication Date Title
CN201297036Y (en) Discharging platform
CN204163364U (en) A kind of elevator shaft formwork and operation steel platform
CN202370233U (en) Pull rod type external wall cantilever discharging platform setting-up structure
CN203583884U (en) Outer climbing frame follow-up type discharging platform
CN218092120U (en) Improved discharging platform with detachable channel
CN211470603U (en) Telescopic tower crane passageway
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN102251666A (en) Overhanging type discharging platform
CN210563481U (en) Assembly type structure shaped steel platform structure of unloading of encorbelmenting
CN210289068U (en) Elevator shaft lifting platform
CN207553615U (en) Elevator shaft formwork climbing stacking platform
CN218623410U (en) Attached discharging platform device
CN219261788U (en) Discharging platform for steel structure assembly type building
CN220621102U (en) Conveniently install and remove formula platform of unloading of encorbelmenting
CN218562968U (en) Device for positioning overhanging vertical rod
CN108930401B (en) Main frame of attached lifting scaffold
CN205046861U (en) Discharging platform
CN217106217U (en) Climb a support type and change material platform
CN213710434U (en) Discharging platform
CN220319159U (en) Assembled cantilever unloading platform
CN215516436U (en) Tower crane connecting channel capable of being used in turnover mode
CN217299751U (en) Safe cat ladder is used in girder steel construction
CN218231633U (en) A escape way for tower crane
CN212893471U (en) Lifting appliance for T-shaped beam template
CN215484773U (en) Novel discharging platform connecting node capable of being assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant