CN218048599U - Fixed type climbing frame spraying device for house construction - Google Patents

Fixed type climbing frame spraying device for house construction Download PDF

Info

Publication number
CN218048599U
CN218048599U CN202220739011.1U CN202220739011U CN218048599U CN 218048599 U CN218048599 U CN 218048599U CN 202220739011 U CN202220739011 U CN 202220739011U CN 218048599 U CN218048599 U CN 218048599U
Authority
CN
China
Prior art keywords
climbing frame
frame
fixed
spraying device
flow distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220739011.1U
Other languages
Chinese (zh)
Inventor
刚绪顺
张伟峰
刚申学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220739011.1U priority Critical patent/CN218048599U/en
Application granted granted Critical
Publication of CN218048599U publication Critical patent/CN218048599U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model discloses a construction is built with fixed frame spray set that climbs in room belongs to and climbs a spray set field. The fixed climbing frame spraying device for house construction comprises a climbing frame, wherein two guide rods which are bilaterally symmetrical are fixedly arranged between the top end and the bottom of the climbing frame, a semicircular pipe is fixedly arranged between the top end and the bottom of the climbing frame, two guide rods are connected with a shunt box in a sliding manner, the semicircular pipe is connected with the shunt box in a sliding manner, three spray heads are uniformly arranged on the positive end surface of the shunt box, a threaded rod is arranged inside the semicircular pipe and is in threaded connection with the shunt box, a second bevel gear is fixedly arranged at one end, arranged at the bottom of the climbing frame, of the semicircular pipe, a first bevel gear is connected onto the second bevel gear in a meshing manner, an installation base is fixedly welded onto the climbing frame, and a hose is fixedly connected onto the outer wall of the shunt box; the utility model discloses can be according to the height that different altitude mixture control sprayed, convenient and fast reduces intensity of labour.

Description

Fixed type climbing frame spraying device for house construction
Technical Field
The utility model relates to a climb a spray set technical field, especially relate to the room is built the construction and is used fixed spray set that climbs.
Background
At the construction site is built in the room, because the appearance of numerous construction equipment and coming and going vehicle, cause the construction site can appear many raise dusts, the raise dust not only threatens staff's healthy, still becomes serious pollution to the surrounding environment, along with the propulsion of building site raise dust treatment work normality and further improve the human settlements environment, the requirement of higher normality has been proposed to construction site raise dust treatment, people often manage the raise dust through spray set for the house construction.
However, most fixed type climbing frame spraying devices cannot freely adjust the spraying height, and the height of the climbing frame needs to be adjusted manually, so that the labor intensity is high, and the efficiency is low.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that most fixed climbing frame spray set can not freely adjust and spray the height among the prior art, and the building construction that proposes is with fixed climbing frame spray set.
In order to realize the purpose, the utility model adopts the following technical scheme:
building construction is with fixed frame spray set that climbs, including climbing the frame, it has two bilateral symmetry's guide bar to climb between frame top and the bottom fixed mounting, it has the semicircle pipe, two to climb between frame top and the bottom sliding connection has the reposition of redundant personnel case on the guide bar, semicircle pipe and reposition of redundant personnel case sliding connection, the positive terminal surface of reposition of redundant personnel case evenly is equipped with three shower nozzle, the inside of semicircle pipe is equipped with the threaded rod, threaded rod and reposition of redundant personnel case threaded connection, the semicircle pipe is arranged in and is climbed the one end fixed mounting of frame bottom in and has second bevel gear, the meshing is connected with first bevel gear on the second bevel gear, it has the installation base to climb fixed welding on the frame, reposition of redundant personnel case outer wall fixedly connected with hose.
Preferably, the inside fixed mounting of flow distribution box has the shunt tubes, the shunt tubes cover is established on the hose, the bottom fixed mounting who climbs the frame has the water pump, the hose is arranged in the outer one end fixed connection of flow distribution box on the water pump, the shower nozzle is linked together with the shunt tubes.
Preferably, a round rod is fixedly connected to the first bevel gear, a bearing is arranged at the bottom of the climbing frame, the round rod is fixedly connected to the bearing, and a handle is fixedly connected to one end, far away from the bottom of the climbing frame, of the round rod.
Preferably, two sliding blocks are fixedly mounted on the flow dividing box, and the two sliding blocks are connected to the guide rod in a sliding mode.
Preferably, the flow distribution box is provided with a semicircular groove matched with the semicircular pipe.
Preferably, the installation base is welded at the left end and the right end of the climbing frame, the installation base is fixedly connected with a shaft sleeve, a bolt is installed at the top of the shaft sleeve in a penetrating mode, and a nut is installed on the bolt.
Compared with the prior art, the utility model provides a construction is built with fixed frame spray set that climbs in room possesses following beneficial effect:
1. this construction is built with fixed frame spray set that climbs in room drives the reposition of redundant personnel case through the threaded rod and removes, can be according to the height that not co-altitude adjustment sprayed, convenient and fast reduces intensity of labour.
2. This construction is built with fixed frame spray set that climbs in room can be fixed to the wall body through the axle sleeve with climbing the frame, can also adjust the size of axle sleeve through screw bolt and nut, makes it to install on the fixture of equidimension not, still convenient dismantlement.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses can be according to the height that different altitude mixture control sprayed, convenient and fast reduces intensity of labour.
Drawings
Fig. 1 is a schematic structural view of a fixed type climbing frame spraying device for house construction provided by the utility model;
fig. 2 is a schematic view of the cross-sectional structure of the fixed type climbing frame spraying device for house construction provided by the utility model;
fig. 3 is a schematic perspective view of a partial structure of the fixed type climbing frame spraying device for house construction according to the present invention;
fig. 4 is a schematic side view of the fixed type climbing frame spraying device for house construction according to the present invention;
fig. 5 is a schematic structural view of the mounting base of the fixed climbing frame spraying device for house construction provided by the utility model;
fig. 6 is the utility model provides a room is built construction and is installed overlooking schematic diagram of base flow distribution box with fixed frame spray set that climbs.
In the figure: 1. climbing a frame; 2. a guide rod; 3. a semicircular tube; 4. a shunt box; 5. a spray head; 6. a hose; 7. a water pump; 8. a round bar; 9. a handle; 10. installing a base; 11. a bearing; 12. a first bevel gear; 13. a second bevel gear; 14. a threaded rod; 15. a shunt tube; 16. a slider; 18. a shaft sleeve; 19. a bolt; 20. and a nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
The embodiment is as follows:
referring to fig. 1-6, construction is built with fixed frame spray set that climbs in room, including climbing frame 1, climb fixed mounting between 1 top of frame and the bottom have two bilateral symmetry's guide bar 2, climb fixed mounting between 1 top of frame and the bottom and have semicircle pipe 3, sliding connection has flow distribution box 4 on two guide bar 2, semicircle pipe 3 and flow distribution box 4 sliding connection, flow distribution box 4's positive terminal surface evenly is equipped with three shower nozzle 5, the inside of semicircle pipe 3 is equipped with threaded rod 14, threaded rod 14 and flow distribution box 4 threaded connection, the one end fixed mounting who climbs frame 1 bottom is arranged in to semicircle pipe 3 has second bevel gear 13, the meshing is connected with first bevel gear 12 on the second bevel gear 13, climb frame 1 and go up fixed welding has installation base 10, flow distribution box 4 outer wall fixedly connected with hose 6.
4 inside fixed mounting of flow distribution box has shunt tubes 15, and 15 covers of shunt tubes are established on hose 6, and the bottom fixed mounting who climbs frame 1 has water pump 7, and hose 6 is arranged in the outer one end fixed connection of flow distribution box 4 on water pump 7, and shower nozzle 5 is linked together with shunt tubes 15, and in water pump 7 extraction water sent into shunt tubes 15 through hose 6, sprays through shower nozzle 5, and shower nozzle 5 is equipped with 3, can enlarge the spray area.
Fixedly connected with round bar 8 on first bevel gear 12 climbs the bottom of frame 1 and is equipped with bearing 11, and 8 fixed connection of round bar are on bearing 11, and the one end fixedly connected with handle 9 of frame 1 bottom is climbed away from to round bar 8, and bearing 11 can let the better rotation of round bar 8, prevents wearing and tearing.
Fixed mounting has two sliders 16 on reposition of redundant personnel case 4, and two sliders 16 sliding connection are on guide bar 2, and guide bar 2 can carry on spacingly to reposition of redundant personnel case 4, play the fixed action.
The flow distribution box 4 is provided with a semicircular groove matched with the semicircular pipe 3, so that the flow distribution box 4 can slide on the semicircular pipe 3.
The installation base 10 is welded at the left end and the right end of the climbing frame 1, the shaft sleeve 18 is fixedly connected to the installation base 10, the bolt 19 is installed at the top of the shaft sleeve 18 in a penetrating mode, the nut 20 is installed on the bolt 19, the size of the shaft sleeve 18 can be adjusted according to the size of a fixed object, and the climbing frame 1 can be fixed on fixed objects of different sizes.
The utility model discloses in, at first will climb frame 1 and install on the wall body through installation base 10, open nut 20, the size of adjustment axle sleeve 18, make it fix on the object, then screw up bolt 19 and nut 20, open water pump 7, water pump 7 extraction water passes through on hose 6 inputs the shunt tubes 15 in shunt box 4, spray through shower nozzle 5, when needs height-adjusting, rotate handle 9, handle 9 drives round bar 8 and rotates, round bar 8 drives first bevel gear 12 and rotates, first bevel gear 12 drives second bevel gear 13 and rotates, second bevel gear 13 drives threaded rod 14 and rotates, threaded rod 14 drives shunt box 4 and removes, handle 9 forward rotation, threaded rod 14 just takes shunt box 4 downstream, handle 9 reverse rotation just drives shunt box 4 rebound, can adjust the height of spraying, high convenience and high speed, and low labor intensity.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. Building construction is with fixed frame spray set that climbs, a serial communication port, including climbing frame (1), it has two bilateral symmetry's guide bar (2) to climb between frame (1) top and the bottom fixed mounting, climb between frame (1) top and the bottom fixed mounting have semicircle pipe (3), two sliding connection has flow distribution box (4) on guide bar (2), semicircle pipe (3) and flow distribution box (4) sliding connection, the positive terminal surface of flow distribution box (4) evenly is equipped with three shower nozzle (5), the inside of semicircle pipe (3) is equipped with threaded rod (14), threaded rod (14) and flow distribution box (4) threaded connection, semicircle pipe (3) are arranged in the one end fixed mounting who climbs frame (1) bottom and are had second cone gear (13), the meshing is connected with first bevel gear (12) on second cone gear (13), it has installation base (10) to climb fixed welding on frame (1), flow distribution box (4) outer wall fixedly connected with hose (6).
2. The fixed type climbing frame spraying device for house construction according to claim 1, wherein a shunt pipe (15) is fixedly installed inside the shunt box (4), the shunt pipe (15) is sleeved on the hose (6), a water pump (7) is fixedly installed at the bottom of the climbing frame (1), the hose (6) is fixedly connected to the water pump (7) at one end of the shunt box (4) outside, and the spray head (5) is communicated with the shunt pipe (15).
3. The fixed type climbing frame spraying device for house construction according to claim 1, wherein a round rod (8) is fixedly connected to the first bevel gear (12), a bearing (11) is arranged at the bottom of the climbing frame (1), the round rod (8) is fixedly connected to the bearing (11), and a handle (9) is fixedly connected to one end, far away from the bottom of the climbing frame (1), of the round rod (8).
4. The fixed type climbing frame spraying device for house construction according to claim 2, wherein two sliding blocks (16) are fixedly mounted on the flow dividing box (4), and the two sliding blocks (16) are slidably connected to the guide rod (2).
5. The fixed type climbing frame spraying device for house construction according to claim 4, wherein the flow distribution box (4) is provided with a semicircular groove matched with the semicircular pipe (3).
6. The fixed climbing frame spraying device for house construction according to claim 1, wherein the mounting base (10) is welded at the left end and the right end of the climbing frame (1), a shaft sleeve (18) is fixedly connected to the mounting base (10), a bolt (19) is installed at the top of the shaft sleeve (18) in a penetrating mode, and a nut (20) is installed on the bolt (19).
CN202220739011.1U 2022-04-01 2022-04-01 Fixed type climbing frame spraying device for house construction Expired - Fee Related CN218048599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220739011.1U CN218048599U (en) 2022-04-01 2022-04-01 Fixed type climbing frame spraying device for house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220739011.1U CN218048599U (en) 2022-04-01 2022-04-01 Fixed type climbing frame spraying device for house construction

Publications (1)

Publication Number Publication Date
CN218048599U true CN218048599U (en) 2022-12-16

Family

ID=84414557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220739011.1U Expired - Fee Related CN218048599U (en) 2022-04-01 2022-04-01 Fixed type climbing frame spraying device for house construction

Country Status (1)

Country Link
CN (1) CN218048599U (en)

Similar Documents

Publication Publication Date Title
CN105615780B (en) Multifunctional high building cleaning device
CN216677519U (en) Environmental protection dust collector for construction
CN218048599U (en) Fixed type climbing frame spraying device for house construction
CN108660996B (en) environment-friendly dust removal equipment for constructional engineering construction
CN211532051U (en) Irrigation equipment for green house
CN216452393U (en) Greening roof in sponge city
CN216604562U (en) Dust device for building engineering
CN215831808U (en) Garden illuminating lamp with garden water spraying irrigation function
CN213467238U (en) Fixed type climbing frame spraying device for house construction
CN214552123U (en) A dust device for civil engineering
CN211753508U (en) Environmental protection dust collecting equipment of building engineering construction
CN211836955U (en) Building engineering construction dust collector
CN213077868U (en) High-efficient dust device of construction is built in room
CN209596801U (en) A kind of road construction atomizing de-dusting apparatus
CN207612829U (en) A kind of agricultural water-saving irrigation device
CN218833992U (en) Dust fall cooling system for construction
CN207331581U (en) A kind of Multifunctional spraying car
CN218438300U (en) Spraying dust device is used in building site construction
CN217855254U (en) Dust device for house construction
CN215482652U (en) Rear tail water pushing device for sprinkler with adjustable scouring distance
CN214613856U (en) Dust fall watering device for construction
CN216963999U (en) Dust device for building engineering with adjustable multi-angle
CN219002453U (en) Climbing frame spraying dust collector
CN215235269U (en) Auxiliary device is used in spraying of real mineral varnish
CN220653286U (en) New forms of energy electric power gathers and uses photovoltaic integrated device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221216