CN218024608U - Hydraulic engineering construction pipe laying pay-off - Google Patents

Hydraulic engineering construction pipe laying pay-off Download PDF

Info

Publication number
CN218024608U
CN218024608U CN202222609784.0U CN202222609784U CN218024608U CN 218024608 U CN218024608 U CN 218024608U CN 202222609784 U CN202222609784 U CN 202222609784U CN 218024608 U CN218024608 U CN 218024608U
Authority
CN
China
Prior art keywords
plate
fixed
hydraulic engineering
engineering construction
pipe laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222609784.0U
Other languages
Chinese (zh)
Inventor
王全营
崔京京
刘星影
韩晓飞
郭文娟
崔少芳
张晓敏
王醒丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Shengding Construction Group Co ltd
Original Assignee
Henan Shengding Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Shengding Construction Group Co ltd filed Critical Henan Shengding Construction Group Co ltd
Priority to CN202222609784.0U priority Critical patent/CN218024608U/en
Application granted granted Critical
Publication of CN218024608U publication Critical patent/CN218024608U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a hydraulic engineering construction pipe laying pay-off, including the bottom plate that removes with fix the backplate of both sides around the bottom plate, two one side that the backplate is relative all is provided with the iron sheet, the vertical actuating mechanism who is in between two backplates that is provided with in bottom plate top, the actuating mechanism top is provided with the horizontally backup pad, the backup pad passes through the bracing piece to be fixed on the bottom plate, be provided with the circular shape rotor plate in the backup pad, coaxial two annular section of thick bamboo that are provided with on the rotor plate, the one big little interval setting of two annular section of thick bamboo. This hydraulic engineering construction pipe laying pay-off can be to the annular pipeline direct use that is that the producer packs, need not take the pipeline apart again and twine again to the roller on, can reduce unnecessary operation during the use, for the staff alleviates the burden.

Description

Hydraulic engineering construction pipe laying pay-off
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a hydraulic engineering construction pipe laying pay-off.
Background
Hydraulic engineering is the general name of each item of engineering construction built for the purpose of controlling, utilizing and protecting surface and underground water resources and environment, the engineering built for the purpose of eliminating water damage and developing and utilizing water resources, pipe laying and paying off are usually carried out during hydraulic engineering construction so as to be convenient for irrigation, urban water supply and the like, when some existing pipeline lines are laid, the pipeline lines are required to be disassembled and wound on a rotating roller again, so that paying off work is finished through the rotating roller on a construction site, and finished products used by the pipeline or the line are generally annularly packaged by manufacturers, and the mode has the defects of redundant process and more time waste during use, so that a pipe laying and paying off device which is directly used by the manufacturers and paved by the annularly packaged finished products is required.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a hydraulic engineering construction pipe laying pay-off reduces unnecessary operation, alleviates the burden for the staff.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a hydraulic engineering construction pipe laying pay-off, includes the bottom plate that removes and fixes the backplate in both sides around the bottom plate, two one side that the backplate is relative all is provided with the iron sheet, the vertical actuating mechanism who is in between two backplates that is provided with in bottom plate top, the actuating mechanism top is provided with the horizontally backup pad, the backup pad passes through the bracing piece to be fixed on the bottom plate, be provided with the circular shape rotor plate in the backup pad, coaxial two annular section of thick bamboos that are provided with on the rotor plate, the big little interval setting of two annular section of thick bamboos, the rotor plate is driven by actuating mechanism, coaxial fixedly connected with fixed column on the rotor plate, coaxial cover is equipped with the clamp plate on the fixed column, be provided with two sets of fixed establishment that correspond with the iron sheet on the clamp plate.
Preferably, the driving mechanism comprises a vertically arranged motor, the shaft end of the motor penetrates through the supporting plate and is fixed on the rotating plate, and the shaft end of the motor is coaxially fixed with the rotating plate.
Preferably, a bearing is coaxially fixed on a transmission shaft of the motor, a circular groove which is through up and down is formed in the support plate, and the bearing is fixed in the circular groove.
Preferably, the support plate is provided with a fixed ball contacting with a lower surface of the rotating plate.
Preferably, fixed establishment is including being the recess that "L" shape set up, be provided with the movable rod that is "L" shape in the recess, the one end of movable rod extends to the rotor plate outside fixed connection and has magnet, and is provided with the baffle that is in on the recess on the clamp plate.
The utility model provides a hydraulic engineering construction pipe laying pay-off possesses following beneficial effect:
this hydraulic engineering construction pipe laying pay-off is, it puts between two annular section of thick bamboo on the rotor plate to be the good pipeline of annular packing with the producer, so that the motor drives the pipeline rotation when rotating, later overlaps the clamp plate on the fixed column, the lower surface that makes the clamp plate leaves the interval with the upper end of two annular section of thick bamboo, under the cooperation of fixed establishment and iron sheet, can fix the rotor plate, make things convenient for the pipeline to pull out from between rotor plate and the circular section of thick bamboo, avoid the pipeline to wind out from the fixed column when the unwrapping wire simultaneously, the utility model discloses can be to the good annular pipeline direct use that is of producer packing, need not take the pipeline apart again on twining the rotor again, can reduce unnecessary operation during the use, lighten the burden for the staff.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
FIG. 3 is a schematic top view of the rotating plate of the present invention;
fig. 4 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
In the figure: 1. a base plate; 2. a guard plate; 3. iron sheets; 4. a support plate; 5. a rotating plate; 6. fixing a column; 7. pressing a plate; 8. a motor; 9. a bearing; 10. a circular groove; 11. fixing the ball; 12. a groove; 13. a movable rod; 14. a magnet; 15. and a baffle plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: a hydraulic engineering construction pipe laying pay-off device comprises a movable bottom plate 1 and guard plates 2 fixed on the front side and the rear side of the bottom plate 1, wherein a movable wheel is arranged below the bottom plate 1 so as to facilitate the movement of the utility model, iron sheets 3 are arranged on the opposite sides of the two guard plates 2, the side sides of the iron sheets 3 are flush with the side sides of the guard plates 2, a driving mechanism between the two guard plates 2 is vertically arranged above the bottom plate 1, a horizontal support plate 4 is arranged above the driving mechanism, the front end and the rear end of the support plate 4 are respectively fixedly connected with the guard plates 2, the support plate 4 is fixed on the bottom plate 1 through a support rod, and the support rod and the guard plates 2 are convenient to support the support plate 4;
a circular rotating plate 5 is arranged on a supporting plate 4, two annular cylinders are coaxially arranged on the rotating plate 5, the two annular cylinders are arranged at a large interval and a small interval, the caliber of the smaller annular cylinder is larger than that of a fixed column 6 so as to place an annular circuit between the two annular cylinders, the rotating plate 5 is positioned between two guard plates 2, a fixed ball 11 is arranged on the supporting plate 4, the fixed ball 11 is in contact with the lower surface of the rotating plate 5, under the matching of the supporting plate 4 and the fixed ball 11, the rotating plate 5 can be supported, the rotating plate 5 is driven by a driving mechanism, the driving mechanism comprises a vertically arranged motor 8, the motor 8 adopts a servo motor, the motor 8 is connected with a frequency converter so as to adjust the rotating speed of the motor 8, the shaft end of the motor 8 penetrates through the supporting plate 4 and is fixed on the rotating plate 5, the shaft end of the motor 8 is coaxially fixed with the rotating plate 5, through the arrangement of the fixed ball 11, when the rotating plate 5 is driven by the motor 8 to rotate, the rotating plate 5 can be supported, meanwhile, the rotating plate 5 can rotate smoothly, a bearing 9 is coaxially fixed on a transmission shaft of the motor 8, a bearing 9 is coaxially arranged, the supporting plate 4, a circular groove 10 which is arranged on the supporting plate 4, and a bearing 9 which is arranged vertically and is arranged in a circular groove 10 which is arranged in a through hole is arranged in the circular groove 10;
coaxial fixedly connected with fixed column 6 on rotor plate 5, the vertical setting of fixed column 6, coaxial cover is equipped with clamp plate 7 on fixed column 6, clamp plate 7 adopts the circular slab, and coaxial with fixed column 6, clamp plate 7 can dismantle the setting, be provided with two sets of fixed establishment that correspond with iron sheet 3 on the clamp plate 7, fixed establishment is including being the recess 12 that "L" shape set up, be provided with the movable rod 13 that is "L" shape in the recess 12, movable rod 13 includes the quarter butt that sets up along left right direction and the stock that the fore-and-aft direction set up, the one end of movable rod 13 extends to the 5 outside fixed connection of rotor plate has magnet 14, stock and magnet 14 fixed connection in the movable rod 13, and be provided with baffle 15 that is located on recess 12 on the clamp plate 7, the length of long and magnet rod 14 in movable rod 13 will be greater than baffle 15 front side to the interval of iron sheet 3, baffle 15 seals movable rod 13 in recess 12 as shown in the figure, avoid movable rod 13 to break away from recess 12, simultaneously movable rod 13 can also slide around in recess 12, so that it carries out the spacing to adsorb magnet 14 on iron sheet 3.
To sum up, this hydraulic engineering construction pipe laying pay-off uses the step as follows:
during the use, it puts between two annular section of thick bamboo on rotor plate 5 to be the circuit that the producer is annular packing, open the packing on the circuit, draw the one end of circuit to the annular frame outside and hand over by the staff, overlap clamp plate 7 on fixed column 6 again, make clamp plate 7 move down along fixed column 6, magnet 14 on clamp plate 7 is parallel with iron sheet 3 and clamp plate 7 leaves the interval with the upper end of annular frame, so that the circuit is drawn from the interval, later rotatory two movable rods 13, release two movable rods 13 to the outside of clamp plate 7, make magnet 14 adsorb and fix clamp plate 7 on iron sheet 3, later open motor 8, rotor plate 5 can emit the circuit in the annular frame under motor 8's rotation, later alright remove the utility model discloses carry out the unwrapping wire.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a hydraulic engineering construction pipe laying pay-off, includes bottom plate (1) that removes and fixes backplate (2) of both sides around bottom plate (1), its characterized in that: two one side that backplate (2) are relative all is provided with iron sheet (3), the vertical actuating mechanism who is in between two backplate (2) that is provided with in bottom plate (1) top, the actuating mechanism top is provided with horizontally backup pad (4), backup pad (4) are fixed on bottom plate (1) through the bracing piece, be provided with circular shape rotor plate (5) on backup pad (4), coaxial two annular section of thick bamboos that are provided with on rotor plate (5), two annular section of thick bamboos one big little interval sets up, rotor plate (5) are driven by actuating mechanism, coaxial fixedly connected with fixed column (6) on rotor plate (5), coaxial cover is equipped with clamp plate (7) on fixed column (6), be provided with two sets of fixed establishment that correspond with iron sheet (3) on clamp plate (7).
2. The hydraulic engineering construction pipe laying and paying-off device according to claim 1, wherein: the driving mechanism comprises a vertically arranged motor (8), the shaft end of the motor (8) penetrates through the supporting plate (4) to be fixed on the rotating plate (5), and the shaft end of the motor (8) is coaxially fixed with the rotating plate (5).
3. The hydraulic engineering construction pipe laying pay-off device of claim 2, wherein: a bearing (9) is coaxially fixed on a transmission shaft of the motor (8), a circular groove (10) which is through up and down is formed in the supporting plate (4), and the bearing (9) is fixed in the circular groove (10).
4. The hydraulic engineering construction pipe laying pay-off device of claim 1, wherein: and the supporting plate (4) is provided with a fixed ball (11), and the fixed ball (11) is in contact with the lower surface of the rotating plate (5).
5. The hydraulic engineering construction pipe laying and paying-off device according to claim 1, wherein: the fixing mechanism comprises a groove (12) which is L-shaped, a movable rod (13) which is L-shaped is arranged in the groove (12), one end of the movable rod (13) extends to the outer side of the rotating plate (5) and is fixedly connected with a magnet (14), and a baffle (15) which is positioned on the groove (12) is arranged on the pressing plate (7).
CN202222609784.0U 2022-09-30 2022-09-30 Hydraulic engineering construction pipe laying pay-off Active CN218024608U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222609784.0U CN218024608U (en) 2022-09-30 2022-09-30 Hydraulic engineering construction pipe laying pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222609784.0U CN218024608U (en) 2022-09-30 2022-09-30 Hydraulic engineering construction pipe laying pay-off

Publications (1)

Publication Number Publication Date
CN218024608U true CN218024608U (en) 2022-12-13

Family

ID=84357275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222609784.0U Active CN218024608U (en) 2022-09-30 2022-09-30 Hydraulic engineering construction pipe laying pay-off

Country Status (1)

Country Link
CN (1) CN218024608U (en)

Similar Documents

Publication Publication Date Title
CN111268557A (en) High stability tower crane for tubular product
CN111003598A (en) Power cable coiling mechanism convenient to use
CN218024608U (en) Hydraulic engineering construction pipe laying pay-off
CN203278102U (en) Vertical type wire barrow
CN207671422U (en) A kind of convenient type cable actinobacillus device
CN205575242U (en) Cable drum machine of scalable removal
CN217457370U (en) Production device of steel wire adhesive tape pipe
CN206828004U (en) A kind of adjustable detachable moveable swing pipe device
CN210885083U (en) Cable trench cover carrying device
CN104528431A (en) Full-automation sheet material uncoiling corollary equipment
CN211444485U (en) Unwrapping wire ware that electric power engineering construction used
CN210857941U (en) Lifting device for housing construction
CN214479133U (en) Cable clamping and steering device for cable tractor
CN204528799U (en) A kind of sheet material uncoiling corollary equipment
CN210944268U (en) Well hole pipe lowering device
CN211712558U (en) Pipeline installation bracket of convenient construction
CN203674636U (en) Cable laying turntable
CN206624503U (en) Paper feeder and admission machine
CN217398054U (en) Hydraulic engineering construction pipe laying pay-off
CN216471409U (en) Cable laying draw gear that cabling was used
CN204528781U (en) A kind of sheet material decoiling unit and with the use of upper winding apparatus
CN219717720U (en) Laying device for paying off cable
CN205367290U (en) Sprinkling irrigation water pipe coiling mechanism
CN220098194U (en) Automatic telescopic building construction paying-off equipment
CN220498038U (en) Steel reinforcement cage traction mechanism for automatic seam welder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant