CN217996495U - Lifting appliance tool for slide rail type installation top hammer assembly body - Google Patents

Lifting appliance tool for slide rail type installation top hammer assembly body Download PDF

Info

Publication number
CN217996495U
CN217996495U CN202221612801.XU CN202221612801U CN217996495U CN 217996495 U CN217996495 U CN 217996495U CN 202221612801 U CN202221612801 U CN 202221612801U CN 217996495 U CN217996495 U CN 217996495U
Authority
CN
China
Prior art keywords
top hammer
hammer assembly
assembly body
slide rail
handed screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221612801.XU
Other languages
Chinese (zh)
Inventor
王育松
李辉平
马鹏飞
徐柱
肖兴刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongnan Diamond Co Ltd
Original Assignee
Zhongnan Diamond Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongnan Diamond Co Ltd filed Critical Zhongnan Diamond Co Ltd
Priority to CN202221612801.XU priority Critical patent/CN217996495U/en
Application granted granted Critical
Publication of CN217996495U publication Critical patent/CN217996495U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a hanger tool for a slide rail type installation top hammer assembly body, which comprises a hanger plate and a plurality of slide rails which are dispersed outwards by taking the hanger plate as a center, wherein each slide rail is provided with a slide rail trolley which is in sliding fit with the slide rail trolley, the slide rail trolley is connected with a hanger which extends downwards, the lower end of the hanger is provided with a connecting component, and the connecting component is used for being connected with the top hammer assembly body; the center of the hanging plate is connected with a downward connecting rod, and the lower end of the connecting rod is provided with a central positioning block. The utility model discloses carry out the hoist design to a plurality of top hammer assemblies of installation, raise the efficiency, realize once installing a plurality of top hammer assemblies of quick, improve workshop production efficiency and reduce process latency, reduce workman's intensity of labour.

Description

Lifting appliance tool for slide rail type installation top hammer assembly body
Technical Field
The utility model relates to a top hammer assembly body installation technical field especially relates to a hoist frock of slide rail formula installation top hammer assembly body.
Background
The top hammer assembly body consists of a hard alloy top hammer, a steel ring, a small cushion block and a steel ring expansion ring, wherein the hard alloy top hammer is high in price and is a core and key component of the synthesis work of a press. When a host is installed on the diamond cubic press, the six assembled hinge beam assemblies (comprising hinge beams, working cylinders, pistons, guide sleeves and large cushion blocks) are firstly hoisted, combined and connected through pins at five hinge beams, namely, a lower hinge beam assembly, a front hinge beam assembly, a rear hinge beam assembly, a left hinge beam assembly and a right hinge beam assembly, and then the lower hinge beam assembly, the front hinge beam assembly, the rear hinge beam assembly, the left hinge beam assembly and the right hinge beam assembly are respectively installed on the corresponding large cushion blocks, and finally the upper hinge beam assembly and the upper jack hammer assembly are installed to deliver the whole host.
The weight of a single top hammer assembly is about 70-90 kg, and due to the fact that the installation space of the front, rear, left and right top hammer assemblies is limited, when all hinge beam assemblies are connected, pin smashing and pin penetrating operations are carried out, and therefore the top hammer assemblies cannot be lifted and installed with the respective hinge beam assemblies as a whole. The traditional method is to lift and install the hinge beam assembly on a large cushion block of the hinge beam assembly one by one, and needs two persons to cooperate, thereby wasting time and labor and having low efficiency. Especially, the waiting time of the process of installing the front, rear, left and right top hammer assemblies is long, which is not beneficial to improving the production efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve the problem among the prior art, provide a hoist frock of slide rail formula installation top hammer assembly body.
In order to solve the technical problem, the utility model adopts the following technical scheme:
a sliding rail type lifting tool for mounting a top hammer assembly body comprises a lifting plate and a plurality of sliding rails which are dispersed outwards by taking the lifting plate as a center, wherein each sliding rail is provided with a sliding rail trolley in sliding fit with the sliding rail trolley, the sliding rail trolleys are connected with lifting tools extending downwards, the lower ends of the lifting tools are provided with connecting components, and the connecting components are used for being connected with the top hammer assembly body; the center of the hanging plate is connected with a downward connecting rod, and the lower end of the connecting rod is provided with a central positioning block.
Further, the hoist includes the left-handed screw rod and the right-handed screw rod that positive and negative knot long nut to and be connected with the cooperation of positive and negative knot long nut upper and lower sections respectively, and the right-handed screw rod upper end is connected with the slide rail dolly, and left-handed screw rod lower extreme is connected with coupling assembling.
Furthermore, a locking mechanism is arranged between the right-handed screw and the corresponding slide rail.
Furthermore, the locking mechanism comprises a pressing plate and a butterfly nut which are sequentially sleeved on the right-handed screw, the shape of the pressing plate is matched with the lower part of the sliding rail, the butterfly nut is located below the pressing plate, the pressing plate is movably matched with the right-handed screw, and the butterfly nut is in threaded fit with the right-handed screw.
Furthermore, the connecting assembly comprises a connecting plate fixedly connected to the lower end of the left-handed screw, and the connecting plate is horizontally arranged and is L-shaped with the left-handed screw; the connecting plate is provided with a connecting hole.
Furthermore, a hanging ring is arranged on the hanging plate.
The mounting base is provided with a central positioning seat at the center, and the central positioning seat is matched with the central positioning block in a positioning way; the mounting base is further provided with four sub-positioning seats, the four sub-positioning seats are in up-down one-to-one correspondence with the four slide rails, and each sub-positioning seat is further provided with a positioning sleeve.
Furthermore, the lower side of the mounting base is provided with a roller.
Furthermore, the slide rail has four, and four slide rails are the cross and distribute, and four two liang of relative one set of slide rail, one of them group is the short slide rail, and as adjusting the slide rail well, another group is long slide rail, as supporting the slide rail.
Furthermore, the end part of the supporting slide rail is provided with a slide rail support.
The utility model has the advantages that:
the utility model discloses carry out the hoist design to a plurality of top hammer assemblies of installation, raise the efficiency, realize once installing a plurality of top hammer assemblies of quick, improve workshop production efficiency and reduce process latency, reduce workman's intensity of labour.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic structural view of a mounting base of the present invention;
FIG. 3 is a schematic view of a base-mounted jack assembly of the present invention;
fig. 4 is a schematic view of the lifting of the present invention;
fig. 5 is a schematic view of the installation top hammer assembly of the present invention.
The drawings are for illustrative purposes only and are not to be construed as limiting the patent; for the purpose of better illustrating the embodiments, certain features of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product; it will be understood by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings. It is to be understood that the description of the embodiments herein is for purposes of illustration and explanation only and is not intended to limit the invention.
As shown in fig. 1 to 5, the utility model discloses a hoist frock of slide rail formula installation top hammer assembly body, including being four slide rails of cross distribution. The four slide rails are arranged in pairs and oppositely to form a group, wherein one group is a short slide rail and is used as a positive slide rail 5, and the other group is a long slide rail and is used as a supporting slide rail 6. The end of the support slide 6 is also provided with a slide support 10.
The central positions of the four slide rails are fixed with a hanging plate 7, and the hanging plate 7 is provided with four hoisting rings which are uniformly distributed.
All be equipped with on every slide rail rather than sliding fit's slide rail dolly, all be connected with downwardly extending's hoist on the slide rail dolly, the lower extreme of hoist is equipped with coupling assembling, and coupling assembling is used for being connected with top hammer assembly body 2.
In this embodiment, the hoist includes positive and negative thread long nut 4 to and the dextrorotation screw rod and the left-handed screw rod of being connected with the cooperation of positive and negative thread long nut upper and lower sections respectively, dextrorotation screw rod upper end is connected with the slide trolley, and left-handed screw rod lower extreme is connected with coupling assembling, and two screw rods are soon to the relative distance about positive and negative thread long nut 4 can the quick adjustment, and the upper and lower position of the manual quick adjustment top hammer assembly body in the time of can realizing the installation.
The connecting component comprises a connecting plate 3 fixedly connected to the lower end of the left-handed screw, and the connecting plate 3 is horizontally arranged and forms an L-shaped lifting appliance screw together with the left-handed screw; the connecting plate 3 is provided with a connecting hole.
The L-shaped lifting appliance screw rod enables the jack hammer assembly body to be lifted stably and vertically in a correct posture by utilizing the principle of aligning the center of gravity for lifting, and ensures that the jack hammer assembly body is smoothly arranged on the large cushion block.
In this embodiment, a locking mechanism is further arranged between the right-handed screw and the corresponding slide rail. The locking mechanism comprises a V-shaped pressing plate 8 (the lower half section of the sliding rail is V-shaped, and the V-shaped pressing plate 8 is matched with the sliding rail) and a butterfly nut 9 which are sequentially sleeved on the right-handed screw, the butterfly nut 9 is positioned below the V-shaped pressing plate 8, the V-shaped pressing plate 8 is movably matched with the right-handed screw, and the butterfly nut 9 is in threaded fit with the right-handed screw.
The V-shaped pressing plate 8 is matched with the butterfly nut 9, so that the sliding rail trolley and the lifting appliance can be positioned on the sliding rail, manual adjustment is easily completed, and the operation is convenient.
A downward connecting rod is connected at the center of the hanging plate 7, and a central positioning block 11 is arranged at the lower end of the connecting rod. The central positioning block 11 is a wood block with a cubic structure, and is attached to the top hammer face to prevent collision and protect the top hammer.
The positioning device further comprises an installation base 1, a center positioning seat 13 is arranged at the center of the installation base 1, and the center positioning seat 13 is matched with the center positioning block 11 in a positioning mode and can be used for positioning the center positioning block.
Still be equipped with four on the installation base 1 and divide positioning seat 12, four divide positioning seat 12 and four slide rails one-to-one from top to bottom, and the shape and the top hammer assembly body 2 adaptation of every minute positioning seat, divide positioning seat department still to be equipped with position sleeve 15, position sleeve 15 and the screw cooperation on the side-mounting hole under the top hammer assembly body 2 to can carry out prepositioning to the top hammer assembly body 2, make four top hammer assembly bodies 2 be in advance and lift by crane required relative position.
The lower side of the mounting base 1 is provided with a roller 14, which is convenient to move.
The utility model discloses a use as follows:
1) Welding a support slide rail 6 and an alignment slide rail 5 which are formed by steel on a steel plate with the thickness of 15mm and 350x350mm, wherein the support slide rail 6, the alignment slide rail 5 and the center of the steel plate are in cross symmetry, and the steel plate is provided with four hoisting rings which are uniformly distributed. The steel plate serves as the hanger plate 7.
2) The two ends of the supporting slide rail 6 are provided with equal-height brackets which are fixed on slide rail supports 10 at the two ends of the slide rail by bolts.
3) And the long screw penetrates through the center hole of the steel plate and is connected with a wooden cuboid center positioning block 11.
4) The L-shaped hanger screw is formed by welding a left-handed screw and a connecting plate 3, the connecting plate 3 is provided with a connecting hole and can pass through a screw to be connected with a steel ring of a top hammer assembly body into a whole.
5) The upper end of the right-handed screw is connected with the slide rail trolley, and the right-handed screw and the left-handed screw are connected into a whole by a long nut with left and right turning directions.
6) A V-shaped pressing plate 8 and a butterfly nut 9 are mounted on the right-handed screw and act together with a central positioning block 11 to limit the top hammer assembly body.
7) During hoisting, the four top hammer assembly bodies 2 are firstly placed on the four sub-positioning seats 12 of the mounting base 1, so that the end face of the steel ring is vertical to the base.
8) And hoisting the connected slide rail lifting appliance by using 4-hook lifting chains with the same length of 1 meter, adjusting the screw rods of the L-shaped lifting appliance to be equal in length, enabling the L-shaped lifting appliance to fall down corresponding to the center of the base, connecting the jacking hammer assembly bodies, and hoisting in parallel.
9) The top hammer assembly body is lifted, the support slide rail 6 corresponds to the space between two ears of the host hinge beam 16, the alignment slide rail 5 aligns with the middle ear of the three-ear piece of the host hinge beam 16, the central positioning block 11 aligns with the center of the host and then is positioned, after the support on the support slide rail 6 is supported stably, the adjusting steel ring and the large cushion block 17 are positioned in a concentric position, the butterfly nut is loosened, and the top hammer assembly body is pushed along the slide rail to be positioned.
10 Three screws on the mounting steel ring fasten the top hammer assembly body, loosen and replace the screws of the connecting plate 3 on the lifting appliance, and after all the top hammer assembly bodies on the slide rail are mounted in place, lifting the lifting appliance, and finishing the work.
The utility model discloses use the back and improve greatly than traditional installation effectiveness one by one, and install board quantity more efficiency higher.
The utility model discloses carry out the hoist design to four top hammer assembly bodies in front of the installation, back, a left side, right side, raise the efficiency, realize once installing four top hammer assembly bodies fast, improve workshop production efficiency and reduce process latency, reduce workman's intensity of labour.
If the terms "first," "second," etc. are used herein to define parts, those skilled in the art will recognize that: the use of "first" and "second" is merely for convenience in describing the invention and to simplify the description, and the words are not intended to have a special meaning unless otherwise stated.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.

Claims (10)

1. The utility model provides a hoist frock of slide rail formula installation top hammer assembly body which characterized in that: the lifting device comprises a lifting plate and a plurality of sliding rails which are dispersed outwards by taking the lifting plate as a center, wherein each sliding rail is provided with a sliding rail trolley in sliding fit with the sliding rail trolley, the sliding rail trolleys are connected with lifting appliances extending downwards, and the lower ends of the lifting appliances are provided with connecting components which are used for being connected with a top hammer assembly body; the center of the hanging plate is connected with a downward connecting rod, and the lower end of the connecting rod is provided with a central positioning block.
2. The hanger tool for installing a top hammer assembly body in a sliding rail manner according to claim 1, wherein: the lifting appliance comprises a positive and negative buckle long nut, a right-handed screw and a left-handed screw, wherein the right-handed screw and the left-handed screw are respectively connected with the upper section and the lower section of the positive and negative buckle long nut in a matching manner, the upper end of the right-handed screw is connected with the slide rail trolley, and the lower end of the left-handed screw is connected with the connecting assembly.
3. The hanger tool for installing a top hammer assembly body in a sliding rail manner according to claim 2, wherein: and a locking mechanism is also arranged between the right-handed screw and the corresponding slide rail.
4. The hanger tool for installing a top hammer assembly body in a sliding rail manner according to claim 3, wherein: the locking mechanism comprises a pressing plate and a butterfly nut which are sequentially sleeved on the right-handed screw, the shape of the pressing plate is matched with the lower part of the sliding rail, the butterfly nut is located below the pressing plate, the pressing plate is movably matched with the right-handed screw, and the butterfly nut is in threaded fit with the right-handed screw.
5. The hanger tool for installing a top hammer assembly body in a sliding rail manner according to claim 2, wherein: the connecting assembly comprises a connecting plate fixedly connected to the lower end of the left-handed screw, and the connecting plate is horizontally arranged and is L-shaped with the left-handed screw; the connecting plate is provided with a connecting hole.
6. The hanger tool for installing a top hammer assembly body in a sliding rail manner according to claim 1, wherein: and the hanging plate is provided with a hanging ring.
7. The hanger tool for installing a top hammer assembly body in a sliding rail manner according to claim 1, wherein: the mounting base is provided with a center positioning seat at the center, and the center positioning seat is matched with the center positioning block in a positioning way; the mounting base is further provided with four sub-positioning seats, the four sub-positioning seats are in one-to-one correspondence with the four slide rails from top to bottom, and each sub-positioning seat is further provided with a positioning sleeve.
8. The hanger tool for installing a top hammer assembly body in a sliding rail manner as claimed in claim 7, wherein: and the lower side of the mounting base is provided with a roller.
9. The tool for lifting a slide rail type top hammer assembly according to any one of claims 1 to 8, wherein: the four slide rails are distributed in a cross shape, the four slide rails are oppositely arranged in pairs to form a group, one group of the four slide rails is short slide rails and serves as alignment slide rails, and the other group of the four slide rails is long slide rails and serves as supporting slide rails.
10. The hanger tool for installing a top hammer assembly body in a sliding rail manner according to claim 9, wherein: the end part of the supporting slide rail is provided with a slide rail support.
CN202221612801.XU 2022-06-27 2022-06-27 Lifting appliance tool for slide rail type installation top hammer assembly body Active CN217996495U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221612801.XU CN217996495U (en) 2022-06-27 2022-06-27 Lifting appliance tool for slide rail type installation top hammer assembly body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221612801.XU CN217996495U (en) 2022-06-27 2022-06-27 Lifting appliance tool for slide rail type installation top hammer assembly body

Publications (1)

Publication Number Publication Date
CN217996495U true CN217996495U (en) 2022-12-09

Family

ID=84313202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221612801.XU Active CN217996495U (en) 2022-06-27 2022-06-27 Lifting appliance tool for slide rail type installation top hammer assembly body

Country Status (1)

Country Link
CN (1) CN217996495U (en)

Similar Documents

Publication Publication Date Title
CN217996495U (en) Lifting appliance tool for slide rail type installation top hammer assembly body
CN202894837U (en) Clamp for machining phi-30mm auxiliary hole of rear leaf spring shackle
CN107570682B (en) Movable die detaching structure of large die casting die and lifting assembly method thereof
CN204771737U (en) Big -end of connecting rod both sides face machining anchor clamps
CN221388767U (en) Quick and convenient clamp replacement rack
CN114195002A (en) Universal hoisting tool and method for front flange
CN106378622B (en) A kind of device convenient for centering
CN111943036A (en) Special lifting appliance for steel coil material
CN203218755U (en) Hanging bracket special for electric power disconnecting switch overhauling
CN210048807U (en) Quenching furnace
CN218695526U (en) Flexible tool for welding pantograph frame
CN219255460U (en) Bearing dismounting tool
CN220300178U (en) Movable hoisting device for rapidly installing steel column head
CN111463689A (en) Distribution transformer hangs core and overhauls specialized tool
CN219669967U (en) Adjustable grinding wheel lifting appliance
CN220317993U (en) Be applied to hanger of discoid work piece of aluminum alloy
CN219906745U (en) Lifting tool for lifting lock head of lifting appliance
CN215854601U (en) Heavy main shaft disassembling and hoisting tool for machine tool
CN216065370U (en) Forging platform convenient to maintain for precision forging machine
CN214686303U (en) Device for quickly assembling wedge block in high-field-intensity magnetic system
CN217432915U (en) Ship forges with jump bit that can change
CN210435767U (en) Connecting rod clamping tool
CN213381094U (en) Manual forging clamping device for machining
CN210825122U (en) Overhauling tool
CN214135040U (en) C-shaped beam mounting surface plane milling tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant