CN217948853U - Construction warning device for building engineering management - Google Patents

Construction warning device for building engineering management Download PDF

Info

Publication number
CN217948853U
CN217948853U CN202220506359.6U CN202220506359U CN217948853U CN 217948853 U CN217948853 U CN 217948853U CN 202220506359 U CN202220506359 U CN 202220506359U CN 217948853 U CN217948853 U CN 217948853U
Authority
CN
China
Prior art keywords
mounting panel
warning
construction
roof
engineering management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220506359.6U
Other languages
Chinese (zh)
Inventor
郝永亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Heshun Construction Development Co ltd
Original Assignee
Tianjin Heshun Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Heshun Construction Development Co ltd filed Critical Tianjin Heshun Construction Development Co ltd
Priority to CN202220506359.6U priority Critical patent/CN217948853U/en
Application granted granted Critical
Publication of CN217948853U publication Critical patent/CN217948853U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Illuminated Signs And Luminous Advertising (AREA)

Abstract

The utility model discloses a construction warning device for building engineering management, including mounting panel, roof and warning sign, the roof is installed at the top of mounting panel, and the both ends of roof bottom all install the bearing, the pivot is all installed to the inside of bearing, and the outside of pivot all installs the warning sign, the one end that the warning sign top is close to the mounting panel all evenly is provided with the second jack. The utility model discloses install the pivot, bearing and roof, during the use, the pivot can be rotated in the inside of bearing, make the warning sign rotate together with the pivot, can rotate two sets of warning signs to different positions department respectively, contained angle to between two sets of warning signs is adjusted, in the use, can shelter from the not equidirectional of construction position through two sets of warning signs, after the use, still can rotate the warning sign, make and keep parallel between two sets of warning signs, can fold two sets of warning signs, can reduce the whole length of device, thereby the workman of being convenient for carries the device.

Description

Construction warning device for building engineering management
Technical Field
The utility model relates to a building engineering construction equipment technical field specifically is a building engineering management is with construction warning device.
Background
The building engineering is an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the various house buildings and the auxiliary facilities, and meets the requirements of people on production, living, study and public activities.
The construction device for the existing building engineering management has a simple structure, is mostly a simple warning board, and during use, the height of the device is fixed, so that the device can not be adjusted according to requirements, is not convenient for workers to store and carry after use, can not be folded in the use process, can only shield one side of a construction position, and can not shield a plurality of directions of the construction position simultaneously, and is inconvenient to use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction warning device is used in building engineering management to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction warning device for building engineering management, includes mounting panel, roof and warning sign, the roof is installed at the top of mounting panel, and the both ends of roof bottom all install the bearing, the pivot is all installed to the inside of bearing, and the outside of pivot all installs the warning sign, the one end that the mounting panel is close to at warning sign top all evenly is provided with the second jack, the one end that the mounting panel was kept away from to the warning sign bottom all is provided with accomodates the groove, and accomodates the inside in groove and all installs the backup pad, the one end that the mounting panel was kept away from to the backup pad all evenly is provided with fixed slot, the one end that the mounting panel was kept away from to the warning sign bottom is installed the fixed plate, and the inside of fixed plate all is provided with the mounting hole, the pull rod is all installed to the inside of mounting hole.
Preferably, the mounting panel is kept away from to the pull rod one end all installs the arm-tie, and the top that the arm-tie is close to fixed plate one end all installs reset spring, reset spring keeps away from the one end of arm-tie all is connected with the fixed plate.
Preferably, the bottom of backup pad all installs the stabilizer blade, and the inside of stabilizer blade all is provided with the screw, the inside all threaded screw of screw installs the screw.
Preferably, both ends at roof top all are provided with first jack, and the inside of first jack all installs fixed inserted bar.
Preferably, the top of fixed inserted bar all installs the connection rope, and connects the rope and keep away from the one end of fixed inserted bar and all be connected with the roof.
Preferably, accomodate the inside one end of keeping away from the mounting panel of inslot and all install sliding subassembly, and sliding subassembly is close to the all slidable mounting of one end of mounting panel and has the sliding block, sliding subassembly's one end is all connected with the backup pad to the sliding block.
Preferably, the two sides of the warning board are provided with fluorescent strips.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the construction warning device for building engineering management is provided with the rotating shaft, the bearing and the top plate, when the device is used, the rotating shaft can rotate in the bearing, so that the warning boards can rotate along with the rotating shaft, two groups of warning boards can be respectively rotated to different positions, an included angle between the two groups of warning boards can be adjusted, in the using process, the two groups of warning boards can shield different directions of construction positions, after the use is finished, the warning boards can also be rotated to keep the two groups of warning boards parallel, the two groups of warning boards can be folded, the overall length of the device can be reduced, and workers can conveniently carry the device;
2. the construction warning device for building engineering management is provided with the fixed insertion rods, a plurality of groups of second insertion holes are uniformly formed in the top of the warning board and matched with the second insertion holes for use, the warning board is rotated to a specified angle and then inserted into the corresponding second insertion holes in the warning board, the warning board is limited by the fixed insertion rods, the warning board can be fixed, the warning board can be prevented from continuously rotating in the using process, and the stability of the device is improved;
3. this construction engineering management is with construction warning device installs arm-tie, fixed plate, slip subassembly, backup pad, pull rod and reset spring to evenly be provided with fixed slot in the backup pad, insert the pull rod in different fixed slot, can adjust the whole height of device, after the use, still can accomodate the backup pad to accomodating the inslot portion, can shorten the whole height of device, thereby be convenient for accomodate and carrying device.
Drawings
Fig. 1 is a schematic front sectional view of the present invention;
fig. 2 is a schematic front view of the present invention;
fig. 3 is a schematic top view of the warning board of the present invention;
fig. 4 is a schematic view of a partial structure of the present invention.
In the figure: 1. a leg; 2. fixing the slot; 3. pulling a plate; 4. a fixing plate; 5. a receiving groove; 6. a sliding assembly; 7. a slider; 8. a rotating shaft; 9. a bearing; 10. fixing the inserted rod; 11. mounting a plate; 12. a top plate; 13. connecting ropes; 14. a first jack; 15. a support plate; 16. a warning board; 17. a pull rod; 18. a fluorescent strip; 19. mounting holes; 20. a second jack; 21. a return spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: the utility model provides a construction warning device for building engineering management, including mounting panel 11, roof 12 and warning sign 16, roof 12 is installed at mounting panel 11's top, and bearing 9 is all installed at the both ends of roof 12 bottom, pivot 8 is all installed to bearing 9's inside, and warning sign 16 is all installed in the outside of pivot 8, the one end that mounting panel 11 is close to at warning sign 16 top all evenly is provided with second jack 20, the one end that mounting panel 11 was kept away from to warning sign 16 bottom all is provided with accomodates groove 5, and accomodate the inside of groove 5 and all install backup pad 15, the one end that mounting panel 11 was kept away from to backup pad 15 all evenly is provided with fixed slot 2, the one end that mounting panel 11 was kept away from to warning sign 16 bottom is installed fixed plate 4, and the inside of fixed plate 4 all is provided with mounting hole 19, pull rod 17 is all installed to the inside of mounting hole 19.
In this implementation:
further, the arm-tie 3 is all installed to the one end that mounting panel 11 was kept away from to pull rod 17, and reset spring 21 is all installed at the top that arm-tie 3 is close to 4 one ends of fixed plate, reset spring 21 keeps away from the one end of arm-tie 3 and all is connected with fixed plate 4, after the regulation, the workman loosens arm-tie 3, reset spring 21's elastic action makes its pulling arm-tie 3 remove and resets, arm-tie 3 drives pull rod 17 and moves together, make pull rod 17 insert in the fixed slot 2 that corresponds in the backup pad 15, it is spacing to backup pad 15 through pull rod 17, can fix backup pad 15.
Furthermore, the supporting legs 1 are mounted at the bottoms of the supporting plates 15, screw holes are formed in the supporting legs 1, screws are mounted in the screw holes in a threaded mode, and the device is fixed on the ground conveniently.
Furthermore, both ends at roof 12 top all are provided with first jack 14, and fixed inserted bar 10 is all installed to the inside of first jack 14, adjusts the back of accomplishing, and in inserting warning sign 16 corresponding second jack 20 with fixed inserted bar 10, it is spacing to warning sign 16 through fixed inserted bar 10, can be fixed warning sign 16, can prevent in the use that warning sign 16 from continuing to rotate, is favorable to improving the stability of device.
Furthermore, the top of the fixed inserting rod 10 is provided with a connecting rope 13, and one end of the connecting rope 13 far away from the fixed inserting rod 10 is connected with the top plate 12, so that the fixed inserting rod 10 can be prevented from falling off the device.
Furthermore, accomodate the inside one end of keeping away from mounting panel 11 in groove 5 and all install sliding assembly 6, and sliding assembly 6 is close to the equal slidable mounting of one end of mounting panel 11 and has sliding block 7, and sliding block 7 keeps away from the one end of sliding assembly 6 and all is connected with backup pad 15, and is spacing to backup pad 15 through sliding block 7 for backup pad 15 can only be along rectilinear movement in vertical direction.
Furthermore, the two sides of the warning board 16 are provided with fluorescent strips 18, which is beneficial to improving the warning effect at night.
The working principle is as follows:
when the warning board device is used, workers can respectively rotate the warning boards 16, so that the warning boards 16 rotate along with the rotating shaft 8, the included angle between the two groups of warning boards 16 can be adjusted, and the two groups of warning boards 16 can simultaneously shield different directions of construction positions;
after the adjustment is finished, the fixed inserting rod 10 is inserted into the corresponding second inserting hole 20 on the warning board 16, the warning board 16 is limited by the fixed inserting rod 10, the warning board 16 can be fixed, the warning board 16 can be prevented from continuously rotating in the using process, and the stability of the device is improved;
then, a worker can pull the pulling plate 3, the pulling plate 3 stretches the return spring 21 and drives the pulling rod 17 to move together, the pulling rod 17 can be pulled out from the inside of the fixing slot 2, the limit of the pulling rod 17 on the supporting plate 15 can be released, the supporting plate 15 can move, then the worker pulls the supporting plate 15, the supporting plate 15 is pulled out from the inside of the accommodating groove 5, the length of the part, extending out of the accommodating groove 5, of the supporting plate 15 can be adjusted, and the height of the device can be adjusted;
after the adjustment is finished, a worker loosens the pulling plate 3, the pulling plate 3 is pulled to move and reset under the elastic action of the reset spring 21, the pulling plate 3 drives the pulling rod 17 to move together, the pulling rod 17 is inserted into the corresponding fixing slot 2 in the supporting plate 15, the supporting plate 15 is limited through the pulling rod 17, the supporting plate 15 can be fixed, then the worker can fix the support legs 1 on the ground, and the construction position can be shielded through the warning board 16;
after the use, the workman can accomodate backup pad 15 to accomodate 5 insides to rotatable warning sign 16 makes and keeps parallel between two sets of warning signs 16, can fold two sets of warning signs 16, can reduce the whole length of device, thereby the workman of being convenient for carries the device.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.

Claims (7)

1. The utility model provides a construction warning device for building engineering management, includes mounting panel (11), roof (12) and warning sign (16), its characterized in that: roof (12) are installed at the top of mounting panel (11), and bearing (9) are all installed at the both ends of roof (12) bottom, pivot (8) are all installed to the inside of bearing (9), and warning sign (16) are all installed in the outside of pivot (8), the one end that warning sign (16) top is close to mounting panel (11) all evenly is provided with second jack (20), the one end of keeping away from mounting panel (11) bottom warning sign (16) all is provided with accomodates groove (5), and all installs backup pad (15) to the inside of accomodating groove (5), the one end that mounting panel (11) were kept away from in backup pad (15) all evenly is provided with fixed slot (2), fixed plate (4) are installed to the one end that mounting panel (11) were kept away from to warning sign (16) bottom, and the inside of fixed plate (4) all is provided with mounting hole (19), pull rod (17) are all installed to the inside of mounting hole (19).
2. The construction warning device for building engineering management according to claim 1, characterized in that: mounting panel (11) is kept away from in pull rod (17) one end all installs arm-tie (3), and arm-tie (3) all install reset spring (21) near the top of fixed plate (4) one end, reset spring (21) keep away from the one end of arm-tie (3) and all are connected with fixed plate (4).
3. The construction warning device for building engineering management according to claim 1, characterized in that: the supporting foot (1) is installed to the bottom of backup pad (15) all, and the inside of stabilizer blade (1) all is provided with the screw, the screw is installed all to the screw thread in the inside of screw.
4. The construction warning device for construction engineering management as set forth in claim 1, wherein: both ends at roof (12) top all are provided with first jack (14), and fixed inserted bar (10) are all installed to the inside of first jack (14).
5. The construction warning device for construction engineering management as set forth in claim 4, wherein: the top of fixed inserted bar (10) all installs and connects rope (13), and connects rope (13) and keep away from the one end of fixed inserted bar (10) and all be connected with roof (12).
6. The construction warning device for construction engineering management as set forth in claim 1, wherein: accomodate the inside one end of keeping away from mounting panel (11) in groove (5) and all install sliding subassembly (6), and sliding subassembly (6) are close to the all slidable mounting of one end of mounting panel (11) and have sliding block (7), sliding block (7) are kept away from the one end of sliding subassembly (6) and are all connected with backup pad (15).
7. The construction warning device for building engineering management according to claim 1, characterized in that: and fluorescent strips (18) are arranged on two sides of the warning board (16).
CN202220506359.6U 2022-03-10 2022-03-10 Construction warning device for building engineering management Active CN217948853U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220506359.6U CN217948853U (en) 2022-03-10 2022-03-10 Construction warning device for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220506359.6U CN217948853U (en) 2022-03-10 2022-03-10 Construction warning device for building engineering management

Publications (1)

Publication Number Publication Date
CN217948853U true CN217948853U (en) 2022-12-02

Family

ID=84208646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220506359.6U Active CN217948853U (en) 2022-03-10 2022-03-10 Construction warning device for building engineering management

Country Status (1)

Country Link
CN (1) CN217948853U (en)

Similar Documents

Publication Publication Date Title
CN213418535U (en) Prefabricated wallboard auxiliary installation mechanism
CN212248815U (en) Quick connection structure is used in installation of building curtain
CN217087394U (en) Layered simply-supported beam type ultrahigh-voltage cable bridge
CN217948853U (en) Construction warning device for building engineering management
CN212224338U (en) Novel half hidden frame glass curtain wall structure of drag-line
CN212060390U (en) Mounting structure of smart electric meter
CN210999470U (en) Appurtenance is used in ammeter case installation
CN109386080B (en) Mounting structure of curtain sunshading board
CN215127046U (en) Length-adjustable curtain rail
CN214855168U (en) Drawing auxiliary stand for architectural structure design
CN211899827U (en) Positioning template for construction of architectural decoration suspended ceiling
CN218349467U (en) Combined type surveying and mapping device for constructional engineering
CN217329221U (en) Angle-adjustable display screen for safety monitoring based on Internet of things
CN216949774U (en) House building construction site protection device
CN216304662U (en) Pit bottom wall-attached supporting equipment
CN215577375U (en) Building electrical construction safety device
CN212849691U (en) Wall-mounted cable bridge
CN213401970U (en) Low-voltage compensation power distribution cabinet easy to install
CN214246658U (en) Indoor suspended ceiling buckle plate mounting machine
CN214402335U (en) Regulation type building curtain anti-drop device
CN218301558U (en) Distribution frame for intelligent engineering of building
CN214615561U (en) Guardrail is consolidated to assembled building
CN216789948U (en) Lighting equipment for building engineering
CN213280903U (en) Typhoon-resistant tree fixing frame
CN221263234U (en) Cable support that power engineering used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant