Prior art keywords
base
fixed mounting
mounting bracket
arch
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221430980.5U
Other languages
Chinese (zh)
Inventor
张小高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Dongxihu Haikou Construction Engineering Co ltd
Original Assignee
Wuhan Dongxihu Haikou Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Dongxihu Haikou Construction Engineering Co ltd filed Critical Wuhan Dongxihu Haikou Construction Engineering Co ltd
Priority to CN202221430980.5U priority Critical patent/CN217808528U/en
Application granted granted Critical
Publication of CN217808528U publication Critical patent/CN217808528U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a lifting device for construction, the on-line screen storage device comprises a base, the equal fixed mounting in both sides of base bottom has the universal wheel, the top fixed mounting of base has second arch mounting bracket, the top of base and the inside that is located second arch mounting bracket are provided with places the board, the top fixed mounting who places the board has first arch mounting bracket, the top of base and the equal fixed mounting in both sides that is located second arch mounting bracket have the install bin, the inside of install bin is rotated and is connected with the wind-up roll. The utility model discloses a set up the universal wheel and realize holistic removal, place the board through the setting and realize placing the material that goes up and down, realize going up and down to placing the board through the cooperation between install bin, motor, leading wheel, steel cable, first connecting block and the wind-up roll to promote the material, solved current elevating gear simultaneously inconvenient to it remove and fix, thereby influence the problem of using.

Description

Elevating gear for construction
Technical Field
The utility model relates to a construction technical field specifically is a elevating gear for construction.
Background
The building is often required to lift up the material in its inside follow-up decoration process when being under construction to satisfy the construction to the top, all often lift up through personnel are manual for this reason, can not satisfy production efficiency when the waste time, for this reason need use elevating gear, current elevating gear is inconvenient removes and fixes it, thereby the influence is used, can not satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a lifting device for construction possesses the convenience and removes and fixed advantage to it, has solved that current lifting device is inconvenient to remove it and fix to influence the problem of using.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a lifting device for construction, includes the base, the equal fixed mounting in both sides of base bottom has the universal wheel, the top fixed mounting of base has second arch mounting bracket, the top of base and the inside that is located second arch mounting bracket are provided with places the board, the top fixed mounting who places the board has first arch mounting bracket, the top of base and the equal fixed mounting in both sides that is located second arch mounting bracket have the install bin, the inside of install bin is rotated and is connected with the wind-up roll, the top fixed mounting of second arch mounting bracket has four leading wheels.
Preferably, jacks are fixedly mounted on two sides of the top of the base, and output shafts of the jacks penetrate through the base and are fixedly provided with supporting blocks.
Preferably, a first connecting block is fixedly mounted at the top of the first arched mounting frame, a steel cable is fixedly mounted at the top of the first connecting block, and the steel cable is guided by a guide wheel and extends to the surface of the winding and winding roller inside the mounting box.
Preferably, the front of the installation box is fixedly provided with a motor, and an output shaft of the motor penetrates through the installation box and is fixedly connected with the front of the winding roller.
Preferably, two first chutes are formed in the second arched mounting frame, a first sliding block is connected to the inside of the first chute in a sliding manner, and one side, close to the first sliding block relatively, of the first sliding block is fixedly connected with the placing plate.
Preferably, the inside of placing the board has been seted up and has been held the chamber, the equal fixed mounting in both sides that holds the intracavity chamber has the second connecting block, fixed mounting has fixed rope between the second connecting block.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the universal wheel and realize holistic removal, place the board through the setting and realize placing the material of going up and down, realize going up and down to placing the board through the cooperation between install bin, motor, leading wheel, steel cable, first connecting block and the wind-up roll to promote the material, solved current elevating gear simultaneously inconvenient to it remove and fix, thereby influence the problem of using.
2. The utility model discloses a cooperation between supporting shoe and the jack is realized lifting up whole, avoids the universal wheel to remove and leads to whole unstability, realizes carrying on spacingly placing the board through the cooperation between first slider and the first spout, increases the stability when placing the board and go up and down, realizes placing the inside material of placing of board through the second connecting block, the cooperation that holds between chamber and the fixed rope.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic cross-sectional structure of the present invention;
fig. 3 is the schematic view of the cross-sectional structure of the installation box of the present invention.
In the figure: 1. a base; 2. a universal wheel; 3. a support block; 4. a jack; 5. installing a box; 6. a motor; 7. placing a plate; 8. a first arcuate mounting bracket; 9. a second arcuate mounting bracket; 10. a first connection block; 11. a guide wheel; 12. a wire rope; 13. a first slider; 14. a first chute; 15. a second connecting block; 16. an accommodating chamber; 17. fixing a rope; 18. and (7) winding the roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description herein, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings to facilitate the description of the patent and to simplify the description, but do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus are not to be considered limiting of the patent. In the description of the present application, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can, for example, be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by one of ordinary skill in the art as appropriate.
Referring to fig. 1-3, a lifting device for building construction comprises a base 1, universal wheels 2 are fixedly installed on both sides of the bottom of the base 1, a second arched mounting rack 9 is fixedly installed on the top of the base 1, a placing plate 7 is arranged on the top of the base 1 and inside the second arched mounting rack 9, a first arched mounting rack 8 is fixedly installed on the top of the placing plate 7, a mounting box 5 is fixedly installed on the top of the base 1 and on both sides of the second arched mounting rack 9, a winding roller 18 is rotatably connected inside the mounting box 5, four guide wheels 11 are fixedly installed on the top of the second arched mounting rack 9, the universal wheels 2 are arranged to realize integral movement, the lifting material is placed through the placing plate 7, the placing plate 7 is lifted through the matching between the mounting box 5, a motor 6, the guide wheels 11, a steel cable 12, a first connecting block 10 and the winding roller 18, thereby lifting the substance, jacks 4 are fixedly arranged on two sides of the top of the base 1, output shafts of the jacks 4 penetrate through the base 1 and are fixedly provided with supporting blocks 3, the whole body is lifted through the matching between the supporting blocks 3 and the jacks 4, the phenomenon that the whole body is unstable due to the movement of the universal wheel 2 is avoided, a first connecting block 10 is fixedly arranged on the top of the first arched mounting frame 8, a steel cable 12 is fixedly arranged on the top of the first connecting block 10, the steel cable 12 is guided by a guide wheel 11 and extends to the surface of an inner winding and winding roller 18 of the mounting box 5, a motor 6 is fixedly arranged on the front surface of the mounting box 5, an output shaft of the motor 6 penetrates through the mounting box 5 and is fixedly connected with the front surface of the winding roller 18, two first sliding grooves 14 are arranged inside the second arched mounting frame 9, and a first sliding block 13 is slidably connected inside the first sliding grooves 14, one side that first slider 13 is close to relatively with place board 7 fixed connection, cooperation through between first slider 13 and the first spout 14 realizes carrying on spacingly to placing board 7, increase the stability when placing board 7 and go up and down, the inside of placing board 7 has been seted up and has been held chamber 16, the equal fixed mounting in both sides that holds the 16 inner chambers in chamber has second connecting block 15, fixed mounting has fixed rope 17 between the second connecting block 15, through second connecting block 15, the cooperation that holds between chamber 16 and the fixed rope 17 realizes placing the inside material of placing of board 7 and places.
During the use, will wholly remove to required position through universal wheel 2, promote supporting shoe 3 downwards through jack 4 to make base 1 rise, break away from universal wheel 2 and ground, drive wind-up roll 18 through motor 6 and rotate, thereby make steel cable 12 by the rolling, make under the effect of steel cable 12 place board 7 by the lifting, realize carrying out the lifting to the material.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a lifting device for construction, includes base (1), its characterized in that: the all-round fixed mounting in both sides of base (1) bottom has universal wheel (2), the top fixed mounting of base (1) has second arch mounting bracket (9), the top of base (1) and the inside that is located second arch mounting bracket (9) are provided with places board (7), the top fixed mounting who places board (7) has first arch mounting bracket (8), the top of base (1) and the equal fixed mounting in both sides that is located second arch mounting bracket (9) have install box (5), the inside rotation of install box (5) is connected with wind-up roll (18), the top fixed mounting of second arch mounting bracket (9) has four leading wheels (11).
2. The lifting device for building construction according to claim 1, characterized in that: jacks (4) are fixedly mounted on two sides of the top of the base (1), and output shafts of the jacks (4) penetrate through the base (1) and are fixedly provided with supporting blocks (3).
3. The lifting device for building construction according to claim 1, characterized in that: the top fixed mounting of first arch mounting bracket (8) has first connecting block (10), the top fixed mounting of first connecting block (10) has steel cable (12), steel cable (12) are passed through leading wheel (11) direction and are extended to the inside of install bin (5) and twine on the surface of wind-up roll (18).
4. The lifting device for building construction according to claim 1, characterized in that: the front of the installation box (5) is fixedly provided with a motor (6), and an output shaft of the motor (6) penetrates through the installation box (5) and is fixedly connected with the front of the winding roller (18).
5. The lifting device for building construction according to claim 1, characterized in that: two first sliding grooves (14) are formed in the second arched mounting frame (9), a first sliding block (13) is connected to the inside of each first sliding groove (14) in a sliding mode, and one side, close to each other, of each first sliding block (13) is fixedly connected with the placing plate (7).
6. The lifting device for building construction according to claim 1, characterized in that: place the inside of board (7) and seted up and hold chamber (16), the equal fixed mounting in both sides that holds chamber (16) inner chamber has second connecting block (15), fixed mounting has fixed rope (17) between second connecting block (15).
CN202221430980.5U 2022-06-08 2022-06-08 Elevating gear for construction Active CN217808528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221430980.5U CN217808528U (en) 2022-06-08 2022-06-08 Elevating gear for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221430980.5U CN217808528U (en) 2022-06-08 2022-06-08 Elevating gear for construction

Publications (1)

Publication Number Publication Date
CN217808528U true CN217808528U (en) 2022-11-15

Family

ID=83989451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221430980.5U Active CN217808528U (en) 2022-06-08 2022-06-08 Elevating gear for construction

Country Status (1)

Country Link
CN (1) CN217808528U (en)

Similar Documents

Publication Publication Date Title
CN212101853U (en) Elevating gear for construction
CN111977550A (en) Concrete plate lifting device for building tower crane
CN217808528U (en) Elevating gear for construction
CN111779243A (en) Wall goes up and down to paste ceramic tile device
CN210365464U (en) Electric power check out test set removes conveyer
CN210764022U (en) Hoisting device for mounting load-bearing light keel
CN215402824U (en) Multifunctional automatic elevator device
CN214401737U (en) Stirring stake construction equipment that ground was handled
CN214531843U (en) Lifting device for climbing frame
CN210192723U (en) High accuracy pay-off slip table
CN216190702U (en) Building material transportation lifting mechanism
CN209890118U (en) Road and bridge hoist and mount construction equipment
CN214417354U (en) Device for producing guide frame coated stainless steel band
CN214691812U (en) Lifting machine is used in production of nutrition enhancer zinc citrate
CN215407496U (en) Lifting support for constructional engineering construction
CN217201856U (en) Building engineering material lifting machine
CN209758919U (en) Lifting device for architectural decoration engineering construction
CN212919349U (en) Construction electrical equipment construction device
CN215042894U (en) Adjustable groove pipe fitting conveying device
CN218061337U (en) Support for building engineering construction
CN213304829U (en) Winch type overhead ground wire lifter
CN212450360U (en) Mechanical equipment hoisting frame
CN210825144U (en) Counterweight device for crane
CN216974226U (en) Lifting device for housing construction