CN217781661U - Water-permeable pavement paving structure for urban road reconstruction project - Google Patents

Water-permeable pavement paving structure for urban road reconstruction project Download PDF

Info

Publication number
CN217781661U
CN217781661U CN202221880101.9U CN202221880101U CN217781661U CN 217781661 U CN217781661 U CN 217781661U CN 202221880101 U CN202221880101 U CN 202221880101U CN 217781661 U CN217781661 U CN 217781661U
Authority
CN
China
Prior art keywords
backup pad
support frame
deflector
urban road
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221880101.9U
Other languages
Chinese (zh)
Inventor
刘苏飞
孙海飞
于茜茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Rongda Construction Engineering Co ltd
Original Assignee
Jilin Rongda Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Rongda Construction Engineering Co ltd filed Critical Jilin Rongda Construction Engineering Co ltd
Priority to CN202221880101.9U priority Critical patent/CN217781661U/en
Application granted granted Critical
Publication of CN217781661U publication Critical patent/CN217781661U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to the technical field of pavement paving, in particular to a permeable pavement paving structure of urban road reconstruction engineering; the utility model discloses urban road rebuilds people moving walkways who permeates water structure of mating formation of engineering, the loach carrying platform comprises a supporting fram, the inner chamber of support frame is provided with slide mechanism, the bottom of support frame is provided with moving mechanism, slide mechanism includes the backup pad, the lateral wall of backup pad evenly is provided with two sets of deflectors, the top of deflector is provided with the grapple, the grapple sets up the top in the backup pad, the inside wall of deflector evenly is provided with the gyro wheel through the pivot, the bottom of deflector is provided with the locating plate, moving mechanism is located the bottom of backup pad, moves the inner wall that the locating plate blocked people moving walkways through the moving deflector, through the bolt fastening deflector to this can adapt to the people moving walkways of different width fast, the workman takes out the brick that permeates water of hopper, arranges in the backup pad.

Description

Water-permeable pavement paving structure for urban road reconstruction project
Technical Field
The utility model relates to a pavement technical field that mats formation specifically is urban road rebuilds the construction's pavement structure of mating formation that permeates water.
Background
The water permeable sidewalk has water permeability, and can quickly eliminate water accumulation on roads and squares when raining; when the rainfall is concentrated, the burden of urban drainage facilities can be lightened, and the flooding of rivers and the water body pollution are prevented.
The pavement surface that permeates water now adopts the brick that permeates water to lay basically, and traditional mode of laying is through artifical squatting then hold the brick and lay one by one, and is big to the manpower consumption, to above-mentioned condition, carries out technological innovation on the pavement structure basis that permeates water of current urban road reconstruction engineering.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pavement structure of mating formation that permeates water of urban road reconstruction engineering to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: urban road rebuilds permeable pavement structure of engineering including the support frame, the inner chamber of support frame is provided with slide mechanism, the bottom of support frame is provided with moving mechanism, slide mechanism includes the backup pad, the lateral wall of backup pad evenly is provided with two sets of deflectors, the top of deflector is provided with the grapple, the grapple sets up the top in the backup pad, the inside wall of deflector evenly is provided with the gyro wheel through the pivot, the bottom of deflector is provided with the locating plate, moving mechanism is located the bottom of backup pad.
Preferably, the top of the grapple is provided with a threaded hole, a bolt is screwed in the threaded hole, and the bottom of the bolt is arranged at the top of the support plate.
Preferably, the inner cavity of the support frame is provided with a sliding groove inclined by 45 degrees, and the support plate is arranged in the sliding groove.
Preferably, the inner cavity of the support frame is provided with a charging hopper, and the charging hopper is positioned above the support plate.
Preferably, the left side of the support frame is welded with a support plate, and the top of the support plate is provided with a fence.
Preferably, the moving mechanism comprises a crawler chassis, and the top of the crawler chassis is arranged at the bottom of the support frame.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the permeable sidewalk paving structure of the urban road reconstruction project drives the positioning plate to clamp the inner wall of the sidewalk through the movable guide plate, and the guide plate is fixed through the bolt, so that the permeable sidewalk paving structure can be quickly adapted to sidewalks with different widths;
the water permeable bricks are paved on the supporting plate at first, then a worker stands on the supporting plate, the crawler chassis drives the device to move leftwards, then the water permeable bricks on the supporting plate fall on a sidewalk neatly downwards under the influence of gravity, then the worker takes out the water permeable bricks of the charging hopper and arranges the water permeable bricks on the supporting plate, and the worker can lay the sidewalk only by standing on the supporting plate, so that the labor amount of the worker is reduced.
Drawings
Fig. 1 is a schematic structural view of a permeable sidewalk paving structure of the urban road reconstruction project of the present application;
FIG. 2 is a front sectional view of the permeable pavement paving structure of the urban road reconstruction project of the present invention;
fig. 3 is an enlarged view of a part a of the permeable pavement structure diagram 2 of the urban road reconstruction project of the present invention.
In the figure: 1. a support plate; 11. a guide plate; 12. a roller; 13. positioning a plate; 14. a grapple; 2. a bolt; 3. a support frame; 4. a charging hopper; 5. a support plate; 51. a fence; 6. a crawler chassis.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-3, the permeable sidewalk pavement structure for urban road reconstruction engineering comprises a support frame 3, a sliding mechanism is fixedly arranged in an inner cavity of the support frame 3, a moving mechanism is fixedly arranged at the bottom of the support frame 3, the sliding mechanism comprises a support plate 1, two groups of guide plates 11 are uniformly arranged on the outer side wall of the support plate 1 in a sliding manner, a grapple 14 is fixedly arranged at the top of each guide plate 11, the grapple 14 is slidably arranged at the top of the support plate 1, the guide plates 11 are hooked on the support plate 1 through the grapple 14, rollers 12 are uniformly and rotatably arranged on the inner side wall of each guide plate 11 through rotating shafts, when permeable bricks are placed on the support plate 1, the permeable bricks are assisted to move downwards through the rollers 12, a positioning plate 13 is fixedly arranged at the bottom of each guide plate 11, and the guide plates 11 are determined to be positioned in a sidewalk through the positioning plate 13, moving mechanism is located the bottom of backup pad 1, the top of grapple 14 is opened chisel and is had the screw hole, threaded hole in-thread connects bolt 2, the bottom of bolt 2 is rotated and is set up at the top of backup pad 1, fix deflector 11 on backup pad 1 through bolt 2, the inner chamber of support frame 3 is opened and is chiseled the spout that has 45 degrees slopes, backup pad 1 is fixed to be set up in the spout, the fixed charging hopper 4 that is provided with of inner chamber of support frame 3, charging hopper 4 is located the top of backup pad 1, the left side welding of support frame 3 has layer board 5, the fixed rail 51 that is provided with in top of layer board 5, the workman stands to take the brick that permeates water on layer board 5 from charging hopper 4, then place the brick that permeates water on backup pad 1, moving mechanism includes crawler chassis 6, crawler chassis 6 fixed settings in the bottom of support frame 3 in top, it removes to drive support frame 3 through crawler chassis 6.
The working principle is as follows: when the sidewalk begins to lay the water permeable bricks, the water permeable bricks are poured into the charging hopper 4, the guide plate 11 is moved after the bolts 2 are rotated, the positioning plate 13 is driven to move through the guide plate 11, the positioning plate 13 is attached to the inner wall of the sidewalk, then the bolts 2 are fixed, the guide plate 11 and the supporting plate 1 are combined, the supporting plate 1 is filled with the water permeable bricks, then the crawler chassis 6 drives the device to move leftwards, the water permeable bricks move downwards under the influence of gravity and are neatly arranged on the sidewalk, then a worker stands on the supporting plate 5 to take the water permeable bricks from the charging hopper 4, and then the water permeable bricks are placed on the supporting plate 1.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Urban road rebuilds people moving walkways who permeates water structure of mating formation of engineering, including support frame (3), its characterized in that: the inner chamber of support frame (3) is provided with slide mechanism, the bottom of support frame (3) is provided with moving mechanism, slide mechanism includes backup pad (1), the lateral wall of backup pad (1) evenly is provided with two sets of deflector (11), the top of deflector (11) is provided with grapple (14), grapple (14) set up the top in backup pad (1), the inside wall of deflector (11) evenly is provided with gyro wheel (12) through the pivot, the bottom of deflector (11) is provided with locating plate (13), moving mechanism is located the bottom of backup pad (1).
2. The water-permeable sidewalk paving structure of the urban road reconstruction project according to claim 1, characterized in that: the top of the grab hook (14) is provided with a threaded hole, a bolt (2) is screwed in the threaded hole, and the bottom of the bolt (2) is arranged at the top of the support plate (1).
3. The water-permeable sidewalk paving structure of the urban road reconstruction project according to claim 1, characterized in that: the inner cavity of the support frame (3) is provided with a chute inclined by 45 degrees, and the support plate (1) is arranged in the chute.
4. The water-permeable sidewalk paving structure of the urban road reconstruction project according to claim 3, wherein: the inner cavity of the support frame (3) is provided with a charging hopper (4), and the charging hopper (4) is positioned above the support plate (1).
5. The water-permeable sidewalk paving structure of the urban road reconstruction project according to claim 1, characterized in that: the left side welding of support frame (3) has layer board (5), the top of layer board (5) is provided with rail (51).
6. The water-permeable sidewalk paving structure of the urban road reconstruction project according to claim 1, characterized in that: the moving mechanism comprises a crawler chassis (6), and the top of the crawler chassis (6) is arranged at the bottom of the support frame (3).
CN202221880101.9U 2022-07-20 2022-07-20 Water-permeable pavement paving structure for urban road reconstruction project Active CN217781661U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221880101.9U CN217781661U (en) 2022-07-20 2022-07-20 Water-permeable pavement paving structure for urban road reconstruction project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221880101.9U CN217781661U (en) 2022-07-20 2022-07-20 Water-permeable pavement paving structure for urban road reconstruction project

Publications (1)

Publication Number Publication Date
CN217781661U true CN217781661U (en) 2022-11-11

Family

ID=83940569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221880101.9U Active CN217781661U (en) 2022-07-20 2022-07-20 Water-permeable pavement paving structure for urban road reconstruction project

Country Status (1)

Country Link
CN (1) CN217781661U (en)

Similar Documents

Publication Publication Date Title
CN110552269B (en) Construction method of ecological sidewalk
CN108677638A (en) Express highway roadbed dam filling construction based on building waste
CN108035219A (en) A kind of instrument of the flat pervious concrete of essence
CN112252214A (en) Road underpass structure with good drainage performance and construction method
CN109371910B (en) Ground-cushion height-filling protection and construction method
CN113186773B (en) Road construction method based on building energy conservation
CN217781661U (en) Water-permeable pavement paving structure for urban road reconstruction project
CN109537392B (en) Water-permeable anti-settlement road and construction method thereof
CN217460139U (en) Long-life road structure
CN215441462U (en) Road paving device for road and bridge
CN101413258B (en) Concrete lining machine
CN211922207U (en) Reduce paver that manual operation can reserve tree hole
CN214939064U (en) Intelligent road brick paver
CN210368543U (en) Pavement paving device for pedestrian roads for road construction
CN201103122Y (en) Concrete lining machine
CN214301907U (en) Ditch excavating gear is used in construction of highway
CN213896659U (en) Municipal works are maintained with level and smooth device with road surface
CN111979865A (en) Composite asphalt pavement construction method
CN215629182U (en) Smooth surface wheel road rolling equipment for highway construction
CN217149763U (en) Asphalt pavement
CN221421599U (en) Road surface leveling equipment
CN221297494U (en) Municipal works construction road levelling machine
CN216891865U (en) Municipal works road levels equipment
CN214573165U (en) Quick leveling combined device for side flat stone installation and mortar paving
CN219045081U (en) Pouring device for paving road by utilizing steel slag solid waste

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant