CN217715351U - Energy consumption monitoring device based on central air conditioner room - Google Patents

Energy consumption monitoring device based on central air conditioner room Download PDF

Info

Publication number
CN217715351U
CN217715351U CN202221144709.5U CN202221144709U CN217715351U CN 217715351 U CN217715351 U CN 217715351U CN 202221144709 U CN202221144709 U CN 202221144709U CN 217715351 U CN217715351 U CN 217715351U
Authority
CN
China
Prior art keywords
box body
water inlet
central air
energy consumption
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221144709.5U
Other languages
Chinese (zh)
Inventor
张立海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yirui Environmental Equipment Co ltd
Original Assignee
Jiangsu Yirui Environmental Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yirui Environmental Equipment Co ltd filed Critical Jiangsu Yirui Environmental Equipment Co ltd
Priority to CN202221144709.5U priority Critical patent/CN217715351U/en
Application granted granted Critical
Publication of CN217715351U publication Critical patent/CN217715351U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model discloses a based on central air conditioning machine room energy consumption monitoring device relates to central air conditioning system technical field, for solving current central air conditioning system in use, has equipment to carry out real time monitoring to its energy consumption, and this real time monitoring mode can lead to internal component in service heat to increase, and the heat does not have the effective problem of utilizing. The water inlet box body is arranged on one side of the machine room box body and is fixedly connected with the machine room box body, the first inner cavity is arranged in the water inlet box body, the heat exchanger is arranged above the first inner cavity, the mounting base plate is arranged in the first inner cavity, the up end of the water inlet box body is provided with a first access board, the first access board is connected with the water inlet box body through first hexagon bolts, the first hexagon bolts are provided with four, the up end of the first access board is provided with a feeding pipeline, and one end of the feeding pipeline runs through and extends to the inside of the machine room box body.

Description

Energy consumption monitoring device based on central air-conditioning machine room
Technical Field
The utility model relates to a central air conditioning system technical field specifically is a based on central air conditioning computer lab energy consumption monitoring device.
Background
The central air conditioning system is composed of one or more cold and heat source systems and a plurality of air conditioning systems, and the system is different from the traditional refrigerant type air conditioner and intensively processes air to meet the comfort requirement. The principle of liquid gasification refrigeration is adopted to provide the required cold energy for the air conditioning system so as to offset the heat load of the indoor environment; the heating system provides the air conditioning system with the required heat to offset the indoor environment cooling and heating load. The refrigeration system is a vital part of the central air-conditioning system, and the type, the operation mode, the structural form and the like of the refrigeration system directly influence the economical efficiency, the high efficiency and the rationality of the central air-conditioning system in operation.
When the existing central air-conditioning system is used, equipment can monitor the energy consumption of the central air-conditioning system in real time, and the real-time monitoring mode can cause the increase of heat of internal elements in the operation and the problem that the heat is not effectively utilized.
Therefore, we propose a central air conditioner room-based energy consumption monitoring device so as to solve the problems proposed in the above.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a based on central air conditioning room energy consumption monitoring device to solve the current central air conditioning system in use who provides in the above-mentioned background art, have equipment to carry out real time monitoring to its energy consumption, and this real time monitoring mode can lead to internal element in service heat to increase, and the heat does not have the effective problem of utilizing.
In order to achieve the above purpose, the utility model provides a following technical scheme: the energy consumption monitoring device based on the central air conditioner room comprises a room box body, wherein a cover plate is arranged above the room box body, two door plates are arranged on the front end surface of the room box body, the two door plates are rotatably connected with the room box body, a plurality of heat dissipation hole grooves are formed in the lower portion of the inner portion of each door plate, and are integrally formed with the door plates;
also comprises the following steps;
the water inlet box body is arranged on one side of the machine room box body and is fixedly connected with the machine room box body;
the first inner cavity is arranged inside the water inlet box body, a heat exchanger is arranged above the inside of the first inner cavity, and a mounting base plate is arranged inside the first inner cavity.
Preferably, the up end of the water inlet box body is provided with a first access board, the first access board is connected with the water inlet box body through first hexagon bolts, and first hexagon bolts are provided with four, the up end of the first access board is provided with a feed pipeline, and one end of the feed pipeline runs through and extends to the inside of the machine room box body.
Preferably, the preceding terminal surface of the box that intakes is provided with ejection of compact pipeline, and ejection of compact pipeline and the box integral type of intaking form, be provided with pipeline between ejection of compact pipeline and the feed channel, the inside of the box that intakes is provided with cavity in the second, and pipeline installs the inside at cavity in the second.
Preferably, the rear end face of the mounting substrate is provided with two fan mechanisms, one side of the lower end face of the heat exchanger is provided with an inlet port, and the other side of the lower end face of the heat exchanger is provided with an outlet port.
Preferably, the other side of the machine room box body is provided with six second maintenance plates, and the second maintenance plates are in threaded connection with the machine room box body through second hexagon bolts.
Preferably, the display screen and the pointer mechanism are arranged above the two door panels respectively, the lock catch is arranged below the display screen and connected with the door panels in an embedded rotating mode, and the handle rod is arranged below the pointer mechanism.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a heat exchanger and the inlet box body that set up inside the computer lab box, let the inlet port of heat exchanger and heat exchanger below, can transmit away heat energy, the outside circulation liquid of rethread, carry out the exchange of heat energy to it, inside the air conditioning access device of absorption heat energy, and heat energy then can effectively heat circulation liquid, thereby can carry out the utilization of maximize to the heat, avoid current central air conditioning system in use, have equipment to carry out real time monitoring to its energy consumption, and this real time monitoring mode, can lead to the internal component to increase at the heat in service, and the heat does not have the effective problem of utilizing.
2. Through the display screen and the pointer mechanism that set up, can let inside each item data in time the presentation of in service behavior, make things convenient for the staff to survey and adjust, and the fan mechanism who sets up can let the quick effluvium of the heat of internal element for the transfer to the heat.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the machine room box of the present invention;
FIG. 3 is a schematic view of the internal structure of the water inlet tank of the present invention;
in the figure: 1. a machine room box body; 2. a cover plate; 3. a water inlet tank body; 4. a first access panel; 5. a first hexagon bolt; 6. a feed conduit; 7. a discharge pipe; 8. a second access panel; 9. a second hexagon bolt; 10. locking; 11. a handle bar; 12. a display screen; 13. a pointer mechanism; 14. a heat dissipation hole slot; 15. a first inner cavity; 16. a mounting substrate; 17. a fan mechanism; 18. a heat exchanger; 19. An inlet port; 20. an output port; 21. a second inner cavity; 22. a delivery conduit; 23. a door panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: an energy consumption monitoring device based on a central air-conditioning machine room comprises a machine room box body 1, wherein a cover plate 2 is arranged above the machine room box body 1, two door plates 23 are arranged on the front end surface of the machine room box body 1, the two door plates 23 are rotatably connected with the machine room box body 1, heat dissipation hole grooves 14 are formed in the lower portions of the inner portions of the two door plates 23, the heat dissipation hole grooves 14 are formed in a plurality of numbers, and the heat dissipation hole grooves 14 are integrally formed with the door plates 23;
also comprises the following steps;
the water inlet box body 3 is arranged on one side of the machine room box body 1, and the water inlet box body 3 is fixedly connected with the machine room box body 1;
and a first inner chamber 15 installed inside the water inlet tank 3, a heat exchanger 18 being provided above the inside of the first inner chamber 15, and a mounting board 16 being provided inside the first inner chamber 15.
Further, the up end of the case body 3 of intaking is provided with first access panel 4, and first access panel 4 is through first hexagon bolt 5 and 3 bolted connection of the case body of intaking, and first hexagon bolt 5 is provided with four, and the up end of first access panel 4 is provided with charge-in pipeline 6, and charge-in pipeline 6's one end runs through and extends to the inside of computer lab box 1.
Referring to fig. 1 and 3, a discharge pipe 7 is disposed on a front end surface of the water inlet tank 3, the discharge pipe 7 and the water inlet tank 3 are integrally formed, a conveying pipe 22 is disposed between the discharge pipe 7 and the feed pipe 6, a second inner cavity 21 is disposed inside the water inlet tank 3, and the conveying pipe 22 is installed inside the second inner cavity 21.
Referring to fig. 2, two fan mechanisms 17 are disposed on the rear end surface of the mounting substrate 16, an inlet port 19 is disposed on one side of the lower end surface of the heat exchanger 18, an outlet port 20 is disposed on the other side of the lower end surface of the heat exchanger 18, and the fan mechanisms 17 are disposed to rapidly evacuate the heat inside.
Referring to fig. 1, a second access panel 8 is disposed on the other side of the machine room box 1, the second access panel 8 is in threaded connection with the machine room box 1 through second hexagon bolts 9, and the number of the second hexagon bolts 9 is six, and the second hexagon bolts 9 are disposed, so that the object can be mounted or dismounted conveniently.
Referring to fig. 1, a display screen 12 and a pointer mechanism 13 are respectively disposed above the interiors of two door panels 23, a lock catch 10 is disposed below the display screen 12, the lock catch 10 is rotatably connected with the door panels 23 in an embedded manner, a handle rod 11 is disposed below the pointer mechanism 13, and the lock catch 10 is arranged to improve safety performance.
The working principle is as follows: carry out real time monitoring management by energy consumption in the terminal product of computer lab box 1 pair central air conditioning, and the inside component of computer lab box 1 and supervisory equipment are when the high frequency is used, the heat exchanger 18 that the heat accessible of production set up, and inlet port 19 of heat exchanger 18 below, outside transmission fast, the outside circulation liquid of rethread, the exchange of heat energy carries out to it, inside the air conditioning access device after the heat absorption, and heat energy then can effectively heat circulation liquid, thereby can carry out the utilization of maximize to the heat.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The energy consumption monitoring device based on the central air-conditioning room comprises a room box body (1), wherein a cover plate (2) is arranged above the room box body (1), two door plates (23) are arranged on the front end surface of the room box body (1), the two door plates (23) are rotatably connected with the room box body (1), heat dissipation hole grooves (14) are formed in the two door plates (23) and below the inner parts of the two door plates (14), a plurality of heat dissipation hole grooves (14) are formed in the heat dissipation hole grooves (14), and the heat dissipation hole grooves (14) and the door plates (23) are integrally formed;
the method is characterized in that: also comprises the following steps;
the water inlet box body (3) is arranged on one side of the machine room box body (1), and the water inlet box body (3) is fixedly connected with the machine room box body (1);
the water inlet tank comprises a first inner cavity (15) arranged inside a water inlet tank body (3), a heat exchanger (18) is arranged above the inside of the first inner cavity (15), and an installation base plate (16) is arranged inside the first inner cavity (15).
2. The energy consumption monitoring device based on the central air conditioner room as claimed in claim 1, wherein: the utility model discloses a water inlet box, including water inlet box body (3), the up end of water inlet box body (3) is provided with first access panel (4), first access panel (4) through first hexagon bolt (5) with water inlet box body (3) bolted connection, and first hexagon bolt (5) are provided with four, the up end of first access panel (4) is provided with charge-in pipeline (6), and the one end of charge-in pipeline (6) runs through and extends to the inside of computer lab box body (1).
3. The energy consumption monitoring device based on the central air conditioner room as claimed in claim 1, wherein: the water inlet box is characterized in that a discharge pipeline (7) is arranged on the front end face of the water inlet box body (3), the discharge pipeline (7) and the water inlet box body (3) are integrally formed, a conveying pipeline (22) is arranged between the discharge pipeline (7) and the feeding pipeline (6), the inside of the water inlet box body (3) is provided with a second inner cavity (21), and the conveying pipeline (22) is installed inside the second inner cavity (21).
4. The energy consumption monitoring device based on the central air conditioner room as claimed in claim 1, wherein: the rear end face of the mounting substrate (16) is provided with two fan mechanisms (17), one side of the lower end face of the heat exchanger (18) is provided with an inlet port (19), and the other side of the lower end face of the heat exchanger (18) is provided with an outlet port (20).
5. The energy consumption monitoring device based on the central air conditioner room as claimed in claim 1, wherein: the opposite side of computer lab box (1) is provided with second access panel (8), second access panel (8) are through second hexagon bolt (9) and computer lab box (1) threaded connection, and second hexagon bolt (9) are provided with six.
6. The energy consumption monitoring device based on the central air conditioner room as claimed in claim 1, wherein: two inside top of door plant (23) is provided with display screen (12) and pointer mechanism (13) respectively, the below of display screen (12) is provided with hasp (10), and hasp (10) and door plant (23) are embedded to be rotated and are connected, the below of pointer mechanism (13) is provided with handle pole (11).
CN202221144709.5U 2022-05-13 2022-05-13 Energy consumption monitoring device based on central air conditioner room Active CN217715351U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221144709.5U CN217715351U (en) 2022-05-13 2022-05-13 Energy consumption monitoring device based on central air conditioner room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221144709.5U CN217715351U (en) 2022-05-13 2022-05-13 Energy consumption monitoring device based on central air conditioner room

Publications (1)

Publication Number Publication Date
CN217715351U true CN217715351U (en) 2022-11-01

Family

ID=83795293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221144709.5U Active CN217715351U (en) 2022-05-13 2022-05-13 Energy consumption monitoring device based on central air conditioner room

Country Status (1)

Country Link
CN (1) CN217715351U (en)

Similar Documents

Publication Publication Date Title
CN204796024U (en) High-density micro-module data center
CN111295085A (en) Evaporative cooling air-conditioning system for data center based on air cooling and water cooling combined unit
WO2017097032A1 (en) Natural cold-source heat-dissipation system for various data equipment rooms
CN111884092B (en) Heat dissipation device for power equipment
CN207589404U (en) A kind of electronic equipment liquid cold cabinet
CN207868686U (en) Double cooling system switchgears
CN111457509A (en) Energy-saving air conditioner
CN207148764U (en) Cabinet fan-free water-cooling heat radiating device
CN217715351U (en) Energy consumption monitoring device based on central air conditioner room
CN213713625U (en) Novel cooling water waste heat recovery device
CN211953115U (en) Energy-saving air conditioner
Li et al. Rack-level Cooling Technologies for Data Centers–A Comprehensive Review
WO2020237743A1 (en) Modular data center for fresh air temperature and humidity control
CN112556041A (en) Simple indoor air cooling device
CN215582334U (en) Data center extended range type refrigerating system and data center
CN211047704U (en) Data center air treatment device
CN213300901U (en) Intelligent environment-friendly cooler with detachable access door
CN210781809U (en) Energy-saving heat dissipation rack
CN111726964A (en) Double-layer container refrigeration system and data center and control method thereof
CN208955516U (en) A kind of power distribution cabinet that safeguard function is good
CN208425097U (en) Lower air-supply refrigerating server cabinet system
CN208462280U (en) A kind of double-deck double cold source container data centers
CN207939928U (en) The liquid cooling system of a kind of electronic equipment
CN215379626U (en) Ring network type fluorine pump cooler mounting system
CN112672619A (en) Container type data center

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant