CN217631645U - Tower crane tower footing auxiliary positioning device - Google Patents

Tower crane tower footing auxiliary positioning device Download PDF

Info

Publication number
CN217631645U
CN217631645U CN202221507747.2U CN202221507747U CN217631645U CN 217631645 U CN217631645 U CN 217631645U CN 202221507747 U CN202221507747 U CN 202221507747U CN 217631645 U CN217631645 U CN 217631645U
Authority
CN
China
Prior art keywords
disc
sets
positioning device
auxiliary positioning
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221507747.2U
Other languages
Chinese (zh)
Inventor
王洲杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Pangyuan Construction Machinery Technology Co ltd
Original Assignee
Suzhou Pangyuan Construction Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Pangyuan Construction Machinery Technology Co ltd filed Critical Suzhou Pangyuan Construction Machinery Technology Co ltd
Priority to CN202221507747.2U priority Critical patent/CN217631645U/en
Application granted granted Critical
Publication of CN217631645U publication Critical patent/CN217631645U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a tower crane column foot auxiliary positioning device, including first disc, first disc surface rotation is connected with the second disc, make two sets of sleeves be the cross-shaped distribution through rotating first disc or second disc, first disc all installs the sleeve pipe with there being second disc surface, sleeve pipe internally mounted has two sets of telescopic cylinders, telescopic cylinder tip fixedly connected with set-square, second disc surface is equipped with two sets of arcs, arc restriction turned range, ensure that two sets of sleeves are the cross, first disc surface is equipped with two sets of metal poles, inside the arc that the metal pole injects the correspondence, the set-square can block in the corner of foundation ditch, the central point of foundation ditch when first disc is located the position this moment, and then confirm the mounted position of base, improve the efficiency of base installation, the engineering degree of difficulty has been reduced when reducing construction cost.

Description

Tower crane tower footing auxiliary positioning device
Technical Field
The utility model relates to a construction technical field specifically is a tower crane column foot auxiliary positioning device.
Background
At present, the frequency of using the tower crane is very high during building construction, the quantity of the tower crane installed on a building site is also more, the base needs to be fixed at the center of a foundation pit when the tower crane is installed, the base is heavy and inconvenient to carry, the base is difficult to fix at the center of the foundation pit under the condition of no tool assistance, the base is repeatedly adjusted to cause considerable waste of personnel and machinery, the carrying efficiency is low, the construction cost is increased, and meanwhile, the engineering difficulty is improved, so that the construction period is prolonged.
Therefore, in view of the above, research and improvement are performed on the existing structure and defects, and an auxiliary positioning device for a tower crane foundation is provided, so as to achieve the purpose of higher practical value.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a tower crane tower footing auxiliary positioning device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a tower crane tower footing auxiliary positioning device comprises a first disc, wherein a handle is fixedly connected to the side surface of the first disc, a second disc is rotatably connected to the surface of the first disc, a bearing is embedded in the center of the surface of the second disc, an insertion rod is arranged in the center of the surface of the first disc and is inserted into the bearing, the first disc and the second disc are identical in size, and a space is reserved between the first disc and the second disc;
the surfaces of the first disc and the second disc are provided with sleeves, the middle part of the surface of each sleeve is sleeved with a fixing plate, the fixing plates are fixedly connected with the corresponding first disc and the corresponding second disc, and the fixing plates are fixedly connected with the first disc and the second disc through two groups of screws;
two groups of telescopic cylinders are arranged in the sleeve, the end parts of the telescopic cylinders are fixedly connected with a triangular plate, a gear is arranged in the middle of the inner part of the sleeve, a first rack is fixedly connected in the telescopic cylinder on the left side, a second rack is fixedly connected in the telescopic cylinder on the right side, the first rack and the second rack are both meshed with the gear, the first rack and the second rack are respectively positioned on the upper side and the lower side of the gear, and the space in the telescopic cylinders can simultaneously accommodate the first rack and the second rack;
the second disc surface is equipped with two sets of arc walls, the second disc surface just is located the arc wall both ends and is equipped with the magnet piece, first disc surface is equipped with two sets of metal poles, inside the metal pole injects the arc wall that corresponds, the metal pole adopts the metal iron as the raw materials for the magnet piece can adsorb the metal pole.
Furthermore, the sleeve pipe tip cup joints the elastic sleeve, and the elastic sleeve still cup joints on telescopic cylinder surface, and the elastic sleeve adopts the rubber material to make, ensures that the elastic sleeve has good wear resistance.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a rotate first disc or second disc and make two sets of sleeve pipes be the cross-shaped distribution, and through arc wall restriction rotation range, ensure that two sets of sleeve pipes are the cross, two sets of telescopic cylinders that the pulling set-square can control to correspond extend in step, make the set-square can block in the corner of foundation ditch, the central point of foundation ditch when first disc is located the position this moment, and then confirm the mounted position of base, improve the efficiency of pedestal mounting, the engineering degree of difficulty has been reduced when reducing construction cost, thereby the time limit for a project has been shortened.
Drawings
Fig. 1 is a side view of the present invention;
FIG. 2 is a schematic structural view of a second disc of the present invention;
fig. 3 is a top view of the present invention;
fig. 4 is a sectional view of the sleeve of the present invention.
In the figure: 1. a first disc; 2. a second disc; 3. a handle; 4. a rod is inserted; 5. a metal rod; 6. a fixing plate; 7. a set square; 8. an arc-shaped slot; 9. a magnet block; 10. a bearing; 11. a sleeve; 12. an elastic sleeve; 13. a telescopic cylinder; 14. a first rack; 15. a second rack; 16. a gear.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a tower crane tower footing auxiliary positioning device comprises a first disc 1, wherein a handle 3 is fixedly connected to the side surface of the first disc 1, the whole positioning device is convenient to carry by utilizing the handle 3, a second disc 2 is rotatably connected to the surface of the first disc 1, a bearing 10 is embedded in the center of the surface of the second disc 2, an inserting rod 4 is arranged at the center of the surface of the first disc 1, the inserting rod 4 is inserted into the bearing 10, and the first disc 1 is rotatably connected with the second disc 2 by utilizing the inserting rod 4 and the bearing 10;
the sleeve 11 is supported by the first disc 1 and the second disc 2, the sleeve 11 is installed on the surfaces of the first disc 1 and the second disc 2, the middle of the surface of the sleeve 11 is sleeved with the fixed plate 6, the fixed plate 6 is fixedly connected with the corresponding first disc 1 and the second disc 2, two groups of telescopic cylinders 13 are installed inside the sleeve 11, the sleeve 11 can be extended through the telescopic cylinders 13, the end part of the sleeve 11 is sleeved with the elastic sleeve 12, and the elastic sleeve 12 is further sleeved on the surface of the telescopic cylinder 13, so that the sliding resistance of the telescopic cylinders 13 can be increased, and the telescopic cylinders 13 are prevented from independently sliding;
the end part of the telescopic cylinder 13 is fixedly connected with a triangular plate 7, the triangular plate 7 can be stably clamped at the corner of a foundation pit, a gear 16 is arranged in the middle inside the sleeve 11, a first rack 14 is fixedly connected inside the telescopic cylinder 13 on the left side, a second rack 15 is fixedly connected inside the telescopic cylinder 13 on the right side, and the first rack 14 and the second rack 15 are both meshed with the gear 16, so that synchronous extension of the two groups of telescopic cylinders 13 is realized;
2 surfaces of second disc are equipped with two sets of arc walls 8, 2 surfaces of second disc just are located 8 both ends of arc wall and are equipped with magnet piece 9, 1 surfaces of first disc are equipped with two sets of metal poles 5, inside metal pole 5 injects the corresponding arc wall 8, magnet piece 9 attracts metal pole 5, avoids metal pole 5 independently to rotate.
Specifically, during the use, put second disc 2 in the foundation ditch, rotate first disc 1, first disc 1 drives metal pole 5 and the sleeve pipe 11 that corresponds and rotates, metal pole 5 slides in arc 8, when metal pole 5 slides to the limit, adsorb by corresponding magnetite piece 9, prevent that first disc 1 from rotating, the sleeve pipe 11 on first disc 1 surface and the sleeve pipe 11 on second disc 2 surface are in the cross state this moment, pulling set-square 7, set-square 7 drives corresponding telescopic cylinder 13 and moves, telescopic cylinder 13 drives first rack 14 and rotates, first rack 14 drives gear 16 and rotates, gear 16 drives another group of telescopic cylinder 13 through the second rack 15 rather than the meshing and moves, make two groups of telescopic cylinder 13 stretch out from sleeve pipe 11 in step, align set-square 7 with the diagonal of foundation ditch, and make two groups of set-square 7 block in two relative corners of foundation ditch, second disc 2 just is in the center department of foundation ditch this moment, mark the position of second disc 2, install the base in mark department, make the base be in the center department of foundation ditch.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a tower crane column foot auxiliary positioning device, includes first disc (1), its characterized in that: first disc (1) surface rotation is connected with second disc (2), first disc (1) with have second disc (2) surface all to install sleeve pipe (11), sleeve pipe (11) internally mounted has two sets of telescopic cylinder (13), telescopic cylinder (13) tip fixedly connected with set-square (7), second disc (2) surface is equipped with two sets of arc wall (8), second disc (2) surface just is located arc wall (8) both ends and is equipped with magnet piece (9), first disc (1) surface is equipped with two sets of metal poles (5), metal pole (5) inject inside corresponding arc wall (8).
2. The tower crane tower footing auxiliary positioning device of claim 1, wherein: the gear (16) is installed in the middle of the inside of the sleeve (11), the left side is a first rack (14) fixedly connected with the inside of the telescopic cylinder (13), the right side is a second rack (15) fixedly connected with the inside of the telescopic cylinder (13), and the first rack (14) and the second rack (15) are both meshed with the gear (16).
3. The tower crane tower footing auxiliary positioning device of claim 1, wherein: the bearing (10) is embedded in the center of the surface of the second disc (2), the inserted rod (4) is arranged in the center of the surface of the first disc (1), and the inserted rod (4) is inserted into the bearing (10).
4. The tower crane tower footing auxiliary positioning device of claim 1, wherein: the middle part of the surface of the sleeve (11) is sleeved with a fixing plate (6), and the fixing plate (6) is fixedly connected with the corresponding first disc (1) and the second disc (2).
5. The tower crane tower footing auxiliary positioning device of claim 1, wherein: the side surface of the first disc (1) is fixedly connected with a handle (3).
6. The tower crane tower footing auxiliary positioning device of claim 1, wherein: the end part of the sleeve (11) is sleeved with an elastic sleeve (12), and the elastic sleeve (12) is further sleeved on the surface of the telescopic cylinder (13).
CN202221507747.2U 2022-06-16 2022-06-16 Tower crane tower footing auxiliary positioning device Active CN217631645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221507747.2U CN217631645U (en) 2022-06-16 2022-06-16 Tower crane tower footing auxiliary positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221507747.2U CN217631645U (en) 2022-06-16 2022-06-16 Tower crane tower footing auxiliary positioning device

Publications (1)

Publication Number Publication Date
CN217631645U true CN217631645U (en) 2022-10-21

Family

ID=83627720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221507747.2U Active CN217631645U (en) 2022-06-16 2022-06-16 Tower crane tower footing auxiliary positioning device

Country Status (1)

Country Link
CN (1) CN217631645U (en)

Similar Documents

Publication Publication Date Title
CN210050396U (en) PCCP pipeline fixing device for hydraulic engineering construction
CN210510507U (en) Pipeline embedding device for hydraulic engineering
CN217631645U (en) Tower crane tower footing auxiliary positioning device
CN109183843B (en) Prefabricated and assembled integral type concrete comprehensive pipe gallery and construction method
CN209780277U (en) Novel light partition plate installation dolly
CN216239838U (en) Embedded box pre-positioning fixing device
CN213461027U (en) Simple cable trench support structure
CN213508489U (en) Foundation pit retaining wall supporting structure
CN215860929U (en) Building engineering water supply and drainage pump convenient to install
CN210134433U (en) Construction management is with consolidating bearing structure
CN210837057U (en) Decision display device for urban and rural planning
CN213361306U (en) Support arrangement for municipal construction pipeline
CN212801291U (en) Warning baffle is used in municipal works construction
CN209080443U (en) A kind of large size PC plate placement bracket
CN219811927U (en) Auxiliary positioning device for hydropower installation
CN219754204U (en) Communication foundation joins in marriage net steel pipe pole subassembly
CN214034404U (en) Reinforcing steel bar mounting and positioning device for semi-grouting sleeve
CN220415582U (en) Support base with compression resistance function for wind driven generator
CN215518263U (en) Novel highway engineering template supports device
CN214740458U (en) Rail for municipal works
CN215803627U (en) Cement electric pole base mounting structure for communication
CN220488469U (en) Water conservancy pipeline laying device
CN215215096U (en) Reinforcement type drainage pipe structure is used in water conservancy water and electricity construction
CN214090813U (en) Ceramic tile soak device for building engineering
CN214900614U (en) Special tension pulley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant