CN217627089U CN202220093381.2U CN202220093381U CN217627089U CN 217627089 U CN217627089 U CN 217627089U CN 202220093381 U CN202220093381 U CN 202220093381U CN 217627089 U CN217627089 U CN 217627089U
Authority
CN
China
Prior art keywords
steel structure
floor
fork
roof beam
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220093381.2U
Other languages
Chinese (zh)
Inventor
张建忠
袁胜强
上建磊
潘源
肖良
李桐
范英春
葛二朋
汪峰
田经柱
肖思其
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction Municipal Engineering Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202220093381.2U priority Critical patent/CN217627089U/en
Application granted granted Critical
Publication of CN217627089U publication Critical patent/CN217627089U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a be used for simple and easy convenient shaped steel structure roof beam hoist and mount supporting device on floor, belong to steel structure roof beam hoist and mount field, a be used for simple and easy convenient shaped steel structure roof beam hoist and mount supporting device on floor, the on-line screen storage device comprises a base, the upside fixedly connected with stand of base, the electric block body is installed through the lug to the upside of stand, be equipped with steel structure roof beam hoist on the lift hook of electric block body downside, steel structure roof beam hoist is including the pulling force area, first fork board and second fork board all comprise a fixed mainboard and two picture pegs at least, one side at fixed mainboard is all fixed to two picture pegs, it can realize, the security of girder steel hoist and mount has been increased, the accuracy of installation, and can utilize the gravity of steel structure roof beam self to promote clamping-force and stability to the steel structure roof beam.

Description

Simple and convenient profile steel structure beam hoisting matching device used on floor
Technical Field
The utility model relates to a steel construction roof beam hoist and mount field, more specifically say, relate to a simple and easy convenient shaped steel structure roof beam hoist and mount supporting device for on floor.
Background
According to the steel structure beam hoisting device disclosed by the authorized bulletin number of CN212668947U, although the operation process of binding at two ends of a steel structure beam through ropes is cancelled, two groups of integral devices are used, two ends of the steel structure beam are respectively placed on two groups of supporting pieces, and then the steel structure beam is respectively connected with two groups of lug plates through two equilong ropes and then hoisted, so that the gravity center of a hoisting point is kept perpendicular to the gravity center of profile steel, the horizontal hoisting of the steel structure beam is facilitated, the construction is convenient, the convenience is improved, and the practicability is high;
but do not solve the security that current device carries out girder steel hoist and mount relatively poor, the accuracy of installation relatively poor, lead to the efficiency of girder steel hoist and mount relatively poor in floor, the construction of roofing steel construction, the engineering comprehensive cost is higher, and the device is to the relatively poor problem of the stability of girder steel fixation, for this reason we provide a simple and easy convenient shaped steel structure roof beam hoist and mount supporting device for on the floor.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a simple and easy convenient shaped steel structure roof beam hoists supporting device for floor, it can realize, has increased the security of girder steel hoist and mount, the accuracy of installation, and can utilize the gravity of steel structure roof beam self to promote clamping-force and stability to the steel structure roof beam.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A simple and convenient steel structure beam hoisting matching device used on a floor comprises a base, wherein an upright post is fixedly connected to the upper side of the base, an electric hoist body is installed on the upper side of the upright post through a lifting lug, and a steel structure beam hoisting tool is installed on a lifting hook on the lower side of the electric hoist body;
the steel structure beam hoist is including pulling force area, first fork board and second fork board all comprise a fixed mainboard and two picture pegs at least, two the picture peg is all fixed in one side of fixed mainboard, two clearance grooves have been seted up on the fixed mainboard of first fork board, the fixed mainboard that clearance groove and second fork board were all run through at the lower part both ends in pulling force area is connected, the upper end in pulling force area is connected with the lift hook of electric block body.
Furthermore, two end corners of the two sides of the base are respectively provided with a lifting sliding wheel.
Furthermore, two inclined struts are fixedly connected between the base and the upright post.
Furthermore, the position of the interior of the clearance groove, which is far away from the insert plate, is rotatably connected with a loss reducing shaft.
Furthermore, two positioning rods are fixedly connected to the fixed main board of the first fork plate, and the fixed main board of the second fork plate is connected with the positioning rods in a sliding mode.
Furthermore, the outside of locating lever and be located the second fork board and keep away from one side of first fork board and cup joint the return spring.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
(1) The cooperation of this scheme through each accessory has realized on floor or the roofing not relying on the tower crane, the mobile crane, the large-scale equipment such as fork truck carries out the breakthrough of hoist and mount, has increased the security of girder steel hoist and mount, the accuracy of installation, has improved the efficiency of girder steel hoist and mount in floor, the construction of roofing steel construction greatly, has reduced the engineering comprehensive cost.
(2) This scheme can utilize the gravity promotion of steel construction roof beam self to the clamping-force of steel construction roof beam through setting up steel construction roof beam hoist to effectual hoisting device's stability.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the steel structure beam hanger of the present invention;
fig. 3 is a schematic view of a sectioning structure of the steel structure beam hanger of the present invention;
fig. 4 is the utility model discloses steel structure beam hoist dissects the side view.
The reference numbers in the figures illustrate:
1. a base; 2. a tension band; 3. a first fork plate; 4. bracing; 5. a column; 6. an electric hoist body; 7. lifting lugs; 8. a sliding wheel capable of lifting; 9. a second yoke plate; 10. positioning a rod; 11. a return spring; 12. the shaft is lost.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
Example 1:
referring to fig. 1-4, a simple and convenient steel structure beam hoisting matching device for floors comprises a base 1, wherein an upright post 5 is fixedly connected to the upper side of the base 1, an electric hoist body 6 is installed on the upper side of the upright post 5 through a lifting lug 7, and a steel structure beam hoisting tool is installed on a lifting hook on the lower side of the electric hoist body;
the base 1 is a rectangular chassis formed by welding 7H-beams with the same length and the same model 20# in a combined mode, the crossing position of 4H-beams in the middle of the upper portion is welded with 1 iron plate with 30X 60cm, namely 4H-beams with the same model are welded in parallel to form a rectangular frame, 3 same H-beams in the frame are welded in a cross mode and are welded with the frame, the crossing position is close to one side of the frame, 1 iron plate with 30X 60cm is welded at the cross position of the H-beams, and 4 holes are formed in four corners of the iron plate respectively and are used for being connected with upright column bolts;
wherein, for the removal of convenient device, two extreme angle departments of base 1 both sides all are provided with liftable movable pulley 8.
Wherein, for the stability of reinforcing stand 5, two bracing 4 of fixedly connected with between base 1 and the stand 5 for consolidate stand 5, pulling force area 2 is oblique hollow steel pipe diameter 8cm, wall thickness 5mm, and its lower part bolted connection is on the reentrant corner of the 1 inboard one side far away from stand 5 of base, and the same bolted connection in upper portion forms stable spatial structure on stand 5, bolted connection, the installation and the dismantlement of being convenient for.
The upright column 5 is formed by combining a thick hollow steel pipe upright rod with the pipe diameter of 18cm, the wall thickness of 8mm and an iron plate, the iron plate is 30 x 60cm in size and is welded at the bottom of the upright rod, holes with the same number and size are formed in the corresponding positions of the iron plate and the base 1 and are used for being connected with the bolts of the base 1, the bolts are convenient for the assembly and disassembly of the upright column 5 and the base 1, and the upright column 5 slightly inclines to the inner side by about 5-10 cm and inclines to the inner side with the inclined strut 4.
Wherein, lug 7 is welded at 5 tops on the stand by violently erecting two 30 x 1.8cm iron plates, and wherein horizontal iron plate parallel weld is at 5 tops on the stand, and vertical iron plate is connected with stand 5 and horizontal roof full weld, and vertical iron plate sets up 2 holes and is used for hanging electric block body 6.
Wherein, electric block body 6 provides its lower extreme lift lifting hook power that wholly rises, and the electric block body is hung on lug 7 through the hinge, selects the simple and easy automatic rising type electric block of the general selection load 3t/5t according to actual conditions, bears the weight and must satisfy the load requirement.
As shown in fig. 1-2, the steel structure beam hanger comprises a tension band 2, a first fork plate 3 and a second fork plate 9, wherein the first fork plate 3 and the second fork plate 9 are both composed of at least one fixed main plate and two plug boards, the two plug boards are both fixed on one side of the fixed main plate, two clearance grooves are formed in the fixed main plate of the first fork plate 3, both ends of the lower part of the tension band 2 penetrate through the clearance grooves and are connected with the fixed main plate of the second fork plate 9, and the upper end of the tension band 2 is connected with a lifting hook of an electric hoist body 6;
the steel structure beam consists of two steel structures Liang Hengban and a steel structure Liang Shuban;
when carrying out the handling to steel construction roof beam, place first fork board 3 and second fork board 9 respectively at the upside and the downside of a steel construction Liang Hengban, and second fork board 9 is located the upside of first fork board 3, two picture pegs are located steel construction Liang Shuban's both sides, then electric block body 6's lift hook pulling tension band 2, when tension band 2 was promoted, can drive second fork board 9 and move downwards, first fork board 3 upwards moves, let first fork board 3 and second fork board 9 carry out the centre gripping to steel construction roof beam, thereby utilize the gravity of steel construction roof beam self to promote the clamping-force of steel construction roof beam hoist to steel construction roof beam, thereby effectual hoisting device's stability.
And, in order to reduce the wearing and tearing that pulling force area 2 received when hoist and mount steel structure roof beam, the position that the picture peg was kept away from to clearance groove inside rotates and is connected with and subtracts and decreases axle 12, and the rotation through subtracting and decrease axle 12 can effectually reduce the frictional force between first fork board 3 and the pulling force area 2 when pulling force area 2 removes. The tension belt 2 is a soft belt and is made of synthetic nylon with strong bearing capacity.
For better to first fork board 3 and second fork board 9 fix a position, two locating levers 10 of fixedly connected with on the fixed mainboard of first fork board 3, the fixed mainboard and the locating lever 10 sliding connection of second fork board 9 can effectually avoid taking place the dislocation phenomenon between first fork board 3 and the second fork board 9 through setting up locating lever 10.
Simultaneously, in order to make first fork board 3 and second fork board 9 can carry out the centre gripping to the steel construction roof beam, the outside of locating lever 10 just is located second fork board 9 and keeps away from one side of first fork board 3 and cup joints return spring 11, can drive second fork board 9 and remove towards the direction that is close to first fork board 3 through setting up return spring 11, lets first fork board 3 and second fork board 9 carry out the centre gripping to the steel construction roof beam. The first fork plate and the second fork plate can be used for sheathing a rubber layer on a clamping surface of the steel structure beam and improving friction force.
When in use: the first fork plate 3 and the second fork plate 9 are respectively placed on the upper side and the lower side of a steel structure Liang Hengban, the second fork plate 9 is located on the upper side of the first fork plate 3, the two plug boards are located on the two sides of the steel structure Liang Shuban, then the electric hoist body 6 is started, the lifting hook of the electric hoist body pulls the tension belt 2, when the tension belt 2 is pulled, the second fork plate 9 is driven to move downwards, the first fork plate 3 moves upwards, the first fork plate 3 and the second fork plate 9 clamp the steel structure beam, the clamping force of a steel structure beam lifting tool on the steel structure beam is improved by utilizing the gravity of the steel structure beam, the stability of the lifting device is effectively improved, the breaking through of lifting by large-scale equipment such as a tower crane, an automobile crane and a forklift on a floor or a roof is realized through the matching of various accessories, the safety of steel beam lifting and the accuracy of steel beam lifting are increased, the floor and the efficiency of lifting in a construction roof are greatly improved, and the comprehensive cost of engineering is reduced.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (6)

1. The utility model provides a be used for simple and easy convenient shaped steel structure roof beam hoist and mount supporting device on floor, includes base (1), its characterized in that: an upright post (5) is fixedly connected to the upper side of the base (1), an electric hoist body (6) is mounted on the upper side of the upright post (5) through a lifting lug (7), and a steel structure beam lifting appliance is mounted on a lifting hook on the lower side of the electric hoist body;
steel construction roof beam hoist is including pulling force area (2), first fork board (3) and second fork board (9) all comprise a fixed mainboard and two picture pegs at least, two the one side at fixed mainboard is all fixed to the picture peg, two clearance grooves have been seted up on the fixed mainboard of first fork board (3), the fixed mainboard that clearance groove and second fork board (9) all run through at the lower part both ends of pulling force area (2) is connected, the upper end in pulling force area (2) is connected with the lift lifting hook of electric block body (6).
2. The simple and convenient steel structure beam hoisting matching device for the floor as claimed in claim 1, which is characterized in that: two end angles on two sides of the base (1) are respectively provided with a lifting sliding wheel (8).
3. The simple and convenient steel structure beam hoisting matching device for the floor as claimed in claim 1, which is characterized in that: two inclined struts (4) are fixedly connected between the base (1) and the upright post (5).
4. The simple and convenient steel structure beam hoisting matching device for the floor as claimed in claim 1, which is characterized in that: and a loss reducing shaft (12) is rotatably connected to the position, far away from the insert plate, in the clearance groove.
5. The simple and convenient steel structure beam hoisting matching device for the floor as claimed in claim 1, which is characterized in that: two positioning rods (10) are fixedly connected to the fixed main board of the first fork plate (3), and the fixed main board of the second fork plate (9) is connected with the positioning rods (10) in a sliding mode.
6. The simple and convenient steel structure beam hoisting matching device for the floor as claimed in claim 5, which is characterized in that: and a return spring (11) is sleeved on the outer side of the positioning rod (10) and on one side of the second fork plate (9) far away from the first fork plate (3).
CN202220093381.2U 2022-01-14 2022-01-14 Simple and convenient profile steel structure beam hoisting matching device used on floor Active CN217627089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220093381.2U CN217627089U (en) 2022-01-14 2022-01-14 Simple and convenient profile steel structure beam hoisting matching device used on floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220093381.2U CN217627089U (en) 2022-01-14 2022-01-14 Simple and convenient profile steel structure beam hoisting matching device used on floor

Publications (1)

Publication Number Publication Date
CN217627089U true CN217627089U (en) 2022-10-21

Family

ID=83643128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220093381.2U Active CN217627089U (en) 2022-01-14 2022-01-14 Simple and convenient profile steel structure beam hoisting matching device used on floor

Country Status (1)

Country Link
CN (1) CN217627089U (en)

Similar Documents

Publication Publication Date Title
CN205443944U (en) A turning device for prefabricating hoist and mount of stand unit
CN217708524U (en) Wallboard overhead hoist
CN207108405U (en) Portable light-duty jacking apparatus
CN217627089U (en) Simple and convenient profile steel structure beam hoisting matching device used on floor
CN218860210U (en) Lifting equipment for conveying
CN201762035U (en) Simple crane movable arm
CN210084790U (en) Hoisting mechanism for assembly construction engineering
CN216425408U (en) Jig frame for storing and transporting heavy hanging beam
CN115583584A (en) Unequal-height double-fulcrum full-rotation type light truss hoisting device and construction method
CN214167159U (en) Hoisting system for installing anti-falling beam stop block in box girder
CN115924707A (en) Hoisting method for large rolling mill frame
CN213387531U (en) Durable counterweight type portable crane
CN214087457U (en) Movable steel frame type small steel column and steel beam hoisting tool
CN210393494U (en) Vertical hoisting device for building
CN210260897U (en) Hoisting device for prefabricated part
CN210140393U (en) Curtain wall suspension hoisting gun carriage
CN210764022U (en) Hoisting device for mounting load-bearing light keel
CN210682973U (en) Crane walking frame capable of improving bearing capacity of I-beam
CN209957212U (en) Lifting appliance and lifting system for mounting component under beam
CN112660993A (en) Box girder falling-prevention stop block mounting system and construction method
CN214570490U (en) Mast type device for lifting forklift
CN221440170U (en) Hoisting mechanism of pier column climbing frame
CN201334337Y (en) Manual crane
CN215711322U (en) Lifting machine for building engineering
CN214692872U (en) Valve lifting hanger plate for bearing