CN217601228U - Bridge floor safety protection guardrail pole setting fixing device - Google Patents

Bridge floor safety protection guardrail pole setting fixing device Download PDF

Info

Publication number
CN217601228U
CN217601228U CN202221384980.6U CN202221384980U CN217601228U CN 217601228 U CN217601228 U CN 217601228U CN 202221384980 U CN202221384980 U CN 202221384980U CN 217601228 U CN217601228 U CN 217601228U
Authority
CN
China
Prior art keywords
safety protection
hook
bracket
fixing device
bridge floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221384980.6U
Other languages
Chinese (zh)
Inventor
祁强
李君�
杨宝塔
崔明
林建清
张元兵
罗耕耘
陈亮
杜成龙
陈晓岚
孙艳丽
薛斌斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN202221384980.6U priority Critical patent/CN217601228U/en
Application granted granted Critical
Publication of CN217601228U publication Critical patent/CN217601228U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a bridge floor safety protection guardrail upright rod fixing device, which comprises a pillar, a bracket and a hook piece; the support columns are vertically arranged; the bracket is transversely arranged; the lower part of the strut is connected with the middle part of the bracket; the hook member has a rod portion and a hook portion connected to one end of the rod portion, and the other end of the rod portion is adjustably lockingly connected to the bracket. The utility model discloses can be simple and easy and firm fix safety protection guardrail pole setting on wall formula guardrail embedded reinforcement, have ann tear open advantages such as simple manufacture. The construction process of the traditional bridge floor safety protection device is greatly simplified, binding or welding is not needed, the bridge floor safety protection device is directly fixed on the embedded steel bars of the wall type guardrail, and the construction period of the safety protection guardrail is effectively accelerated.

Description

Bridge floor safety protection guardrail pole setting fixing device
Technical Field
The utility model relates to a bridge railing construction field, concretely relates to bridge floor safety protection guardrail pole setting fixing device.
Background
According to the regulation, need set up the guardrail bar and hang and establish the safety net in roof beam face both sides before the bridge floor construction. The traditional guardrail bar generally adopts the mode of welding, fastener or steel wire ligature to fix the pole setting on bridge railing embedded bar, or adopts the mode of setting up the bracing to fix the guardrail pole setting. The traditional guard rail has the defects of inconvenient disassembly and assembly, poor stability, larger occupied space and the like in the use process. Even the current popular fabricated safety protection guardrail has the characteristics of high manufacturing cost, large occupied space and the like, and most of the fabricated safety protection guardrails can only be installed on the inner sides of the embedded steel bars of the guardrail, so that the fabricated safety protection guardrail is less in bridge deck construction safety protection. Therefore, the installation mode of the safety protection guardrail at present mainly has the following problems:
1. inconvenient disassembly and assembly, poor stability, low working efficiency, labor and time consumption.
The traditional safety protection guardrail vertical rod is mostly made of a steel pipe with the diameter of 48 and fixed on the embedded steel bars of the bridge guardrail in a fastener, welding or binding mode. The traditional safety protection guardrail has the defects of inconvenience in mounting and dismounting, long working period, low construction efficiency, poor stability, material consumption, damage to embedded steel bars and the like in the using process. If adopt the fixed guardrail pole setting of the mode that sets up the bracing, there are ann to tear open inconveniently equally, duty cycle extension, the efficiency of construction is lower, stability is relatively poor scheduling problem, occupies bridge floor space shortcoming such as great simultaneously.
2. High cost and large occupied space.
The assembled guardrail is concentrated by the batch production and is made, transports the field assembly, and the installation is swift, but its cost is higher, and the safe input cost is great, uneconomic, and can only install at the guardrail inboard mostly, and it is great to occupy the bridge floor space.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide a bridge floor safety protection guardrail pole setting fixing device, aim at shortening safety protective guard installation time, improve work efficiency.
For solving the technical problem, the utility model discloses the technical scheme who adopts does: a bridge floor safety protection guardrail upright rod fixing device comprises a pillar, a bracket and a hook piece; the support columns are vertically arranged; the bracket is transversely arranged; the lower part of the strut is connected with the middle part of the bracket; the hook member has a rod portion and a hook portion connected to one end of the rod portion, and the other end of the rod portion is adjustably lockingly connected to the bracket.
As a further technical solution of the above aspect, at least two hook members are provided.
As a further technical solution of the above solution, the hook members are separately provided at both sides of the bracket or all provided at the same side of the bracket.
As a further technical solution of the above aspect, the number of the hook members is even, and the even number of the hook members are symmetrically arranged on both sides of the bracket with respect to the pillar.
As a further technical solution of the above scheme, the bracket is provided with a through hole or a through groove for the rod part of the hook part to pass through.
As a further technical scheme of the scheme, the device also comprises a nut; the rod part of the hook part is provided with a thread matched with the nut; and the rod part of the hook part penetrates through the through hole or the through groove on the support and is locked by the nut in a screwing way.
As a further technical solution of the above, the pillar, the bracket and the hook member are all made of metal materials.
As a further technical scheme of the scheme, the supporting column, the bracket and the hook piece are all made of steel bars.
Compared with the prior art, the utility model, have following advantage and beneficial effect: the utility model discloses can be simply and firmly fix safety protection guardrail pole setting on wall formula guardrail embedded steel bar, have ann tear open advantages such as simple and easy, simple manufacture. The construction process of the traditional bridge deck safety protection device is greatly simplified. And the wall type guardrail is directly fixed on the embedded steel bars of the wall type guardrail without binding or welding, so that the construction period of the safety protection guardrail is effectively shortened.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is the utility model discloses with guardrail embedded steel bar's relation of connection schematic diagram.
The explanation of each reference number in the figure is: pillar 1, support 2, hook portion 3, pole portion 4, nut 5, screw thread 6, guardrail embedded steel 7, hook portion 8.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the present invention will be further described in detail with reference to the specific embodiments.
In the description of the present invention, it should be understood that the directional descriptions, such as the directions or positional relationships indicated by upper, lower, front, rear, left, right, etc., are based on the directions or positional relationships shown in the drawings, and are only for convenience of description and simplification of the description, but not for indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and thus should not be construed as limiting the present invention.
In the description of the present invention, a plurality of means are one or more, a plurality of means are two or more, and the terms greater than, less than, exceeding, etc. are understood as not including the number, and the terms greater than, less than, within, etc. are understood as including the number. The terms first, second and the like, if any, are used for distinguishing technical features only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of technical features indicated.
In the description of the present invention, unless there is an explicit limitation, the words such as setting, installation, connection, etc. should be understood in a broad sense, and those skilled in the art can reasonably determine the specific meanings of the above words in combination with the specific contents of the technical solution.
As shown in fig. 1 to 2, a bridge deck safety protection guardrail vertical rod fixing device according to an embodiment of the present application includes a pillar 1, a bracket 2, and a hook member 8.
The support column 1 is vertically arranged; the bracket 2 is transversely arranged; the lower part of the strut 1 is connected with the middle part of the bracket 2; the hook member 8 has a rod portion 4 and a hook portion 3 connected to one end of the rod portion 4, and the other end of the rod portion 4 is adjustably lockingly connected to the bracket 2.
Specifically, bridge floor safety protection guardrail pole setting fixing device who this application embodiment mainly contained: a cross fork formed by welding reinforcing steel bars, two hooks with screw heads made of round steel and two nuts matched with the hooks.
Two steel bars with the diameter not smaller than C16 can be used and are horizontally aligned up and down, and the two ends of the two steel bars are welded together to form the whole bracket 2. The length of the reinforcing steel bars is determined according to the width of the guardrail embedded reinforcing steel bars 7 of the bridge floor. Then, a steel bar with the length of 45cm and the diameter not less than C32 is selected as the pillar 1 and welded at the middle position of the support 2, so that the pillar 1 and the support 2 form a cross, but the upper part of the pillar 1 is required to be ensured to exceed the support 2 by about 40cm. The upright stanchion of the guardrail to be installed is inserted into the upper part of the stanchion 1, thereby realizing the installation of the safety protection guardrail.
The crotch of taking the silk head chooses for use the round steel that the diameter is not less than A12, and one end is made into crotch portion 3, and one end is as pole portion 4 and car silk external screw thread 6, and car silk length is not less than 10cm, and length should be according to 7 intervals of guardrail embedded steel, and guarantee that crotch portion 3 can catch on guardrail embedded steel 7 can.
When the cross guardrail embedded steel bar fixing device is used, as shown in fig. 2, the short edge of the welded cross vertical steel bar is downwards kept horizontally placed with wall guardrail embedded steel bars, one side of the smooth round steel bar elbow is hooked on the wall guardrail embedded steel bars, the tail of the smooth round steel bar elbow penetrates through the gap of the left end of the cross transverse steel bar, and the cross transverse steel bar is fixed through the tightening nut. The right end also uses plain steel bar elbow to collude on wall formula guardrail embedded bar, and the afterbody passes the horizontal reinforcing bar right-hand member clearance of cross, and it is fixed to tighten nut. And finally, the common steel pipe is inserted on the upper edge of the cross-shaped steel bar, so that the installation time of the safety protective guard is greatly shortened, and the working efficiency is improved.
In some embodiments, the number of the hook members 8 is at least two, the more the hook members 8 are arranged, and the connection between the bridge deck safety protection guardrail upright rod fixing device and the guardrail embedded steel bars 7 is more stable in the embodiment of the application.
The hook members 8 may be disposed on two sides of the bracket 2 in a dispersed manner, or may be disposed on the same side of the bracket 2.
If the number of the hook elements 8 is even, the even number of the hook elements 8 are symmetrically arranged on two sides of the support 2 relative to the support 1 so as to balance stress and avoid deformation caused by uneven stress.
The support 2 can be composed of two reinforcing steel bars, a through groove for the rod part 4 of the hook part 8 to pass through is formed between the two reinforcing steel bars, so that the hook part 8 can be randomly adjusted to be connected with the support 2 according to actual conditions. The support 2 can also be made of a steel plate, and a plurality of through holes are formed in the steel plate for the rod part 4 of the hook part 8 to pass through, so that the same connecting function and position adjusting function can be realized.
The supporting column 1, the support 2 and the hook piece 8 can be made of steel plates, steel pipes and other metal materials except steel bars, and the selection is flexible and various.
Bridge floor safety protection guardrail pole setting fixing device can simplify bridge floor safety protection guardrail installation procedure, promote work efficiency, improve the construction safety nature. And the device can be repeatedly used, and the construction safety is also grasped to the real position while the engineering benefit is improved. The device is practical application for the applicant, has obvious effect, low cost and high income, is safe and reliable, and is worth of being widely popularized and publicized in similar construction.
The device also has the following advantages:
1. the construction is simple and convenient, and efficiency is high-efficient:
traditional bridge floor safety device generally adopts the mode of welding, fastener or ligature to fix the pole. And a bridge floor safety protection guardrail pole setting fixing device then can be simply and firmly fix safety protection guardrail pole setting on wall formula guardrail embedded steel bar, have ann tear open advantages such as simple to operate. The construction process of the traditional bridge deck safety protection device is greatly simplified, the operation difficulty of constructors is effectively reduced, and the installation efficiency of the bridge deck safety protection guardrail is greatly improved.
2. Low cost and high yield:
the mode of fixedly adopting the ligature by traditional safety protection guardrail pole setting is to new installation and need not ligature or welding, directly fixes on the pre-buried reinforcing bar of wall formula guardrail, has accelerated the construction cycle of safety protection guardrail effectively. Meanwhile, the device is processed by waste steel bars on a construction site and can be repeatedly used, so that the construction cost is greatly saved. Therefore, the invention truly puts the life and property safety of workers to the first place, and greatly improves the construction safety and economic feasibility.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above preferred embodiments should not be considered as limiting the invention, which is intended to be limited only by the scope of the appended claims. It will be apparent to those skilled in the art that various modifications and enhancements can be made without departing from the spirit and scope of the invention, and such modifications and enhancements are intended to be within the scope of the invention.

Claims (8)

1. The utility model provides a bridge floor safety protection guardrail pole setting fixing device which characterized in that: comprises a pillar (1), a bracket (2) and a hook piece (8); the supporting columns (1) are vertically arranged; the bracket (2) is transversely arranged; the lower part of the strut (1) is connected with the middle part of the bracket (2); the hook piece (8) is provided with a rod part (4) and a hook part (3) connected to one end of the rod part (4), and the other end of the rod part (4) is connected with the support (2) in an adjustable locking mode.
2. The bridge floor safety protection guardrail pole setting fixing device of claim 1, characterized in that: the number of the hook elements (8) is at least two.
3. The bridge floor safety protection guardrail pole setting fixing device of claim 2, characterized in that: the hook members (8) are dispersedly arranged on two sides of the support (2) or are all arranged on the same side of the support (2).
4. The bridge floor safety protection guardrail pole setting fixing device of claim 2, characterized in that: the number of the hook pieces (8) is even, and the even number of the hook pieces (8) are symmetrically arranged on two sides of the support (2) relative to the support (1).
5. A bridge deck safety barrier upright fixing device as claimed in any one of claims 2 to 4, wherein: the support (2) is provided with a through hole or a through groove for the rod part (4) of the hook piece (8) to pass through.
6. The bridge floor safety protection guardrail pole setting fixing device of claim 5, characterized in that: also comprises a nut (5); a screw thread (6) matched with the nut (5) is arranged on the rod part (4) of the hook part (8); the rod part (4) of the hook piece (8) penetrates through the through hole or the through groove in the support (2) and then is locked by the nut (5) in a threaded mode.
7. The bridge floor safety protection guardrail pole setting fixing device of claim 1, characterized in that: the supporting column (1), the bracket (2) and the hook piece (8) are all made of metal materials.
8. The bridge deck safety barrier upright fixing device of claim 7, wherein: the supporting column (1), the bracket (2) and the hook piece (8) are all made of steel bars.
CN202221384980.6U 2022-06-06 2022-06-06 Bridge floor safety protection guardrail pole setting fixing device Active CN217601228U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221384980.6U CN217601228U (en) 2022-06-06 2022-06-06 Bridge floor safety protection guardrail pole setting fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221384980.6U CN217601228U (en) 2022-06-06 2022-06-06 Bridge floor safety protection guardrail pole setting fixing device

Publications (1)

Publication Number Publication Date
CN217601228U true CN217601228U (en) 2022-10-18

Family

ID=83588175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221384980.6U Active CN217601228U (en) 2022-06-06 2022-06-06 Bridge floor safety protection guardrail pole setting fixing device

Country Status (1)

Country Link
CN (1) CN217601228U (en)

Similar Documents

Publication Publication Date Title
CN205557398U (en) View cable guardrail
CN215564668U (en) Safety belt hangs mobile device
CN217601228U (en) Bridge floor safety protection guardrail pole setting fixing device
AU2017100323A4 (en) Apparatus for Bolstering a Monopole
CN110714603A (en) Steel pipe and steel rope composite scaffold system and construction method thereof
CN211080240U (en) Circular triangular support assembly for cylindrical reinforcement cage
CN212249150U (en) Scaffold gangboard
CN214658653U (en) A overhanging type scaffold strutting arrangement for building engineering
CN107435444A (en) A kind of bracing means of combined frame work height across part
CN211736295U (en) Detachable multifunctional high-strength bolt construction platform device
CN217870014U (en) Bridge railing construction safety device
CN209907905U (en) Construction scaffold is wall spare even
CN217266942U (en) Wall device is held up to assembled safe cat ladder with adjustable
CN216616786U (en) Pole setting limiting device for overhanging scaffold
CN219587046U (en) Pressure load dispersion anchoring device
CN101525947A (en) Three-pole steel tube lapping fastener
CN219826193U (en) Steel bar positioning structure for building construction
CN214055810U (en) Integral tensioning structure of prefabricated bridge plate
CN211775552U (en) Detachable door type scaffold system
CN220686720U (en) Adjustable horizontal pull rod device for template support
CN218090580U (en) Inclined leg rigid frame bridge dismantling device
CN217886832U (en) Device for preventing high falling
CN211647200U (en) Floor type bearing platform system
CN220395274U (en) Fixing device of safety belt
CN217076777U (en) Tower crane attachment system for frame structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant