CN217571158U - Steel pipe cutting equipment for house construction engineering - Google Patents

Steel pipe cutting equipment for house construction engineering Download PDF

Info

Publication number
CN217571158U
CN217571158U CN202221539710.8U CN202221539710U CN217571158U CN 217571158 U CN217571158 U CN 217571158U CN 202221539710 U CN202221539710 U CN 202221539710U CN 217571158 U CN217571158 U CN 217571158U
Authority
CN
China
Prior art keywords
steel pipe
cutting
workstation
installs
limiting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221539710.8U
Other languages
Chinese (zh)
Inventor
王德峰
王鹏
王建立
孙思雷
刘先振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221539710.8U priority Critical patent/CN217571158U/en
Application granted granted Critical
Publication of CN217571158U publication Critical patent/CN217571158U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a steel pipe cutting equipment for building engineering, include: the workstation, all install the support column all around of workstation bottom, and the intermediate position department on workstation top has seted up the silo, the both ends of workstation both sides all rotate and are connected with the gim peg, and one side of gim peg installs the limiting plate through the bearing, the intermediate position department on workstation top installs the cutting case, and the bottom of cutting case one side installs the scale, pneumatic telescopic rod is installed on the inside top of cutting case, and pneumatic telescopic rod's output installs the cutting knife. The utility model discloses the accessible rotates the adjusting bolt and drives the limiting plate motion and carry on spacingly to the steel pipe, and the steel pipe of being convenient for removes through setting up of ball during, then rotates the lead screw and drives the sleeve and make the expansion plate motion, and it is spacing to finally cooperate the scale to carry on the steel pipe, is convenient for remove steel pipe and accurate control cutting position to the problem that lacks good spacing and cutting point location has been solved.

Description

Steel pipe cutting equipment for house construction engineering
Technical Field
The utility model relates to an engineering apparatus technical field is built in the room, specifically is a steel pipe cutting equipment is built in room engineering.
Background
In the building construction, a large amount of building materials are transported and installed, wherein a steel pipe is used as one of main stream materials and is often used as a support member or a transport pipeline, and when the steel pipe is transported to a construction site, the length of the steel pipe is often long, and when the steel pipe is used in different places, a cutting device is required to be used for cutting.
Present steel pipe cutting equipment often places the steel pipe on equipment, moves the steel pipe through the manual work, makes it cutting position department be in the cutting knife below, and the manual work is pressed the steel pipe and is fixed during the cutting, and it is very troublesome that whole use gets up.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel pipe cutting equipment is used in building engineering to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a steel pipe cutting equipment for house construction engineering, includes: the workstation, all install the support column all around of workstation bottom, and the intermediate position department on workstation top has seted up the silo, the both ends of workstation both sides all rotate and are connected with the gim peg, and one side of gim peg installs the limiting plate through the bearing, the intermediate position department on workstation top installs the cutting case, and the bottom of cutting case one side installs the scale, pneumatic telescopic rod is installed on the inside top of cutting case, and pneumatic telescopic rod's output installs the cutting knife.
As a further aspect of the present invention: guide rods are installed at two ends of one side of the limiting plate, and guide grooves are correspondingly formed in the side wall of the workbench on one side of each guide rod.
As a further aspect of the present invention: the lower extreme of cutting case one side rotates and is connected with the lead screw, and the outer wall of lead screw rotates and is connected with the sleeve, telescopic cover is installed to telescopic bottom, and telescopic cover's inside sliding connection has the expansion plate.
As a further aspect of the present invention: the upper end of one side of the cutting box is provided with a slide bar, and the outer wall of the slide bar is connected with a guide cylinder connected with a sleeve in a sliding manner.
As a further aspect of the present invention: the limiting plate looks sideways at the shape and is the arc, and the inside upper end of limiting plate and lower extreme rotate evenly to be connected with the ball.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this steel pipe cutting equipment for building engineering drives the limiting plate motion through rotating the adjusting bolt and carries on spacingly to the steel pipe, and the steel pipe of being convenient for removes through setting up of ball during, then rotates the lead screw and drives the sleeve and make the expansion plate motion, and it is spacing to finally cooperate the scale to carry out the steel pipe, is convenient for remove steel pipe and accurate control cutting position to the problem that lacks good spacing and cutting point location has been solved.
Drawings
Fig. 1 is a schematic view of the three-dimensional structure of the present invention.
Fig. 2 is a schematic view of the front view cross-sectional structure of the present invention.
Fig. 3 is the utility model discloses limiting plate look sideways at section structure schematic diagram.
In the figure: 1. a work table; 2. a trough; 3. a guide bar; 4. adjusting the bolt; 5. a support pillar; 6. a guide groove; 7. a limiting plate; 8. cutting the box; 9. a graduated scale; 10. a retractable plate; 11. a telescopic sleeve; 12. a screw rod; 13. a sleeve; 14. a guide cylinder; 15. a slide bar; 16. a cutting knife; 17. a pneumatic telescopic rod; 18. and a ball.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, in the embodiment, a steel pipe cutting apparatus for house building engineering includes: workstation 1, all install support column 5 around the 1 bottom of workstation, and the intermediate position department on 1 top of workstation has seted up silo 2, the both ends of 1 both sides of workstation all rotate and are connected with adjusting bolt 4, and limiting plate 7 is installed through the bearing in one side of adjusting bolt 4, the intermediate position department on 1 top of workstation installs cutting box 8, and the bottom of cutting box 8 one side installs scale 9, pneumatic telescopic handle 17 is installed on the inside top of cutting box 8, and pneumatic telescopic handle 17's output installs cutting knife 16.
Referring to fig. 1, 2 and 3, in the present embodiment, the guide rods 3 are installed at two ends of one side of the limiting plate 7, and the side wall of the workbench 1 at one side of the guide rods 3 is correspondingly provided with the guide grooves 6.
It should be noted that, the guide rod 3 slides in the guide groove 6, so that the limiting plate 7 is conveniently positioned and guided, and the limiting plate 7 is prevented from being twisted.
Referring to fig. 2, in the present embodiment, a screw rod 12 is rotatably connected to a lower end of one side of the cutting box 8, a sleeve 13 is rotatably connected to an outer wall of the screw rod 12, a telescopic sleeve 11 is installed at a bottom end of the sleeve 13, and a telescopic plate 10 is slidably connected to an inside of the telescopic sleeve 11.
It should be noted that the screw rod 12 is rotated to drive the sleeve 13 to enable the expansion plate 10 to move, and the graduated scale 9 is finally matched to limit the position of the steel pipe, so that the cutting position can be accurately controlled.
Referring to fig. 2, in the present embodiment, a sliding rod 15 is installed at an upper end of one side of the cutting box 8, and a guide cylinder 14 connected to the sleeve 13 is slidably connected to an outer wall of the sliding rod 15.
It should be noted that, the guide cylinder 14 slides on the outer wall of the sliding rod 15, so as to facilitate the positioning of the sleeve 13.
Referring to fig. 3, in the present embodiment, the side view of the position limiting plate 7 is arc-shaped, and the upper end and the lower end of the inside of the position limiting plate 7 are uniformly and rotatably connected with balls 18.
It should be noted that, by the arrangement of the balls 18, the steel pipe can be stably moved while being limited.
It can be understood that this steel pipe cutting equipment for building engineering can carry out certain spacing to the steel pipe, still does not influence the motion of steel pipe, can remove the steel pipe simultaneously and accurate control cutting position.
The working principle of the above embodiment is as follows:
during operation, place the device in the building engineering place, and switch on external power supply, then place the steel pipe inside silo 2, drive limiting plate 7 motion through rotating adjusting bolt 4, during slide and fix a position the direction in 6 inside guide ways through guide bar 3, it is finally spacing to the steel pipe, the steel pipe of being convenient for through setting up of ball 18 removes, then rotate lead screw 12 and drive sleeve 13 and make the expansion plate 10 motion, during slide on 15 outer walls of slide bar through guide cylinder 14, fix a position sleeve 13, it is spacing to finally cooperate scale 9 to carry out the steel pipe, the accurate control cutting position of being convenient for, it accomplishes cutting work to drive cutting knife 16 downstream through pneumatic telescopic link 17 work, after the cutting is accomplished, pulling expansion plate 10 can take out the steel pipe.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.

Claims (5)

1. A steel pipe cutting equipment for house construction engineering, includes: workstation (1), its characterized in that: support column (5) are all installed all around to workstation (1) bottom, and the intermediate position department on workstation (1) top has seted up silo (2), the both ends of workstation (1) both sides are all rotated and are connected with adjusting bolt (4), and one side of adjusting bolt (4) installs limiting plate (7) through the bearing, the intermediate position department on workstation (1) top installs cutting box (8), and the bottom of cutting box (8) one side installs scale (9), pneumatic telescopic handle (17) are installed on the inside top of cutting box (8), and cutting knife (16) are installed to the output of pneumatic telescopic handle (17).
2. The steel pipe cutting equipment for house building engineering according to claim 1, characterized in that: guide rods (3) are installed at two ends of one side of the limiting plate (7), and guide grooves (6) are correspondingly formed in the side wall of the workbench (1) on one side of each guide rod (3).
3. The steel pipe cutting device for house building engineering according to claim 1, characterized in that: the lower extreme of cutting case (8) one side rotates and is connected with lead screw (12), and the outer wall of lead screw (12) rotates and is connected with sleeve (13), telescopic sleeve (11) are installed to the bottom of sleeve (13), and the inside sliding connection of telescopic sleeve (11) has expansion plate (10).
4. The steel pipe cutting device for house building engineering according to claim 1, characterized in that: the upper end of one side of the cutting box (8) is provided with a sliding rod (15), and the outer wall of the sliding rod (15) is connected with a guide cylinder (14) connected with a sleeve (13) in a sliding manner.
5. The steel pipe cutting device for house building engineering according to claim 1, characterized in that: the limiting plate (7) looks sideways at the shape and is the arc, and the inside upper end of limiting plate (7) and lower extreme rotate evenly and are connected with ball (18).
CN202221539710.8U 2022-06-20 2022-06-20 Steel pipe cutting equipment for house construction engineering Active CN217571158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221539710.8U CN217571158U (en) 2022-06-20 2022-06-20 Steel pipe cutting equipment for house construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221539710.8U CN217571158U (en) 2022-06-20 2022-06-20 Steel pipe cutting equipment for house construction engineering

Publications (1)

Publication Number Publication Date
CN217571158U true CN217571158U (en) 2022-10-14

Family

ID=83528926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221539710.8U Active CN217571158U (en) 2022-06-20 2022-06-20 Steel pipe cutting equipment for house construction engineering

Country Status (1)

Country Link
CN (1) CN217571158U (en)

Similar Documents

Publication Publication Date Title
CN205985981U (en) Cable pay -off rack of adjustable size
CN217571158U (en) Steel pipe cutting equipment for house construction engineering
CN209830684U (en) Fixing and supporting device of welding robot
CN208416478U (en) A kind of drilling tool external application cutting tool
CN110976157A (en) Automatic paint spraying apparatus of structural steel
CN110014100B (en) High-precision cutting machine suitable for steel bars of different specifications
CN112191766A (en) Power cable bending tool
CN217670300U (en) Electric piping slotting device for building electromechanical installation
CN216921591U (en) Cable support rod for building construction
CN213437261U (en) Intelligent drilling equipment that can fix a position
CN213297190U (en) Building engineering assembled support
CN217169173U (en) Evaporate and press aerated concrete block cutting device
CN217597307U (en) Cutting equipment for furniture board
CN218522082U (en) Quick locator of vertical pipeline foundation pier of roofing
CN218050029U (en) Bending device for steel structure production
CN216420938U (en) Cutting device with positioning structure for construction engineering construction
CN215550889U (en) Pipeline bending device for ground wiring
CN212146738U (en) Perforating device that concatenation toy was made
CN212926916U (en) Wall plastering equipment
CN213259232U (en) Positioning device for mounting aluminum-plastic doors and windows
CN216759681U (en) Tunnel ventilation pipeline laying device
CN220698439U (en) Carousel formula reinforcing bar mantle fiber equipment
CN220515629U (en) Steel pipe fixed length cutting device
CN114482490B (en) Positioning construction device for attaching building engineering wall
CN218311131U (en) Cutting device is used in processing of fire control pipe fitting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant