CN217557822U - Prefabricated wall body operation instrument of ascending a height - Google Patents

Prefabricated wall body operation instrument of ascending a height Download PDF

Info

Publication number
CN217557822U
CN217557822U CN202220895346.2U CN202220895346U CN217557822U CN 217557822 U CN217557822 U CN 217557822U CN 202220895346 U CN202220895346 U CN 202220895346U CN 217557822 U CN217557822 U CN 217557822U
Authority
CN
China
Prior art keywords
pole
subassembly
pole setting
fixedly connected
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220895346.2U
Other languages
Chinese (zh)
Inventor
黄春峰
李清远
秦瑞旋
李振彪
牛童
赵亚鹏
王丽丽
马建祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongtian North Construction Co ltd
Zhongtian Construction Group Co Ltd
Original Assignee
Beijing Zhongtian North Construction Co ltd
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhongtian North Construction Co ltd, Zhongtian Construction Group Co Ltd filed Critical Beijing Zhongtian North Construction Co ltd
Priority to CN202220895346.2U priority Critical patent/CN217557822U/en
Application granted granted Critical
Publication of CN217557822U publication Critical patent/CN217557822U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a prefabricated wall body climbing operation tool, including climbing subassembly, first pole setting, first pole marking pole, first solid fixed ring, shore subassembly, bracing piece and prevent weighing down the subassembly, prevent weighing down the subassembly and include the second pole setting, and the one end fixed connection of second pole setting is in the top of first pole setting, fixedly connected with second pole marking pole on the both sides outer wall of second pole setting, the upper surface fixed connection of second pole marking pole has the third solid fixed ring, one side of second pole setting is provided with the protection rope, and the both ends of protection rope are respectively fixedly connected to the third solid fixed ring; the main structure of the utility model adopts thin-wall square steel pipes, which is light and easy to be turned around, the designed top bracing component and the fixing component have the advantages of simple structure and convenient installation, and the combination of the two components can improve the stability of the device and ensure the bearing capacity of the device; the utility model discloses the design has the anti-falling assembly, has effectively improved the safety guarantee ability, the risk hidden danger of falling when reducing the workman's operation.

Description

Prefabricated wall body operation instrument of ascending a height
Technical Field
The utility model relates to a working tool technical field of ascending a height, in particular to prefabricated wall body working tool of ascending a height.
Background
In the assembled engineering, vertical member's rings all set up at the component top, when hoist, the workman need scramble the component top, fix tower crane lifting hook and rings in order to hoist the operation, because vertical member is minimum highly all more than 2.9 meters, the workman can step on component side connecting reinforcement usually and climb to the component top from the side and carry out follow-up operation, but this kind of mode can lead to side connecting reinforcement to be stepped on curved, and because the component top does not have safety protection, the security is difficult to guarantee during the construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a prefabricated wall body operation instrument of ascending a height to solve the problem that proposes in the above-mentioned background art.
In order to solve the technical problem, the utility model provides a following technical scheme: the utility model provides a prefabricated wall body operation instrument of ascending a height, includes the climbing subassembly, install the shore subassembly on the climbing subassembly, the top of climbing subassembly is installed and is prevented weighing down the subassembly, prevents weighing down and installs fixed subassembly on the subassembly, and the climbing subassembly includes first pole setting, and the pole of marking time is first fixedly connected with on the both sides outer wall of first pole setting, and the first solid fixed ring that is connected with of upper surface of the pole of marking time.
Preferably, prevent weighing down the subassembly and include the second pole setting, and the one end fixed connection of second pole setting in the top of first pole setting, the pole is marked time to fixedly connected with second on the both sides outer wall of second pole setting, and the last fixed surface of pole is marked time to the second is connected with the solid fixed ring of third, and one side of second pole setting is provided with the protection rope, and the both ends difference fixed connection of protection rope is on the solid fixed ring of third.
Preferably, both ends of the second vertical rod are fixedly connected with handrails, and the upper surfaces of the handrails are fixedly connected with second fixing rings.
Preferably, the top bracing assembly comprises a support rod, and one end of the support rod is fixedly connected to the first stepping rod at the bottommost part.
Preferably, the fixed component comprises a connecting rod, one end of the connecting rod is fixedly connected to the second stepping rod, the other end of the connecting rod is fixedly connected with a first angle steel, the outer wall of one side of the first angle steel is fixedly connected with a second angle steel, and the outer wall of one side of the second angle steel is fixedly connected with a third angle steel.
Compared with the prior art, the utility model discloses the beneficial effect who reaches is: the main structure of the utility model adopts a thin-wall square steel pipe, which is light and easy to be turned around, the designed top bracing component and the fixing component have the advantages of simple structure and convenient installation, and the combination of the two components can improve the stability of the device and ensure the bearing capacity of the device; the utility model discloses the design has the subassembly of preventing weighing down, has effectively improved the safety guarantee ability, the risk hidden danger of falling when reducing the workman's operation.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of the overall three-dimensional structure of the present invention;
fig. 2 is a schematic view of the overall front view structure of the present invention;
FIG. 3 is a schematic view of the installation and use of the present invention;
in the figure: 1. a climbing assembly; 10. a first upright rod; 11. a first stepping rod; 12. a first retaining ring; 2. a top bracing assembly; 20. a support bar; 3. a fall arrest assembly; 30. a second upright stanchion; 31. a handrail; 32. a second retaining ring; 33. a second stepping rod; 34. a third fixing ring; 35. a protective rope; 4. a fixing component; 40. a connecting rod; 41. a first angle steel; 42. a second angle steel; 43. and (4) third angle steel.
Detailed Description
To make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides an embodiment: a prefabricated wall body climbing operation tool comprises a climbing assembly 1, wherein a top support assembly 2 is installed on the climbing assembly 1, an anti-falling assembly 3 is installed at the top end of the climbing assembly 1, a fixing assembly 4 is installed on the anti-falling assembly 3, the climbing assembly 1 comprises a first vertical rod 10, first stepping rods 11 are fixedly connected to the outer walls of two sides of the first vertical rod 10, and first fixing rings 12 are fixedly connected to the upper surfaces of the first stepping rods 11; the anti-falling component 3 comprises a second vertical rod 30, one end of the second vertical rod 30 is fixedly connected to the top end of the first vertical rod 10, the outer walls of two sides of the second vertical rod 30 are fixedly connected with a second stepping rod 33, the upper surface of the second stepping rod 33 is fixedly connected with a third fixing ring 34, one side of the second vertical rod 30 is provided with a protection rope 35, and two ends of the protection rope 35 are respectively and fixedly connected to the third fixing ring 34; the two ends of the second vertical rod 30 are fixedly connected with handrails 31, and the upper surfaces of the handrails 31 are fixedly connected with second fixing rings 32; the top bracing assembly 2 comprises a support rod 20, and one end of the support rod 20 is fixedly connected to the first stepping rod 11 at the bottommost part; fixed subassembly 4 includes connecting rod 40, and connecting rod 40's one end fixed connection is on second pole 33 of marking time, and connecting rod 40's the first angle steel 41 of other end fixedly connected with, fixedly connected with second angle steel 42 on the outer wall of one side of first angle steel 41, and fixedly connected with third angle steel 43 on the outer wall of one side of second angle steel 42.
Specifically, when the lifting device is used for lifting operation, the climbing device is carried to the position of a wall body, the fixing component 4 is placed at the top of the prefabricated wall body, the wall body is propped through the propping component 2, then the climbing component 1 is climbed to the operation position, and protection is carried out through the anti-falling component 3; the specific operation is as follows: hooking a hook-shaped structure formed by first angle steel 41, second angle steel 42 and third angle steel 43 on the top of a wall, supporting the wall by a support rod 20, climbing upwards through a first step rod 11 and a second step rod 33 until the upper half of a person is higher than a protection rope 35, and performing anti-falling protection through the protection rope 35, wherein the first angle steel 41, the second angle steel 42 and the third angle steel 43 are of an integrated structure and are fixed on the second step rod 33 through a connecting rod 40, an angle steel with the specification of L50 is adopted, the length of the first angle steel 41 is 200mm, the length of the second angle steel 42 is 220mm, and the length of the third angle steel 43 is 150mm; the first fixing ring 12, the second fixing ring 32 and the third fixing ring 34 are round steel with the diameter of 6mm, the height of the round steel is 40mm, and the round steel is used for installing a protection rope 35; the first vertical rod 10 and the second vertical rod 30 are of an integrated structure and are made of square steel with the specification of 40 multiplied by 60; the specification of the supporting rod 20, the first stepping rod 11, the second stepping rod 33 and the handrail 31 is 40 × 40 square steel, the length of the supporting rod 20 is 200mm, the handrail 31 is used for assisting people to climb, the length of the handrail is 350mm, the length of the first stepping rod 11 and the length of the second stepping rod 33 are 520mm, the distance between the first stepping rod 11 and the top handrail 31 is 300mm, the distance between the first stepping rod 11 and the top handrail 31 is 350mm, the distance between the second stepping rod 33 and the bottom handrail 31 is 550mm, and the distance between the second stepping rod 33 and the top handrail 31 is 600mm.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.
The above-described embodiments of the apparatus are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (5)

1. The utility model provides a prefabricated wall body tool of ascending a height, includes climbing subassembly (1), its characterized in that: install shore subassembly (2) on climbing subassembly (1), the top of climbing subassembly (1) is installed and is prevented weighing down subassembly (3), prevents weighing down to install on subassembly (3) and fixes subassembly (4), and climbing subassembly (1) includes first pole setting (10), and fixedly connected with first pole (11) of marking time on the both sides outer wall of first pole setting (10), the first solid fixed ring (12) of upper surface fixedly connected with of pole (11) of marking time.
2. The prefabricated wall body climbing work tool according to claim 1, characterized in that: prevent weighing down subassembly (3) and include second pole setting (30), and the one end fixed connection of second pole setting (30) is on the top of first pole setting (10), and fixedly connected with second pole setting (33) of marking time on the both sides outer wall of second pole setting (30), and the last fixed surface of second pole setting (33) of marking time is connected with the solid fixed ring of third (34), and one side of second pole setting (30) is provided with protection rope (35), and the both ends difference fixed connection of protection rope (35) is on the solid fixed ring of third (34).
3. The prefabricated wall body climbing tool according to claim 2, wherein: both ends fixedly connected with handrail (31) of second pole setting (30), the last fixed ring (32) of fixed surface connection of handrail (31).
4. The prefabricated wall body climbing work tool according to claim 1, characterized in that: the top bracing assembly (2) comprises a support rod (20), and one end of the support rod (20) is fixedly connected to the first stepping rod (11) at the bottommost part.
5. The prefabricated wall body climbing work tool according to claim 1, characterized in that: fixed subassembly (4) include connecting rod (40), and the one end fixed connection of connecting rod (40) is on second pole (33) of marking time, the first angle steel (41) of other end fixedly connected with of connecting rod (40), fixedly connected with second angle steel (42) on the outer wall of one side of first angle steel (41), fixedly connected with third angle steel (43) on the outer wall of one side of second angle steel (42).
CN202220895346.2U 2022-04-19 2022-04-19 Prefabricated wall body operation instrument of ascending a height Active CN217557822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220895346.2U CN217557822U (en) 2022-04-19 2022-04-19 Prefabricated wall body operation instrument of ascending a height

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220895346.2U CN217557822U (en) 2022-04-19 2022-04-19 Prefabricated wall body operation instrument of ascending a height

Publications (1)

Publication Number Publication Date
CN217557822U true CN217557822U (en) 2022-10-11

Family

ID=83472508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220895346.2U Active CN217557822U (en) 2022-04-19 2022-04-19 Prefabricated wall body operation instrument of ascending a height

Country Status (1)

Country Link
CN (1) CN217557822U (en)

Similar Documents

Publication Publication Date Title
CN101435276B (en) Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN102168484A (en) External hanging scaffold and application method thereof
CN217557822U (en) Prefabricated wall body operation instrument of ascending a height
CN106150057A (en) A kind of split blade type hydraulic pressure lift climbing frame
CN109736625A (en) The bracing means and reinforcement means of tall and big concrete chimney outer tube wall
CN209874468U (en) Construction hydraulic pressure template climbing device
CN209990112U (en) Scaffold for building engineering who possesses safety protection facility
EP3859121A1 (en) Accessories for mounting the ladder in the access to the container roof, especially double-decker
CN211816861U (en) Anti-falling device for water collecting well
CN209924409U (en) Wall-attached self-climbing electric lifting platform
CN220036560U (en) Suspension type cage ladder
CN219059723U (en) Wet joint connection module
CN206397107U (en) Armored concrete construction of lift well operating platform bracket
CN218027232U (en) Bridge hanging basket cast-in-place section vertical safety channel attached to outer side formwork
CN216950218U (en) Well drilling staircase falls protector
CN220203504U (en) High-efficient operating tool of demolishing of blast furnace downcomer
CN216616754U (en) Scaffold for building engineering
CN220814839U (en) Building engineering building climbing frame
CN214402638U (en) Safe cat ladder of being under construction
CN212054463U (en) Safety ladder stand
CN214169873U (en) Hanging basket for mounting loading platform
CN212671122U (en) Scaffold for building construction
CN219316360U (en) Stair operation platform tool