CN217534299U - Cement electric pole hauling traction device - Google Patents

Cement electric pole hauling traction device Download PDF

Info

Publication number
CN217534299U
CN217534299U CN202221517636.XU CN202221517636U CN217534299U CN 217534299 U CN217534299 U CN 217534299U CN 202221517636 U CN202221517636 U CN 202221517636U CN 217534299 U CN217534299 U CN 217534299U
Authority
CN
China
Prior art keywords
sleeve
pole body
connecting block
spacing ring
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221517636.XU
Other languages
Chinese (zh)
Inventor
刘炳
余海容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoshan Ruifeng Cement Products Co ltd
Original Assignee
Baoshan Ruifeng Cement Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Ruifeng Cement Products Co ltd filed Critical Baoshan Ruifeng Cement Products Co ltd
Priority to CN202221517636.XU priority Critical patent/CN217534299U/en
Application granted granted Critical
Publication of CN217534299U publication Critical patent/CN217534299U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a cement pole haulage draw gear relates to cement pole technical field, including the pole body, the surface of pole body is equipped with the spacing ring, and the inner wall of spacing ring and the surface laminating of pole body, the connecting plate is installed to the tip of spacing ring, and connecting plate and spacing ring integrated into one piece, two run through between the connecting plate of spacing ring tip and have connecting bolt, and two spacing rings pass through connecting bolt and connect, the top and the bottom of pole body are equipped with first sleeve and second sleeve respectively, and first sleeve and second sleeve cup joint the top and the bottom at the pole body respectively. First sleeve and second sleeve overlap respectively in the top and the bottom of pole body, can pull the haulage to the pole body through first sleeve, carry out a guard action through the second sleeve to the bottom of pole body to can realize carrying out the haulage to the pole body at rugged subaerial and the pole body can not receive the damage.

Description

Cement electric pole hauling traction device
Technical Field
The utility model relates to a cement pole technical field especially relates to a cement pole haulage draw gear.
Background
In the transportation process of the telegraph pole, the telegraph pole is directly horizontally placed on the frame at present and then transported to an installation construction site, however, on some construction sites with rugged roads, large transportation equipment cannot pass through, therefore, the telegraph pole is often transported to the construction site by being lifted by a person shoulder lever, and the telegraph pole is also transported under the traction of a traction winch machine by being sleeved with a traction rope.
The existing cement electric pole dragging process generally pulls one end to drag, the other end can land, the dragged end which lands on the ground is affected by the unevenness of the bottom surface, and the cement electric pole can be damaged.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a cement electric pole hauling and drawing device.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a cement pole haulage draw gear, includes the pole body, the surface of pole body is equipped with the spacing ring, and the inner wall of spacing ring and the surface laminating of pole body, the connecting plate is installed to the tip of spacing ring, and connecting plate and spacing ring integrated into one piece, two run through between the connecting plate of spacing ring tip has connecting bolt, and two spacing rings pass through connecting bolt and connect, the top and the bottom of pole body are equipped with first sleeve and second sleeve respectively, and first sleeve and second sleeve cup joint the top and the bottom at the pole body respectively.
Preferably, first connecting block is installed to first telescopic bottom, the third connecting block is installed at the spacing ring top, first link is installed at the top of third connecting block.
Preferably, the bottom of first connecting block is installed the couple, and the bottom of couple inlays in the inside of first link, and first connecting block and third connecting block pass through first couple and connect.
Preferably, a second connecting block is installed at the bottom of the limiting ring, a fourth connecting block is installed at the top of the second sleeve, and a hanging ring is installed at the top of the fourth connecting block.
Preferably, a pull rope is arranged between the second connecting block and the fourth connecting block, the top end of the pull rope is connected with the second connecting block, and the bottom end of the pull rope is connected with the hanging ring through a hook.
Preferably, a fixing ring is mounted at the top of the first sleeve.
Preferably, the inner wall of the limiting ring is provided with a rubber pad.
Advantageous effects
The utility model discloses in, adopt first sleeve and second sleeve, first sleeve and second sleeve overlap respectively in the top and the bottom of pole body, can pull the haulage to the pole body through first sleeve, carry out a guard action to the bottom of pole body through the second sleeve to can realize carrying out the haulage to the pole body and the pole body can not receive the damage subaerially at rugged.
The utility model discloses in, adopt the spacing ring, before carrying out the haulage to the pole body, install the tip at the pole body with the spacing ring earlier, wrap up the surface at the pole body through two spacing rings, and the rubber pad is installed to the inner wall of spacing ring, can prevent to have the not hard up condition at the in-process of haulage, rubber pad has certain extension simultaneously, can guarantee that spacing ring and pole body laminate more, rethread connecting bolt is fixed with two spacing rings, guarantee that not hard up condition can not appear at the in-process of haulage, connect through the couple between first sleeve and the spacing ring again, connect through stay cord and couple between second sleeve and the spacing ring, thereby can realize the haulage to the pole body, on the one hand, haulage in-process is more stable, on the other hand haulage in-process does not receive ground influence.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of a partial structure of the present invention;
FIG. 3 is a schematic view of a partial three-dimensional structure of the present invention;
fig. 4 is a sectional view of the present invention.
Illustration of the drawings:
1. a fixing ring; 2. a first sleeve; 3. a connecting plate; 4. an electric pole body; 5. pulling a rope; 6. a first connection block; 7. a limiting ring; 8. a second connecting block; 9. hooking; 10. a third connecting block; 11. hanging a ring; 12. a connecting bolt; 13. a second sleeve; 14. and a fourth connecting block.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the present invention will be further explained below with reference to the following embodiments and the accompanying drawings, but the following embodiments are only the preferred embodiments of the present invention, and not all embodiments are included. Based on the embodiments in the embodiment, those skilled in the art can obtain other embodiments without making creative efforts, and all of them belong to the protection scope of the present invention.
Specific embodiments of the present invention will be described below with reference to the accompanying drawings.
The specific embodiment is as follows:
referring to fig. 1-4, a cement pole haulage draw gear, including pole body 4, the surface of pole body 4 is equipped with spacing ring 7, and the inner wall of spacing ring 7 and the surface laminating of pole body 4, connecting plate 3 is installed to the tip of spacing ring 7, and connecting plate 3 and spacing ring 7 integrated into one piece, connecting bolt 12 has run through between the connecting plate 3 of two spacing ring 7 tip, and two spacing rings 7 pass through connecting bolt 12 and connect, the top and the bottom of pole body 4 are equipped with first sleeve 2 and second sleeve 13 respectively, and first sleeve 2 and second sleeve 13 cup joint respectively at the top and the bottom of pole body 4, solid fixed ring 1 is installed at the top of first sleeve 2, the rubber pad is installed to the inner wall of spacing ring 7.
Adopt first sleeve 2 and second sleeve 13, first sleeve 2 and second sleeve 13 overlap respectively at the top and the bottom of pole body 4, can pull haulage to pole body 4 through first sleeve 2, carry out a guard action to the bottom of pole body 4 through second sleeve 13 to can realize carrying out the haulage and can not receive the damage to pole body 4 at rugged subaerial pole body 4.
First connecting block 6 is installed to the bottom of first sleeve 2, and third connecting block 10 is installed at 7 tops of spacing ring, and link 11 is installed at the top of third connecting block 10, and couple 9 is installed to the bottom of first connecting block 6, and the bottom of couple 9 inlays in the inside of link 11, and just first connecting block 6 and third connecting block 10 are connected through first couple 9.
Adopt spacing ring 7, before carrying out haulage to pole body 4, install the tip at pole body 4 with spacing ring 7 earlier, wrap up on the surface of pole body 4 through two spacing rings 7, and the rubber pad is installed to the inner wall of spacing ring 7, can prevent to have the not hard up condition at the in-process of haulage, the rubber pad has certain extension simultaneously, can guarantee that spacing ring 7 and pole body 4 laminate more, rethread connecting bolt 12 is fixed with two spacing rings 7, guarantee that not hard up condition can not appear at the in-process of haulage, connect through couple 9 between first sleeve 2 and the spacing ring 7 again, connect through stay cord 5 and couple 9 between second sleeve 13 and the spacing ring 7, thereby can realize the haulage to pole body 4, on the one hand, haulage in-process more stable, on the other hand haulage in-process does not receive ground influence.
Second connecting block 8 is installed to the bottom of spacing ring 7, and fourth connecting block 14 is installed at the top of second sleeve 13, and link 11 is installed at the top of fourth connecting block 14, is equipped with stay cord 5 between second connecting block 8 and the fourth connecting block 14, and the top and the second connecting block 8 of stay cord 5 are connected, and the bottom of stay cord 5 is connected through couple 9 and link 11.
The utility model discloses a theory of operation: before carrying out the haulage to pole body 4, install the tip at pole body 4 with spacing ring 7 earlier, wrap up the surface at pole body 4 through two spacing rings 7, and the rubber pad is installed to the inner wall of spacing ring 7, can prevent to have the not hard up condition at the in-process play of haulage, the rubber pad has certain extension simultaneously, can guarantee that spacing ring 7 and pole body 4 laminate more, rethread connecting bolt 12 is fixed with two spacing rings 7, guarantee that the not hard up condition can not appear at the in-process of haulage, connect through couple 9 between first sleeve 2 and the spacing ring 7 again, connect through stay cord 5 and couple 9 between second sleeve 13 and the spacing ring 7, thereby can realize the haulage to pole body 4.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature "on," "above" and "over" the second feature may include the first feature being directly above and obliquely above the second feature, or simply indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only the preferred embodiments of the present invention, and is not intended to limit the present invention, and that there may be various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a cement pole haulage draw gear, includes pole body (4), its characterized in that: the utility model discloses a pole, including pole body (4), connecting plate (12), connecting plate (3), and connecting plate (3) and spacing ring (7) integrated into one piece, two run through between connecting plate (3) of spacing ring (7) tip have connecting bolt (12), and two spacing ring (7) connect through connecting bolt (12), the top and the bottom of pole body (4) are equipped with first sleeve (2) and second sleeve (13) respectively, and cup joint the top and the bottom at pole body (4) respectively in first sleeve (2) and second sleeve (13), and first sleeve (2) and second sleeve (13).
2. The concrete pole hauling and hauling device as claimed in claim 1, wherein: first connecting block (6) are installed to the bottom of first sleeve (2), third connecting block (10) are installed at spacing ring (7) top, link (11) are installed at the top of third connecting block (10).
3. The concrete pole hauling and hauling device of claim 2, wherein: couple (9) are installed to the bottom of first connecting block (6), and inlay in the inside of link (11) the bottom of couple (9), and first connecting block (6) and third connecting block (10) are connected through first couple (9).
4. The hauling device for concrete poles as claimed in claim 1, wherein: second connecting block (8) are installed to the bottom of spacing ring (7), fourth connecting block (14) are installed at the top of second sleeve (13), link (11) are installed at the top of fourth connecting block (14).
5. The hauling device for concrete poles as claimed in claim 4, wherein: be equipped with stay cord (5) between second connecting block (8) and fourth connecting block (14), and the top and second connecting block (8) of stay cord (5) are connected, and the bottom of stay cord (5) is connected through couple (9) and link (11).
6. The hauling device for concrete poles as claimed in claim 1, wherein: the top of the first sleeve (2) is provided with a fixed ring (1).
7. The hauling device for concrete poles as claimed in claim 1, wherein: and a rubber pad is arranged on the inner wall of the limiting ring (7).
CN202221517636.XU 2022-06-16 2022-06-16 Cement electric pole hauling traction device Active CN217534299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221517636.XU CN217534299U (en) 2022-06-16 2022-06-16 Cement electric pole hauling traction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221517636.XU CN217534299U (en) 2022-06-16 2022-06-16 Cement electric pole hauling traction device

Publications (1)

Publication Number Publication Date
CN217534299U true CN217534299U (en) 2022-10-04

Family

ID=83419294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221517636.XU Active CN217534299U (en) 2022-06-16 2022-06-16 Cement electric pole hauling traction device

Country Status (1)

Country Link
CN (1) CN217534299U (en)

Similar Documents

Publication Publication Date Title
CN105421860B (en) A kind of power network electric pole stringer and construction method
CN204230769U (en) Climb type steel cable ladder
CN106741070B (en) A kind of cable channel cover plate transport laying vehicle
CN101831913A (en) Method for jacking steel casting of bored pile by using jacks
CN217534299U (en) Cement electric pole hauling traction device
CN206625177U (en) A kind of scalable anti-flood wall
CN204170002U (en) A kind of artificial digging pile safety apparatus
CN105621231A (en) Combined lifting appliance special for large-diameter reinforced concrete drainage pipe
CN204532122U (en) Double lifting derrick and base
CN104410009A (en) Climbing type steel wire rope ladder
CN204173830U (en) Pumping plant travelling hoist
CN211110783U (en) Portable column type heavy object dragging device
CN200992473Y (en) Skid-mounted rig integral transfer device
CN204615274U (en) A kind of actinobacillus device of transmission line
CN207618885U (en) Diesel engine lubricant filtering device hoisting tool
CN209818062U (en) Cable dragging device of tunneling machine
CN204590740U (en) With the line bar structural assembly of pull wire arrangement
CN207497908U (en) The unmanned draw off gear of floating body is carried in automatic positioning
CN207434924U (en) A kind of safe concrete, which rises, carries dress
CN208402893U (en) The purse seine of off-lying sea tubular pole seining cultivation system
CN206986897U (en) A kind of tethered sliding formula toe slab grouting system
CN202012079U (en) Pile anchor for cable crane
CN205772922U (en) A kind of overload-alarm pulley
CN205687456U (en) A kind of portable high-pressure line guy dish delivery device
CN205901178U (en) Concrete pole tower overhead earth wire hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant