CN217480549U - Stone curtain wall dry hanging assembly - Google Patents

Stone curtain wall dry hanging assembly Download PDF

Info

Publication number
CN217480549U
CN217480549U CN202221133484.3U CN202221133484U CN217480549U CN 217480549 U CN217480549 U CN 217480549U CN 202221133484 U CN202221133484 U CN 202221133484U CN 217480549 U CN217480549 U CN 217480549U
Authority
CN
China
Prior art keywords
steel pipe
wall
screw
supporting steel
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221133484.3U
Other languages
Chinese (zh)
Inventor
林明晖
曾江辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Nan'an Dongling Stone Co ltd
Original Assignee
Fujian Nan'an Dongling Stone Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Nan'an Dongling Stone Co ltd filed Critical Fujian Nan'an Dongling Stone Co ltd
Priority to CN202221133484.3U priority Critical patent/CN217480549U/en
Application granted granted Critical
Publication of CN217480549U publication Critical patent/CN217480549U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to the technical field of curtain wall installation, the utility model provides a stone curtain wall dry hanging component, which comprises a supporting steel pipe, a long hole is arranged on the side of the supporting steel pipe far from the wall direction, a moving part is arranged inside the supporting steel pipe, a plurality of strip holes are evenly arranged on the upper surface of the supporting steel pipe, a first screw is arranged inside the strip hole, the bottom end of the first screw passes through the strip hole and is in threaded connection with the moving part, the side of the moving part far from the wall direction is fixedly connected with a supporting plate, the end of the supporting plate far from the wall direction passes through the long hole and is fixedly connected with an upper limiting plate and a lower limiting plate, the supporting steel pipe is in threaded connection with the supporting steel pipe through an adjusting screw, a transverse plate is separated from the inner wall of the supporting steel pipe by unscrewing the first screw, then the adjusting screw is rotated, the position of the stone curtain wall can be adjusted continuously, then tighten first screw and realize the fixed of stone material curtain, and can not cause the slabstone to hang the drunkenness of position futilely when adjusting, realize the accurate regulation of stone material curtain.

Description

Stone curtain wall dry hanging assembly
Technical Field
The utility model relates to a curtain installation technical field especially relates to a stone material curtain hangs subassembly futilely.
Background
The stone curtain wall is one kind of building outer wall structure, and has granite, marble and other stone as main decorating surface. The stone dry hanging method is also called a hollow hanging method, and is a novel construction process in the prior wall decoration. The method uses the metal hanging piece to directly hang the facing stone on the wall surface or hang the facing stone on the steel frame in the air, and grouting and pasting are not needed. The principle is that main stress points are arranged on a main body structure, and stone is fixed on a building through a metal hanging piece to form the stone decorative curtain wall.
When the stone curtain wall is installed, due to the fact that the wall surface is uneven, the thickness of the stone is different, and the construction workers hang the stone in a dry mode, the position of the stone after splicing needs to be adjusted, when the existing dry hanging component adjusts the stone dry hanging position, fastening bolts need to be loosened to adjust the connecting position of the components, then the stone dry hanging position is adjusted, nuts are screwed, in the process of loosening and screwing the nuts in the adjusting mode, the stone dry hanging position is prone to shifting, and accurate adjustment is extremely difficult to achieve.
SUMMERY OF THE UTILITY MODEL
For overcoming the technical defect that prior art exists, the utility model provides a subassembly is hung futilely to stone material curtain, and can not cause the slabstone to hang the drunkenness of position futilely when adjusting, realizes the accurate regulation of stone material curtain.
The utility model discloses a technical solution be: the utility model provides a stone material curtain hangs subassembly futilely, is including supporting the steel pipe, the wall direction side of keeping away from of supporting the steel pipe is opened and is equipped with the slot hole, the inside of supporting the steel pipe is provided with the moving part, a plurality of rectangular holes have evenly been seted up to the upper surface of supporting the steel pipe, the inside in rectangular hole is provided with first screw, the bottom of first screw run through rectangular hole and with moving part threaded connection, the wall direction side fixedly connected with backup pad of keeping away from of moving part, the wall direction end of keeping away from of backup pad runs through slot hole and fixedly connected with and goes up spacing plate and lower spacing plate, the moving part passes through adjusting screw and supports steel pipe threaded connection.
Preferably: the supporting steel pipe is fixedly connected with the wall body through a second screw, and a plurality of mounting holes corresponding to the second screws are uniformly formed in the side, close to the wall, of the supporting steel pipe.
Preferably: the cross section of the support steel pipe is rectangular, and the long holes penetrate through the front end and the rear end of the support steel pipe.
Preferably: the moving part includes riser and two diaphragms fixed connection respectively is in the upper and lower both sides of riser, riser and two integrative the buckling of diaphragm form, first screw hole has been seted up on the diaphragm, first screw and first screw hole looks adaptation.
Preferably, the following components: the upper surface of backup pad is close to two strengthening ribs of wall direction side fixedly connected with, one side and riser fixed connection of strengthening rib, the opposite side and the backup pad fixed connection of strengthening rib.
Preferably, the following components: the size of going up the limiting plate is equal with the size of limiting plate down, go up limiting plate and lower limiting plate all with backup pad integrated into one piece.
Preferably, the following components: the wall-direction-side inner wall of the support steel pipe is uniformly and fixedly connected with a plurality of nuts, the vertical plate is provided with a second through hole, and the threaded end of the adjusting screw penetrates through the second through hole and is in threaded connection with the nuts
The beneficial effects of the utility model are that:
make diaphragm and the inner wall separation of supporting the steel pipe through unscrewing first screw, adjusting screw passes the second through-hole on the riser and with nut threaded connection this moment, make the stone material can not remove to keeping away from the wall direction, then rotate adjusting screw and drive the riser and remove to being close to the wall direction, the riser can drive backup pad and stone material and remove to being close to the wall direction at the in-process that removes, then constantly rotating adjusting screw, until making stone material curtain position adjustment good, then it makes the moving part fixed with the inner wall that supports the steel pipe to tighten first screw, thereby realize the fixed of stone material curtain, and can not cause the drunkenness that slabstone hung the position futilely when adjusting, realize the accurate regulation of stone material curtain.
Drawings
FIG. 1 is a view of the overall structure of the present invention;
FIG. 2 is a front sectional view of the present invention;
FIG. 3 is a schematic view of the movable member of the present invention;
fig. 4 is a structural diagram of the support steel pipe of the present invention.
Description of the reference numerals: 1. supporting the steel pipe; 2. a long hole; 3. a movable member; 4. a strip hole; 5. a first screw; 6. a support plate; 7. an upper limiting plate; 8. a lower limiting plate; 9. an adjusting screw; 101. a second screw; 102. mounting holes; 301. a vertical plate; 302. a transverse plate; 303. a threaded hole; 601. reinforcing ribs; 10. a nut; 11. a second via.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings:
as shown in fig. 1-4, this embodiment provides a stone curtain hangs subassembly futilely, including supporting steel pipe 1, support steel pipe 1 keep away from wall direction side and open and be equipped with slot hole 2, the inside of supporting steel pipe 1 is provided with moving part 3, a plurality of rectangular holes 4 have evenly been seted up to the upper surface of supporting steel pipe 1, the inside in rectangular hole 4 is provided with first screw 5, the bottom of first screw 5 runs through rectangular hole 4 and with 3 threaded connection of moving part, the wall direction side fixedly connected with backup pad 6 of keeping away from of moving part 3, the wall direction end of keeping away from of backup pad 6 runs through slot hole 2 and fixedly connected with upper limit plate 7 and lower limit plate 8, upper limit plate 7 and lower limit plate 8 insert the stone material lateral wall and then fix the stone material, moving part 3 passes through adjusting screw 9 and supports steel pipe 1 threaded connection.
In this embodiment, specifically: the support steel pipe 1 is fixedly connected with a wall body through second screws 101, and a plurality of mounting holes 102 corresponding to the second screws 101 are uniformly formed in the side, close to the wall, of the support steel pipe 1.
The second screw 101 can be inserted into the mounting hole 102 to firmly fix the support steel pipe 1 to the wall.
The cross section of the support steel pipe 1 is rectangular, the long holes 2 penetrate through the front end and the rear end of the support steel pipe 1, and the moving piece 3 and the support plate 6 can penetrate through the front side and the rear side of the support steel pipe 1.
In this embodiment, specifically: the moving part 3 includes riser 301 and two horizontal plates 302, and two horizontal plates 302 are fixed connection respectively in the upper and lower both sides of riser 301, and riser 301 and two horizontal plates 302 are integrative to be buckled and are formed, has seted up first screw hole 303 on the horizontal plate 302, and first screw 5 and first screw hole 303 looks adaptation tighten first screw 5 and make moving part 3 fixed with the inner wall that supports steel pipe 1 to carry on spacingly to moving part 3.
In this embodiment, specifically: two strengthening ribs 601 of wall direction side fixedly connected with are close to the upper surface of backup pad 6, one side and riser 301 fixed connection of strengthening rib 601, the opposite side and the backup pad 6 fixed connection of strengthening rib 601, and strengthening rib 601 improves the structural strength between backup pad 6 and riser 301.
In this embodiment, specifically: go up the spacer plate 7 and the size of spacer plate 8 equals down, go up spacer plate 7 and spacer plate 8 down all with backup pad 6 integrated into one piece, improve the structural strength between spacer plate 7 and spacer plate 8 and the backup pad down to it is more convenient to process.
In this embodiment, specifically: support a plurality of nuts 10 of the even fixedly connected with of wall direction side inner wall of steel pipe 1, seted up second through-hole 11 on riser 301, adjusting screw 9's screw thread end run through second through-hole 11 and with nut 10 threaded connection, the thread length in the nut 10 is longer, makes adjusting screw 9's control range wider.
The utility model discloses at the during operation: the supporting steel pipe 1 is fixedly connected to the wall through the second screw 101, the stone is clamped and connected with the upper limiting plate 7 and the lower limiting plate 8, when the position of the stone needs to be adjusted, the first screw 5 is unscrewed to separate the transverse plate 302 from the inner wall of the supporting steel pipe 1, at the moment, the adjusting screw 9 penetrates through the second through hole 11 on the vertical plate 301 and is in threaded connection with the nut 10, so that the stone cannot move in the direction away from the wall, then the adjusting screw 9 is rotated to drive the vertical plate 301 to move in the direction close to the wall, the vertical plate 301 can drive the supporting plate 6 and the stone to move in the direction close to the wall in the moving process, then the adjusting screw 9 is rotated until the position of the stone curtain wall is well adjusted, then the first screw 5 is screwed to fix the moving part 3 with the inner wall of the supporting steel pipe 1, thereby fixing the stone curtain wall is realized, and the movement of the dry hanging position of the stone slab cannot be caused during adjustment, realize the accurate regulation of stone material curtain.
Having shown and described the fundamental principles and the principal features of the invention and its advantages, it will be understood by those skilled in the art that the present invention is not limited by the embodiments described above, which are merely illustrative of the principles of the invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the invention as defined by the appended claims and their equivalents.

Claims (7)

1. A stone curtain wall dry hanging component comprises a supporting steel pipe (1) which is arranged on a wall, it is characterized in that a long hole (2) is arranged on the side of the supporting steel pipe (1) far away from the wall, the movable piece (3) is arranged inside the supporting steel pipe (1), the upper surface of the supporting steel pipe (1) is uniformly provided with a plurality of strip holes (4), a first screw (5) is arranged in the long hole (4), the bottom end of the first screw (5) penetrates through the long hole (4) and is in threaded connection with the moving part (3), a supporting plate (6) is fixedly connected to the side of the moving piece (3) far away from the wall, the end of the supporting plate (6) far away from the wall penetrates through the long hole (2) and is fixedly connected with an upper limiting plate (7) and a lower limiting plate (8), the moving piece (3) is in threaded connection with the supporting steel pipe (1) through an adjusting screw (9).
2. The stone curtain wall dry hanging assembly as claimed in claim 1, wherein: the supporting steel pipe (1) is fixedly connected with a wall body through a second screw (101), and a plurality of mounting holes (102) corresponding to the second screws (101) are uniformly formed in the side, close to the wall, of the supporting steel pipe (1).
3. The stone curtain wall dry-hanging assembly as claimed in claim 2, wherein: the cross section of the support steel pipe (1) is rectangular, and the long holes (2) penetrate through the front end and the rear end of the support steel pipe (1).
4. The stone curtain wall dry-hanging assembly as claimed in claim 3, wherein: moving part (3) include riser (301) and two diaphragm (302), two diaphragm (302) fixed connection is in the upper and lower both sides of riser (301) respectively, riser (301) and two integrative the buckling of diaphragm (302) form, first screw hole (303) have been seted up on diaphragm (302), first screw (5) and first screw hole (303) looks adaptation.
5. The stone curtain wall dry-hanging assembly as claimed in claim 4, wherein: the upper surface of backup pad (6) is close to two strengthening ribs (601) of wall direction side fixedly connected with, one side and riser (301) fixed connection of strengthening rib (601), the opposite side and backup pad (6) fixed connection of strengthening rib (601).
6. The stone curtain wall dry-hanging assembly as claimed in claim 5, wherein: go up spacing board (7) and the size of spacing board (8) down equals, go up spacing board (7) and spacing board (8) down and all with backup pad (6) integrated into one piece.
7. The stone curtain wall dry-hanging assembly as claimed in claim 6, wherein: support a plurality of nuts (10) of the even fixedly connected with of wall direction side inner wall of being close to of steel pipe (1), second through-hole (11) have been seted up on riser (301), the screw thread end of adjusting screw (9) run through second through-hole (11) and with nut (10) threaded connection.
CN202221133484.3U 2022-05-12 2022-05-12 Stone curtain wall dry hanging assembly Expired - Fee Related CN217480549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221133484.3U CN217480549U (en) 2022-05-12 2022-05-12 Stone curtain wall dry hanging assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221133484.3U CN217480549U (en) 2022-05-12 2022-05-12 Stone curtain wall dry hanging assembly

Publications (1)

Publication Number Publication Date
CN217480549U true CN217480549U (en) 2022-09-23

Family

ID=83309959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221133484.3U Expired - Fee Related CN217480549U (en) 2022-05-12 2022-05-12 Stone curtain wall dry hanging assembly

Country Status (1)

Country Link
CN (1) CN217480549U (en)

Similar Documents

Publication Publication Date Title
CN201507051U (en) Removable glass inner curtain wall hanging sectional material
CN211172571U (en) Three-dimensional adjusting device of unitized curtain wall
CN102704645B (en) Detachable frameless big glass keel dry-hanging method construction system and construction method
CN210239026U (en) Stone dry hanging structure convenient for direction adjustment
CN202731044U (en) Dismountable frameless big glass keel dry-hanging method construction system
CN2654759Y (en) Regulatable plane installing construction unit
CN107217810A (en) A kind of cladding suspension member of decoration panel detachably installed and mount system and method
CN104929297A (en) Combined type ceiling hanging part and wood veneer ceiling installing process
CN217480549U (en) Stone curtain wall dry hanging assembly
CN212427869U (en) Wall surface hanging flush joint system
CN210263733U (en) Stone dry-hanging structure
CN108360717A (en) One kind being easily installed adjustable type Curtainwall connector
CN202359714U (en) Installing structure for concealed frame glass curtain wall
CN204691158U (en) Decorative panel Components installation syndeton
CN210439524U (en) Sectional type vertical aluminum plate decorative line connection structure
CN210342356U (en) Open type close-seam metal plate curtain wall system
CN210369480U (en) Balcony curtain wall
CN208934214U (en) A kind of stone curtain wall fixed structure
CN220035807U (en) Curtain wall mounting structure capable of adjusting mounting distance
CN216042376U (en) Regulation formula dado suspended structure
CN214090748U (en) Water transfer printing GRC decoration component
CN112942720A (en) Hanging part system
CN218233931U (en) Indoor dry-hanging stone curtain wall mounting structure
CN213174594U (en) Novel wall dry-hanging ceramic tile structure
CN219753593U (en) Building beautifies curtain installation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220923

CF01 Termination of patent right due to non-payment of annual fee