Prior art keywords
plate body
utility tunnel
built
repairing
connecting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221122764.4U
Other languages
Chinese (zh)
Inventor
陈森森
张津嘉
陈禹
王军
陈应忠
李康
翟斌
吕智鹏
邹婕
范李
陈登
王欣瑞
张克芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Kangtai Building Grouting Technology Co ltd
Original Assignee
Nanjing Kangtai Building Grouting Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Kangtai Building Grouting Technology Co ltd filed Critical Nanjing Kangtai Building Grouting Technology Co ltd
Priority to CN202221122764.4U priority Critical patent/CN217480171U/en
Application granted granted Critical
Publication of CN217480171U publication Critical patent/CN217480171U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a defect repairing device for an underground comprehensive pipe gallery, which comprises a repairing plate body, a pressing column is arranged at the inner position of the connecting column, a connecting spring is arranged at the outer side position of the pressing column close to the tail end, the back end of the pressing column is provided with a built-in plate, the front end of the magnet is provided with a scraping blade connecting block, the lower end of the scraping blade connecting block is provided with a scraping blade opening, the repair plate body is improved by adding the built-in plate, so that the phenomenon that cement is easy to fall from the defect repair device to cause waste when workers paint the cement for repairing the underground comprehensive pipe gallery on the wall surface of the underground comprehensive pipe gallery can be effectively avoided, the scraper mouth and the scraper connecting block with the magnet can enable workers to clean the winding cement on the defect repairing device for the underground comprehensive pipe gallery more conveniently and quickly.

Description

A defect prosthetic devices for utility tunnel
Technical Field
The utility model belongs to the technical field of utility tunnel is relevant, concretely relates to a defect repair device for utility tunnel.
Background
Underground pipe gallery, be exactly underground city pipeline utility tunnel, build a tunnel space in city underground promptly, with electric power, communication, gas, the heat supply, various engineering pipelines such as plumbing collect in an organic whole, be equipped with special access hole, hoist and mount mouth and monitoring system, implement unified planning, unified design, unified construction and management, be the important infrastructure and the "lifeline" of guarantee city operation, because underground pipe gallery's wall need whitewash and prevent leaking, and the defect prosthetic devices who is used for underground pipe gallery maintains at underground pipe gallery and uses comparatively extensively, consequently, it has important meaning to improve to the defect prosthetic devices who is used for underground pipe gallery.
The defect repair device technology for the underground comprehensive pipe gallery in the prior art has the following problems: current defect repair device technique for utility tunnel when going on to paint the cement that is used for repairing utility tunnel to utility tunnel wall, cement drops easily from defect repair device and leads to the waste.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a defect repair device for utility tunnel to solve the current defect repair device technique for utility tunnel that provides among the above-mentioned background art and when the staff paintd utility tunnel wall with the cement that will be used for repairing utility tunnel, cement dropped the problem that leads to the waste easily from defect repair device.
In order to achieve the above object, the utility model provides a following technical scheme: a defect repairing device for an underground comprehensive pipe gallery comprises a repairing plate body, wherein a connecting disc is arranged at the front end of the repairing plate body, a connecting column is arranged at the front end of the connecting disc, a handle is arranged at the front end of the connecting column, a pressing column is arranged at the inner position of the connecting column, a connecting spring is arranged at the outer side position of the pressing column close to the tail end, an inner plate is arranged at the rear end of the pressing column, a connecting iron sheet is arranged at the position of the repairing plate body close to the lower side, a magnet is arranged at the front end position of the connecting iron sheet, a scraping plate connecting block is arranged at the front end position of the magnet, a scraping plate opening is arranged at the lower end position of the scraping plate connecting block, the repairing plate body is made of stainless steel materials, a cuboid groove is arranged at the rear side position of the repairing plate body, the handle adopts wooden material preparation to form, be provided with the through-hole on the handle, the external diameter according to the compression leg equals the through-hole internal diameter who sets up on the handle, the end according to the compression leg is provided with helicitic texture, the helicitic texture that presses compression leg and built-in board through end setting is connected with built-in board, the external diameter length and width of built-in board equals the cuboid recess of restoreing the setting of plate body rear side position department, be provided with the screw thread groove on the built-in board, the cuboid platelike structure that the connection iron sheet adopts the iron metal preparation to form, the rear end of connecting the iron sheet is connected to on the restoration plate body through welded mode, be provided with the cuboid recess on the doctor-bar connecting block, the doctor-bar connecting block is connected with magnet through the viscose, doctor-bar mouth and doctor-bar connecting block formula structure as an organic whole, the doctor-bar mouth is the cutting edge shape structure.
Preferably, the repair plate body is made of stainless steel materials, and a cuboid groove is formed in the position of the rear side of the repair plate body.
Preferably, the handle is made of wood materials, and a through hole is formed in the handle.
Preferably, the outer diameter of the pressing column is equal to the inner diameter of a through hole formed in the handle, a threaded structure is arranged at the tail end of the pressing column, and the pressing column and the built-in plate are connected through the threaded structure arranged at the tail end of the pressing column and the built-in plate.
Preferably, the length and the width of the outer diameter of the built-in plate are equal to the cuboid groove formed in the position of the rear side of the repair plate body, and the built-in plate is provided with a threaded hole groove.
Preferably, the connecting iron sheet is of a cuboid plate structure made of iron metal, and the rear end of the connecting iron sheet is connected to the repair plate body in a welding mode.
Preferably, a cuboid groove is formed in the scraping piece connecting block, and the scraping piece connecting block is connected with the magnet through adhesive.
Preferably, the scraping sheet opening and the scraping sheet connecting block are of an integrated structure, and the scraping sheet opening is of a blade-shaped structure.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a position department is provided with the pressing post in the inside of spliced pole, the outside position department that the pressing post is close to the end is provided with coupling spring, position department is provided with built-in board in the rear end of pressing the post, the external diameter of pressing the post equals the through-hole internal diameter that sets up on the handle, the end of pressing the post is provided with the helicitic texture, pressing the post and built-in board through the helicitic texture that the end set up and built-in board are connected, the external diameter length and width of built-in board equals the cuboid recess that sets up in the position department of repairing the plate body rear side, be provided with the screw hole groove on the built-in board, because the defect repair device technology that has been used for utility tunnel is when smearing the cement that is used for repairing utility tunnel on the utility tunnel wall, cement drops from the defect repair device easily and leads to the waste, through improving, the staff can place the cement that is used for repairing utility tunnel on the built-in board, then with the whole wall that will restore that covers of repair device, press the compression post and will embed the board and extrude out, then paint the cement of built-in board repeatedly on utility tunnel's wall, improve the repair plate body through adding built-in board and can effectually avoid when the staff is painting the cement that will be used for repairing utility tunnel on the utility tunnel wall, cement drops easily from defect repair device and leads to the phenomenon of wasting to take place.
2. The utility model is provided with the connecting iron sheet at the position of the repairing plate body close to the lower side, the front end position of the connecting iron sheet is provided with the magnet, the front end position of the magnet is provided with the scraping sheet connecting block, the lower end position of the scraping sheet connecting block is provided with the scraping sheet opening, the connecting iron sheet adopts the cuboid plate structure made of iron metal, the rear end of the connecting iron sheet is connected to the repairing plate body by welding, the scraping sheet connecting block is provided with the cuboid groove, the scraping sheet connecting block is connected with the magnet by viscose glue, the scraping sheet opening and the scraping sheet connecting block are of an integral structure, the scraping sheet opening is of a knife edge structure, because a great amount of cement easily remained on the repairing plate body and the built-in plate after the defect repairing device for the underground comprehensive pipe gallery is finished, the workers usually need to search other shovels for cleaning, look for the easy waste time of shovel, through improving the back, can directly take down the doctor-bar connecting block that has the doctor-bar mouth after the staff's staff finishes and clear up remaining cement on restoreing plate body and the built-in board, after the clearance finish the staff with the piece connecting block through inhale iron magnet place connect iron sheet position department can, doctor-bar mouth and doctor-bar connecting block that have inhale iron magnet through adding can make the staff clear up the winding water mud that is used for on the defect repair device of utility tunnel more convenient and fast.
Drawings
Fig. 1 is a schematic view of the overall structure of the defect repairing device for the utility model;
fig. 2 is a rear view structural schematic diagram of the defect repairing device for the underground comprehensive pipe gallery of the present invention;
fig. 3 is a schematic structural view of the lower end position of the scraper connecting block of the defect repairing device for the utility model;
fig. 4 is a schematic diagram of the sectional structure of the repair plate body of the defect repair device for the utility model;
in the figure: 1. repairing the plate body; 2. a grip; 3. pressing the column; 4. connecting columns; 5. a blade scraping opening; 6. connecting the disc; 7. a scraping blade connecting block; 8. connecting iron sheets; 9. a built-in plate; 10. a connecting spring; 11. and a magnet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a defect repair device for utility tunnel, including repairing plate body 1, the front end position department of repairing plate body 1 is provided with connection pad 6, the front end position department of connection pad 6 is provided with spliced pole 4, the front end position department of spliced pole 4 is provided with handle 2, the inside position department of spliced pole 4 is provided with presses post 3, it is provided with connecting spring 10 to press post 3 to be close to terminal outside position department, the rear end position department of pressing post 3 is provided with built-in plate 9, it is provided with connection iron sheet 8 to repair plate body 1 and be close to the position department of downside, the front end position department of connecting iron sheet 8 is provided with magnet 11, magnet 11's front end position department is provided with doctor-bar connecting block 7, the lower extreme position department of doctor-bar connecting block 7 is provided with doctor-bar mouth 5.
The repairing plate body 1 is made of stainless steel materials, a cuboid groove is formed in the position of the rear side of the repairing plate body 1, the handle 2 is made of wood materials, and a through hole is formed in the handle 2.
When the painting repair tool works, a worker holds the grip 2 and presses the pressing column 3 with the thumb to paint and repair.
The external diameter of pressing post 3 equals to state the through-hole internal diameter that sets up on the handle 2, and the end of pressing post 3 is provided with helicitic texture, presses post 3 to be connected with built-in board 9 through the helicitic texture that the end set up with built-in board 9, and the external diameter length and width of built-in board 9 equals the cuboid recess that repair plate body 1 rear side position department set up, is provided with the screw hole groove on the built-in board 9.
When in work, when the existing defect repairing device technology for the underground comprehensive pipe gallery is used for smearing cement for repairing the underground comprehensive pipe gallery on the wall surface of the underground comprehensive pipe gallery, the cement is easy to fall off from the defect repairing device to cause waste, after the improvement, the worker can place the cement for repairing the underground comprehensive pipe gallery on the built-in plate 9, then the repairing device is integrally covered on the wall to be repaired, the pressing column 3 is pressed to extrude the built-in plate 9 out, then paint the wall of utility tunnel repeatedly with the cement of built-in plate 9, through adding built-in plate 9 and improving restoration plate body 1 and can effectually avoid when the staff paints utility tunnel wall with the cement that will be used for repairing utility tunnel on, cement drops easily from defect prosthetic devices and leads to extravagant phenomenon to take place.
Connect the cuboid platelike structure that iron sheet 8 adopted the iron metal preparation to form, the rear end of connecting iron sheet 8 is connected to repair plate body 1 through welding mode on, is provided with the cuboid recess on doctor-bar connecting block 7, doctor-bar connecting block 7 is connected with magnet 11 through the viscose, doctor-bar mouth 5 and doctor-bar connecting block 7 formula structure as an organic whole, doctor-bar mouth 5 is cutting edge shape structure.
During operation, because repair the plate body 1 and build-in board 9 after the defect repair device work that is used for utility tunnel and remain a lot of cement and not too convenient clearance easily, the staff need look for other shovels in addition and clear up usually, look for the easy waste time of shovel, through improving the back, can directly take off doctor-bar connecting block 7 that has doctor-bar mouth 5 after the staff's staff finishes and clear up and repair remaining cement on plate body 1 and the build-in board 9, the staff places the connection iron sheet 8 position department through magnet 11 with the piece connecting block after the clearance finishes, doctor-bar mouth 5 and doctor-bar connecting block 7 that have magnet 11 through adding can make the staff clear up the winding water mud that is used for on utility tunnel's the defect repair device more convenient and fast.
The utility model discloses a theory of operation and use flow: after the utility model is installed, because the existing defect repair device technology for the underground comprehensive pipe gallery is used for smearing the cement for repairing the underground comprehensive pipe gallery on the wall surface of the underground comprehensive pipe gallery, the cement easily drops from the defect repair device to cause waste, after improvement, a worker can place the cement for repairing the underground comprehensive pipe gallery on the built-in plate 9, then the repair device is integrally covered on the wall to be repaired, the built-in plate 9 is extruded out by pressing the pressing column 3, then the cement of the built-in plate 9 is repeatedly smeared on the wall of the underground comprehensive pipe gallery, the phenomenon that the cement easily drops from the defect repair device to cause waste when the worker paints the cement for repairing the underground comprehensive pipe gallery on the wall surface of the underground comprehensive pipe gallery can be effectively avoided by improving the repair plate body 1 by adding the built-in plate 9, during operation, the staff is through holding handle 2, use the thumb to press and press post 3 to paint repair work, after work, it is too convenient clearance to remain a lot of cement on repair plate body 1 and the built-in board 9 easily, the staff need look for other shovels in addition in general and clear up, look for the easy waste time of shovel, through improving the back, can directly take down doctor-bar connecting block 7 that has doctor-bar mouth 5 after the staff's staff finishes and clear up remaining cement on repair plate body 1 and the built-in board 9, doctor-bar mouth 5 and doctor-bar connecting block 7 that have magnet 11 can make the staff clear up the winding water mud that is used for on the defect repair device of utility tunnel convenient and fast more through adding, after the clearance finish the staff with the piece connecting block through magnet 11 place connecting iron sheet 8 position department.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a defect repair device for utility tunnel, is including repairing plate body (1), its characterized in that: a connecting disc (6) is arranged at the front end of the repairing plate body (1), a connecting column (4) is arranged at the front end of the connecting disc (6), a handle (2) is arranged at the front end of the connecting column (4), a pressing column (3) is arranged at the inner position of the connecting column (4), a connecting spring (10) is arranged at the outer side position of the pressing column (3) close to the tail end, an internal plate (9) is arranged at the rear end of the pressing column (3), a connecting iron sheet (8) is arranged at the position of the repair plate body (1) close to the lower side, the front end position of the connecting iron sheet (8) is provided with a magnet (11), a scraping blade connecting block (7) is arranged at the front end of the magnet (11), the lower end of the scraping blade connecting block (7) is provided with a scraping blade opening (5).
2. The defect repair device for the underground utility tunnel according to claim 1, characterized in that: the repairing plate body (1) is made of stainless steel materials, and a cuboid groove is formed in the position of the rear side of the repairing plate body (1).
3. The defect repair device for the underground utility tunnel according to claim 1, characterized in that: the handle (2) is made of wood materials, and through holes are formed in the handle (2).
4. The defect repair device for the underground utility tunnel according to claim 1, characterized in that: the outer diameter of the pressing column (3) is equal to the inner diameter of a through hole formed in the handle (2), the tail end of the pressing column (3) is provided with a thread structure, and the pressing column (3) and the built-in plate (9) are connected through the thread structure arranged at the tail end of the pressing column and the built-in plate (9).
5. The defect repair device for the underground utility tunnel according to claim 1, characterized in that: the length and the width of the outer diameter of the built-in plate (9) are equal to the cuboid grooves formed in the positions of the rear sides of the repair plate body (1), and threaded hole grooves are formed in the built-in plate (9).
6. The defect repair device for the underground utility tunnel according to claim 1, characterized in that: the connecting iron sheet (8) is of a cuboid plate-shaped structure made of iron metal, and the rear end of the connecting iron sheet (8) is connected to the repairing plate body (1) in a welding mode.
7. The defect repair device for the underground utility tunnel according to claim 1, characterized in that: the upper portion of the scraping piece connecting block (7) is provided with a cuboid groove, and the scraping piece connecting block (7) is connected with the magnet (11) through viscose.
8. The defect repair device for the underground utility tunnel according to claim 1, characterized in that: the scraper blade opening (5) and the scraper blade connecting block (7) are of an integrated structure, and the scraper blade opening (5) is of a blade-shaped structure.
CN202221122764.4U 2022-05-11 2022-05-11 A defect prosthetic devices for utility tunnel Active CN217480171U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221122764.4U CN217480171U (en) 2022-05-11 2022-05-11 A defect prosthetic devices for utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221122764.4U CN217480171U (en) 2022-05-11 2022-05-11 A defect prosthetic devices for utility tunnel

Publications (1)

Publication Number Publication Date
CN217480171U true CN217480171U (en) 2022-09-23

Family

ID=83310434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221122764.4U Active CN217480171U (en) 2022-05-11 2022-05-11 A defect prosthetic devices for utility tunnel

Country Status (1)

Country Link
CN (1) CN217480171U (en)

Similar Documents

Publication Publication Date Title
CN202627475U (en) Scaffold wall connecting member
CN217480171U (en) A defect prosthetic devices for utility tunnel
CN217139773U (en) Dust removal and spray device for labor safety engineering
CN210510753U (en) Stainless steel corrugated pipe joint protective sleeve for gas
CN203459302U (en) Scrap iron cleaning tool
CN206903189U (en) A kind of connecting structure of wall of dual-raw external scaffold
CN201818050U (en) Three-section type wall water seal pull rod
CN218126918U (en) Automatic cleaning device of paper joint detector of forming machine splicing system
CN210507071U (en) Hand-held type cold joint filling device
CN206053331U (en) Detachable reusable split bolt
CN211816815U (en) Drainage structures for building
CN212452406U (en) Waste collecting device for building energy conservation
CN216517054U (en) Shovel sword for building decoration convenient to clearance
CN205000641U (en) Aluminum alloy template built -in fitting for headtotail
CN212836843U (en) Building outer wall repair equipment based on electroosmosis method
CN217824096U (en) Electric secondary cable embedded pipe finished product protection plug cover for pumped storage power station
CN221013094U (en) Multifunctional cleaning tool
CN203626253U (en) Formwork removing tool
CN217696470U (en) Ground cleaning and shoveling device for waterproof engineering
CN217250130U (en) Portable single-barrel bolt oiling machine
CN202672746U (en) Core irrigating funnel for concrete block
CN220538360U (en) Special napping brush for airport terrace with replaceable teeth
CN218990808U (en) External corner plastering plate
CN208009851U (en) A kind of composite plate installation auxiliary aligning device
CN207538414U (en) A kind of assembling paint brush

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant