CN217439318U - Assembled furred ceiling structure - Google Patents

Assembled furred ceiling structure Download PDF

Info

Publication number
CN217439318U
CN217439318U CN202221279631.8U CN202221279631U CN217439318U CN 217439318 U CN217439318 U CN 217439318U CN 202221279631 U CN202221279631 U CN 202221279631U CN 217439318 U CN217439318 U CN 217439318U
Authority
CN
China
Prior art keywords
false keel
ceiling structure
gypsum board
keel
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221279631.8U
Other languages
Chinese (zh)
Inventor
高卷文
张豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Deming Decoration Engineering Co ltd
Original Assignee
Shaanxi Deming Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Deming Decoration Engineering Co ltd filed Critical Shaanxi Deming Decoration Engineering Co ltd
Priority to CN202221279631.8U priority Critical patent/CN217439318U/en
Application granted granted Critical
Publication of CN217439318U publication Critical patent/CN217439318U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The application relates to an assembled furred ceiling structure, it includes main joist, false keel, hangs muscle, pendant and gypsum board, the main joist is connected on the floor through hanging the muscle, pendant one end is connected with the main joist, and the other end is connected with the false keel, the gypsum board is located the false keel bottom and with false keel fixed connection. This application has the effect that improves the installation effectiveness of furred ceiling.

Description

Assembled furred ceiling structure
Technical Field
The application relates to the technical field of interior decoration, in particular to an assembled ceiling structure.
Background
The suspended ceiling has the functions of heat preservation, heat insulation, sound insulation and sound absorption; meanwhile, the suspended ceiling is also a hidden layer of pipeline equipment such as electric equipment, ventilation air conditioners, communication equipment, fireproof alarm equipment and the like. The decorative board plays a very important role in the decoration of the whole living room. The top surface of the room is properly decorated, so that the indoor environment can be beautified, and a colorful indoor space artistic image can be created. When the ceiling decoration material and the design scheme are selected, the principles of material saving, firmness, safety, attractiveness and practicability are followed.
At present, the most common traditional furred ceiling in the market is the gypsum furred ceiling, and the installation procedure of gypsum furred ceiling is: the method comprises the steps of bouncing a ceiling horizontal marking line → a fine-cut keel grading line → an installation pipeline facility → an installation main keel suspender → an installation main keel → an installation secondary keel → an installation paper-surface gypsum board (a sleeve cutting process, a gypsum board inverted splayed seam is reserved), → a rust-proof paint is brushed → an installation batten (an anti-cracking inside and outside corner edge strip) is → installation of a gypsum line, and the installation ceiling has high requirements on manual technology of installation workers.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: traditional gypsum furred ceiling is because technology and work piece are various and complicated when the construction, and the complexity of installation is high, and the engineering time can be than longer.
Disclosure of Invention
In order to improve the installation effectiveness of furred ceiling, this application provides an assembled furred ceiling structure.
The application provides an assembled furred ceiling structure adopts following technical scheme:
the utility model provides an assembled furred ceiling structure, includes main joist, false keel, hangs muscle, pendant and gypsum board, the main joist passes through to hang the muscle and connects on the floor, pendant one end is connected with the main joist, and the other end is connected with the false keel, the gypsum board is located the false keel bottom and with false keel fixed connection.
Through adopting above-mentioned technical scheme, assembled furred ceiling structure is fixed through with the main joist, and then is fixed with the false keel under the effect of pendant, then installs the gypsum board on the false keel, compares in traditional gypsum furred ceiling's mounting means, and the installation procedure of assembled furred ceiling is simple, and simple to operate is swift, can improve the efficiency of construction at to a great extent.
Optionally, the hanger comprises a connecting rod and a clamping block, the clamping block is fixedly connected with the end portion of the connecting rod, one end, far away from the connecting rod, of the clamping block is connected with the auxiliary keel, and one end, far away from the clamping block, of the connecting rod is connected with the main keel.
By adopting the technical scheme, the pendant is formed by the connecting rod and the clamping block, the clamping block is positioned at the bottom of the connecting rod, the two parts are integrally connected, the auxiliary keel and the main keel can be stably connected and fixed through the pendant, the connection mode is simple, and the working efficiency can be effectively improved.
Optionally, the false keel comprises a first false keel and a second false keel, wherein a clamping groove is formed in the first false keel along the length direction, a clamping block is connected in the clamping groove in the first false keel, the second false keel is arranged at the bottom of the first false keel, and the second false keel and the first false keel are perpendicular to each other in the length direction and are detachably connected.
Through adopting above-mentioned technical scheme, the block piece of the block groove of seting up along a false keel length direction and pendant blocks and can effectually fix the false keel, and two perpendicular to false keels one of false keel just connects in a false keel bottom through the detachable mode to set up the basic structure of furred ceiling, can dismantle the connection not only convenient in setting up, also make things convenient for overall structure's dismantlement when needs are maintained.
Optionally, the gypsum board is two-layer, two-layer the gypsum board stacks from top to bottom, and the gypsum board that is located the upper strata is connected with the false keel, and the gypsum board that is located the lower floor and upper gypsum board fixed connection.
Through adopting above-mentioned technical scheme, the gypsum board is installed in the false keel bottom, and the gypsum board is two-layer, compares in the individual layer gypsum board of ordinary structure, and double-deck gypsum board is not only more stable, and is in the heat preservation, and the effect on giving sound insulation is also better.
Optionally, a heavy groove is formed in one side wall, away from the connecting rod, of the clamping block, and the heavy groove is used for reducing friction between the clamping block and the clamping groove.
By adopting the technical scheme, the bottom of the clamping block is provided with the sunk groove, and when the clamping block slides in the clamping groove, the contact area between the clamping block and the clamping groove is reduced, so that more labor is saved.
Optionally, the assembled suspended ceiling structure still includes coupling assembling, coupling assembling includes slide and connecting cylinder, be equipped with the spout on the main joist, slide sliding connection is in the spout, the connecting cylinder is located on the slide, the connecting rod with the connecting cylinder is connected.
Through adopting above-mentioned technical scheme, can adjust the position of slide at the in-process of installation through the slide to reach and adjust the position of pendant, make the position of pendant more suitable.
Optionally, the connecting cylinder is in threaded connection with the sliding seat, and the connecting cylinder is in threaded connection with the connecting rod.
Through adopting above-mentioned technical scheme, after the position adjustment with the pendant to suitable position, can be with the rigidity of slide through the connecting cylinder outside with the screw thread in the slide, the height of pendant can be adjusted to the screw thread of rethread connecting cylinder inboard and connecting rod for carry out the leveling through connecting cylinder and connecting rod to the position of pendant when the floor unevenness.
Optionally, the connecting seams of the two gypsum boards which are stacked are staggered.
Through adopting above-mentioned technical scheme, can effectual solution partly problem of leaking out through the crisscross setting of gypsum board connecting gap with the bilayer stacks to the effect in the aspect of thermal-insulated heat preservation can be better.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the whole fabricated suspended ceiling structure can be built through simple connection modes among the main keel, the auxiliary keel, the hanging piece and the gypsum board, and the fabricated suspended ceiling structure is simple to install, short in time consumption and high in installation efficiency;
2. through the connection between the clamping block and the clamping groove, the connection between the first auxiliary keel and the hanger becomes very quick, the installation is very simple, the operation is easy, and the construction efficiency can be effectively improved;
3. the connecting cylinder and the sliding seat are also in threaded connection between the connecting rods, so that the fixing of the auxiliary keel is greatly realized, the hanging piece is limited and fixed through the threaded connection between the connecting cylinder and the sliding seat, and the hanging piece is leveled through the threaded connection between the connecting rods and the connecting cylinder.
Drawings
Fig. 1 is a schematic structural diagram of a fabricated ceiling structure according to an embodiment of the present disclosure.
Fig. 2 is a perspective cross-sectional view of a fabricated ceiling structure according to an embodiment of the present application.
Fig. 3 is an enlarged schematic view of a part of a perspective sectional view a of a fabricated ceiling structure according to an embodiment of the present application.
Reference numerals: 1. a main keel; 11. a chute; 2. a false keel; 21. a first auxiliary keel; 211. a clamping groove; 22. a secondary keel II; 3. hanging the ribs; 4. hanging parts; 41. a connecting rod; 42. a clamping block; 421. sinking a groove; 5, gypsum boards; 6. a connecting assembly; 61. a slide base; 62. a connecting cylinder.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses assembled furred ceiling structure. Referring to fig. 1, 2 and 3, an assembled suspended ceiling structure includes main joist 1, false keel 2, hang muscle 3, pendant 4, gypsum board 5 and coupling assembling 61, main joist 1 is through hanging muscle 3 and floor fixed connection, spout 11 has been seted up to main joist 1 bottom, coupling assembling 61 includes slide 62 and connecting cylinder 62, slide 62 sliding connection is in spout 11, connecting cylinder 62 and slide 62 threaded connection, after slide 62 slides to suitable position, connecting cylinder 62 upwards moves through the screw thread, just can play the fixed action to slide 62 when the top of connecting cylinder 62 meets with spout 11.
Referring to fig. 3, the hanging member 4 includes a connecting rod 41 and a locking block 42, the connecting rod 41 is integrally connected with the locking block 42, one end of the connecting rod 41 extends into the connecting cylinder 62 to be coaxially screwed with the connecting cylinder 62, the false keel 2 includes a first false keel 21 and a second false keel 22, the first false keel 21 is provided with a locking groove 211, the locking block 42 is locked in the locking groove 211, a side wall of the locking block 42 far from one end of the connecting rod 41 is provided with a sinking groove 421, at this time, the locking block 42 can reduce friction force when sliding in the locking groove 211, the length direction of the first false keel 21 is perpendicular to the length direction of the main keel 1, the bottom of the first false keel 21 is provided with locking openings at regular intervals along the length direction of the first false keel 21, the top of the second false keel 22 is provided with locking openings at regular intervals along the length direction of the second false keel 22, the first auxiliary keel 21 and the second auxiliary keel 22 are spliced through the clamping interface, and then are fixed at the clamping positions of the first auxiliary keel 21 and the second auxiliary keel 22 through bolts, and the length directions of the first auxiliary keel 21 and the second auxiliary keel 22 are vertical.
Referring to fig. 1 and fig. 2, the gypsum boards 5 have two layers, the first layer gypsum board 5 and the auxiliary keel 2 are directly fixedly connected through the self-tapping screw, after the first layer gypsum board 5 is connected, the joint of the second layer gypsum board 5 and the first layer gypsum board 5 is arranged in a staggered mode, and the second layer gypsum board 5 is connected with the first layer gypsum board 5 through the self-tapping screw.
The implementation principle of an assembled furred ceiling structure of the embodiment of this application does: firstly fixing a main keel 1 on a floor slab through a hanging rib 3, then slidably connecting a sliding seat 61 in a sliding groove 11, after the position of the sliding seat 61 in the sliding groove 11 is determined, rotating a connecting cylinder 62 upwards through a screw thread until the connecting cylinder 62 abuts against the main keel 1 to stop, fixing the position of the sliding seat 61 by the connecting cylinder 62, then connecting a connecting rod 41 of a pendant 4 with the bottom of the connecting cylinder 62 through a screw thread, adjusting all pendants 4 to the same height position through the screw thread, connecting a first auxiliary keel 21 through a clamping block 42 and a clamping groove 211, sliding the clamping block 42 in the clamping groove 211 more quickly under the action of a sinking groove 421, clamping the first auxiliary keel 22 and the first auxiliary keel 21 through a clamping port after the first auxiliary keel 21 is connected, then fixing a second auxiliary keel 22 through a bolt, and connecting through the bolt can provide convenience for dismounting in the future, after the second auxiliary keel 22 is fixed, the first gypsum board layer 5 is connected to the first auxiliary keel 21 and the second auxiliary keel 22 through self-tapping screws, and finally the second gypsum board layer 5 is connected to the first gypsum board layer 5 through the self-tapping screws.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. An assembled furred ceiling structure which characterized in that: including main joist (1), false keel (2), hanging muscle (3), pendant (4) and gypsum board (5), main joist (1) is connected on the floor through hanging muscle (3), pendant (4) one end is connected with main joist (1), and the other end is connected with false keel (2), gypsum board (5) are located false keel (2) bottom and with false keel (2) fixed connection.
2. A fabricated ceiling structure according to claim 1, wherein: pendant (4) include connecting rod (41) and block piece (42), block piece (42) and connecting rod (41) tip fixed connection, block piece (42) are kept away from connecting rod (41) one end and are connected with false keel (2), and block piece (42) one end is kept away from in connecting rod (41) is connected with main joist (1).
3. A fabricated ceiling structure according to claim 2, wherein: the false keel (2) includes false keel one (21) and false keel two (22), the block groove (211) has been seted up along length direction to false keel one (21), block piece (42) are connected in the last block groove (211) of false keel (2), false keel two (22) are located false keel one (21) bottom, false keel two (22) and false keel one (21) length direction is perpendicular and for dismantling the connection.
4. A fabricated ceiling structure according to claim 1, wherein: the gypsum board (5) is two-layer, two-layer gypsum board (5) stack from top to bottom, and gypsum board (5) and false keel (2) that are located the upper strata are connected, and gypsum board (5) and upper gypsum board (5) fixed connection that are located the lower floor.
5. A fabricated ceiling structure according to claim 2, wherein: a sunk groove (421) is formed in one side wall, away from the connecting rod (41), of the clamping block (42), and the sunk groove (421) is used for reducing friction force between the clamping block (42) and the clamping groove (211).
6. A fabricated ceiling structure according to claim 2, wherein: the assembled suspended ceiling structure still includes coupling assembling (6), coupling assembling (6) are including slide (61) and connecting cylinder (62), be equipped with spout (11) on main joist (1), slide (61) sliding connection is in spout (11), connecting cylinder (62) are located on slide (61), connecting rod (41) with connecting cylinder (62) are connected.
7. A fabricated ceiling structure according to claim 6, wherein: the connecting cylinder (62) is in threaded connection with the sliding seat (61), and the connecting cylinder (62) is in threaded connection with the connecting rod (41).
8. A fabricated ceiling structure according to claim 4, wherein: the connecting seams of the two gypsum boards (5) which are stacked are staggered.
CN202221279631.8U 2022-05-25 2022-05-25 Assembled furred ceiling structure Active CN217439318U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221279631.8U CN217439318U (en) 2022-05-25 2022-05-25 Assembled furred ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221279631.8U CN217439318U (en) 2022-05-25 2022-05-25 Assembled furred ceiling structure

Publications (1)

Publication Number Publication Date
CN217439318U true CN217439318U (en) 2022-09-16

Family

ID=83220935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221279631.8U Active CN217439318U (en) 2022-05-25 2022-05-25 Assembled furred ceiling structure

Country Status (1)

Country Link
CN (1) CN217439318U (en)

Similar Documents

Publication Publication Date Title
CN103510631B (en) A kind of indoor sound insulation constructing structure and construction method thereof
CN205935362U (en) Light gauge steel furred ceiling building structure
CN210177784U (en) Assembled adjustable large-block-plate suspended ceiling
CN101070713A (en) Environment-protection energy-saving ventilating air-conditioning sound-insulating novel building and construction method
CN104727514A (en) Wooden facing hanging plate wall body
CN210441079U (en) Top surface concealed installation lamp belt box fixing structure
CN206016026U (en) A kind of fast-assembling suspended ceiling device
CN217439318U (en) Assembled furred ceiling structure
CN112554425B (en) Can install drop-level suspended ceiling connecting piece, suspended ceiling system and installation method fast
CN214614935U (en) Can install fast and fall level furred ceiling connecting piece and furred ceiling system
CN111576712B (en) Ceiling board mounting structure and ceiling board paving method with same
CN213174416U (en) Lamp area and air outlet processing structure are hidden to furred ceiling system limit portion
CN2537760Y (en) Quick assembling wall plate structure
CN205917957U (en) Modularization furred ceiling falls a grade device
CN216713553U (en) Fireproof environment-friendly curtain box
CN210049471U (en) Novel suspended ceiling plate and mounting structure thereof
CN112982799B (en) Energy-saving building interior decoration structure
CN112160483A (en) Assembled furred ceiling with steel framed aerial layer locking structure
CN104652753B (en) Special accessory for hanging wall decoration building materials
CN204571180U (en) A kind of wooden facing link plate wall body
CN219671751U (en) Assembled is ridged for partition wall
CN219298560U (en) Aluminum-plastic plate suspended ceiling lamp groove structure with air port
CN219261489U (en) Suspended ceiling structure adopting prefabricated large-size lines
CN217711313U (en) Assembled energy-concerving and environment-protective type interior decoration furred ceiling
CN212613313U (en) Assembled top surface connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant